northwest region projects - wisconsin department of ... · 2020-2023 final stip project listing...

85
Northwest Region Projects 2020 – 2023 Statewide Transportation Improvement Program

Upload: others

Post on 25-Jun-2020

11 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

Northwest Region Projects

2020 – 2023 Statewide Transportation Improvement Program

Page 2: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

2020-2023 FINAL STIP Project ListingNorthwest Region

ASHLAND

268268 2020-2023 FINAL STIP Project Listing Northwest Region

ASHLAND

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2021 8540-00-70 01/12/2021 206 LET RSRF20 9.200 CTH GG LORETTA - CLAM LAKE $1,000,000 - $1,999,999

SCL TO ELF ROAD/FR 173

CONSTRUCTION/RESURFACING

FOREST HWYS/PUBLIC LANDS/FLAP FEDERAL LAND ACCESS PROGRA

2021 8995-00-04 01/25/2021 290 LLC MISC 0.000 NON HWY

C ASHLAND, VARIOUS LOCATIONS $750,000 - $999,999

BIKE & PED FACILITY IMPROVEMENTS

CONSTR/BIKE PED TRAIL IMPRVMNTS/TAP

BICYCLE AND PEDESTRIAN FACILITIES TRANS ALTERNATIVES 5-200K

2020 1610-11-70 11/10/2020 303 LET COLD10 9.390 STH 013 PARK FALLS - MELLEN $4,000,000 - $4,999,999

MORSE ROAD TO JEFFERSON AVENUE

CONSTRUCTION/CIR/RESURFACE

STATE 3R SURFACE TRANSP BLOCK GRTS-

2021 1610-00-56 09/25/2021 303 R/R MISC 0.000 STH 013 C MELLEN, MAIN STREET $250,000 - $499,999

WISCONSIN CENTRAL LTD RR 699392L

RR/UPGRADE RAIL CROSSING

STATE 3R SURFACE TRANSP BLOCK GRTS-

2022 1610-00-76 03/08/2022 303 LET RSRF20 2.980 STH 013 MELLEN - ASHLAND $4,000,000 - $4,999,999

JEFFERSON AVE TO GOLF COURSE ROAD

CONSTRUCTION/RESURFACING

STATE 3R STBG <5K POP FAST

2022 1610-00-78 03/08/2022 303 LET MISC 0.960 STH 013 MELLEN - ASHLAND $1,000,000 - $1,999,999

JEFFERSON AVE TO GOLF COURSE ROAD

CONSTRUCTION/LOCAL UTILITIES

STATE 3R NON-FEDERAL

2022 1610-00-86 03/08/2022 303 LET MISC 2.978 STH 013 MELLEN - ASHLAND $0 - $99,999

JEFFERSON AVE TO GOLF COURSE ROAD

Page 3: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

269 2020-2023 FINAL STIP Project Listing Northwest Region

ASHLAND

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

CONSTRUCTION/SAFETY/RUMBLE STRIPS

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

2020 8727-04-74 03/10/2020 303 LET BRRPL 0.100 STH 112 MARENGO - ASHLAND $500,000 - $749,999

ANDERSON CREEK BRIDGE B-02-0068

CONSTRUCTION/BRIDGE REPLACEMENT

SHR BRIDGES STBG <5K POP FAST

2021 8727-01-60 02/09/2021 303 LET BRRHB 0.020 STH 112 MARENGO - ASHLAND $250,000 - $499,999

WHITE RIVER BRIDGE B-02-0414

CONSTR/BRSHRM/JOINT RPL/CONC OVRLY

SHR BRIDGES STBG <5K POP FAST

2022 1180-44-70 11/08/2022 303 LET RSRF10 9.000 USH 002 ODANAH - SAXON $4,000,000 - $4,999,999

GOVERNMENT ROAD TO EAST COUNTY LINE

CONSTRUCTION/RESURFACING

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 4: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

270 2020-2023 FINAL STIP Project Listing Northwest Region

BARRON

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2022 8335-00-70 03/08/2022 205 LET BRRPL 0.003 LOC STR T VANCE CREEK, 5TH ST & 1/2 AVE $250,000 - $499,999

VANCE CREEK BRIDGE B-03-0210

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

2020 8332-00-70 02/25/2020 290 LLC MISC 0.000 NON HWY

V CAMERON, SAFE ROUTES TO SCHOOL $250,000 - $499,999

SIDEWALKS ON VARIOUS STREETS

CONSTRUCTION/SRTS TAP PROGRAM

SAFE ROUTES TO SCHOOL TRANS ALTERN 5K AND UNDER

8824-00-01 303 I/E BRRHB 0.000 STH 025 BARRON - STH 48 $0 - $99,999

ENGLE CREEK BRIDGE B-03-0006

DESIGN/BRIDGE REHABILITATION

SHR BRIDGES STBG <5K POP FAST

8824-00-02 303 I/E COLD20 7.530 STH 025 BARRON - STH 48 $100,000 - $249,999

USH 8 E TO STH 48

DESIGN/CIR/RESURFACE

STATE 3R SURFACE TRANSP BLOCK GRTS-

2021 8090-00-72 05/11/2021 303 LET MISC 0.120 STH 025 RIDGELAND - BARRON $250,000 - $499,999

FOUR MILE CREEK CULVERT

CONST/MISC/CULVERT REPLACEMENT

SHR BRIDGES STBG <5K POP FAST

2021 8120-01-70 11/09/2021 303 LET MISC 0.034 STH 048 C CUMBERLAND, ELM STREET $750,000 - $999,999

HAY RIVER FLOWAGE CULVERT C-03-0NEW

CONSTRUCTION/BOX CULVERT REPLACEMNT

STATE 3R STBG <5K POP FAST

2022 8120-00-70 11/08/2022 303 LET MISC 0.500 STH 048 C RICE LAKE, HAMMOND AVENUE $500,000 - $749,999

CULVERTS C-03-0063, 0064, AND 0065

Page 5: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

271 2020-2023 FINAL STIP Project Listing Northwest Region

BARRON

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

CONST/MISC/CULVERT REPLACEMENT

SHR BRIDGES STBG 5-200K POP FASTG

2022 8120-07-70 11/08/2022 303 LET RSRF20 4.000 STH 048 MCKINLEY - RICE LAKE $2,000,000 - $2,999,999

STH 25 TO WEST AVENUE

CONSTRUCTION/RESURFACING

STATE 3R STBG <5K POP FAST

2023 8120-02-66 12/12/2023 303 LET MISC 9.120 STH 048 MCKINLEY - RICE LAKE $250,000 - $499,999

USH 63 NORTH TO STH 25

CONS/SFTY/WIDN PAVD SHLDR/RUMBLSTRP

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

2023 8120-02-76 12/12/2023 303 LET COLD10 9.120 STH 048 MCKINLEY - RICE LAKE $3,000,000 - $3,999,999

USH 63 NORTH TO STH 25

CONSTRUCTION/RESURFACING

STATE 3R STBG <5K POP FAST

2020 1570-00-75 03/10/2020 303 LET RSRF20 5.433 USH 008 TURTLE LAKE - CAMERON $3,000,000 - $3,999,999

ASH STREET TO CTH P

CONSTRUCTION/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

2020 1570-00-76 03/10/2020 303 LET MISC 5.433 USH 008 TURTLE LAKE - CAMERON $100,000 - $249,999

ASH STREET TO CTH P

CONSTR/SFTY/RMBLSTRP/WDN PVD SHLDRS

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

2021 1570-05-63 11/09/2021 303 LET MISC 8.200 USH 008 TURTLE LAKE - CAMERON $250,000 - $499,999

CTH P TO WYE STREET

CONS/SFTY/WIDN PAVD SHLDR/RUMBLSTRP

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

2021 1570-05-73 11/09/2021 303 LET RSRF30 8.200 USH 008 TURTLE LAKE - CAMERON $4,000,000 - $4,999,999

Page 6: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

272 2020-2023 FINAL STIP Project Listing Northwest Region

BARRON

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

CTH P TO WYE STREET

CONSTRUCTION/RESURFACE

STATE 3R SURFACE TRANSP BLOCK GRTS-

1195-05-01 303 I/E BRRHB 0.000 USH 053 NEW AUBURN - RICE LAKE $0 - $99,999

STH 48 SOUTH BOUND BRIDGE B-03-0048

DESIGN/BRIDGE REHABILITATION

BACKBONE NON-FEDERAL

1195-06-00 303 I/E BRRHB 0.020 USH 053 NEW AUBURN - RICE LAKE $0 - $99,999

STH 48 NORTH BOUND BRIDGE B-03-0049

DESIGN/BRIDGE REHABILITATION

BACKBONE NON-FEDERAL

2020 1190-11-84 05/12/2020 303 LET BRPVTV 2.060 USH 053 BARRON, DOUGLAS & WASHBURN COUNTIES

$0 - $99,999

BRIDGE DECK SEALING - USH 53

CONSTRUCTION/BRIDGE MAINTENANCE

BACKBONE NATIONAL HIGHWAY PERF FAST

2021 1196-04-78 11/09/2021 303 LET RSRF20 8.580 USH 053 NEW AUBURN - RICE LAKE $6,000,000 - $6,999,999

CTH I TO USH 8 (NB)

CONSTRUCTION/RESURF/BRIDGE REHAB

BACKBONE NATIONAL HIGHWAY PERF FAST

2021 1196-05-77 11/09/2021 303 LET RSRF20 7.880 USH 053 NEW AUBURN - RICE LAKE $8,000,000 - $8,999,999

CHIPPEWA COUNTY LINE TO CTH I (NB)

CONSTRUCTION/RESURFACING

BACKBONE NATIONAL HIGHWAY PERF FAST

2022 1196-04-77 11/08/2022 303 LET RSRF20 16.630 USH 053 NEW AUBURN - RICE LAKE $13,000,000 - $13,999,999

CHIPPEWA COUNTY LINE - USH 8 (SB)

Page 7: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

273 2020-2023 FINAL STIP Project Listing Northwest Region

BARRON

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

CONSTR/RESURFACE/BRRHB

BACKBONE NATIONAL HIGHWAY PERF FAST

2022 1196-04-88 01/25/2022 303 MIS MISC 8.350 USH 053 NEW AUBURN - RICE LAKE $0 - $99,999

CTH I TO USH 8 (NB)

MISC/PROCUREMENT ITS ITEMS

BACKBONE NON-FEDERAL

2022 1196-04-98 03/25/2022 303 SFA MISC 8.350 USH 053 NEW AUBURN - RICE LAKE $0 - $99,999

CTH I TO USH 8 (NB)

TRF MITIFGATION(CONS ID 1196-04-78)

BACKBONE NON-FEDERAL

2022 1196-05-97 03/25/2022 303 SFA MISC 7.650 USH 053 NEW AUBURN - RICE LAKE $0 - $99,999

CHIPPEWA CO LINE TO CHETEK RIVER

TRAFFIC MITIGATION 1196-05-77

BACKBONE NON-FEDERAL

2023 1196-04-97 03/25/2023 303 SFA MISC 0.000 USH 053 NEW AUBURN - RICE LAKE $0 - $99,999

CHIPPEWA COUNTY LINE TO USH 8 (SB)

TRF MITIGATION CONSTR ID 1196-04-77

BACKBONE NON-FEDERAL

2023 1198-10-77 12/12/2023 303 LET PVRPLA 7.830 USH 053 RICE LAKE - SPOONER $20,000,000 - $24,999,999

26TH AVE TO PINE GROVE RD (NB & SB)

CONSTRUCTION/PAVEMENT REPLACEMENT

BACKBONE NATIONAL HIGHWAY PERF FAST

2023 1198-10-78 12/12/2023 303 LET MISC 1.100 USH 053 RICE LAKE - SPOONER $250,000 - $499,999

26TH AVENUE TO 27TH AVENUE

CONSTR/SAFETY/CABLE BARRIER

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

1550-04-07 303 I/E RSRF20 6.503 USH 063 CUMBERLAND - SPOONER $100,000 - $249,999

CHARRIE LN TO BARRON/WASHBURN CO LN

Page 8: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

274 2020-2023 FINAL STIP Project Listing Northwest Region

BARRON

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

DESIGN/RESURFACE/RSRF20

STATE 3R STBG <5K POP FAST

1550-04-08 303 I/E RSRF20 10.930 USH 063 CLEAR LAKE - CUMBERLAND $250,000 - $499,999

USH 8 E TO STH 48 W

DESIGN/RESURFACE/RSRF20

STATE 3R STBG <5K POP FAST

1550-04-09 303 I/E MISC 0.154 USH 063 C CUMBERLAND, SUPERIOR AVENUE $100,000 - $249,999

BEAVER DAM LAKE C-03-1459

DESIGN/CULVERT REPLACEMENT

STATE 3R NON-FEDERAL

2020 1550-04-24 04/25/2020 303 R/E RSRF20 2.330 USH 063 C CUMBERLAND, ELM STR AND 2ND AVE $0 - $99,999

WEST JUNCTION STH 48 TO CHARRIE LN

REAL ESTATE ACQUISITION/RESURFACING

STATE 3R NON-FEDERAL

2022 1550-04-22 09/25/2022 303 R/E MISC 0.154 USH 063 C CUMBERLAND, SUPERIOR AVENUE $0 - $99,999

BEAVER DAM LAKE C-03-1459

REAL ESTATE ACQUISTION/1550-04-79

STATE 3R NON-FEDERAL

Page 9: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

275 2020-2023 FINAL STIP Project Listing Northwest Region

BAYFIELD

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2021 8732-00-72 03/09/2021 206 LET PVRPLA 5.420 CTH M CABLE - ECL $2,000,000 - $2,999,999

