NOTICE TO ALL CONTRACTORS AND SUB-CONTRACTORS – February 10, 2020
KWU Nursing School Remodel and Addition, Salina KS – Project 14-2650
Bid Date: Thursday February 13th, 2019 at 2:00pm. Bids are to be delivered to the office of Jones Gillam Renz Architects, 730 N. Ninth St. Salina, KS 67401 ADDENDUM NO. 1 YOU ARE INSTRUCTED TO READ AND TO NOTE THE FOLLOWING DESCRIBED CHANGES, CORRECTIONS, CLARIFICATIONS, OMISSIONS, DELETIONS, ADDITIONS, APPROVALS AND STATEMENTS PERTINENT TO THE CONTRACT AND CONSTRUCTION DOCUMENTS. THIS ADDENDUM IS A PART OF THE CONTRACT AND CONSTRUCTION DOCUMENTS AND SHALL GOVERN IN THE PERFORMANCE OF THE WORK. GENERAL
1. Attached with this addendum is the Pre-Bid Sign-in Sheet from meeting held 2-5-2020.
ARCHITECTURAL –Specifications 1. Bid Form: ALTERNATE NO. 4 has been added by addendum. Reference Section 01030 Alternates,
below. Include pricing for this alternate on the bid form. 2. Section SC1-SC3, Supplementary Conditions of the Contract - PROPERTY INSURANCE MARINE
ALL RISK SPECIAL BUILDERS RISK AND TRANSIT FORM Refer to Paragraph 11.4 Property Insurance and insert the following:
a. Until the Work is completed and accepted by the Owner, the Contractor shall effect and maintain total Property Insurance (Marine All Risk Special Builders Risk and Transit Form) upon the Work at the site to 100% of the insurable value thereof (plus 8% of this insured value for Architect’s Fee in connection with any loss covered by this insurance) including items of labor and materials connected therewith in or adjacent to the structure insured, materials in place or to be used as a part of the permanent construction, including surplus materials, shanties, protective fences, bridges or temporary structures, miscellaneous materials and supplies incidental to the Work, and such scaffoldings, stagings, towers, forms and equipment as are not owned or rented by the Contractor, the cost of which is included in the cost of the work. EXCLUSIONS: This insurance does not cover any tools owned by mechanics; any tools, equipment, scaffoldings, stagings, towers and forms owned or rented by the Contractor; the capital value of which is not included in the cost of the work, nor loss of equipment, materials, tools, etc., by theft. Contractor shall not commence construction prior to receipt of policy copy to Architect.
b. This insurance shall include the interest of the Owner, the Contractor, Subcontractor and Sub-Subcontractor in the Work.
3. Section 01030 – Alternates – Paragraph 3.1 Schedule of Alternates, Add the following: 4. ALTERNATE NO. 4: The Contractor shall state the amount of dollars to be added to the Base
Bid for all work, materials associated with the installation of Mapei: Planiseal MSP Moisture-Control Membrane at the basement level at areas to receive carpet and LVT. Contractor to install per manufacturer’s instructions, including but not limited to all floor leveling, surface preparation, cleaning, and product installation.
4. Section 08520 – Aluminum Windows – Paragraph 2.01A.1 – The windows shall be Manko 3232xpt Series Fixed Windows. Includes all sill, head, jamb, panning, and snap trim components.
5. Section 09306 – Floor and Wall Tile – Paragraph 3.06.A.3.a, Delete this sentence and replace with the following: Located at Restroom 106 per Base Bid, Located at Restrooms 024, 026, 134 and 137 per Alternate 2.
6. Section 09688 – Carpet, Glue Down: Paragraph 1.02 Allowances, A. Cash Allowance. At Walk-off Carpet Areas (Lobby 101 and Elev. Lobby 127) Contractor shall allow the sum of $45.00 per square yard for purchase and delivery of carpet only. All other carpet shall remain $32.00 per square yard.
7. Section 10800, Toilet and Bath Accessories – ASI shall be an approved manufacturer for bidding purposes. All products must meet specifications.
8. Section 10850, Building Specialties – a. Paragraph 1.02.B Interior Building Signage – Allowance amount shall read $25,000 in lieu
of $20,000. b. Paragraph 1.06 Fiberglass Reinforced Plastic Paneling – Add subheading C. Product is
intended to be used at mop locations only. Install up to 48” a.f.f. and extending horizontally past sink for 24” each side.
c. Paragraph 1.07 Frosted Glass Dry Erase Board – Clarification, Frosted Glass Dry Erase Boards shall be located as follows: Office 104 36x48 east wall; Conference Room 129 36x48 south wall; Meeting Room 131 east wall; Classroom 139 48x72 east wall; Classroom 141 48x72 west wall; Learning Lab 009 36x48 north wall; Classroom 018 48x96 north wall; Simulation 013 36x36 west wall; Simulation 016 36x36 east wall.
ARCHITECTURAL – Drawings
1. Sheet D2.2 – Basement Plan Demolition & Existing Structure – Contractor is responsible for removing existing concrete equipment pads, sewage ejector and other uneven floor items as required for level floor finish installation.
2. Sheet A1.2 – Detail F - Exterior Stair Section: Contractor shall sand blast exposed concrete foundation wall and remove all existing waterproofing down to a smooth and consistent finish.
3. Sheet A2.2 – Basement Floor Plan: Add 60-minute rated door 010, Type D, S.C, wood door w/view lights. Provide fire rated glazing for full 60-minute door assembly. Door shall be provided with removable mullion, rim panic device, and lever pulls per hardware allowance. All surrounding walls shall be 1 hour rated, extended to concrete deck above. Provide Magnetic Hold-Open devices per electrical. Reference attached revised Sheet A2.2.
4. Sheet A2.3 – First Floor Finish Plan: Stairs 128 to receive Ceramic Tile CT3 floor finish. Reference Specification 09306 Floor and Wall Tile.
5. Sheets A2.3 and A2.4 Floor Finish Plans: Clarification: Contractor is responsible for all floor leveling. Please note that there are several areas of greater than normal unevenness. Contractor is responsible for grinding/floating as required for a level, professional and aesthetic finished appearance.
