notes from apr 21 whiteboard session 1 robin lafever thursday afternoon, 21 apr we convened around a...

10
Notes from Apr 21 Whiteboard session Notes from Apr 21 Whiteboard session 1 Robin Lafever Thursday afternoon, 21 Apr We convened around a Whiteboard to try to integrate the spectrum of ideas about what is happening at the “Top End”, around the Focal Plane. This my sketch of the sketch on the Whiteboard As we summarized our session. In attendence: Robin Henry Jerry Pat With comments, peek-ins, or weird looks from: Bobby Chris Matt My apologies to anyone I left out. 05/16/22

Upload: brandon-mills

Post on 16-Jan-2016

216 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Notes from Apr 21 Whiteboard session 1 Robin Lafever Thursday afternoon, 21 Apr We convened around a Whiteboard to try to integrate the spectrum of ideas

Notes from Apr 21 Whiteboard sessionNotes from Apr 21 Whiteboard session

1Robin Lafever

Thursday afternoon, 21 Apr

We convened around a Whiteboard to

try to integrate the spectrum of ideas about what is happening at the “Top End”, around the Focal Plane.

This my sketch of the sketch on the Whiteboard

As we summarized our session.

In attendence:

Robin

Henry

Jerry

Pat

With comments, peek-ins, or weird looks from:

Bobby

Chris

Matt

My apologies to anyone I left out.

04/21/23

Page 2: Notes from Apr 21 Whiteboard session 1 Robin Lafever Thursday afternoon, 21 Apr We convened around a Whiteboard to try to integrate the spectrum of ideas

2Robin Lafever

To summarize:

A fiber cable assembly currently has these dimensions

And the Corrector assembly has these black boxes attached to it somewhere

Notes from Apr 21 Whiteboard sessionNotes from Apr 21 Whiteboard session

X 10

04/21/23

Page 3: Notes from Apr 21 Whiteboard session 1 Robin Lafever Thursday afternoon, 21 Apr We convened around a Whiteboard to try to integrate the spectrum of ideas

3Robin Lafever

Here’s our list of utilities that need to find a place on the corrector assembly…….

Fiber Cable Breakout box X 10

Vacuum distribution

Illuminator/Tracker/Focus Box

Hexapod Box

ADC Box

FiberView Camera

Power

Notes from Apr 21 Whiteboard sessionNotes from Apr 21 Whiteboard session

…resulting in a list of the cables that go from the corrector, through the telescope and into the spectro room.

Utility cross-section (Guess)

Vacuum 25mm width max

Fiber Cable 25mm X 10

IL/T/F 5mm

Hexapod 5mm

ADC 15mm

FiberViewCamera 15mm

Power 15mm

X 10

04/21/23

Page 4: Notes from Apr 21 Whiteboard session 1 Robin Lafever Thursday afternoon, 21 Apr We convened around a Whiteboard to try to integrate the spectrum of ideas

404/21/23 Robin Lafever

Other topics of note from Apr 21 Whiteboard sessionOther topics of note from Apr 21 Whiteboard session

Best idea of the day !

All positioners have the same length Fiber lead.

It should also include the Power lead.

Many reasons why this is attractive.

(make a list)

Will work for both Front-load and Back-load options as long as

the connectors will fit through the 10 mm Focal Plane holes.

Page 5: Notes from Apr 21 Whiteboard session 1 Robin Lafever Thursday afternoon, 21 Apr We convened around a Whiteboard to try to integrate the spectrum of ideas

504/21/23Robin Lafever

Other topics of note from Apr 21 Whiteboard sessionOther topics of note from Apr 21 Whiteboard session

The Corrector Barrel moves relative to the Cage assembly.

Whatever utilities cross between them need flexures designed in.

A lot of stuff crosses.

List is building.

Page 6: Notes from Apr 21 Whiteboard session 1 Robin Lafever Thursday afternoon, 21 Apr We convened around a Whiteboard to try to integrate the spectrum of ideas

604/21/23Robin Lafever

Other topics of note from Apr 21 Whiteboard sessionOther topics of note from Apr 21 Whiteboard session

Since these will be assembled separately,

then integrated on-site, this interface is

a busy place.

This forces us to put our connectors

somewhere around here…..

..and it rules out the option of a

Cable assembly with NO connectors.

Page 7: Notes from Apr 21 Whiteboard session 1 Robin Lafever Thursday afternoon, 21 Apr We convened around a Whiteboard to try to integrate the spectrum of ideas

704/21/23Robin Lafever

Other topics of note from Apr 21 Whiteboard sessionOther topics of note from Apr 21 Whiteboard session

500 Fibers

16 X 32 Fibers

32 Fibers 1 Fiber

Positioner installation, Top fed, 32 per cluster

Page 8: Notes from Apr 21 Whiteboard session 1 Robin Lafever Thursday afternoon, 21 Apr We convened around a Whiteboard to try to integrate the spectrum of ideas

804/21/23Robin Lafever

Other topics of note from Apr 21 Whiteboard sessionOther topics of note from Apr 21 Whiteboard session

Positioner installation, Side fed, Single or cluster.

Install positioner using ample slack…… then tie the fibers down on the anchor plane

If we invoke the ‘One-length’ option we can try

distributing connectors radially (see later slide) Otherwise we will certainly

need a take-up loop in the circuit

Page 9: Notes from Apr 21 Whiteboard session 1 Robin Lafever Thursday afternoon, 21 Apr We convened around a Whiteboard to try to integrate the spectrum of ideas

904/21/23Robin Lafever

Other topics of note from Apr 21 Whiteboard sessionOther topics of note from Apr 21 Whiteboard session

Positioner Fibers are all the same length.

Focal Plane

Center Line

32 Fibers / Connector

Page 10: Notes from Apr 21 Whiteboard session 1 Robin Lafever Thursday afternoon, 21 Apr We convened around a Whiteboard to try to integrate the spectrum of ideas

1004/21/23Robin Lafever

Other topics of note from Apr 21 Whiteboard sessionOther topics of note from Apr 21 Whiteboard session

Positioner Fibers are all the same length.

Focal Plane

CenterLine

Single Fiber connectors distributed radially