SPRUCE STREET TO FRELS ROAD

CONSTRUCTION/PAVEMENT REPLACEMENT

STP RURAL STBG <5K POP FAST

2021 8732-00-73 01/12/2021 206 LET PVRPLA 5.100 CTH M CABLE - CLAM LAKE $1,000,000 - $1,999,999

FRELS ROAD TO CTH D

CONSTRUCTION/PAVEMENT REPLACEMENT

FOREST HWYS/PUBLIC LANDS/FLAP FEDERAL LAND ACCESS PROGRA

2020 8357-01-73 03/10/2020 206 LET RSRF10 1.660 LOC STR T RUSSELL, OLD CTH K ROAD $750,000 - $999,999

LITTLE SAND BAY RD TO PETERSON HILL

CONST/FLAP PROG RESURFACE

FOREST HWYS/PUBLIC LANDS/FLAP FEDERAL LAND ACCESS PROGRA

2020 8358-00-70 12/08/2020 206 LET RSRF20 0.980 LOC STR T TRIPP, FAIRVIEW ROAD $250,000 - $499,999

CTH A TO WEIDENAAR ROAD

CONST/FLAP PROG RESURFACE

FOREST HWYS/PUBLIC LANDS/FLAP FEDERAL LAND ACCESS PROGRA

2021 8354-00-70 03/09/2021 205 LET BRRPL 0.004 LOC STR T PILSEN, OLD USH 2 $250,000 - $499,999

PINE CREEK BRIDGE B-04-0123

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

2022 8337-00-70 02/08/2022 205 LET BRRPL 0.006 LOC STR T BARNES, SOUTH SHORE ROAD $250,000 - $499,999

EAU CLAIRE LAKES BR B-04-0124

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

2021 8347-01-70 01/25/2021 290 LLC MISC 0.000 NON HWY

T IRON RIVER, PEDESTRIAN IMPRVMNTS $500,000 - $749,999

Page 10: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

276 2020-2023 FINAL STIP Project Listing Northwest Region

BAYFIELD

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

USH 2 AND BOHN STREET SIDEWALKS

CONSTR/PEDESTRIAN IMPRVMNTS/TAP

TAP < 5,000 TAP AREA 5K AND UND MAP-21

8160-03-30 303 I/E PSRS10 10.700 STH 013 ASHLAND - BAYFIELD $0 - $99,999

SUPERIOR AVENUE TO 7TH STREET

DESIGN/ROAD MAINTENANCE/CHIP SEAL

STATE 3R NON-FEDERAL

8510-00-03 303 I/E BRRHB 0.009 STH 013 CORNUCOPIA - PORT WING $0 - $99,999

CRNBRRY & FLAG RVR BRDGS B-04-61,62

DESIGN/BRIDGE REHABILITATION

SHR BRIDGES STBG <5K POP FAST

2020 8160-01-70 05/12/2020 303 LET BRPVTV 0.050 STH 013 ASHLAND - BAYFIELD $500,000 - $749,999

BONO CREEK BRIDGE B-04-0029

CONSTRUCTION/BRIDGE REHABILITATION

SHR BRIDGES STBG <5K POP FAST

2020 8510-00-21 01/25/2020 303 R/E MISC 0.651 STH 013 CORNUCOPIA - PORT WING $0 - $99,999

LOST CREEK CULVERTS C-04-0031,32,33

REAL ESTATE ACQ/MISC/CULVERT RPL

SHR BRIDGES NON-FEDERAL

2022 8510-03-72 11/08/2022 303 LET MISC 21.520 STH 013 CORNUCOPIA - SUPERIOR $1,000,000 - $1,999,999

BARK POINT ROAD TO CTH H

CONSTRUCTUCTION/MISC/SMALL CULVERTS

STATE 3R STBG <5K POP FAST

2023 8160-00-75 12/12/2023 303 LET PVRPLA 2.080 STH 013 ASHLAND - BAYFIELD $5,000,000 - $5,999,999

THOMPSON CREEK TO SUPERIOR AVE

CONSTRUCTION/PAVEMENT REPLACEMENT

STATE 3R STBG <5K POP FAST

2023 8510-00-71 11/14/2023 303 LET MISC 0.589 STH 013 CORNUCOPIA - PORT WING $1,000,000 - $1,999,999

Page 11: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

277 2020-2023 FINAL STIP Project Listing Northwest Region

BAYFIELD

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

LOST CREEK CULVERTS C-04-0031,32,33

CONST/MISC/CULVERT REPLACEMENT

SHR BRIDGES STBG <5K POP FAST

2021 8725-02-70 03/09/2021 303 LET RSRF30 6.860 STH 118 BENOIT - STH 112 $3,000,000 - $3,999,999

USH 63 TO STH 112

CONSTRUCTION/RESURFACING

STATE 3R SURFACE TRANSP BLOCK GRTS-

1180-00-09 303 I/E BRRHB 0.000 USH 002 INO - ASHLAND $0 - $99,999

N FISH CREEK BRIDGE B-04-0022

DESIGN/BRIDGE REHABILITATION/REDECK

SHR BRIDGES STBG <5K POP FAST

2021 1180-00-75 02/09/2021 303 LET RSRF20 12.060 USH 002 BRULE - INO $7,000,000 - $7,999,999

CTH A TO CTH E

CONSTRUCTION/RESURFACING

STATE 3R NATIONAL HIGHWAY PERF FAST

2021 1180-00-77 07/13/2021 303 LET RSRF20 6.090 USH 002 INO - ASHLAND $3,000,000 - $3,999,999

CTH E TO USH 63

CONSTRUCTION/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

2021 1180-00-78 02/09/2021 303 LET MISC 12.030 USH 002 BRULE - INO $500,000 - $749,999

CTH A TO CTH E

CONS/SFTY/WIDN PAVD SHLDR/RUMBLSTRP

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

2022 1180-03-76 03/08/2022 303 LET RSRF20 5.640 USH 002 BRULE - INO $3,000,000 - $3,999,999

SZNAIDER ROAD TO CTH A

CONSTRUCTION/RESURFACING

STATE 3R STBG <5K POP FAST

2020 1560-00-72 05/12/2020 303 LET BRRPL 0.150 USH 063 DRUMMOND - USH 2 $1,000,000 - $1,999,999

Page 12: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

278 2020-2023 FINAL STIP Project Listing Northwest Region

BAYFIELD

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

SOUTH FISH CREEK BRIDGE B-04-0119

CONSTRUCTION/BRIDGE REPLACEMENT

SHR BRIDGES NATIONAL HIGHWAY PERF FAST

2021 1560-02-24 05/25/2021 303 R/E MISC 0.380 USH 063 DRUMMOND - USH 2 $0 - $99,999

MILL POND DAM

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

2021 1560-07-70 11/09/2021 303 LET COLD10 12.760 USH 063 DRUMMOND - USH 2 $5,000,000 - $5,999,999

DRUMMOND LK RD TO EAST JCT CTH E

CONSTRUCTION/RESURFACE

STATE 3R SURFACE TRANSP BLOCK GRTS-

2023 1560-02-74 12/12/2023 303 LET MISC 0.380 USH 063 DRUMMOND - USH 2 $1,000,000 - $1,999,999

MILL POND DAM

CONSTRUCTION/CULVERT REPLACEMENT

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 13: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

279 2020-2023 FINAL STIP Project Listing Northwest Region

BUFFALO

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2021 7311-00-70 04/13/2021 205 LET BRRPL 0.004 CTH D NELSON - STH 37 $250,000 - $499,999

TAMARACK CREEK BRIDGE B-06-0193

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

2022 7313-00-70 03/08/2022 205 LET BRRPL 0.003 CTH E STH 88 - STH 95 $250,000 - $499,999

BR WAUMANDEE CR BR B-06-0208

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

2021 7361-00-70 04/13/2021 205 LET BRRPL 0.008 CTH G FOUNTAIN CITY - N JCT STH 95 $250,000 - $499,999

EAGLE CREEK BRIDGE B-06-0194

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

2022 7363-00-70 02/08/2022 205 LET BRRPL 0.003 CTH HH CTH H - CTH Y $250,000 - $499,999

BR BUFFALO RIVER BRIDGE B-06-0196

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

2022 7317-00-70 03/08/2022 205 LET BRRPL 0.004 CTH J STH 37 - CTH JJ $250,000 - $499,999

TIFFANY CREEK BRIDGE B-06-0195

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

2021 7356-00-70 11/09/2021 205 LET BRRPL 0.008 CTH OO PRAIRIE MOON ROAD - CTH O $250,000 - $499,999

BR ROSE VALLEY CREEK BR B-06-0197

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

2021 7218-00-71 03/09/2021 205 LET BRRPL 0.047 LOC STR T NAPLES, ALLEMAN ROAD $750,000 - $999,999

BUFFALO RIVER BRIDGE B-06-0301

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

Page 14: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

280 2020-2023 FINAL STIP Project Listing Northwest Region

BUFFALO

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2021 7230-00-70 12/14/2021 205 LET BRRPL 0.006 LOC STR T GLENCOE, PRONSCHINSKE DRIVE $250,000 - $499,999

SWINNS VALLEY CREEK BRIDGE B06-0198

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

2022 7234-00-70 01/11/2022 205 LET BRRPL 0.004 LOC STR T MODENA, HANSON BLUFF ROAD $100,000 - $249,999

LEE VALLEY CREEK BRIDGE B-06-0184

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

2020 7170-00-77 02/25/2020 303 OST BRRHB 0.000 STH 025 WABASHA - DURAND $1,000,000 - $1,999,999

WABASHA BRIDGE B-06-0079

CONSTR/BRRHB/REIMBURSEMENT TO MN

SHR BRIDGES NATIONAL HIGHWAY PERF FAST

7160-00-02 303 I/E BRRHB 0.000 STH 035 FOUNTAIN CITY - ALMA $0 - $99,999

WAUMANDEE CREEK BRIDGE B-06-0059

DESIGN/BRRHB/CONCRETE OVERLAY

SHR BRIDGES STBG <5K POP FAST

2021 7160-04-53 04/25/2021 303 R/R MISC 0.000 STH 035 TREMPEALEAU - FOUNTAIN CITY $100,000 - $249,999

WCL RR XING 281844K

RR OPS/RAIL CROSSING SURFACE

SHR BRIDGES SURFACE TRANSP BLOCK GRTS-

2022 7160-04-75 12/13/2022 303 LET BRRPL 0.470 STH 035 TREMPEALEAU - FOUNTAIN CITY $3,000,000 - $3,999,999

MISSISSIPPI RVR TRIBUTARY/3 BRIDGES

CONSTRUCT/BRRPL B-06-0201,0204,0206

SHR BRIDGES STBG <5K POP FAST

2020 7125-00-21 01/25/2020 303 R/E BRRPL 0.003 STH 037 ALMA - MONDOVI $0 - $99,999

BRANCH TROUT CREEK BRIDGE B-06-0896

REAL ESTATE ACQ/BRIDGE REPLACEMENT

SHR BRIDGES NON-FEDERAL

Page 15: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

281 2020-2023 FINAL STIP Project Listing Northwest Region

BUFFALO

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2022 7125-00-71 11/08/2022 303 LET BRRPL 0.014 STH 037 ALMA - MONDOVI $1,000,000 - $1,999,999

BRANCH TROUT CREEK BRIDGE B-06-0207

CONSTRUCTION/BRIDGE REPLACEMENT

SHR BRIDGES STBG <5K POP FAST

7150-00-00 303 I/E MISC 0.800 STH 054 WINONA - GALESVILLE $100,000 - $249,999

MINNESOTA STATE LINE TO STH 35

PLAN/PLANNING DEVELOPMENT & REVIEW

STATE 3R NON-FEDERAL

7730-00-00 303 I/E MISC 0.200 STH 088 CZECHVILLE - CREAM $0 - $99,999

CULVERTS C-03-5551 AND C-06-5678

DESIGN/MISC/CULVERT REPLACEMENT

SHR BRIDGES NON-FEDERAL

2020 7735-01-64 02/25/2020 303 LFA MISC 8.330 STH 121 GILMANTON - INDEPENDANCE $0 - $99,999

STH 88 TO EAST COUNTY LINE

CONSTR/LFA/CULVERT REPLACEMENT

STATE 3R NON-FEDERAL

1530-06-08 303 I/E BRRHB 0.000 USH 010 C MONDOVI, E MAIN STREET $0 - $99,999

BROWN LEE CREEK BRIDGE B-06-0096

DESIGN/BRRHB/CONCRETE OVERLAY

SHR BRIDGES STBG <5K POP FAST

2022 1533-00-70 02/08/2022 303 LET BRRPL 0.002 USH 010 DURAND - MONDOVI $1,000,000 - $1,999,999

HOLMES CREEK BRIDGE B-06-0387

CONSTRUCTION/BRIDGE REPLACEMENT

SHR BRIDGES SURFACE TRANSP BLOCK GRTS-

Page 16: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

2020-2023 FINAL STIP Project ListingNorthwest Region

BURNETT

282282 2020-2023 FINAL STIP Project Listing Northwest Region

BURNETT

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2020 8844-00-71 05/12/2020 205 LET BRRHB 0.027 CTH B SIREN - CTH X $250,000 - $499,999

N FK CLAM RIVER BRIDGE B-07-0005

CONSTRUCTION/BRRHB/DECK REPLACEMENT

LOCAL BRIDGES NON-FEDERAL

2020 8841-00-20 05/25/2020 206 R/E RCND10 3.650 CTH D GRANTSBURG - STH 35 $0 - $99,999

N WILLIAMS ROAD TO CTH M

REAL ESTATE ACQUISITION

STP RURAL STBG <5K POP FAST

2022 8841-00-70 03/08/2022 206 LET RCND10 3.650 CTH D GRANTSBURG - STH 35 $2,000,000 - $2,999,999

N WILLIAMS ROAD TO CTH M

CONSTRUCTION/RECONDITION

STP RURAL STBG <5K POP FAST

2021 8377-00-70 03/09/2021 205 LET BRRPL 0.016 LOC STR

T UNION, YELLOW LAKE ROAD $250,000 - $499,999

YELLOW LAKE BRIDGE B-07-0060

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

2021 8040-01-74 11/09/2021 303 LET BRRHB 0.050 STH 070 ST CROIX RIVER - GRANTSBURG $750,000 - $999,999

ST CROIX RIVER BRIDGE B-07-0020

CONST/BRRHB/WI LEAD/COST SHARE MN

SHR BRIDGES NON-FEDERAL

2021 8050-00-71 04/13/2021 303 LET MISC 1.503 STH 070 SIREN - SPOONER $100,000 - $249,999

FOSMO DRIVE TO WEST HERTEL DRIVE

CONSTR/SAFETY/WIDEN PAVED SHOULDERS

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

2021 8560-01-73 05/11/2021 303 LET BRRHB 0.030 STH 077 ST CROIX RIVER - DANBURY $500,000 - $749,999

ST CROIX RIVER BRIDGE B-07-0006

Page 17: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

283 2020-2023 FINAL STIP Project Listing Northwest Region

BURNETT

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

CONST/BRRHB/WI LEAD/COST SHARE MN

SHR BRIDGES NON-FEDERAL

Page 18: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

284 2020-2023 FINAL STIP Project Listing Northwest Region

CHIPPEWA

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2022 8953-04-72 03/08/2022 206 LET PVRP_O 3.250 CTH SS BLOOMER - NEW AUBURN $2,000,000 - $2,999,999