5. Sheet A2.4 – Basement Finish Plan: Stairs 001 to receive Ceramic Tile CT3 floor finish. Reference Specifications. 6. Sheets A3.1 and 3.2 – Building Elevations: Clarification. The existing painted concrete window head, CMU/precast
wall, and precast sills shall have all paint removed and the wall prepped for opaque masonry stain by Nawkaw. 7. Sheets A3.1 and A3.2 – Building Elevations: Clarification, the vertical bands in the existing brick walls to remain,
are to be set into the existing brick. Contractor shall make vertical cuts in the existing brick for placement of the vertical brick accents.
8. Sheets A4.1, A4.2 – Delete all reference to Zip System sheathing. Exterior sheathing shall be Dens-Glass, or where indicated on structural drawings, fire retardant treated plywood. Brick installation shall include appropriate sheathing, vapor barrier, insulation, and masonry anchors at 16 “ o.c.
9. Sheet A5.1 – Roof Plan: At the south entry canopy, the roof of the canopy shall be TPO over HD cover board over 1” insulation. Roof membrane shall be fully flashed thru wall at EIFS and masonry walls.
10. Sheet A6.1 Interior Stair First Floor Plan – Clarification - At Elevator control panel (approx. 2 feet between edge of masonry and elevator door jamb), wall construction is to include 5/8” type ‘X’ G.B. over 1” Shaft Liner panel and appropriate studs. Elevator hoistway, doors, and all components shall be constructed for 2-hour assembly of all components.
11. Sheet A10.1 – Interior Finish Schedule: a. Vestibule 101 shall have a 2x2 lay-in Type 1 ceiling. Reference First Floor Reflected Ceiling Plan on Sheet
A7.1. b. Stairs 128/001 to receive Ceramic Tile (CT3) finished with Schluter Nosing. Reference Specifications. c. Vestibule 101, Lobby 102 and Hall 121 are to receive a 4” wood base finish.
12. Sheet A10.1 – Door Schedule: a. Add Door 010 – PR 3’-0” x 7’-0” Doors, Hollow Metal Doors with Hollow Metal Frame. 90-minute rated
with view lights, on magnetic hold open device. Reference attached revised sheet A10.1. b. Door 014 – Shall be Type A – Full Glass with special etching as described per Specifications Section
08800 – Glazing, paragraph 2.03.D. 13. Sheet A10.2 – Details AA, BB and CC – No Zip System sheathing is to be used on this project. Exterior Sheathing
shall be Dens-glass or fire-retardant treated plywood. 14. Sheet L1 Landscape Plan: Landscape contractor shall include in the landscape bid all labor and material for the
installation of a complete, fully automatic irrigation system. System shall include, but not be limited to programmable multi-zone, multi-function controller, all associated piping, commercial grade sprinkler heads, and all associated devices, valves, etc., for a fully operational irrigation system. Sprinkler heads shall be directional type to avoid any spray onto sidewalks, drives, equipment, or the building. Sprinkler system shall provide complete coverage of all landscape planting area and turf areas around the building and extending to the curb line at the east and south.
STRUCTURAL – Drawings 1. Sheet S1.2 – North Addition Foundation and Framing Plans – Reference the attached revised Sheet S1.2. 2. Sheet S1.3 – New Opening Framing Details – Reference the attached revised Sheet S1.3. 3. Sheet S1.5 – Existing Structure Framing and Details – Reference the attached revised Sheet S1.5. 4. Sheet S3.1 – Miscellaneous Structural Details – Reference the attached revised Sheet S3.1.
MECHANICAL
Clarification to M2.3-4 – Condensate piping shall be copper or PVC. However, PVC is not an acceptable piping material in
return air plenum. The use of CPVC is not allowed.
MECHANICAL – Drawings
1. Sheet M2.8 – Domestic Water Plan: Added notes for water service entrance and lawn irrigation system connection.
2. Sheet M6.2 – Domestic Water Plan: Added fire protection sprinkler service detail.
ELECTRICAL – Specifications
1. Substitutions – Subject to compliance with requirements, the following manufacturers may provide Light Fixtures as
indicated.
A. Type ‘A1’, ‘A2’, ‘A3’, ‘E’, ‘K’, ‘N’, ‘P1’, ‘P2’, ‘R’ – Lithonia Lighting
B. Type ‘B’ – Mark Architectural Lighting
C. Type ‘C1’, ‘C2’ – Juno
D. Type ‘D’ – Indessa Lighting
E. Type ‘E1’, ‘X1’, ‘X2’, ‘XE’ – Exitronix
F. Type ‘E2’ - AstraLite
G. Type ‘F’, ‘H1’, ‘H2’ – Pinnacle Architectural Lighting
H. Type ‘G1’, ‘G2’, ‘G3’ - ALW
I. Type ‘L’ – GM Lighting
2. Section 283100 Fire Detection and Alarm – Clarification: The fire alarm system’s digital emergency voice/alarm
communication shall be an integral component to the fire alarm control panel. Systems utilizing a fire alarm control
panel connected to a separate emergency voice/alarm communication panel are not acceptable.
ELECTRICAL – Drawings
1. Sheet ME1.1 – M/E Site Plan: Adjust conduit for 3-phase underground primary to terminate at existing pole at east
property line. See revised sheet ME1.1.
2. Sheet E2.6 – Basement Special Systems Plan: Add magnetic door holders and associated smoke detector at new fire
doors between Hall 006 and Lobby Elevator Lobby 002. See revised sheet E2.6.
Receipt of this Addendum shall be noted on the Bid Form.
END OF ADDENDUM NO. 1
Attachments Prebid Meeting Attendees Revised Sheet A2.2 Revised Sheet A10.1
Revised Sheet S1.2 Revised Sheet S1.3 Revised Sheet S1.5 Revised Sheet S3.1 Revised Sheet ME1.1 Revised Sheet M2.8 Revised Sheet M6.2 Revised Sheet E2.6
PARTITION TYPES
A2.2
NU
RSI
NG
SCH
OO
L-R
EMO
DEL
&A
DD
ITIO
NSA
LIN
A,
KA
NSA
S
A BASEMENT FLOOR PLAN
B TYP. COLUMN DETAIL
DOOR SCHEDULEINTERIOR FINISH SCHEDULEWINDOW SCHEDULE
A10.1
KA
NS
AS
W
ES
LE
YA
N U
NIV
ER
SIT
Y
NU
RS
IN
G S
CH
OO
L - R
EM
OD
EL
&
A
DD
IT
IO
N
SA
LIN
A,
KA
NS
AS
Arch
ite
cts P
la
nn
ers D
esig
ne
rs
JO
NE
S G
IL
LA
M R
EN
Z
B
DOOR TYPES
A
FRAME TYPES
D
WINDOW TYPES
C
REPLACEMENT WINDOWS
SCHEDULE
GLAZING
S1.2
NU
RSI
NG
SCH
OO
L-R
EMO
DEL
&A
DD
ITIO
NSA
LIN
A,
KA
NSA
S
A FOUNDATION PLANBASEMENT
C FRAMING PLANROOF
B FRAMING PLANFIRST FLOOR
SLAB CONTROL JOINTS INTERSECTION DETAILSTYP CONCRETE WALL
FRM'G AT JOISTROOF DECK OPENING
TYPICAL EXIST. FLOOR INFILL SECTION
S1.3
NU
RSI
NG
SCH
OO
L-R
EMO
DEL
&A
DD
ITIO
NSA
LIN
A,
KA
NSA
S
A VIEW @ GRID LINE EFRAMING ELEVATION
B VIEW @ GRID LINE 1FRAMING ELEVATION
C VIEW @ GRID LINE 7FRAMING ELEVATION
D VIEW @ NEW OPENINGSFRAMING ELEVATION
E SECTION F SECTION
G SECTION
H DETAIL J DETAIL
S1.5
NU
RSI
NG
SCH
OO
L-R
EMO
DEL
&A
DD
ITIO
NSA
LIN
A,
KA
NSA
S
D SECTION
A FRAMING PLANPARTIAL (E) ROOF
B FRAMING PLANPARTIAL (E) FLOOR
C FOUNDATION PLANPARTIAL (E)
E SECTIONF SECTION
G SECTIONH SECTIONJ SECTION
L SECTIONM SECTIONN SECTION
S SECTION
P SECTION
T SECTION R SECTION
K ROOF FRAMING PLANPARTIAL (E)
S3.1
NU
RSI
NG
SCH
OO
L-R
EMO
DEL
&A
DD
ITIO
NSA
LIN
A,
KA
NSA
S
A SECTIONB SECTIONC SECTIOND SECTIONE SECTIONF SECTION
G SECTIONH SECTIONJ SECTIONK SECTIONL SECTIONM SECTION
N SECTIONP SECTIONR SECTIONS SECTION
12"
36"
MIN
CO
VER
FINISHED GRADE
SECTION "B"
12"
24"
MIN
CO
VER
FINISHED GRADE
SECTION "C"
3" SANDENCASEMENT
CONDUITS ASINDICATED ONDRAWINGS
BACKFILLCOMPACTED TO95% RELATIVEDENSITY
PLASTICCAUTION TAPE
3" SANDENCASEMENT
CONDUITS ASINDICATED ONDRAWINGS
BACKFILLCOMPACTED TO95% RELATIVEDENSITY
PLASTICCAUTION TAPE
12"
48"
MIN
DEP
TH
FINISHED GRADE
SECTION "A"
3" SANDENCASEMENT
CONDUIT ASINDICATED ONDRAWINGS
BACKFILLCOMPACTED TO95% RELATIVEDENSITY
PLASTICCAUTION TAPE
12" MIN SEPARATION
4CONDUIT TRENCH DETAILSNo Scale
POWER COMPANY PAD MOUNTEDTRANSFORMER. CONCRETE PAD BY GENERALCONTRACTOR PER EVERGY ELECTRIC SERVICESTANDARD DRAWING 10.33. COORDINATEEXACT LOCATION AND REQUIREMENTS WITHEVERGY PRIOR TO COMMENCING WORK.
UNDERGROUND ELECTRICALSERVICE LATERAL. SEE POWERRISER DIAGRAM ON SHEET E6.1.
CONDUIT FOR POWER COMPANYPROVIDED PRIMARY CABLING.COORDINATE ROUTING WITH EVERGY.SEE RISER DIAGRAM ON SHEET E6.2.
EXISTING POWER COMPANYPRIMARY OVERHEAD ELECTRICALDISTRIBUTION TO REMAIN.
EXISTING UTILITY POLETO REMAIN. SHOWNFOR REFERENCE ONLY.
CLAFLIN AVENUE
SO
UT
H 4
TH
ST
REET
ALLEY
PROVIDE IN-GRADECOMMUNICATIONSHANDHOLE ENCLOSUREPER DETAIL 3, THIS SHEET.
PRO
PERTY L
INE
PRO
PERTY L
INE
PROPERTY LINE
PROPERTY LINE
4BME1.1
E OHE OH E OH
ee
e
4AME1.1
2ME1.1
4CME1.1
EXISTING UTILITY POLE TO REMAIN.SHOWN FOR REFERENCE ONLY.
RE: 1/E2.6 FORCONTINUATIONTO I.T. ROOM
ORD ORD
ORD
ORD
ORDRD
RD
RDRDRDRD
ORD
RD
ORD
RD
ORD
RD
ORD
ORDRD
DOAS
GG
G
1"
CONNECT GAS PIPING TO HVAC EQUIPMENT.PROVIDE GAS COCK, UNION AND DIRT LEG.
RH
ROUTE GAS PIPING DOWN TO GASMETER. SEE M2.7 FOR CONTINUATION.PAINT EXPOSED GAS PIPING.COORDINATE WITH G.C. AND ARCH.
ROUTE GAS PIPING ON ROOF TO HVACEQUIPMENT. PROVIDE SUPPORTSEQUAL TO ERICO PYRAMID. SEE DETAIL5:M6.1 FOR MORE INFORMATION.
BATRHOOM EXHAUSTDUCT TERMINATION. SEEM2.1 AND EXHAUST FANSCHEDULE FOR MOREINFORMATION.
1MDP
CONNECT 120V CIRCUIT TO FACTORYINSTALLED RECEPTACLE AT HVAC UNIT
R
(2) 2" CONDUITS FOR PHONE AND CATVSERVICE PROVIDER CABLING. PROVIDEPULL ROPE IN EACH RACEWAY.