83RD STREET TO CTH Q

CONSTRUCTION/PAVEMENT REPLACEMENT

STP RURAL STBG <5K POP FAST

2022 8915-00-70 01/11/2022 205 LET BRRPL 0.139 CTH TT STH 178 - CTH K $5,000,000 - $5,999,999

CHIPPEWA RIVER BRIDGE B-09-0387

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

2020 8996-01-01 03/10/2020 206 LET RECST 0.750 LOC STR C OF CHIPPEWA FALLS, PARK AVENUE $2,000,000 - $2,999,999

MAIN ST TO 0.75 MILES WEST

CONST/RECST

STP URBAN 50,000 - 200,000 STBG 5-200K POP FASTG

8200-00-01 303 I/E RSRF20 15.560 STH 027 CADOTT - CORNELL $250,000 - $499,999

STH 29 TO JOHNSON ROAD

DESIGN/RESURFACE

STATE 3R STBG <5K POP FAST

2021 7070-06-61 11/09/2021 303 LET BRRHB 0.050 STH 027 CADOTT - CORNELL $500,000 - $749,999

BIG DRYWOOD CREEK BRIDGE B-09-0127

CONSTR/BRIDGE REHABILITATION/REDECK

SHR BRIDGES STBG <5K POP FAST

2022 7070-06-72 11/08/2022 303 LET COLD20 5.520 STH 027 AUGUSTA - CADOTT $3,000,000 - $3,999,999

EAU CLAIRE/CHIPPEWA CO LN TO STH 29

CONSTRUCTION/CIR/RESURFACE

STATE 3R STBG <5K POP FAST

1050-00-30 303 I/E RSRF20 8.010 STH 029 CHIPPEWA FALLS - ABBOTSFORD $750,000 - $999,999

320TH ST TO KOSER AVE EB & WB

DESIGN/RESURFACE

BACKBONE NATIONAL HIGHWAY PERF FAST

Page 19: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

285 2020-2023 FINAL STIP Project Listing Northwest Region

CHIPPEWA

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

1050-00-33 303 I/E PSRS10 13.232 STH 029 MENOMONIE - CHIPPEWA FALLS $500,000 - $749,999

CTH T TO STILLSON CREEK (E & W BD)

DESIGN/MAINLINE&RAMP/JOINT REPAIRS

BACKBONE NATIONAL HIGHWAY PERF FAST

2020 1050-01-08 06/25/2020 303 C/E BRRPL 0.048 STH 029 CHIPPEWA FALLS - CADOTT $250,000 - $499,999

CTH X/37TH AVENUE BRIDGE B-09-0030

DESIGN/BRIDGE REPLACEMENT

BACKBONE NON-FEDERAL

2020 1050-01-09 06/25/2020 303 C/E BRRPL 0.036 STH 029 CHIPPEWA FALLS - CADOTT $250,000 - $499,999

50TH AVENUE BRIDGE B-09-0033

DESIGN/BRIDGE REPLACEMENT

BACKBONE NON-FEDERAL

2022 1050-01-81 02/08/2022 303 LET BRRHB 0.000 STH 029 CHIPPEWA FALLS - ABBOTSFORD $500,000 - $749,999

STILLSON CREEK TO CARDINAL AVENUE

CONSTRUCTION/REHABILITATION/9 BRGS

BACKBONE NATIONAL HIGHWAY PERF FAST

2022 1050-01-82 02/08/2022 303 LET BRRHB 0.000 STH 029 CHIPPEWA FALLS - CADOTT $250,000 - $499,999

CTH X BRIDGE B-09-0019

CONSTRUCTION/BRIDGE REHABILITATION

BACKBONE NATIONAL HIGHWAY PERF FAST

8620-00-06 303 I/E RSRF20 15.680 STH 040 ELK MOUND - BLOOMER $250,000 - $499,999

CTH M TO USH 53

DESIGN/RESURFACE

STATE 3R STBG <5K POP FAST

2023 8620-00-73 02/14/2023 303 LET COLD20 3.075 STH 040 BLOOMER - BRUCE $1,000,000 - $1,999,999

13TH AVENUE TO EAST JUNCTION STH 64

CONSTRUCTION/CIR/RESURFACING

STATE 3R SURFACE TRANSP BLOCK GRTS-

Page 20: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

286 2020-2023 FINAL STIP Project Listing Northwest Region

CHIPPEWA

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2023 8190-00-72 02/14/2023 303 LET COLD20 6.670 STH 064 BLOOMER - CORNELL $3,000,000 - $3,999,999

NORTH JUNCTION STH 40 TO CTH E

CONSTRUCTION/CIR/RESURFACING

STATE 3R SURFACE TRANSP BLOCK GRTS-

2023 8610-02-74 11/14/2023 303 LET RSRF20 0.820 STH 124 C CHIPPEWA FALLS, BAY STREET $1,000,000 - $1,999,999

HIGH STREET TO BRIDGE STREET

CONSTRUCTION/RESURFACING/RSRF20

STATE 3R NATIONAL HIGHWAY PERF FAST

2023 8610-02-75 11/14/2023 303 LET MISC 0.820 STH 124 C CHIPPEWA FALLS, BAY STREET $100,000 - $249,999

HIGH STREET TO BRIDGE STREET

CONSTRUCTION/WATER MAIN

STATE 3R NON-FEDERAL

2023 8610-08-72 11/14/2023 303 LET RSRF20 10.610 STH 124 CHIPPEWA FALLS - BLOOMER $5,000,000 - $5,999,999

CTH S TO STH 64

CONSTRUCTION/RESURFACING

STATE 3R SURFACE TRANSP BLOCK GRTS-

2023 8610-08-73 11/14/2023 303 LET RSRF20 1.870 STH 124 CHIPPEWA FALLS - BLOOMER $1,000,000 - $1,999,999

ELM STREET TO CTH S

CONSTRUCTION/RESURFACING/RSRF20

STATE 3R NATIONAL HIGHWAY PERF FAST

8600-08-04 303 I/E BRRPL 0.000 STH 178 CHIPPEWA FALLS - CORNELL $100,000 - $249,999

ONEIL CREEK BRIDGE B-09-0010

DESIGN/BRIDGE REPLACEMENT

SHR BRIDGES NON-FEDERAL

2021 8600-01-74 03/09/2021 303 LET RECST 0.004 STH 178 C CHIPPEWA FLS,SEYMOUR CRAY SR BLVD $250,000 - $499,999

CTH I INTERSECTION

CONSTR/DUAL LEFT TURN LN & SIGNALS

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

Page 21: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

287 2020-2023 FINAL STIP Project Listing Northwest Region

CHIPPEWA

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

7600-00-02 303 I/E RSRF20 15.680 USH 012 MENOMONIE - EAU CLAIRE $0 - $99,999

STH 29 TO PRINCETON DRIVE

DESIGN/RESURFACE

STATE 3R STBG <5K POP FAST

1192-00-01 303 I/E RSRF20 0.000 USH 053 CHIPPEWA FALLS - NEW AUBURN $100,000 - $249,999

STH 64 TO NORTH COUNTY LINE (SB)

DESIGN/RESURFACE

BACKBONE NON-FEDERAL

1192-07-00 303 I/E BRRPL 0.035 USH 053 CHIPPEWA FALLS - NEW AUBURN $0 - $99,999

CTH Q BRIDGE B-09-0066

DESIGN/BRIDGE REHABILITATION

BACKBONE NON-FEDERAL

1192-07-01 303 I/E BRRHB 0.020 USH 053 CHIPPEWA FALLS - NEW AUBURN $0 - $99,999

190TH AVENUE BRIDGE B-09-0067

DESIGN/BRIDGE MAINTENANCE

BACKBONE NON-FEDERAL

2020 1190-00-89 05/12/2020 303 LET BRPVTV 0.014 USH 053 NW REGION, VAR CTYS US HIGHWAY 53 $100,000 - $249,999

WI CENTRAL RR B-09-0052 & B-09-0053

CONSTRUCTION/THIN POLYMER OVERLAY

BACKBONE NATIONAL HIGHWAY PERF FAST

2020 1190-11-82 05/12/2020 303 LET BRPVTV 1.990 USH 053 NW REGION CHIPPEWA COUNTY - USH 53 $0 - $99,999

BRIDGE DECK SEALING (VARIOUS BRDGS)

CONST/BRMNTNC/LOC ON STN ANNUAL PLN

BACKBONE NATIONAL HIGHWAY PERF FAST

2020 1192-00-72 05/12/2020 303 LET RSRF30 6.085 USH 053 CHIPPEWA FALLS - NEW AUBURN $4,000,000 - $4,999,999

STH 64 TO NORTH COUNTY LINE (NB)

CONSTRUCTION/RESURFACING

BACKBONE NATIONAL HIGHWAY PERF FAST

Page 22: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

288 2020-2023 FINAL STIP Project Listing Northwest Region

CHIPPEWA

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2020 1192-00-73 05/12/2020 303 LET RSRF30 0.000 USH 053 CHIPPEWA FALLS - NEW AUBURN $4,000,000 - $4,999,999

STH 64 TO NORTH COUNTY LINE (SB)

CONSTRUCTION/RESURFACING

BACKBONE NATIONAL HIGHWAY PERF FAST

2021 1190-08-79 12/14/2021 303 LET PVRPLA 7.140 USH 053 CHIPPEWA FALLS - NEW AUBURN $20,000,000 - $24,999,999

40TH AVENUE - CTH B (NB & SB)

CONSTRUCTION/PAVEMENT REPLACEMENT

BACKBONE NATIONAL HIGHWAY PERF FAST

Page 23: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

289 2020-2023 FINAL STIP Project Listing Northwest Region

CLARK

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2022 7864-03-72 01/11/2022 206 LET PVRPLA 5.360 CTH K GRANTON - LOYAL $2,000,000 - $2,999,999

CTH H TO CHICKADEE ROAD

CONSTRUCTION/PAVEMENT REPLACEMENT

STP RURAL STBG <5K POP FAST

2021 7834-03-73 12/14/2021 205 LET BRRPL 0.022 CTH N CTH M - STH 73 $750,000 - $999,999

S FK EAU CLAIRE RIVER BR B-10-0387

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

2021 7834-03-72 12/14/2021 205 LET BRRPL 0.008 CTH NN WCL - CTH M $250,000 - $499,999

WOLF RIVER BRIDGE B-10-0391

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

2020 7842-00-70 02/11/2020 205 LET BRRPL 0.019 LOC STR T UNITY, RIPLINGER ROAD $250,000 - $499,999

S FORK POPPLE RIVER BRIDGE B100238

CONST/BRRPL

LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG

2021 7834-00-70 11/09/2021 205 LET BRRPL 0.006 LOC STR T RESEBURG, BROEK ROAD $100,000 - $249,999

BR S FK EAU CLAIRE RIVER BR B100390

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

2021 7852-00-70 03/09/2021 205 LET BRRPL 0.010 LOC STR T MENTOR, FAIRVIEW AVENUE $250,000 - $499,999

E FK HALLS CREEK BRIDGE B-10-0389

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

2021 7856-00-70 04/13/2021 205 LET BRRPL 0.004 LOC STR T LYNN, HILL ROAD $100,000 - $249,999

BR CUNNINGHAM CREEK BRIDGE B10-0388

CONSTRUCTION/BRPPL

LOCAL BRIDGES NON-FEDERAL

Page 24: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

290 2020-2023 FINAL STIP Project Listing Northwest Region

CLARK

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2020 8880-00-20 01/25/2020 290 R/E MISC 0.830 NON HWY

C ABBOTSFORD, SRTS IMPROVEMENTS $0 - $99,999

REAL ESTATE ACQUISITION

REAL ESTATE/SRTS TAP PROGRAM

SAFE ROUTES TO SCHOOL TRANS ALTERN 5K AND UNDER

2020 8880-00-50 01/25/2020 290 R/R MISC 0.830 NON HWY

C ABBOTSFORD, SRTS IMPROVEMENTS $0 - $99,999

WIDENING RAIL CROSSING 699447W

WCL RAIL CROSSING/SRTS TAP PROGRAM

SAFE ROUTES TO SCHOOL TRANS ALTERN 5K AND UNDER

2020 8880-00-71 04/25/2020 290 LLC MISC 0.830 NON HWY

C ABBOTSFORD, SRTS IMPROVEMENTS $500,000 - $749,999

SIDEWALKS ON VARIOUS STREETS

CONSTRUCTION/SRTS TAP PROGRAM

SAFE ROUTES TO SCHOOL TRANS ALTERN 5K AND UNDER

1610-02-03 303 I/E BRRPL 0.000 STH 013 ABBOTSFORD - MEDFORD $0 - $99,999

PORKY CREEK B-10-0240 & B-10-0241

DESIGN/BRIDGE REPLACEMENT

STATE 3R NATIONAL HIGHWAY PERF FAST

1050-01-04 303 I/E RSRF20 12.120 STH 029 THORP - ABBOTTSFORD $750,000 - $999,999

CTH D TO STH 13

DESIGN/RESURFACE

BACKBONE NATIONAL HIGHWAY PERF FAST

1051-01-07 303 I/E BRNEW 2.980 STH 029 CHIPPEWA FALLS - THORP $500,000 - $749,999

COPENHAVER AVENUE INTERSECTION

DESGN/BRNEW/NEW AT GRADE SEPARATION

Page 25: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

291 2020-2023 FINAL STIP Project Listing Northwest Region

CLARK

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

BACKBONE NATIONAL HIGHWAY PERF FAST

2021 7050-06-72 11/09/2021 303 LET BRRHB 0.040 STH 073 NEILLSVILLE - THORP $250,000 - $499,999

GILES CREEK B-10-0040

CONSTR/BRIDGE REHABILITATION/REDECK

SHR BRIDGES STBG <5K POP FAST

2020 7040-00-41 05/25/2020 303 UTL MISC 0.069 STH 098 GREENWOOD - SPENCER $0 - $99,999

BRANCH ROCK CREEK CULVERT C-10-0130

UTL/LEVEL-OF-EFFORT/7040-00-70

SHR BRIDGES NON-FEDERAL

2020 7040-00-70 05/12/2020 303 LET MISC 0.100 STH 098 GREENWOOD - SPENCER $500,000 - $749,999

BRANCH ROCK CREEK CULVERT C-10-0017

CONST/MISC/CULVERT REPLACEMENT

SHR BRIDGES STBG <5K POP FAST

2023 7040-00-71 12/12/2023 303 LET RSRF20 9.650 STH 098 GREENWOOD - SPENCER $4,000,000 - $4,999,999

ELM DRIVE TO EAST COUNTY LINE

CONSTRUCTION/RESURFACE

STATE 3R SURFACE TRANSP BLOCK GRTS-

7030-00-02 303 I/E RSRF20 16.320 USH 010 NEILLSVILLE - MARSHFIELD $250,000 - $499,999

STH 73 TO EAST COUNTY LINE

DESIGN/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

2022 1520-02-72 12/13/2022 303 LET COLD20 8.805 USH 010 OSSEO - NEILLSVILLE $4,000,000 - $4,999,999

USH 12 EAST JCT TO BACHELORS AVENUE

CONSTRUCTION/CIR/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 26: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