VERIFY TERMINATION POINTS ATPROPERTY LINE WITH LOCALTELEPHONE & CATV COMPANIES
4CME1.1
(2) 4" CONDUITS FOR OWNERPROVIDED TELECOMMUNICATIONSCABLING. PROVIDE PULL ROPE INEACH RACEWAY.
RE: 1/E2.6 FORCONTINUATIONTO I.T. ROOM
4CME1.1
(2) 4" CONDUITS FOR OWNERPROVIDED TELECOMMUNICATIONSCABLING. PROVIDE PULL ROPE INEACH RACEWAY.
PROVIDE IN-GRADECOMMUNICATIONSHANDHOLE ENCLOSUREPER DETAIL 3, THIS SHEET.
HP-1 HP-2
RE:1/E2.3
RE:1/E2.1
PROVIDE RAYCHEM "ELECTROMELT" 208V-1ɸ AUTOMATICSNOW MELT SYSTEM FOR THIS AREA. SPACE HEATINGCABLES AT 8" ON CENTER, MAX CABLE LENGTH SHALL BE265'. PROVIDE MANUFACTURER'S JUNCTION BOX, POWERCONNECTION KIT, SPLICE KIT, AND EXPANSION JOINT KITSAS REQUIRED. INSTALL ACCORDING TO MANUFACTURER'SINSTRUCTIONS. COORDINATE JUNCTION BOX LOCATIONON EXTERIOR WALL WITH ARCHITECT. SEE POWER PLAN,SHEET E2.4, FOR MORE INFORMATION.
PROVIDE RAYCHEM "ELECTROMELT" 208V-1ɸ AUTOMATICSNOW MELT SYSTEM FOR THIS AREA. SPACE HEATINGCABLES AT 8" ON CENTER, MAX CABLE LENGTH SHALL BE160'. PROVIDE MANUFACTURER'S JUNCTION BOX, POWERCONNECTION KIT, SPLICE KIT, AND EXPANSION JOINT KITSAS REQUIRED. INSTALL ACCORDING TO MANUFACTURER'SINSTRUCTIONS. COORDINATE JUNCTION BOX LOCATIONON EXTERIOR WALL WITH ARCHITECT. SEE POWER PLAN,SHEET E2.4, FOR MORE INFORMATION.
J-BOX
J-BOX
E UG
E UG
E UG
E UG
E UG
E UG
E UG
EXISTING UTILITY POLE TOBE UTILIZED FOR NEW 3ɸPRIMARY SERVICE DROP.COORDINATE CONDUITSTUB-UP LOCATION WITHEVERGY.
E O
HE
OH
E O
HE
OH
E O
He
E O
HE
OH
E O
HE
OH
ee
ee
ee
ee
EXISTING POWER COMPANYOVERHEAD 3ɸ PRIMARYELECTRICAL DISTRIBUTIONTO REMAIN.
E O
He
1
1
LIGHTING POLE
HAND HOLE
3" 3"
GROUT BETWEEN POLEBASE PLATE AND TOP OFCONCRETE BASE
3/4" CHAMFEREDCORNERS
#4 BAR HOOPS AT 16" O.C.LAP ENDS 16" MIN.
(8) #6 VERTICAL BARSEQUALLY SPACED
RIGID STEEL OR PVCCONDUIT
POLE BASE BOLT DIAPLUS 3", 18" Ø MIN.
No Scale
CONCRETE POLE BASE DETAIL2
BOND LIGHT POLETO GROUND WIRE
BASE COVER ATTACHEDTO POLE BASE
FINISHED GRADE
1"Ø ANCHOR BOLT.NUMBER AND PLACEMENTPER MANUFACTURER'SRECOMMENDATIONS
HDPE OR PVCCONDUIT
#6 GND IN 1"C
1/2"Ø x 8'LGROUND ROD
3/8" - 16NCHEX BOLTWITH WASHER
FINISHED GRADE
ENCLOSURE SHALL BE24"W x 36"L x 36"D WITHOPEN BOTTOM, QUAZITE#PG-2436-BA-36
PULL SLOT
LOGO TO BE"COMMUNICATIONS"
SKID RESISTANT SURFACE8" MIN. LAYEROF 1/2" CLEANCRUSHED ROCK
COVER SECTION
CONDUITS ASSHOWN ON PLAN
3IN-GRADE HAND HOLE ENCLOSURENo Scale
COVER SHALL BERATED FOR 15,000POUND DESIGN LOAD
LOCAL POWER UTILITY COMPANY :
EVERGYCONTACT: BRADLEY CARLSON
1001 EDISON PLSALINA, KS 67401
PHONE: (785) 515-5552
EMAIL: [email protected]
UTILITY CONTACT INFORMATION
NU
RS
IN
G S
CH
OO
L - R
EM
OD
EL
&
A
DD
IT
IO
N
SA
LIN
A,
KA
NS
AS
4809 Vue Du Lac Place, Suite 201Manhattan, Kansas 66503785.587.8042 FAX 785.587.8039
LST Consulting Engineers, PAProject 19088 January 2020
2 F
eb. 2020
ME1.1
3/32" = 1'-0"
M/E SITE PLAN1
1A
DD
END
UM
1 -
2-7
-2020
W
FP
WC-A WC-B
LAV-A
UR
-A UR-B
EWC
BS-A
SS
WC-B
WC-A
LAV-A
LAV-A
LAV-A
BS-A
BS-A
BS-A BS-A
HWH
HWP
2-1/2"1-1/4"
CCB
2-1/2"
1-1/2"
2"
2"
1-1/2"
UP TO 'WC'UP TO'UR'
UP TO'LAV' UP TO
'WC'UP TO'LAV'
UP TO'EWC'
UP TO'LAV'
UP TO'WC'
UP TO 'BS'
1-1/2"
3/4"
1/2"
1-1/4"
1"
3/4"
2"
1-1/2"
1-1/2"3/4"
1"
3/4"
1"
1-1/4"
1-1/4"
3/4"
UP TO 'WH'
3/4"
UP TO 'WH'
UP TO 'WH'
UP TO 'WH'
1
UP TO'BS'
BS-A
UP TO 'SS'
UP TO'RH'
AA
AA
VV
VV
A
V
VV
3/4"
5
(TYP)
A
A
VA
V
A
4
1"
7
V
A
AV
5
8
9
8
M6.2
1
NOTES BY SYMBOL1. PROPOSED DOMESTIC WATER AND FIRE PROTECTION SERVICE
ENTRANCE. SEE CIVIL DRAWINGS FOR CONTINUATION.