292 2020-2023 FINAL STIP Project Listing Northwest Region

CLARK

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

7540-00-03 303 I/E MISC 0.130 USH 012 FAIRCHILD - NEILLSVILLE $0 - $99,999

CULVERTS C-10-1339 AND C-10-1655

DESIGN/MISC/CULVERT REPLACEMENT

SHR BRIDGES NON-FEDERAL

Page 27: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

293 2020-2023 FINAL STIP Project Listing Northwest Region

DOUGLAS

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

1199-00-04 303 I/E BRRHB 0.000 IH 535 SUPERIOR - DULUTH $0 - $99,999

STLOUIS RV BR/B16-0005-0001 TO 0005

DESGN/BRSHRM/PNT/MISC/100% WI COST

BACKBONE NON-FEDERAL

2020 1199-00-07 01/25/2020 303 OST BRRPL 0.000 IH 535 SUPERIOR - DULUTH $4,000,000 - $4,999,999

STLOUIS RV BR B16-0005-0001 TO 0005

DESIGN/REIMBURSEMENT TO MINNESOTA

BACKBONE NON-FEDERAL

2020 1199-00-74 07/25/2020 303 OST BRPVTV 0.000 IH 535 SUPERIOR - DULUTH $5,000,000 - $5,999,999

STLOUIS RV BR B16-0005-0001 TO 0005

CONST/REIMBURSEMENT TO MINNESOTA

BACKBONE NON-FEDERAL

2021 8396-00-73 11/09/2021 205 LET BRRPL 0.021 LOC STR

T WASCOTT, LAWLER BRIDGE ROAD $250,000 - $499,999

EAU CLAIRE RIVER BRIDGE B-10-0146

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

2022 8381-00-70 02/08/2022 205 LET BRRPL 0.008 LOC STR

T AMNICON, OLD ROAD 11 $250,000 - $499,999

MIDDLE RIVER BRIDGE B-16-0145

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

2022 8998-00-34 01/11/2022 206 LET BRRPL 0.138 LOC STR

C SUPERIOR, MARINA DRIVE $250,000 - $499,999

BARKERS ISLAND BRIDGE

CONSTRUCTION/BRRPL

STP URBAN 50,000 - 200,000 STBG 5-200K POP FASTG

8510-01-05 303 I/E BRRHB 0.000 STH 013 PORT WING - SUPERIOR $250,000 - $499,999

BRIDGES (B-16-014, 015, 016 & 023)

Page 28: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

294 2020-2023 FINAL STIP Project Listing Northwest Region

DOUGLAS

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

DESIGN/BRIDGE REHABILITATION

SHR BRIDGES SURFACE TRANSP BLOCK GRTS-

2021 8510-01-70 11/09/2021 303 LET COLD10 15.790 STH 013 PORT WING - SUPERIOR $6,000,000 - $6,999,999

CTH H TO ENGDAHL ROAD

CONSTRUCTION/RESURFACE/CIR

STATE 3R SURFACE TRANSP BLOCK GRTS-

8010-00-03 303 I/E RSRF20 4.050 STH 035 C SUPERIOR, TOWER AVENUE $100,000 - $249,999

64TH STREET TO BELKNAP STREET

DESIGN/RESURFACE/CONCRETE REPAIR

STATE 3R NATIONAL HIGHWAY PERF FAST

2020 3700-50-54 08/11/2020 305 LET TOSIG 0.130 STH 035 C SUPERIOR, TOWER AVENUE $500,000 - $749,999

STH 105 INTERSECTION

CONSTRUCTION/TRAFFIC SIGNALS

INTELLIGENT TRANSPORTATION SYSTEMS (ITS)

NON-FEDERAL

2020 3700-50-55 07/25/2020 305 MIS TOSIG 0.130 STH 035 C SUPERIOR, TOWER AVENUE $0 - $99,999

STH 105 INTERSECTION

CONSTRUCTION/MISC/PURCHASE ORDERS

INTELLIGENT TRANSPORTATION SYSTEMS (ITS)

NON-FEDERAL

2020 8010-00-70 05/12/2020 303 LET RSRF20 0.460 STH 035 V SUPERIOR, TOWER AVENUE $750,000 - $999,999

69TH STREET TO 64TH STREET

CONSTRUCTION/RESURFACE

STATE 3R SURFACE TRANSP BLOCK GRTS-

8760-00-01 303 I/E RSRF20 4.682 STH 105 OLIVER - SUPERIOR $100,000 - $249,999

MN/WI STATE LINE TO STH 35

Page 29: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

295 2020-2023 FINAL STIP Project Listing Northwest Region

DOUGLAS

Year Project Contract

Schd Dt Pgm Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

DESIGN/RESURFACE

STATE 3R SURFACE TRANSP BLOCK GRTS-

1180-00-31 303 I/E PSRS20 6.520 USH 002 SUPERIOR - WENTWORTH $100,000 - $249,999

53RD AVE E TO CTH C

DESIGN/JOINT REPAIR

BACKBONE NON-FEDERAL

2020 1195-03-00 01/25/2020 303 C/E BRRHB 0.000 USH 002 SUPERIOR - WENTWORTH $100,000 - $249,999

STH 13 BRIDGE B-16-0024

DESIGN/BRIDGE REHABILITATION

BACKBONE NATIONAL HIGHWAY PERF FAST

2020 1198-03-78 12/08/2020 303 LET RSRF20 2.300 USH 002 C SUPERIOR, EAST SECOND STREET $6,000,000 - $6,999,999

29TH AVENUE EAST - 53RD AVENUE EAST

CONST/RESURF 1ST OVRLY/BRRHB 2 BRGS

BACKBONE NATIONAL HIGHWAY PERF FAST

2022 1180-05-75 03/08/2022 303 LET RSRF20 4.513 USH 002 WENTWORTH - INO $2,000,000 - $2,999,999

CLEVEDON RD TO SZNAIDER RD

CONSTRUCTION/RESURFACING

STATE 3R NATIONAL HIGHWAY PERF FAST

1197-08-00 303 I/E MISC 15.670 USH 053 MINONG - SUPERIOR $250,000 - $499,999

BERGEN SPRINGS RD-STONE CHIMNEY RD

OPERATIONAL ANALYSIS

STATE 3R MINIMUM GUARANTEE

1198-02-01 303 I/E RSRF20 10.040 USH 053 SOLON SPRINGS - SUPERIOR $250,000 - $499,999

WI CENTRAL RR TO KENT RD (NB & SB)

DESIGN/RESURFACE

BACKBONE NON-FEDERAL

2020 1196-00-93 01/25/2020 303 SFA MISC 5.310 USH 053 MINONG - SOLON SPRINGS $0 - $99,999

CTH T TO ST CROIX RVR (NORTH BOUND)

Page 30: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

296 2020-2023 FINAL STIP Project Listing Northwest Region

DOUGLAS

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

TRAFFIC MITIGATION/CONST 1196-00-63

BACKBONE NON-FEDERAL

2020 1198-00-72 11/10/2020 303 LET RSRF30 5.970 USH 053 SOLON SPRINGS - SUPERIOR $8,000,000 - $8,999,999

KENT ROAD TO CTH C (NB & SB)

CONSTRUCTION/RESURF/2ND OVERLAY

BACKBONE NATIONAL HIGHWAY PERF FAST

2020 1198-03-03 06/25/2020 303 C/E RSRF20 1.760 USH 053 C SUPERIOR, EAST SECOND STREET $100,000 - $249,999

BELKNAP ST TO BLATNIK BRIDGE

DESIGN/RESURFACING

BACKBONE NATIONAL HIGHWAY PERF FAST

2021 1198-00-92 03/25/2021 303 SFA MISC 6.043 USH 053 SOLON SPRINGS - SUPERIOR $0 - $99,999

KENT ROAD TO CTH C (NB & SB)

TRF MITIGATION/CONSTR ID 1198-00-72

BACKBONE NON-FEDERAL

Page 31: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

297 2020-2023 FINAL STIP Project Listing Northwest Region

DUNN

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2022 7996-00-43 01/11/2022 206 LET RECST 1.000 CTH B C MENOMONIE, CTH B $4,000,000 - $4,999,999

USH 12 TO 610TH AVENUE

CONSTRUCTION/RECONSTRUCTION

STP URBAN 5,000 - 20,000 STBG 5-200K POP FASTG

8923-09-00 206 I/E MISC 1.970 CTH BB USH 12 - CEDAR FALLS $0 - $99,999

USH 12 TO STH 25

DESIGN/HRRR/SAFETY TREATMENTS

SAFETY - HIGH RISK RURAL ROADS HIGHWAY SAFETY IMP PROG-FA

2021 8923-09-70 12/14/2021 206 LET MISC 1.970 CTH BB USH 12 - CEDAR FALLS $250,000 - $499,999

USH 12 TO STH 25

CONSTR/HRRR/SAFETY TREATMENTS

SAFETY - HIGH RISK RURAL ROADS HIGHWAY SAFETY IMP PROG-FA

2022 7880-07-73 03/08/2022 206 LET PVRP_O 2.550 CTH H CARYVILLE - CTH M $2,000,000 - $2,999,999

CTH HH TO CTH M

CONSTRUCTION/PAVEMENT REPLACEMENT

STP RURAL STBG <5K POP FAST

2022 8837-08-70 01/11/2022 205 LET BRRPL 0.008 CTH K CONNORSVILLE - NCL $250,000 - $499,999

FLAYTON CREEK BRIDGE B-17-0230

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

2021 8925-03-71 11/09/2021 205 LET BRRPL 0.004 CTH Q KNAPP - DOWNING $250,000 - $499,999

WILSON CREEK BRIDGE B-17-0232

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

2020 8929-06-70 12/08/2020 205 LET BRRPL 0.030 CTH W 890TH STREET - CTH S $750,000 - $999,999

POPPLE CREEK BRIDGE B-17-0210

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

Page 32: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

298 2020-2023 FINAL STIP Project Listing Northwest Region

DUNN

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

1020-05-33 303 I/E PSRS20 2.900 IH 094 MENOMONIE - EAU CLAIRE $250,000 - $499,999

WILSON CREEK - RED CEDAR RIVER

DESIGN/ROADWAY MNTNC, BASE PATCHING

BACKBONE NON-FEDERAL

1021-01-08 303 I/E BRRHB 0.000 IH 094 BALDWIN - MENOMONIE $100,000 - $249,999

EAST BR WILSON CR BRIDGE B-17-0051

DESIGN/BRIDGE REHABILITATION

BACKBONE NON-FEDERAL

1021-03-06 303 I/E BRRPL 0.070 IH 094 MENOMONIE - EAU CLAIRE $100,000 - $249,999

DIVISION STREET BRIDGE B-17-0061

DESIGN/BRIDGE REPLACEMENT

BACKBONE NON-FEDERAL

1022-04-05 303 I/E RECST 0.971 IH 094 MENOMONIE - EAU CLAIRE $4,000,000 - $4,999,999

USH 12/STH 29 INTERCHANGE

DESIGN/RECONSTRUCTION

BACKBONE NATIONAL HIGHWAY PERF FAST

2020 1020-00-75 05/12/2020 303 LET BRPVTV 0.298 IH 094 NW REGION, VAR CTYS INTERSTATE 94 $750,000 - $999,999

THIN POLYMER (VAR)

CONSTRUCTION/THIN POLYMER OVERLAY

BACKBONE NATIONAL HIGHWAY PERF FAST

2021 8931-00-70 04/13/2021 205 LET BRRPL 0.006 LOC STR T WILSON, 705TH STREET $250,000 - $499,999

PINE CREEK BRIDGE B-17-0231

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

7220-00-05 303 I/E MISC 0.100 STH 025 DURAND - MENOMONIE $0 - $99,999

CULVERT C-17-1601

DESIGN/MISC/CULVERT REPLACEMENT

SHR BRIDGES NON-FEDERAL

Page 33: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

299 2020-2023 FINAL STIP Project Listing Northwest Region

DUNN

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2020 7220-00-40 05/25/2020 303 UTL RSRF20 6.660 STH 025 DURAND - MENOMONIE $0 - $99,999

SOUTH COUNTY LINE TO RED CEDAR RVR

UTL/LEVEL-OF-EFFORT/7220-00-60

STATE 3R NON-FEDERAL

2020 7220-00-60 05/12/2020 303 LET RSRF20 6.560 STH 025 DURAND - MENOMONIE $2,000,000 - $2,999,999

SOUTH COUNTY LINE TO RED CEDAR RVR

CONSTRUCTION/RESURFACING

STATE 3R NATIONAL HIGHWAY PERF FAST

2020 7220-00-61 05/12/2020 303 LET MISC 6.660 STH 025 DURAND - MENOMONIE $250,000 - $499,999

SOUTH COUNTY LINE TO RED CEDAR RVR

CONS/SFTY/WIDN PAVD SHLDR/RUMBLSTRP

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

2021 8090-00-23 06/25/2021 303 R/E BRRPL 0.040 STH 025 MENOMONIE - RIDGELAND $0 - $99,999

BEAVER CREEK BRIDGE B-17-0115

REAL ESTATE ACQUISITION

SHR BRIDGES NON-FEDERAL

2022 7220-00-78 03/08/2022 303 LET COLD20 6.270 STH 025 DURAND - MENOMONIE $3,000,000 - $3,999,999

RED CEDAR RIVER TO 490TH STREET

CONSTRUCTION/RESURFACE

STATE 3R SURFACE TRANSP BLOCK GRTS-

2022 8090-00-73 05/10/2022 303 LET BRRPL 0.040 STH 025 MENOMONIE - RIDGELAND $500,000 - $749,999

BEAVER CREEK BRIDGE B-17-0233

CONSTRUCTION/BRIDGE REPLACEMENT

SHR BRIDGES NATIONAL HIGHWAY PERF FAST

7610-00-07 303 I/E BRRHB 0.056 STH 029 SPRING VALLEY - MENOMONIE $0 - $99,999

RED CEDAR RIVER BRIDGE B-17-0005

DESIGN/BRIDGE REHABILITATION

SHR BRIDGES SURFACE TRANSP BLOCK GRTS-

Page 34: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

300 2020-2023 FINAL STIP Project Listing Northwest Region

DUNN

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

8620-00-04 303 I/E MISC 0.050 STH 040 ELK MOUND - BLOOMER $0 - $99,999

BRANCH SINKING CREEK C-17-1124

DESIGN/CULVERT REPLACEMENT

STATE 3R NON-FEDERAL

8620-00-05 303 I/E RSRF20 8.900 STH 040 ELK MOUND - BLOOMER $100,000 - $249,999

USH 12 TO CTH M

DESIGN/RESURFACE

STATE 3R STBG <5K POP FAST

2021 8110-00-78 11/09/2021 303 LET MISC 0.048 STH 064 CONNORSVILLE - BLOOMER $250,000 - $499,999

CULVERT C-17-0047

CONST/MISC/CULVERT REPLACEMENT

SHR BRIDGES STBG <5K POP FAST

7105-00-04 303 I/E RSRF20 10.270 STH 072 ELLSWORTH - DOWNSVILLE $250,000 - $499,999

PIERCE/DUNN COUNTY LINE TO STH 25

DESIGN/RESURFACE

STATE 3R STBG <5K POP FAST

2020 8630-03-50 01/25/2020 303 R/R MISC 0.020 STH 079 GLENWOOD CITY - COLFAX $0 - $99,999

CANANDIAN NATIONAL RAILROAD 693002B

RR OPS/RAILROAD CROSSING REPAIR

STATE 3R NATIONAL HIGHWAY PERF FAST

2020 8640-00-21 09/25/2020 303 R/E BRRPL 0.060 STH 079 MENOMONIE - BOYCEVILLE $0 - $99,999

COON CREEK BRIDGE B-17-0412

REAL ESTATE ACQ/BRIDGE REPLACEMENT

SHR BRIDGES NON-FEDERAL

2020 8640-00-23 01/25/2020 303 R/E BRRPL 0.008 STH 079 MENOMONIE - CONNORSVILLE $0 - $99,999

CLACK CREEK BRIDGE B-17-0143

REAL ESTATE ACQ/BRIDGE REPLACEMENT

SHR BRIDGES NON-FEDERAL

Page 35: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

301 2020-2023 FINAL STIP Project Listing Northwest Region

DUNN

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2021 7120-01-74 12/14/2021 303 LET BRRPL 0.057 STH 085 DURAND - EAU CLAIRE $1,000,000 - $1,999,999

ROCK CREEK BRIDGE B-17-0226

CONSTRUCTION/BRIDGE REPLACEMENT

SHR BRIDGES STBG <5K POP FAST

8630-00-00 303 I/E BRRHB 0.000 STH 170 GLENWOOD CITY - COLFAX $0 - $99,999

RED CEDAR RIVER BRIDGE B-17-0002

DESIGN/BRIDGE REHABILITATION/REDECK

SHR BRIDGES STBG <5K POP FAST

2020 8630-03-22 01/25/2020 303 R/E RSRF20 0.000 STH 170 GLENWOOD CITY - COLFAX $0 - $99,999

STH 128 TO STH 79

REAL ESTATE/RESURF/BRRHB B-17-0132

STATE 3R NON-FEDERAL

2020 8630-03-82 12/08/2020 303 LET RSRF20 7.477 STH 170 GLENWOOD CITY - COLFAX $4,000,000 - $4,999,999

STH 128 TO STH 79

CONSTR/RESURFACE/BRRHB B-17-0132

STATE 3R SURFACE TRANSP BLOCK GRTS-

2020 8630-05-23 01/25/2020 303 R/E COLD10 6.440 STH 170 GLENWOOD CITY - COLFAX $0 - $99,999

STH 79 TO STH 25

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

2020 8630-05-82 12/08/2020 303 LET COLD10 4.130 STH 170 GLENWOOD CITY - COLFAX $1,000,000 - $1,999,999

STH 25 TO CTH D

CONSTRUCTION/RESURFACE

STATE 3R STBG <5K POP FAST

2020 8630-05-83 12/08/2020 303 LET COLD10 6.440 STH 170 GLENWOOD CITY - COLFAX $2,000,000 - $2,999,999

STH 79 TO STH 25

CONSTRUCTION/RESURFACE

STATE 3R STBG <5K POP FAST

Page 36: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

302 2020-2023 FINAL STIP Project Listing Northwest Region

DUNN

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2020 7090-02-71 07/14/2020 303 LET RSRF20 6.136 USH 012 MENOMONIE - EAU CLAIRE $3,000,000 - $3,999,999

CTH B TO IH 94

CONSTRUCTION/RESURFACE

STATE 3R STBG <5K POP FAST

2020 7600-01-25 06/25/2020 303 R/E MISC 1.070 USH 012 C MENOMONIE, STOUT ROAD $0 - $99,999

6TH STREET TO 21ST STREET

REAL ESTATE/TWO WAY LEFT TURN LANE

STATE 3R NON-FEDERAL

2020 8949-00-20 09/25/2020 303 R/E MISC 0.016 USH 012 BALDWIN - MENOMONIE $0 - $99,999

WILSON CREEK TRIB CULVERT C-17-5038

REAL ESTATE/MISC/CULVERT REPLACEMNT

SHR BRIDGES NON-FEDERAL

2020 8949-05-72 11/10/2020 303 LET BRRPL 0.020 USH 012 BALDWIN - MENOMONIE $1,000,000 - $1,999,999

WILSON CREEK BRIDGE B-17-0206

CONSTRUCTION/BRIDGE REPLACEMENT

SHR BRIDGES STBG <5K POP FAST

2021 7600-01-75 12/14/2021 303 LET MISC 1.070 USH 012 C MENOMONIE, STOUT ROAD $1,000,000 - $1,999,999

6TH STREET TO 21ST STREET

CONST/SAFETY/TWO WAY LEFT TURN LANE

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

2021 8949-00-70 11/09/2021 303 LET MISC 0.028 USH 012 BALDWIN - MENOMONIE $1,000,000 - $1,999,999

WILSON CREEK TRIB CULVERT C-17-0048

CONST/MISC/CULVERT REPLACEMENT

SHR BRIDGES SURFACE TRANSP BLOCK GRTS-

Page 37: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

303 2020-2023 FINAL STIP Project Listing Northwest Region

EAU CLAIRE

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2021 7823-07-72 03/09/2021 206 LET PVRPLA 2.760 CTH D FALL CREEK - NCL $1,000,000 - $1,999,999

BOARDWALK STREET TO CTH N

CONSTRUCTION/PAVEMENT REPLACEMENT

STP RURAL STBG <5K POP FAST

2022 7823-07-73 03/08/2022 206 LET RCND10 3.760 CTH D FALL CREEK - NCL $1,000,000 - $1,999,999

CTH XX TO STH 27

CONSTRUCTION/RECONDITION

STP RURAL STBG <5K POP FAST

2021 7823-03-70 03/09/2021 205 LET BRRPL 0.004 CTH K AUGUSTA - CTH GG $1,000,000 - $1,999,999

FALL CREEK BRIDGE B-18-0237

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

2021 7995-02-57 01/12/2021 206 LET PVRPLA 1.280 CTH T C EAU CLAIRE, N CLAIREMONT AVE $750,000 - $999,999

STH 312 TO COUNTY LINE ROAD

CONSTRUCTION/PVRPL

STP URBAN 50,000 - 200,000 STBG 5-200K POP FASTG

2021 7831-07-70 01/12/2021 205 LET BRRPL 0.004 CTH V CTH AF - STH 27 $750,000 - $999,999

BRIDGE CREEK BRIDGE B-18-0238

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

1021-03-07 303 I/E BRRPL 0.068 IH 094 EAU CLAIRE - OSSEO $250,000 - $499,999

LOWES CREEK ROAD BRIDGE B-18-0031

DESIGN/BRIDGE REHABILITATION

BACKBONE NON-FEDERAL

1021-03-15 303 I/E BRRHB 0.000 IH 094 EAU CLAIRE - OSSEO $100,000 - $249,999

E MALLARD ROAD BRIDGE B-18-0217

DESIGN/BRIDGE REHABILITATION

BACKBONE NON-FEDERAL

Page 38: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

304 2020-2023 FINAL STIP Project Listing Northwest Region

EAU CLAIRE

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

1022-09-06 303 I/E BRRPL 0.000 IH 094 EAU CLAIRE - OSSEO $100,000 - $249,999

OTTER CREEK BRIDGE B-18-0055

DESIGN/BRIDGE REPLACEMENT

BACKBONE NON-FEDERAL

1022-09-07 303 I/E BRRPL 0.020 IH 094 EAU CLAIRE - OSSEO $100,000 - $249,999

OTTER CREEK BRIDGE B-18-0056

DESIGN/BRIDGE REPLACEMENT

BACKBONE NON-FEDERAL

2020 1020-01-89 05/12/2020 303 LET BRPVTV 0.053 IH 094 NW REGION, VAR CTYS INTERSTATE 94 $100,000 - $249,999

THIN POLYMER (VAR)

CONSTRUCTION/THIN POLYMER OVERLAY

BACKBONE NATIONAL HIGHWAY PERF FAST

2021 1022-09-98 07/25/2021 303 SFA MISC 0.000 IH 094 USH 53 TO MALLARD ROAD (EB & WB) $100,000 - $249,999

EAU CLAIRE - OSSEO

TRF MITIGATION/CONSTR ID 1022-09-78

BACKBONE NON-FEDERAL

2022 1022-08-74 12/13/2022 303 LET PVRPLA 5.840 IH 094 MENOMONIE - EAU CLAIRE $15,000,000 - $16,999,999

STH 312/CTH EE TO STH 37

CONSTRUCTION/PAVEMENT REPLACEMENT

BACKBONE NATIONAL HIGHWAY PERF FAST

2022 1022-08-94 07/25/2022 303 SFA MISC 5.840 IH 094 STH 312/CTH EE TO STH 37 $100,000 - $249,999

MENOMONIE - EAU CLAIRE

TRF MITIGATION/CONSTR ID 1022-08-74

BACKBONE NON-FEDERAL

2023 1021-03-71 11/14/2023 303 LET BRRPL 0.050 IH 094 EAU CLAIRE - OSSEO $3,000,000 - $3,999,999

CTH J BRIDGE B-18-0212 (WEST BOUND)

CONSTRUCTION/BRIDGE REPLACEMENT

BACKBONE NATIONAL HIGHWAY PERF FAST

Page 39: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

305 2020-2023 FINAL STIP Project Listing Northwest Region

EAU CLAIRE

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2023 1021-03-72 11/14/2023 303 LET BRRPL 0.052 IH 094 EAU CLAIRE - OSSEO $5,000,000 - $5,999,999

CTH D BRIDGE B-18-0213 (EAST BOUND)

CONSTRUCTION/BRIDGE REPLACEMENT

BACKBONE NATIONAL HIGHWAY PERF FAST

2023 1021-03-73 11/14/2023 303 LET BRRPL 0.050 IH 094 EAU CLAIRE - OSSEO $4,000,000 - $4,999,999

CTH J BRIDGE B-18-0211 (EAST BOUND)

CONSTRUCTION/BRIDGE REPLACEMENT

BACKBONE NATIONAL HIGHWAY PERF FAST

2023 1021-03-91 11/25/2023 303 SFA MISC 0.000 IH 094 EAU CLAIRE - OSSEO $100,000 - $249,999

CTH J BRIDGE B-18-0212 (WEST BOUND)

TRF MITIGATION CONST ID 1021-03-71

BACKBONE NON-FEDERAL

2023 1022-09-74 11/14/2023 303 LET BRRPL 0.050 IH 094 EAU CLAIRE - OSSEO $4,000,000 - $4,999,999

CTH D BRIDGE B-18-0214 (WEST BOUND)

CONSTRUCTION/BRIDGE REPLACEMENT

BACKBONE NATIONAL HIGHWAY PERF FAST

2023 1022-09-78 11/14/2023 303 LET PVRPLA 8.490 IH 094 EAU CLAIRE - OSSEO $35,000,000 - $39,999,999

USH 53 TO MALLARD ROAD (EB & WB)

CONSTRUCTION/PAVEMENT REPLACEMENT

BACKBONE NATIONAL HIGHWAY PERF FAST

7995-02-58 206 I/E RECST 0.500 LOC STR C EAU CLAIRE, FAIRFAX STREET $0 - $99,999

S HASTINGS WAY TO SPOONER AVENUE

DESIGN/RECST

STP URBAN 50,000 - 200,000 NON-FEDERAL

7995-02-60 206 I/E RECST 1.020 LOC STR C EAU CLAIRE, JEFFERS ROAD $0 - $99,999

STH 312 TO COUNTY LINE ROAD

DESIGN/RECST

STP URBAN 50,000 - 200,000 NON-FEDERAL

Page 40: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

306 2020-2023 FINAL STIP Project Listing Northwest Region

EAU CLAIRE

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2021 7995-02-59 04/13/2021 206 LET RECST 0.500 LOC STR C EAU CLAIRE, FAIRFAX STREET $1,000,000 - $1,999,999

S HASTINGS WAY TO SPOONER AVENUE

CONSTRUCTION/RECST

STP URBAN 50,000 - 200,000 STBG 5-200K POP FASTG

2022 7995-02-61 04/12/2022 206 LET RECST 1.020 LOC STR C EAU CLAIRE, JEFFERS ROAD $1,000,000 - $1,999,999

STH 312 TO COUNTY LINE ROAD

CONSTRUCTION/RECST

STP URBAN 50,000 - 200,000 STBG 5-200K POP FASTG

2022 7070-00-20 06/25/2022 303 R/E MISC 0.065 STH 027 AUGUSTA - CADOTT $0 - $99,999

DARROW CREEK CULVERT C-18-1864

REAL ESTATE/CULVERT REPLACEMENT

SHR BRIDGES NON-FEDERAL

2022 7110-00-70 11/08/2022 303 LET RSRF20 15.310 STH 037 MONDOVI - EAU CLAIRE $8,000,000 - $8,999,999

USH 10 TO STH 85

CONSTRUCTION/RESURFACING

STATE 3R SURFACE TRANSP BLOCK GRTS-

2023 7590-00-73 11/14/2023 303 LET RSRF20 8.370 STH 093 ELEVA - EAU CLAIRE $4,000,000 - $4,999,999

SOUTH COUNTY LINE TO CEDAR ROAD

CONSTRUCTION/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

7028-00-03 303 I/E MISC 0.010 STH 312 C EAU CLAIRE, NORTH CROSSING $0 - $99,999

JEFFERS ROAD INTERSECTION

DESIGN/INTERSECTION REALIGNMENT

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

2021 7028-00-72 03/09/2021 303 LET BRRHB 0.708 STH 312 C EAU CLAIRE, NORTH CROSSING $0 - $99,999

CHIPPEWA RIVER BRIDGE B-18-0132

CONST/BRRHB/WING WALL REPLACEMENT

SHR BRIDGES NATIONAL HIGHWAY PERF FAST

Page 41: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

307 2020-2023 FINAL STIP Project Listing Northwest Region

EAU CLAIRE

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2021 7028-00-73 11/09/2021 303 LET MISC 0.010 STH 312 C EAU CLAIRE, NORTH CROSSING $500,000 - $749,999