2. PROVIDE GAS METER AND REGULATOR. COORDINATE REQUIREMENTSWITH UTILITY AND PAY ALL FEES. TOTAL DEMAND = 150 CFH.
3. ROUTE GAS PIPING UP TO ROOF, SEE ME1.1 FOR CONTINUATION.COORDINATE EXACT ROUTING WITH ARCHITECT AND PAINT ASDIRECTED.
4. PROVIDE AIR COMPRESSOR, SPEEDAIRE MODEL #2MLW4, 120V, 20GALLON, WITH CORD AND PLUG. PROVIDE ADAPTERS AND FLEXIBLEHOSE CONNECTION AS REQUIRED TO TRANSITION FROM QUICKCONNECT OUTLET TO DISTRIBUTION PIPING.
5. ROUTE 1/2" VALVED AIR AND VACUUM PIPING TO HEADWALLINLETS/OUTLETS AND CONNECT PER MANUFACTURER'SINSTRUCTIONS. COORDINATE WITH EQUIPMENT PROVIDED.
6. ROUTE 3/4" CW PIPING UP TO ROOF HYDRANT.
7. PROVIDE TANK VACUUM SYSTEM, WELCH #8150B-30, 10 GALLONS,26" Hg MAX VAC, 2.3 GPM @ 20" Hg, 1/2 HP, 120 VOLT, WITH CORDAND PLUG CONNECTION. PROVIDE ADAPTERS AND FLEXIBLE HOSECONNECTION AS REQUIRED TO TRANSITION FROM OUTLET TODISTRIBUTION PIPING. INSTALL IN ACCORDANCE WITHMANUFACTURER'S RECOMMENDATIONS.
8. PROVIDE SHUT-OFF VALVE IN WATER SERVICE RISER AND PRESSUREREDUCING VALVE SET TO 80 PSI, IF REQUIRED.
9. PROVIDE VALVED AND CAPPED TEE WITH BACKFLOW PREVENTER FORCONNECTION TO LAWN IRRIGATION SYSTEM. COORDINATEREQUIREMENTS WITH LAWN IRRIGATION SYSTEM PROVIDER AND CITYOF SALINA.
#
NOTE:
PLENUM SPACE IS EXTREMELY LIMITED AND CONGESTED.ROUTE MECHANICAL AND ELECTRICAL INSTALLATION AS HIGHAS POSSIBLE AND IN COORDINATION WITH OTHER TRADES.OFFSET COMPONENTS AS REQUIRED TO MAXIMIZE CEILINGHEIGHTS. COORDINATE WITH ARCHITECT AND GENERALCONTRACTOR.
1
NU
RSI
NG
SC
HO
OL
- REM
OD
EL &
AD
DIT
ION
SALI
NA
,K
AN
SAS
4809 Vue Du Lac Place, Suite 201
Manhattan, Kansas 66503
785.587.8042 FAX 785.587.8039
LST Consulting Engineers, PAProject 19088 January 2020
2 F
eb. 2020
M2.83/16" = 1'-0"
BASEMENT DOMESTIC WATER AND MED GAS PLAN1
1A
DD
END
UM
1 -
2-7
-2020
VRF OUTDOOR UNIT MOUNTING DETAILNO SCALE
6
C3X4.1 GALVANIZED STEEL CHANNEL.ON TWINNED UNITS CHANNEL SHALLBE SINGLE CONTINUOUS CHANNELSPANNING UNDER BOTH UNITS.
DRILL STEEL CHANNEL TO MATCHEQUIPMENT MOUNTING HOLES. BOLT THRUBOTH INTO ISOLATOR WITH GRADE 5 ORBETTER BOLT. PROVIDE FLAT WASHER &LOCK WASHER BELOW BOLT HEAD.
RUBBER IN-SHEAR VIBRATION ISOLATORSEQUAL TO AMBER/BOOTH MODEL RVD-1-C(210 LB. MAX. LOAD, 1-7/8 " HIGH, 0.38"DEFLECTION)
BOLT ISOLATOR TO SUPPORT STAND WITHGRADE 5 OR BETTER BOLTS. PROVIDE FLATWASHERS BELOW BOLT HEADS. PROVIDEFLAT WASHERS & LOCK WASHERS BELOWNUTS OR FLAT WASHERS & NYLOCK NUTS.
PROVIDE FULL PERIMETER METAL FRAMEWITH LEVEL TOP BOLTED TO EQUIPMENTPAD. OUTDOOR UNITS MUST BEINSTALLED MINIMUM 12” ABOVE MAX.EXPECTED SNOW ACCUMULATION DEPTH,AND TOP OF UNIT IS NO LOWER THANTOP OF SCREEN WALL. REFER TOOUTDOOR UNIT INSTALLATION GUIDEFOR ADDITIONAL DETAILS, ANDCOORDINATE WITH ARCH.
PIPE SUPPORT DETAILNO SCALE
4
INSULATED PIPE SUPPORTK-FLEX 360 OR EQUAL
APPLY CONTACT ADHESIVE TO COLLARJOINT AND SEAL THE SUPPORT BYOVERLAPPING ADHESIVE TABS.
PROVIDE COLLAR TO FIX AROUND SUPPORTEQUAL TO CADDY CUSHION CLAMP PCC.
GLUE INSULATION TO PIPESUPPORT (TYPICAL BOTH SIDES).
1-1/4" DRAIN CONNECTION
REFRIGERANT PIPINGTO HEAT PUMP
PROVIDE 2-3/4" DEEP, BACK TO BACKUNISTRUT CHANNEL EQUAL TOCOOPER STRUT B32A TO SUPPORTREFRIGERANT LINE SET SEPARATELYFROM BC CONTROLLER.
MAINTAIN MANUFACTURER'SSERVICE/WORKING CLEARANCES
HANGER ATTACHMENT(TYP. 4)
PROVIDE TEST PORT AND ISOLATIONVALVES PER SPECIFICATION ATSUB-BC PORTS AND ALL SPAREPORTS.
ELECTRICAL CONNECTION
ELEVATION VIEW
PLAN VIEW
BC CONTROLLER CONNECTION DETAILNO SCALE
2
PROVIDE TEST PORT AND VALVES PERSPECIFICATIONS AND FULLY INSULATE.REFRIGERANT LINE SET CONNECTIONTO BC CONTROLLER PERMANUFACTURER'S RECOMMENDATION.
REFRIGERANT LINESETS TO INDOOR UNITS
INSULATE PER MANUFACTURERRECOMMENDATIONS. SEESUPPORT DETAILS.
PROVIDE 2-3/4" DEEP, BACK TO BACKUNISTRUT CHANNEL EQUAL TOCOOPER STRUT B32A AND SECUREREFRIGERANT LINE SETS WITHCHANNEL CLIPS EQUAL TO ERICO TMSI.
3/8" THREADED ROD TOSTRUCTURE (TYP. 4)
AT HANGER ATTACHMENT PROVIDEDOUBLE NUTS AND WASHER PERMANUFACTURER'S RECOMMENDATIONS.
BRANCH CIRCUIT 'BC'CONTROLLER, INSTALL LEVEL.
HIGH PRESSURE REFRIGERANT PIPECONNECTION TO OUTDOOR UNIT.
1-1/4" DRAIN CONNECTION.
LOW PRESSURE REFRIGERANT PIPECONNECTION TO OUTDOOR UNIT.
MAIN DRAIN PIPE. SEE PLANSFOR CONTINUATION. SLOPEMIN. 1/8" PER FOOT.
3/8" THREADED RODTO STRUCTURE
24"
MIN
.ST
RA
IGH
T L
INE
SET
BEF
ORE
AN
Y B
END
S
REFRIGERANT LINE SET SUPPORT DETAILNO SCALE
1
B-LINE 'SNAP 'N SHIELD'PRE-INSULATED PIPE SUPPORT.
ATTACH 3/8" THREADEDROD TO STRUCTURE.
PRE-INSULATEDREFRIGERANT LINE SET
USE UNISTRUT HANGER SIZED TO ACCEPT PIPESUPPORT FOR MULTIPLE LINE SETS, AND USECLEVIS HANGER SIZED TO ACCEPT PIPESUPPORT FOR INDIVIDUAL LINE SETS.
DOUBLE NUT
3/8" THREADED ROD
GAS PIPE ROOF SUPPORT DETAILNO SCALE
3
ROOF TOP PIPE SUPPORT.ERICO, OR EQUIVALENT.
4" MIN.
SECURE GAS PIPE TO ROOFTOP SUPPORT WITHCOMPATIBLE PIPE CLAMP.
RTU CURB DETAILNO SCALE
7
14" MIN
HUSH SEALANT ACOUSTICALCAULK AT ALL DUCT DROPSAND CURB PERIMETER ABOVEAND BELOW HUSHCORE DECKSYSTEM (TYP.)
DECK SYSTEM IN-CURB ACOUSTICALTREATMENT EQUAL TO BRD NOISE ANDVIBRATION CONTROL, HUSHCOREMODEL NIC-DS-32. INSTALL ALLCOMPONENTS IN ACCORDANCE WITHMANUFACTURER RECOMMENDATIONS.
ROOF STRUCTURE
DECK
ROOF INSULATION
ROOFING
CONTINUOUS SPRINGVIBRATION ISOLATION RAIL(AMBER BOOTH TYPE RTIR)
RETURN AIRTO RTU
FLEXIBLECONNECTIONS
SUPPLY AIRFROM RTU
INSULATED ROOFCURB
FLASH INTO ROOFAS REQUIRED.
REFRIGERANT PIPINGCONNECTION TO SUB-BCCONTROLLER WHEN REQUIRED.
TAMPER SWITCH
FIRE PROTECTION RISER DIAGRAMNO SCALE
8
SIZE BY FIRE PROTECTIONENGINEER BASED ON PRESSUREAVAILABILITY AND FIRESPRINKLER REQUIREMENTS.
BUILDING SHUTOFFGATE VALVE
DO
UBLE
CH
ECK
TYPE
BA
CK
FLO
WPR
EVEN
TER
, W
AT
TS
70
9 O
R E
QU
AL.
BUILDING SHUTOFFGATE VALVE
PROVIDE 4" LINE TO FIREDEPARTMENT CONNECTION.COORDINATE LOCATIONWITH FIRE DEPARTMENT.
FIRE DEPARTMENTCONNECTION.COORDINATE LOCATIONWITH FIRE DEPARTMENT.
WATER FLOW DETECTOR.PROVIDE ALARM BELL ANDCONNECT TO SOUND UPONDETECTION OF FLOW.
TO AUTOMATICSPRINKLER SYSTEM
CHECK VALVE. PROVIDEBALL DRIP AS REQUIRED.
PRESSURE GAUGEWITH VALVE, TYPICAL
2" TEST/DRAIN
ANGLE VALVE
TAMPER SWITCH
EXTERIOR WALL
BASEMENTFLOOR
FLOOR
1
NU
RSI
NG
SC
HO
OL
- REM
OD
EL &
AD
DIT
ION
SALI
NA
,K
AN
SAS
4809 Vue Du Lac Place, Suite 201
Manhattan, Kansas 66503
785.587.8042 FAX 785.587.8039
LST Consulting Engineers, PAProject 19088 January 2020
2 F
eb. 2020
M6.2
1A
DD
END
UM
1 -
2-7
-2020
2M
1
1
1M
1M
1M1M
1M
1M
1
1
1
1
1
1
1
1
1
1
(TYP.)
2M
AP
MC
MC
MC
MC
CT
MC
AP
C
MC
MC
MC
M C
AP
APC
2
2
75SP
SP
75SP
75SP
SP
30SP
30SPSP
SP
SPSP
30SP30SP
30SP 30SP
30SP
P
P
SP
SP
30SP
30SP
30SP
75SP
SP
(1)4"
(1)2"
(1)2"
(1)2"
(1)4"(1)2"
(1)2" (1)2" (1)2" (1)2"
(1)2"
(1)4"
(1)4"tvtv
2M
2M
2M
2M
2M
2M
2M
2M
tv
2M
2M
6
6
6
6 6
66
6
6 6 6
6
1
(TYP.)