JEFFERS ROAD INTERSECTION

CONSTR/INTERSECTION REALIGNMENT

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

2020 7080-01-42 03/25/2020 303 UTL MISC 0.056 USH 012 EAU CLAIRE - FALL CREEK $0 - $99,999

ELCO RD TO OAK KNOLL RD

UTL/LEVEL-OF-EFFORT/7080-01-72

STATE 3R NON-FEDERAL

2020 7080-01-72 03/10/2020 303 LET MISC 0.072 USH 012 EAU CLAIRE - FALL CREEK $1,000,000 - $1,999,999

ELCO RD TO OAK KNOLL RD

CONSTRUCTION/CULVERT REPLACEMENTS

SHR BRIDGES SURFACE TRANSP BLOCK GRTS-

2021 7080-00-75 01/12/2021 303 LET MISC 0.200 USH 012 C ALTOONA, USH 12 $100,000 - $249,999

NOTTINGHAM WAY INTERSECTION

CONSTR/SFTY/PEDESTRIAN IMPROVEMENTS

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

2021 7080-03-25 02/25/2021 303 R/E COLD10 9.584 USH 012 EAU CLAIRE - FAIRCHILD $0 - $99,999

CTH D TO SOUTH JUNCTION CTH M

REAL ESTATE ACQUISITION/RESURFACING

STATE 3R NON-FEDERAL

2021 7080-03-75 12/14/2021 303 LET COLD20 9.584 USH 012 EAU CLAIRE - FAIRCHILD $5,000,000 - $5,999,999

CTH D TO SOUTH JUNCTION CTH M

CONSTRUCTION/RESURFACE

STATE 3R SURFACE TRANSP BLOCK GRTS-

7905-07-01 303 I/E PVRPLA 1.260 USH 053 OSSEO - EAU CLAIRE $500,000 - $749,999

OLD TOWN HALL RD TO GOLF RD NB & SB

DESIGN/PAVEMENT REPLACEMENT

BACKBONE NON-FEDERAL

Page 42: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

308 2020-2023 FINAL STIP Project Listing Northwest Region

EAU CLAIRE

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2020 1190-11-83 05/12/2020 303 LET BRPVTV 1.350 USH 053 NW REGION EAU CLAIRE CO - USH 53 $0 - $99,999

BRIDGE DECK SEALING (VARIOUS BRDGS)

CONST/BRMNTNC/LOC ON STN ANNUAL PLN

BACKBONE NATIONAL HIGHWAY PERF FAST

2020 7905-00-20 09/25/2020 303 R/E MISC 0.111 USH 053 OSSEO - EAU CLAIRE $0 - $99,999

BRANCH OTTER CR CULVERT C-18-3176

REAL ESTATE/MISC/CULVERT REPLACEMNT

SHR BRIDGES NON-FEDERAL

2021 7905-00-70 11/09/2021 303 LET MISC 0.110 USH 053 OSSEO - EAU CLAIRE $500,000 - $749,999

BRANCH OTTER CR CULVERT C-18-0052

CONST/MISC/CULVERT REPLACEMENT

SHR BRIDGES SURFACE TRANSP BLOCK GRTS-

Page 43: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

309 2020-2023 FINAL STIP Project Listing Northwest Region

JACKSON

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2021 7027-00-70 04/13/2021 205 LET BRRPL 0.011 CTH O MILLSTON - CTH HH $250,000 - $499,999

ROBINSON CREEK BRIDGE B-27-0173

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

2020 7340-00-70 02/11/2020 205 LET BRRPL 0.028 CTH X CTH H - CTH P $250,000 - $499,999

TROUT RUN CREEK BRIDGE B270165

CONST/BRRPL

LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG

1021-03-08 303 I/E BRRPL 0.020 IH 094 BLACK RIVER FALLS - TOMAH $100,000 - $249,999

CHARCOAL ROAD EB BRIDGE B-27-0027

DESIGN/BRIDGE REPLACEMENT

BACKBONE NON-FEDERAL

1023-00-00 303 I/E PVRPLA 7.940 IH 094 BLACK RIVER FALLS - TOMAH $3,000,000 - $3,999,999

PERRY CREEK TO CTH O (E & W BOUND)

DESIGN/PAVEMENT REPLACEMENT

BACKBONE NATIONAL HIGHWAY PERF FAST

1023-00-03 303 I/E RSRF20 7.080 IH 094 OSSEO - BLACK RIVER FALLS $750,000 - $999,999

BUFFALO RIVER TO STH 121 (E & WB)

DESIGN/RESURFACE

BACKBONE NON-FEDERAL

1023-00-05 303 I/E PSRS20 4.960 IH 094 BLACK RIVER FALLS - TOMAH $250,000 - $499,999

BLACK RIVER TO PERRY CREEK(EB & WB)

DESIGN/ROADWAY MAINTENANCE

BACKBONE NATIONAL HIGHWAY PERF FAST

1023-06-08 303 I/E RSRF30 7.440 IH 094 BLACK RIVER FALLS - TOMAH $250,000 - $499,999

CTH O TO CTH EW (EAST BOUND)

DESIGN/RESURFACE

BACKBONE NON-FEDERAL

Page 44: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

310 2020-2023 FINAL STIP Project Listing Northwest Region

JACKSON

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2020 1009-60-32 06/25/2020 303 MIS MISC 0.000 IH 094 BACKBONE TRAFFIC MITIGATION - LOE $1,000,000 - $1,999,999

NW REGION INTERSTATE HIGHWAY

TRF MITIGATION/LOE/STN ANNUAL PLN

BACKBONE NON-FEDERAL

2020 1023-04-04 07/25/2020 303 C/E RECST 17.030 IH 094 EAU CLAIRE - BLACK RIVER FALLS $250,000 - $499,999

USH 10 TO STH 95

DESIGN/4 LANE RECONSTRUCTION

BACKBONE NON-FEDERAL

2021 1020-00-79 03/09/2021 303 LET BRPVTV 0.000 IH 094 NW REGION, IH94 BRIDGE DECK SEALING $250,000 - $499,999

BRIDGE DECK SEALING (VAR)

CONSTRUCTION/BRIDGE DECK SEALING

BACKBONE NATIONAL HIGHWAY PERF FAST

2022 1023-00-79 02/08/2022 303 LET RSRF30 4.480 IH 094 BLACK RIVER FALLS - TOMAH $10,000,000 - $10,999,999

BLACK RIVER - PERRY CREEK

CONSTRUCTION/RESURFACING

BACKBONE NATIONAL HIGHWAY PERF FAST

2022 1023-00-89 02/25/2022 303 MIS MISC 4.550 IH 094 BLACK RIVER FALLS - TOMAH $0 - $99,999

BLACK RIVER - PERRY CREEK

TOIPS/ITEMS FOR CONST ID 1023-00-79

BACKBONE NATIONAL HIGHWAY PERF FAST

2022 1023-00-99 02/25/2022 303 SFA MISC 0.000 IH 094 BLACK RIVER - PERRY CREEK (EB & WB) $0 - $99,999

BLACK RIVER FALLS - TOMAH

TRF MITIGATION CONST ID 1023-00-79

BACKBONE NON-FEDERAL

2022 1024-01-75 02/08/2022 303 LET RSRF10 2.374 IH 094 OSSEO - BLACK RIVER FALLS $3,000,000 - $3,999,999

CTH F TO BLACK RIVER (EAST/WEST BD)

CONSTRUCTION/RESURFACING

BACKBONE NATIONAL HIGHWAY PERF FAST

Page 45: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

311 2020-2023 FINAL STIP Project Listing Northwest Region

JACKSON

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2022 1024-01-90 02/25/2022 303 SFA MISC 2.374 IH 094 CTH F TO BLACK RIVER (EAST/WEST BD) $0 - $99,999

OSSEO - BLACK RIVER FALLS

TRAFFIC MITIGATION 1024-01-75

BACKBONE NON-FEDERAL

2022 7249-00-70 04/12/2022 205 LET BRRPL 0.008 LOC STR T GARFIELD, MOE ROAD (EAST) $100,000 - $249,999

NF BUFFALO RIVER BRIDGE B-27-0174

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

2020 7550-00-42 12/25/2020 303 UTL RSRF10 8.800 STH 054 GALESVILLE - MELROSE $0 - $99,999

WEST COUNTY LINE TO STH 71 EAST BND

UTL 900 INT/CENTURLINK

STATE 3R NON-FEDERAL

2022 7550-00-25 06/25/2022 303 R/E BRRPL 0.004 STH 054 GALESVILLE - MELROSE $0 - $99,999

WILSON CR & MILL CR BR B270233,0018

REAL ESTATE ACQUISITION

SHR BRIDGES NON-FEDERAL

2023 7550-00-75 11/14/2023 303 LET BRRPL 0.004 STH 054 GALESVILLE - MELROSE $2,000,000 - $2,999,999

WILSON CR & MILL CR BR B270175,0235

CONSTRUCTION/BRIDGE REPLACEMENT

SHR BRIDGES STBG <5K POP FAST

7710-00-01 303 I/E RSRF20 1.420 STH 071 MELROSE - SPARTA $0 - $99,999

STH 54 TO STH 108

DESIGN/RESURFACE

STATE 3R STBG <5K POP FAST

2023 7710-00-70 03/14/2023 303 LET BRRHB 0.132 STH 071 MELROSE - SPARTA $100,000 - $249,999

BLACK RIVER BRIDGE B-27-0074

CONSTR/BRRHB/JOINT REPLACEMENT

SHR BRIDGES STBG <5K POP FAST

Page 46: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

312 2020-2023 FINAL STIP Project Listing Northwest Region

JACKSON

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2020 7520-00-27 01/25/2020 303 R/E BRRPL 0.071 STH 095 MERRILLAN - NEILLSVILLE $0 - $99,999

E FK HALLS CREEK BRIDGE B-27-0147

REAL ESTATE/BRIDGE REPLACEMENT

SHR BRIDGES NON-FEDERAL

2022 7520-00-77 12/13/2022 303 LET BRRPL 0.070 STH 095 MERRILLAN - NEILLSVILLE $500,000 - $749,999

E FK HALLS CREEK BRIDGE B-27-0238

CONSTRUCTION/BRIDGE REPLACEMENT

SHR BRIDGES SURFACE TRANSP BLOCK GRTS-

2023 7520-00-78 01/10/2023 303 LET BRRPL 0.060 STH 095 BLAIR - MERRILLAN $1,000,000 - $1,999,999

HALLS CREEK BRIDGE B-27-0168

CONSTRUCTION/BRIDGE REPLACEMENT

SHR BRIDGES STBG <5K POP FAST

2023 7520-00-79 01/10/2023 303 LET BRRPL 0.028 STH 095 BLAIR - MERRILLAN $500,000 - $749,999

CISNA CREEK BRIDGE B-27-0169

CONSTRUCTION/BRIDGE REPLACEMENT

SHR BRIDGES STBG <5K POP FAST

2023 7560-05-74 11/14/2023 303 LET RSRF20 10.070 STH 095 BLAIR - MERRILLAN $4,000,000 - $4,999,999

TREMPEALEAU/JACKSON CO LN TO IH 94

CONSTRUCTION/RESURFACE/RSRF20

STATE 3R SURFACE TRANSP BLOCK GRTS-

7930-00-01 303 I/E RSRF20 2.850 STH 108 WEST SALEM - MELROSE $0 - $99,999

LA CROSSE/JACKSON CO LN TO STH 71 N

DESIGN/RESURFACE

STATE 3R STBG <5K POP FAST

7505-00-02 303 I/E MISC 0.100 STH 121 NORTHFIELD - ALMA CENTER $0 - $99,999

CULVERT C-27-1002

DESIGN/MISC/CULVERT REPLACEMENT

SHR BRIDGES NON-FEDERAL

Page 47: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

313 2020-2023 FINAL STIP Project Listing Northwest Region

JACKSON

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2021 1520-00-73 11/09/2021 303 LET COLD10 10.200 USH 010 OSSEO - FAIRCHILD $5,000,000 - $5,999,999

WEST COUNTY LINE TO USH 12 WEST

CONSTRUCTION/RESURFACE/COLD10

STATE 3R NATIONAL HIGHWAY PERF FAST

2021 1520-02-70 11/09/2021 303 LET MISC 10.200 USH 010 OSSEO - FAIRCHILD $1,000,000 - $1,999,999

WEST COUNTY LINE TO USH 12 WEST

CONSTR/SAFETY/WIDEN PAVED SHOULDER

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

7185-00-00 303 I/E BRRHB 0.000 USH 012 BLACK RIVER FALLS - TOMAH $0 - $99,999

COFFEE CREEK BRIDGE B-27-0150

DESIGN/DECK REPLACEMENT

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 48: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