4
(TYP)
4
(TYP)
4
(TYP)
4
(TYP)5
(TYP)
5
(TYP)
2
8
8
8
8
8
8
8
8
5(TYP)
5(TYP)
av 2
9
(1)2"
13
13
13
14
(TYP.)
14
(TYP.)
14
(TYP.)
14
(TYP.)
13
1
tv tv
88 6
6 6
C C
14
(TYP.)
FACP
MDP
B
15
16
17
R RR R
AM
18
RE:1/ME1.1
RE:1/ME1.1
2121
2020
23
R
24
1
A. PROVIDE A COMPLETE TURNKEY TELECOMMUNICATIONS CABLING SYSTEM TO INCLUDE OUTLETS, JACKS,CONNECTORS, HORIZONTAL COPPER CABLING, PATCH PANELS, TERMINATIONS, LABELING, TESTING ANDCERTIFICATION. OWNER WILL PROVIDE ALL FIBER OPTIC CABLING AND TERMINATIONS, PATCH CABLES, ACTIVEELECTRONIC EQUIPMENT AND TELECOM RACKS IN I.T. HEAD END (MDF) ROOM.
B. PROVIDE NYLON BUSHINGS FOR ALL CONDUIT ENDS NOT CONNECTED TO A BOX OR FITTING TO PROTECT CABLINGFROM DAMAGE.
C. REFER TO 1:E6.2 FOR TELECOM OUTLET REQUIREMENTS.
D. PATCH PANELS SHALL BE 48-PORT, CATEGORY 6, 19" WIDE OCCUPYING 2 RACK UNITS OF SPACE, WITH REAR IDCCONNECTIONS AND FRONT 8P8C JACKS, UNIVERSAL T568A/B WIRING, HUBBELL #HP648. COORDINATE WITHOWNER FOR MOUNTING LOCATION OF PATCH PANELS IN OWNER FURNISHED RACK. PROVIDE SEPARATE PATCHPANELS FOR NORMAL NETWORK, MEDICAL NETWORK, AND VOIP NETWORK CABLING IN QUANTITIES AS REQUIREDTO TERMINATE ALL CABLING.
E. PROVIDE FIELD INSTALLED LABELS COMPLYING WITH TIA/EIA-606 USING ENCODED IDENTIFIERS. PROVIDE LABELINGFOR EACH OUTLET JACK AT ITS FACE PLATE USING A UNIQUE NUMERICAL IDENTIFIER, AND LABEL CORRESPONDINGJACKS AT PATCH PANELS. LABEL EACH CAT6 CABLE AT BOTH ENDS.
F. PERFORM TESTING FOR ALL CATEGORY 6 COPPER CABLING AND ASSOCIATED CONNECTORS. PERFORM TESTS FORWIRE MAP, LENGTH, ATTENUATION, NEXT, AND PROPAGATION DELAY. PROVIDE CERTIFICATION OF CABLINGSYSTEM TO OWNER UPON COMPLETION OF SUCCESSFUL TESTING.
GENERAL TELECOMMUNICATIONS NOTES
A. FIRE ALARM CABLING SHALL BE INSTALLED IN CONDUIT.
B. DUCT TYPE SMOKE DETECTORS SHALL BE FURNISHED AND WIRED BY FIRE ALARM CONTRACTOR, INSTALLED INDUCT BY MECHANICAL CONTRACTOR.
C. FIRE ALARM SYSTEM HVAC SHUT DOWN RELAYS SHALL BE PROVIDED AND WIRED TO FIRE ALARM CONTROL PANELBY FIRE ALARM CONTRACTOR. LOCATE RELAYS WITHIN 5' OF HVAC EQUIPMENT AND PROVIDE CONDUIT WITHPULL STRING FROM RELAY TO EQUIPMENT. UNIT SHUT DOWN CONTROL WIRING SHALL BE PROVIDED BYMECHANICAL CONTRACTOR.
D. IN ADDITION TO VALVES INSTALLED ON FIRE SPRINKER SYSTEM RISER, ALL VALVES INSTALLED OUTSIDE THEBUILDING (POST INDICATOR VALVE, TAPPING SLEEVE VALVE, ETC.) SHALL BE SUPERVISED BY THE FIRE ALARMSYSTEM. PROVIDE ADDRESSABLE MONITORING MODULE AND SURGE PROTECTION DEVICE (DITEK #DTK-2MHLP48B)FOR EACH MONITORED VALVE. COORDINATE WITH GC AND SITE WORK CONTACTOR FOR ALL VALVES INSTALLED.MONITORING IS NOT REQUIRED FOR VALVES INSTALLED IN ROADWAY BOXES BY THE MUNICIPALITY/PUBLICUTILITY.
GENERAL FIRE ALARM NOTES
1. REFER TO SHEETS E2.3 AND E2.4 FOR INFORMATION ON COMBINATION POWER/DATA FLOOR BOXES.
2. PROVIDE ALL REQUIRED FIRE ALARM ADDRESSABLE MONITORING MODULES AND CONNECTIONS TO ALL FIRESPRINKLER FLOW AND TAMPER SWITCHES. COORDINATE REQUIREMENTS WITH FIRE SPRINKLER CONTRACTOR.
3. COVER WALL WITH 4'x8'x3/4" ACX FIRE RETARDANT PLYWOOD SHEETS INSTALLED VERTICALLY WITH BOTTOM AT6" AFF. PLYWOOD SHALL BE PERMANENTLY FASTENED TO THE WALL BY MEANS OF WALL ANCHORS UTILIZINGGALVANIZED, ZINC PLATED, OR STAINLESS STEEL HARDWARE WITH A FLAT HEAD. FINISHED INSTALLATION SHALLHAVE FLUSH APPEARANCE WITH COUNTERSUNK SCREW HEADS TO PREVENT SPLITTING OF THE PLYWOOD.DRYWALL SCREWS ARE NOT ACCEPTABLE. PAINT WITH TWO COATS OF LIGHT GRAY FIRE RETARDANT SEALERPRIOR TO INSTALLATION OF ANY EQUIPMENT.
4. J-HOOKS FOR TELECOM CABLING INSTALLED ABOVE SUSPENDED CEILING, SPACED AT MAXIMUM 5'-0" ON CENTER.J-HOOKS SHALL HAVE 4" MIN BUNDLE CAPACITY, 1" BEND RADIUS CONTROL, AND SHALL BE U.L. 2043 LISTED.PANDUIT "J-PRO JP4 SERIES" OR EQUAL. PROVIDE ALL FASTENERS AND ACCESSORIES AS REQUIRED FOR ACOMPLETE INSTALLATION.
5. EMT CONDUIT SLEEVE(S) THROUGH WALL WITH NYLON BUSHINGS FOR OWNER PROVIDED TELECOM CABLING.QUANTITY AND TRADE SIZE AS NOTED. INSTALL ABOVE ACCESSIBLE CEILING.
6. PROVIDE 1-1/4" CONDUIT BELOW SLAB TO FLOOR BOXES AS SHOWN FOR FUTURE OWNER PROVIDED TELECOMCABLING. ROUTE UP WALL AND STUB-UP TO ABOVE ACCESSIBLE CEILING. PROVIDE PULL STRING IN RACEWAY.COORDINATE ALL SAW CUTTING AND PATCHING WITH GC.
7. VERIFY EXACT MOUNTING LOCATION OF REMOTE PAGING STATION WITH OWNER PRIOR TO ROUGH-IN.
8. TELECOM COMPARTMENT IN BOX SHALL BE FOR FUTURE USE BY OWNER. NO CABLING OR JACKS INSTALLED ASPART OF THIS CONTRACT.
9. VERIFY EXACT MOUNTING HEIGHT AND LOCATION OF VOIP PHONE OUTLET WITH ELEVATOR EQUIPMENTINSTALLER PRIOR TO ROUGH-IN.
10. PROVIDE 2" CONDUIT SLEEVE IN WALL, ROUTED FROM BELOW FLOOR AND STUBBED OUT TO ABOVE ACCESSIBLECEILING.
11. REFER TO DETAIL 4, SHEET E6.1, FOR TELECOM CABLING AND JACK REQUIREMENTS AT THIS FLOOR BOX.
12. TELECOMMUNICATIONS GROUND BAR: 13-1/4"W x 2"H x 1/4" THICK ELECTRO-TIN PLATED COPPER BUS BAR,COMPLETE WITH INSULATED STAND-OFFS AND STAINLESS STEEL BRACKETS, ERICO #TGBA14L06PT OR EQUAL.MOUNT AT 18" AFF AND PROVIDE #4 CU GROUND TO BUILDING STEEL AND TO EQUIPMENT GROUND BUS OFPANEL 'MDP'. ALL CONNECTIONS TO GROUND BAR SHALL BE MADE USING COMPRESSION TYPE LUGS.
13. WIRELESS ACCESS POINT: PROVIDE (2) CAT6 CABLES ABOVE CEILING WITH MALE RJ45 END AND 20' SERVICE LOOP.DO NOT PROVIDE RACEWAY OR OUTLET BOX. ROUTE CABLE BACK TO I.T. ROOM 122, PROVIDE 6' SERVICE LOOPAND TERMINATE AT PATCH PANEL.
14. IP CAMERA: PROVIDE (1) CAT6 CABLE ABOVE CEILING WITH MALE RJ45 END AND 20' SERVICE LOOP (BLUE FORNORMAL NETWORK, BLACK FOR MEDICAL NETWORK). DO NOT PROVIDE RACEWAY OR OUTLET BOX. ROUTE CABLEBACK TO I.T. ROOM 122, PROVIDE 6' SERVICE LOOP AND TERMINATE AT PATCH PANEL.
15. PROVIDE (2) WHITE CAT6 CABLES IN 3/4" CONDUIT FROM DACT INSIDE FACP TO I.T. ROOM 122 AND TERMINATEAT VOIP PATCH PANEL FOR REMOTE MONITORING.
16. INSTALL HEAT DETECTOR IN ELEVATOR PIT FOR SHUNT TRIP OPERATION OF ELEVATOR POWER CIRCUIT.
17. ELEVATOR LOBBY SMOKE DETECTOR FOR ELEVATOR RECALL FUNCTION.
18. ADDRESSABLE RELAYS FOR ELEVATOR RECALL, FIREMAN'S HAT, AND POWER SHUNT-TRIP, AND ADDRESSABLEMONITORING MODULE FOR MONITORING OF SHUNT TRIP VOLTAGE.
19. INSTALL SMOKE DETECTOR AND HEAT DETECTOR AT TOP OF ELEVATOR HOISTWAY PER LOCAL JURISDICTIONREQUIREMENTS.
20. EXTEND CONDUITS OVERHEAD AND STUB-UP INTO I.T. ROOM 122. FIELD COORDINATE EXACT ROUTING.
21. CORE DRILL THROUGH EXISTING WALL AND PROVIDE MODULAR MECHANICAL SEALS AROUND CONDUITS(LINK-SEAL OR EQUAL).
22. (3) 3"X3" FIRE RATED PATHWAYS THROUGH FLOOR FOR TELECOM CABLING, SPECIFIED TECHNOLOGIES "EZ-PATH -SERIES 33" OR EQUAL. PROVIDE EXTENSION MODULES AS NEEDED TO EXTEND COMPLETELY THROUGH FLOOR.
23. PROVIDE FIRESTOPPING FITTINGS IN-LIEU OF NYLON BUSHINGS AT CONDUIT ENDS, WIREMOLD #FS2R-RED OREQUAL.
24. PROVIDE 24VDC, FLUSH MOUNTED ELECTROMAGNETIC DOOR HOLDERS POWERED FROM FIRE ALARM PANELAUXILIARY POWER CIRCUIT. PROVIDE AREA SMOKE DETECTOR AND ADDRESSABLE RELAY FOR CONTROL OF DOORHOLDERS. DOORS SHALL RELEASE UPON DETECTION OF SMOKE.
SPECIAL SYSTEMS NOTES BY SYMBOL#
1
NU
RS
IN
G S
CH
OO
L - R
EM
OD
EL
&
A
DD
IT
IO
N
SA
LIN
A,
KA
NS
AS
4809 Vue Du Lac Place, Suite 201Manhattan, Kansas 66503785.587.8042 FAX 785.587.8039
LST Consulting Engineers, PAProject 19088 January 2020
29 Jan
. 2020
E2.6
3/16" = 1'-0"
BASEMENT SPECIAL SYSTEMS PLAN1
1A
DD
END
UM
1 -
2-7
-2020