2020-2023 FINAL STIP Project ListingNorthwest Region

NORTHWEST REGION WIDE

314314 2020-2023 FINAL STIP Project Listing Northwest Region

NORTHWEST REGION WIDE

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

1000-08-29 303 I/E PSRS10 0.000 VAR HWY SFY 2020 CHIP SEALS - NORTH $100,000 - $249,999

NORTHWEST REGION - VARIOUS HIGHWAYS

DESIGN/CHIP SEAL/LOC STN ANNUAL PLN

STATE 3R NON-FEDERAL

1000-18-20 305 I/E TOPM 0.000 VAR HWY NW REGION, PAVEMENT MARKING 2021 $0 - $99,999

VARIOUS HIGHWAYS, NW REGION WIDE

CONST/TRF/PVMT MRK/STN ANNUAL PLN

STATE HIGHWAY OPERATIONS PROGRAM NON-FEDERAL

1000-18-22 305 I/E TOPM 0.000 VAR HWY NW REGION, PAVEMENT MARKING 2022 $0 - $99,999

VARIOUS HIGHWAYS, NW REGION WIDE

CONST/TRF/PVMT MRK/STN ANNUAL PLN

STATE HIGHWAY OPERATIONS PROGRAM NON-FEDERAL

9227-01-29 303 I/E MISC 0.000 VAR HWY NW REGION,CULV PIPE & MIS STRC INSP $100,000 - $249,999

VAR HWY CULV PIPE/MIS STRC INSP

PE/INSPECTION/LOC ON STN ANNUAL PLN

STATE 3R NON-FEDERAL

2020 1000-18-19 02/11/2020 305 LET TOPM 0.000 VAR HWY NW REGION, PAVEMENT MARKING 2020 $1,000,000 - $1,999,999

VARIOUS HIGHWAYS, NW REGION WIDE

CONST/TRF/PVMT MRK/STN ANNUAL PLN

STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANSP BLOCK GRTS-

2020 1000-18-45 06/25/2020 303 C/E MISC 0.000 VAR HWY NWR CIR INVESTIGATION $250,000 - $499,999

NW REGION WIDE, VARIOUS HIGHWAYS

EX - CE PLACEHOLDER

STATE 3R NON-FEDERAL

2020 1000-18-49 01/25/2020 303 C/E MISC 0.000 VAR HWY NW REGION, MATERIALS CERTIFICATION $0 - $99,999

MATERIALS CERTIFICATION SERVICES

Page 49: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

315 2020-2023 FINAL STIP Project Listing Northwest Region

NORTHWEST REGION WIDE

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

REDISTRIBUTION CONTRACT SFY20

STATE 3R NON-FEDERAL

2020 1000-18-50 05/25/2020 303 C/E MISC 0.000 VAR HWY NW REGION, MATERIALS TESTING $100,000 - $249,999

MATERIALS TESTING SERVICES, EC LAB

REDISTRIBUTION CONTRACT FY2020

STATE 3R NON-FEDERAL

2020 1000-18-51 05/25/2020 303 C/E MISC 0.000 VAR HWY NW REGION, MATERIALS TESTING $100,000 - $249,999

MATERIALS TESTING SERVICES, SUP LAB

REDISTRIBUTION CONTRACT FY2020

STATE 3R NON-FEDERAL

2020 1000-18-52 04/25/2020 303 C/E MISC 0.000 VAR HWY THERMOGRAPHIC BRIDGE DECK SURVEYS $100,000 - $249,999

NW REGION WIDE, VARIOUS HIGHWAYS

DESIGN/MISC

STATE 3R NON-FEDERAL

Page 50: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

2020-2023 FINAL STIP Project ListingNorthwest Region

PEPIN

316316 2020-2023 FINAL STIP Project Listing Northwest Region

PEPIN

Year Project Schd

Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

7180-00-06 303 I/E MISC 0.002 STH 035 PEPIN - HAGER CITY $0 - $99,999

DRAINAGE WAY CULVERT C-46-0006

DESIGN/CULVERT REHABILIITATION

STATE 3R SURFACE TRANSP BLOCK GRTS-

1530-07-05 303 I/E RECST 0.060 USH 010 ELLSWORTH - DURAND $0 - $99,999

STH 25 NORTH JUNCTION INTERSECTION

DESIGN/RECONSTRUCTION

STATE 3R NON-FEDERAL

Page 51: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

317 2020-2023 FINAL STIP Project Listing Northwest Region

PIERCE

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

7896-02-00 206 I/E MISC 7.780 CTH A STH 35 - USH 10 $100,000 - $249,999

GREAT RIVER ROAD TO USH 10

DESIGN/HRRR/SAFETY TREATMENTS

SAFETY - HIGH RISK RURAL ROADS HIGHWAY SAFETY IMP PROG-FA

2021 7896-02-70 12/14/2021 206 LET MISC 7.780 CTH A STH 35 - USH 10 $500,000 - $749,999

GREAT RIVER ROAD TO USH 10

CONSTR/HRRR/SAFETY TREATMENTS

SAFETY - HIGH RISK RURAL ROADS HIGHWAY SAFETY IMP PROG-FA

2021 7894-03-73 03/09/2021 205 LET BRRHB 0.005 CTH O STH 35 - USH 10 $250,000 - $499,999

TRIMBELLE RIVER BRIDGE B-47-0048

CONSTRUCTION/BRRHB/DECK REPLACEMENT

LOCAL BRIDGES NON-FEDERAL

2020 7891-00-72 03/10/2020 205 LET BRRPL 0.071 LOC STR T EL PASO, 465TH AVENUE $500,000 - $749,999

RUSH RIVER BRIDGE B470508

CONST/BRRPL

LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG

2022 7994-00-35 01/25/2022 290 C/E MISC 0.000 NON HWY

C RIVER FALLS, VARIOUS LOCATIONS $0 - $99,999

BICYCLE AND PEDESTRIAN PLAN

PLANNING/BIKE & PEDESTRIAN PLAN/TAP

TAP 5,000 - 50,000 TAP AREAS 5K-200K MAP21-EX

2020 7630-00-22 01/25/2020 303 R/E RSRF10 4.270 STH 029 RIVER FALLS - SPRING VALLEY $0 - $99,999

CTH CC SOUTH TO STH 128

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

Page 52: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

318 2020-2023 FINAL STIP Project Listing Northwest Region

PIERCE

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2020 7630-00-72 11/10/2020 303 LET RSRF20 4.270 STH 029 RIVER FALLS - SPRING VALLEY $2,000,000 - $2,999,999

CTH CC SOUTH TO STH 128

CONSTRUCTION/RESURFACE

STATE 3R STBG <5K POP FAST

2020 7630-00-73 11/10/2020 303 LET BRRHB 0.000 STH 029 RIVER FALLS - SPRING VALLEY $250,000 - $499,999

EAU GALLE RIVER BRIDGE B-47-0775

CONSTRUCTION/DECK OVERLAY

SHR BRIDGES STBG <5K POP FAST

2020 7640-00-72 12/08/2020 303 LET RSRF20 1.310 STH 029 C RIVER FALLS, CEMETERY ROAD $1,000,000 - $1,999,999

SOUTH MAIN STREET TO STH 65

CONSTRUCTION/RESURFACE/RSRF20

STATE 3R STBG 5-200K POP FASTG

2020 7650-00-74 12/08/2020 303 LET MISC 0.030 STH 029 C RIVER FALLS, SOUTH MAIN STREET $1,000,000 - $1,999,999

CULVERT C-47-0058

CONST/MISC/CULVERT REPLACEMENT

SHR BRIDGES NATIONAL HIGHWAY PERF FAST

2020 7650-01-25 01/25/2020 303 R/E PVRPLA 5.540 STH 029 PRESCOTT - RIVER FALLS $0 - $99,999

CTH QQ SOUTH JCT TO CEMETERY ROAD

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

2020 7650-01-74 12/08/2020 303 LET PVRPLA 5.200 STH 029 PRESCOTT - RIVER FALLS $5,000,000 - $5,999,999

USH 10 TO SOUTH JUNCTION CTH QQ

CONSTRUCTION/PAVEMENT REPLACEMENT

STATE 3R SURFACE TRANSP BLOCK GRTS-

2020 7650-01-75 12/08/2020 303 LET PVRPLA 5.540 STH 029 PRESCOTT - RIVER FALLS $5,000,000 - $5,999,999

CTH QQ SOUTH JCT TO CEMETERY ROAD

CONSTRUCTION/PAVEMENT REPLACEMENT

STATE 3R SURFACE TRANSP BLOCK GRTS-

Page 53: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

319 2020-2023 FINAL STIP Project Listing Northwest Region

PIERCE

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2020 7650-02-73 12/08/2020 303 LET RCND10 0.003 STH 029 PRESCOTT - RIVER FALLS $750,000 - $999,999

CTH FF & 770TH AVENUE INTERSECTION

CONST/SFTY/WEST BOUND LEFT TURN LN

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

2021 7650-00-75 11/09/2021 303 LET BRRHB 0.003 STH 035 C RIVER FLS, E DIVISION ST (CTH M) $250,000 - $499,999

CTH M BRIDGE B-47-0134

CONSTRUCTION/BRRHB/REPLACE WINGS

SHR BRIDGES STBG 5-200K POP FASTG

2021 1540-01-72 03/09/2021 303 LET RSRF20 0.270 STH 065 V ELLSWORTH, MAPLE STREET $100,000 - $249,999

USH 10 TO MIDWAY AVENUE

CONSTRUCTION/RESURFACE/RSRF20

STATE 3R STBG <5K POP FAST

7105-00-03 303 I/E COLD20 10.940 STH 072 ELLSWORTH - DOWNSVILLE $100,000 - $249,999

CTH BB TO CTH G

DESIGN/CIR/RESURFACE

STATE 3R STBG <5K POP FAST

2020 1530-00-20 01/25/2020 303 R/E MISC 0.184 USH 010 PRESCOTT - ELLSWORTH $0 - $99,999

SPRING CR CULVERTS C-47-0032 & 0033

REAL ESTATE ACQUISITION

SHR BRIDGES NON-FEDERAL

2020 1530-02-21 01/25/2020 303 R/E RSRF20 14.390 USH 010 PRESCOTT - ELLSWORTH $0 - $99,999

STH 29 TO SOUTH JUNCTION USH 63

REAL ESTATE ACQUISITION/RESURFACE

STATE 3R NON-FEDERAL

2020 1530-03-26 07/25/2020 303 R/E RSRF20 0.403 USH 010 V ELLSWORTH, MAIN STREET $0 - $99,999

STH 65 TO NORTH BEULAH STREET

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

Page 54: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

320 2020-2023 FINAL STIP Project Listing Northwest Region

PIERCE

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2021 1530-03-76 03/09/2021 303 LET RSRF20 0.413 USH 010 V ELLSWORTH, MAIN STREET $1,000,000 - $1,999,999

STH 65 TO NORTH BEULAH STREET

CONSTRUCTION/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

2022 1530-05-72 01/11/2022 303 LET RSRF20 10.860 USH 010 ELLSWORTH - DURAND $7,000,000 - $7,999,999

CTH A TO EAST COUNTY LINE

CONSTRUCTION/RESURFACING

STATE 3R STBG <5K POP FAST

2023 1530-00-79 01/10/2023 303 LET MISC 1.020 USH 010 PRESCOTT - ELLSWORTH $1,000,000 - $1,999,999

SPRING CR CULVERTS C-47-0060 & 0061

CONST/MISC/CULVERT REPLACEMENT

SHR BRIDGES SURFACE TRANSP BLOCK GRTS-

2023 1530-02-70 01/10/2023 303 LET RSRF20 14.390 USH 010 PRESCOTT - ELLSWORTH $9,000,000 - $9,999,999

STH 29 TO SOUTH JUNCTION USH 63

CONSTRUCTION/RESURFACE

STATE 3R SURFACE TRANSP BLOCK GRTS-

2023 1530-02-80 01/10/2023 303 LET MISC 14.390 USH 010 PRESCOTT - ELLSWORTH $500,000 - $749,999

STH 29 TO SOUTH JUNCTION USH 63

CONSTR/SFTY/WDN PVD SHLDRS/RMBLSTRP

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

Page 55: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

321 2020-2023 FINAL STIP Project Listing Northwest Region

POLK

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2020 8866-00-72 12/08/2020 206 LET PVRPLA 7.920 CTH M STAR PRAIRIE - OSCEOLA $3,000,000 - $3,999,999

SCL TO CTH Y

CONST/PVRPLA

STP RURAL STBG <5K POP FAST

2021 8398-00-70 03/09/2021 205 LET BRRPL 0.008 LOC STR T APPLE RIVER, 165TH AVENUE $250,000 - $499,999

FOX CREEK BRIDGE B-48-0053

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

2021 8400-00-70 02/09/2021 205 LET BRRPL 0.004 LOC STR T BEAVER, 40TH STREET $100,000 - $249,999

APPLE RIVER BRIDGE B-48-0056

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

2021 8405-00-71 03/09/2021 205 LET BRRPL 0.017 LOC STR T CLEAR LAKE, 30TH STREET $250,000 - $499,999

WILLOW RIVER BRIDGE B-48-0055

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

2021 8415-00-70 11/09/2021 205 LET BRRPL 0.023 LOC STR T MCKINLEY, 270TH AVENUE $100,000 - $249,999

CLAM RIVER BRIDGE B-48-0054

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

8010-01-10 303 I/E RSRF20 6.843 STH 035 LUCK - SIREN $100,000 - $249,999

STH 48 E TO POLK STREET

DESIGN/RESURFACE

STATE 3R STBG <5K POP FAST

8070-00-05 303 I/E PVRPLA 2.000 STH 046 C AMERY, KELLER AVENUE $250,000 - $499,999

GRIFFIN ST TO YORK PARK ENTRANCE

DESIGN/PAVEMENT REPLACEMENT

STATE 3R NON-FEDERAL

Page 56: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

322 2020-2023 FINAL STIP Project Listing Northwest Region

POLK

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2020 8072-00-20 06/25/2020 303 R/E COLD10 11.326 STH 046 CYLON - AMERY $0 - $99,999

STH 64 TO SNOW STREET

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

2021 8070-00-74 02/09/2021 303 LET RSRF10 1.971 STH 046 C AMERY, KELLER AVENUE $1,000,000 - $1,999,999

SNOW STREET TO YORK PARK ENTRANCE

CONSTR/SAFETY/3 LANE CONVERSION

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

2021 8072-00-70 12/14/2021 303 LET COLD10 11.326 STH 046 CYLON - AMERY $5,000,000 - $5,999,999

STH 64 TO SNOW STREET

CONSTRUCTION/RESURFACING

STATE 3R SURFACE TRANSP BLOCK GRTS-

2021 8072-00-71 12/14/2021 303 LET MISC 11.326 STH 046 CYLON - AMERY $250,000 - $499,999

STH 64 TO SNOW STREET

CONSTR/SFTY/RMBLSTRP/WDN PVD SHLDRS

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

8820-00-00 303 I/E COLD20 11.140 STH 048 FREDERIC - MCKINLEY $250,000 - $499,999

STH 35 TO BASS LAKE LANE

DESIGN/CIR/RESURFACE

STATE 3R STBG <5K POP FAST

8865-01-03 303 I/E RECST 0.050 STH 065 WANDEROOS - USH 8 $0 - $99,999

WEST JUNCTION CTH F INTERSECTION

DESIGN/SAFETY/RECONSTRUCTION

STATE 3R STP ANY AREAS

2020 8865-00-24 11/25/2020 303 R/E PVRPLA 14.880 STH 065 NEW RICHMOND - USH 8 $100,000 - $249,999

NORTH JCT JEWELL STREET TO USH 8

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

Page 57: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

323 2020-2023 FINAL STIP Project Listing Northwest Region

POLK

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2023 8865-00-74 11/14/2023 303 LET PVRPLA 14.950 STH 065 NEW RICHMOND - USH 8 $13,000,000 - $13,999,999

NORTH JCT JEWELL STREET TO USH 8

CONSTRUCTION/PAVEMENT REPLACEMENT

STATE 3R STBG <5K POP FAST

8840-00-00 303 I/E COLD20 14.640 STH 087 ST. CROIX FALLS - GRANTSBURG $250,000 - $499,999

USH 8 TO 270TH AVENUE

DESIGN/CIR/RESURFACE

STATE 3R STBG <5K POP FAST

2020 8417-00-02 01/25/2020 303 OST BRRPL 0.300 STH 243 ST CROIX RIVER - OSCEOLA $250,000 - $499,999

ST CROIX RIVER BRIDGE B-48-0224

PENG/BR CONDITN INVESTGTN/MNDOTLEAD

SHR BRIDGES SURFACE TRANSP BLOCK GRTS-

2020 1570-00-74 03/10/2020 303 LET RSRF20 9.749 USH 008 ST CROIX FALLS - TURTLE LAKE $5,000,000 - $5,999,999

STH 46 SOUTH JUNCTION TO FRONT AVE

CONSTRUCTION/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

2020 1570-00-77 03/10/2020 303 LET MISC 9.749 USH 008 ST CROIX FALLS - TURTLE LAKE $250,000 - $499,999

STH 46 SOUTH JUNCTION TO FRONT AVE

CONST/SFTY/RMBLSTRP/WIDN PVD SHLDRS

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

2020 1550-04-26 05/25/2020 303 R/E RECST 0.019 USH 063 CLEAR LAKE - CUMBERLAND $0 - $99,999

60TH AVENUE INTERSECTION

REAL ESTATE/SFTY/REALIGNMENT

STATE 3R NON-FEDERAL

2021 1550-02-26 06/25/2021 303 R/E COLD20 8.400 USH 063 BALDWIN - CUMBERLAND $0 - $99,999

ST CROIX/POLK CO LN TO CTH J

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

Page 58: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

324 2020-2023 FINAL STIP Project Listing Northwest Region

POLK

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2021 1550-04-72 11/09/2021 303 LET COLD20 6.950 USH 063 CLEAR LAKE - CUMBERLAND $3,000,000 - $3,999,999

CTH J TO USH 8

CONSTRUCTION/RESURFACING

STATE 3R NATIONAL HIGHWAY PERF FAST

2021 1550-04-76 11/09/2021 303 LET RECST 0.019 USH 063 CLEAR LAKE - CUMBERLAND $100,000 - $249,999

60TH AVENUE INTERSECTION

CONSTRUCTION/SFTY/REALIGNMENT

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

2021 1550-04-82 11/09/2021 303 LET MISC 6.950 USH 063 CLEAR LAKE - CUMBERLAND $250,000 - $499,999

CTH J TO USH 8

CONSTR/SFTY/RMBLSTRP/WIDN PVD SHLDR

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

2022 1550-02-76 11/08/2022 303 LET COLD20 8.400 USH 063 BALDWIN - CUMBERLAND $4,000,000 - $4,999,999

ST CROIX/POLK CO LN TO CTH J

CONSTRUCTION/CIR/RESURFACING

STATE 3R NATIONAL HIGHWAY PERF FAST

2022 1550-06-75 12/13/2022 303 LET MISC 0.003 USH 063 BALDWIN - CLEAR LAKE $250,000 - $499,999

PEDESTRIAN TRAIL C-48-0025

CONSTR/MISC/CULVERT REPLACEMENT

STATE 3R STBG <5K POP FAST

Page 59: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

2020-2023 FINAL STIP Project ListingNorthwest Region

RUSK

325325 2020-2023 FINAL STIP Project Listing Northwest Region

RUSK

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2021 8793-00-72 03/09/2021 205 LET BRRPL 0.010 CTH B SCL - GLEN FLORA $500,000 - $749,999

MIDDLE FORK MAIN CREEK BR B-54-0137

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

2021 8595-00-71 03/09/2021 205 LET BRRPL 0.027 CTH D STH 27 - SHELDON $750,000 - $999,999

LITTLE JUMP RIVER BRIDGE B-54-0138

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

2021 8794-00-70 03/09/2021 205 LET BRRHB 0.060 CTH G SCL - CONRATH $1,000,000 - $1,999,999

JUMP RIVER BRIDGE B-54-0019

CONSTRUCTION/BRRHB/DECK REPLACEMENT

LOCAL BRIDGES NON-FEDERAL

2021 8771-00-70 12/14/2021 205 LET BRRPL 0.006 CTH M HAWKINS - NCL $500,000 - $749,999

SKINNER CREEK BRIDGE B-54-0135

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

2020 8439-00-72 02/11/2020 205 LET BRRPL 0.011 LOC STR

T STUBBS, S HUTCHINSON ROAD $250,000 - $499,999

SOFT MAPLE CREEK BRIDGE B540127

DESIGN/BRRPL

LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG

2022 8180-01-60 01/11/2022 303 LET BRRHB 0.100 STH 027 C LADYSMITH, NINTH STREET $500,000 - $749,999

FLAMBEAU RIVER BRIDGE B-54-0050

CONSTRUCTION/BRIDGE MAINTENANCE

SHR BRIDGES NON-FEDERAL

2020 8213-01-70 05/12/2020 303 LET BRRPL 0.020 STH 073 THORP - INGRAM $250,000 - $499,999

ALDER CREEK BRIDGE B-54-0133

Page 60: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

326 2020-2023 FINAL STIP Project Listing Northwest Region

RUSK

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

CONSTRUCTION/BRIDGE REPLACEMENT

SHR BRIDGES STBG <5K POP FAST

2020 1570-06-22 01/25/2020 303 R/E RSRF20 9.150 USH 008 CAMERON - LADYSMITH $0 - $99,999

CEDAR SWAMP ROAD TO CHIPPEWA RIVER

REAL ESTATE ACQUISITION/RESURFACE

STATE 3R NON-FEDERAL

2021 1580-04-22 06/25/2021 303 R/E RSRF20 10.571 USH 008 LADYSMITH - HAWKINS $0 - $99,999

RIVER AVENUE TO PRENTICE STREET

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

2021 1580-04-23 06/25/2021 303 R/E RSRF20 11.142 USH 008 LADYSMITH - PRENTICE $0 - $99,999

PRENTICE STREET TO RUSK/PRICE CO LN

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

2021 1580-31-71 04/13/2021 303 LET RSRF20 0.830 USH 008 C LADYSMITH, LAKE AVENUE & E 3RD ST $750,000 - $999,999

STH 27 TO RIVER AVENUE

CONSTRUCTION/RESURFACING

STATE 3R NATIONAL HIGHWAY PERF FAST

2022 1570-06-72 11/08/2022 303 LET COLD20 9.165 USH 008 CAMERON - LADYSMITH $4,000,000 - $4,999,999

CEDAR SWAMP ROAD TO CHIPPEWA RIVER

CONSTRUCTION/RESURFACE/COLD20

STATE 3R SURFACE TRANSP BLOCK GRTS-

2023 1580-04-72 11/14/2023 303 LET RSRF20 10.571 USH 008 LADYSMITH - HAWKINS $5,000,000 - $5,999,999

RIVER AVENUE TO PRENTICE STREET

CONSTRUCTION/RESURFACE/RSRF20

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 61: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

327 2020-2023 FINAL STIP Project Listing Northwest Region

RUSK

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2023 1580-04-73 11/14/2023 303 LET RSRF20 11.142 USH 008 LADYSMITH - PRENTICE $5,000,000 - $5,999,999

PRENTICE STREET TO RUSK/PRICE CO LN

CONSTRUCTION/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

2023 1580-04-74 03/14/2023 303 LET MISC 20.550 USH 008 LADYSMITH - PRENTICE $1,000,000 - $1,999,999

E 16TH ST N/OLD 8 RD TO PRICE CO LN

CONSTRUCTION/MISCELLANEOUS

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 62: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

2020-2023 FINAL STIP Project ListingNorthwest Region

SAWYER

328328 2020-2023 FINAL STIP Project Listing Northwest Region

SAWYER

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated

Funding

2021 8773-00-73 03/09/2021 205 LET BRRPL 0.020 CTH E STH 27/70 - CTH B $250,000 - $499,999

COUDERAY RIVER BRIDGE B-57-0090

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

2021 8452-00-70 12/14/2021 205 LET BRRPL 0.041 LOC STR T LENROOT, TAG ALDER ROAD $250,000 - $499,999

NAMEKAGON RIVER BRIDGE B-57-0091

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

2023 8170-01-74 12/12/2023 303 LET MISC 0.024 STH 070 OJIBWA - OXBO $500,000 - $749,999

LOG CREEK C-57-0033

CONSTR/MISC/CULVERT REPLACEMENT

STATE 3R STBG <5K POP FAST

2021 8520-01-25 06/25/2021 303 R/E RSRF20 4.910 STH 077 HAYWARD - CLAM LAKE $0 - $99,999

USH 63 TO CTH K

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

2022 1560-00-75 11/08/2022 303 LET MISC 0.060 USH 063 C HAYWARD, FIRST STREET $250,000 - $499,999

SMITH LAKE CREEK CULVERT

CONSTRUCTION/CULVERT REPLACEMENT

SHR BRIDGES STBG <5K POP FAST

Page 63: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

329 2020-2023 FINAL STIP Project Listing Northwest Region

ST. CROIX

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2021 8944-00-77 05/11/2021 206 LET MISC 8.885 CTH A CTH A, HUDSON NEW RICHMOND $500,000 - $749,999

CTH U TO MACKIN ROAD

CONST/HSIP/INSTALL WARNING DEVICE

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

2020 8939-08-75 03/10/2020 206 LET RCND10 1.316 CTH E ST JOSEPH - STH 65 $2,000,000 - $2,999,999

CTH I TO CTH A

CONST/RECOND

STP RURAL STBG <5K POP FAST

2022 8939-08-76 03/08/2022 206 LET RECST 1.670 CTH E HOULTON - STH 65 $1,000,000 - $1,999,999

14TH STREET TO CTH V

CONSTRUCTION/RECONSTRUCTION

STP RURAL STBG <5K POP FAST

2020 8940-00-15 04/14/2020 206 LET PVRPLA 1.077 CTH GG C NEW RICHMOND, CTH GG $1,000,000 - $1,999,999

140TH STREET TO 150TH STREET

CONST/PVRPLA

STP URBAN 5,000 - 20,000 STBG 5-200K POP FASTG

8939-03-08 206 I/E MISC 6.933 CTH I CTH A - SOMERSET $0 - $99,999

CTH A TO KOHLER DRIVE

DESIGN/HRRR/SAFETY TREATMENTS

SAFETY - HIGH RISK RURAL ROADS HIGHWAY SAFETY IMP PROG-FA

2023 8939-03-78 12/12/2023 206 LET MISC 6.933 CTH I CTH A - SOMERSET $750,000 - $999,999

CTH A TO KOHLER DRIVE

CONSTRUCTION/HRRR/SAFETY TREATMENTS

SAFETY - HIGH RISK RURAL ROADS HIGHWAY SAFETY IMP PROG-FA

1020-02-31 303 I/E PSRS20 4.330 IH 094 HUDSON - BALDWIN $250,000 - $499,999

STH 35 NORTH JCT TO USH 12(EB & WB)

DESIGN/RDMTN/CONCRETE REPAIRS

BACKBONE NON-FEDERAL

Page 64: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

330 2020-2023 FINAL STIP Project Listing Northwest Region

ST. CROIX

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

1020-06-04 303 I/E PVRPLA 5.630 IH 094 HUDSON - MENOMONIE $1,000,000 - $1,999,999

STH 65 TO CTH T (EAST & WESTBOUND)

DESIGN/PAVEMENT REPLACEMENT

BACKBONE NATIONAL HIGHWAY PERF PLAN

1020-06-08 303 I/E RECST 5.570 IH 094 HUDSON - MENOMONIE $1,000,000 - $1,999,999

STH 65 TO CTH T (WEST BOUND)

DESIGN/RECONSTRUCTION

BACKBONE NATIONAL HIGHWAY PERF PLAN

1020-07-06 303 I/E RECST 0.000 IH 094 HUDSON - MENOMONIE $1,000,000 - $1,999,999

CTH T - CTH BB (WB)

DESIGN/RECONSTRUCTION

BACKBONE NATIONAL HIGHWAY PERF PLAN

1021-00-10 303 I/E BRRPL 0.050 IH 094 BALDWIN - MENOMONIE $250,000 - $499,999

NORSEMAN DRIVE BRIDGE EB B-55-0019

DESIGN/BRIDGE REPLACEMENT

BACKBONE NON-FEDERAL

1021-00-11 303 I/E BRRPL 0.040 IH 094 BALDWIN - MENOMONIE $250,000 - $499,999

NORSEMAN DRIVE BRIDGE WB B-55-0020

DESIGN/BRIDGE REPLACEMENT

BACKBONE NON-FEDERAL

1021-00-13 303 I/E BRRPL 0.080 IH 094 BALDWIN - MENOMONIE $250,000 - $499,999

WILSON ROAD BRIDGE WB B-55-0023

DESIGN/BRIDGE REPLACEMENT

BACKBONE NON-FEDERAL

1021-03-31 303 I/E BRRHB 0.020 IH 094 BALDWIN - MENOMONIE $100,000 - $249,999

EAU GALLE RIVER EB BRIDGE B-55-0015

DESIGN/BRIDGE REHABILITATION

BACKBONE NON-FEDERAL

Page 65: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

331 2020-2023 FINAL STIP Project Listing Northwest Region

ST. CROIX

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

1021-03-32 303 I/E BRRHB 0.000 IH 094 BALDWIN - MENOMONIE $100,000 - $249,999

EAU GALLE RIVER WB BRIDGE B-55-0016

DESIGN/BRIDGE REHABILITATION

BACKBONE NON-FEDERAL

2020 1020-01-86 05/12/2020 303 LET BRPVTV 0.008 IH 094 NW REGION, VAR CTYS INTERSTATE 94 $250,000 - $499,999

FRONT ST B550065, STH 35 SB B550066

CONSTRUCTION/THIN POLYMER OVERLAY

BACKBONE NATIONAL HIGHWAY PERF FAST

2020 1020-06-40 03/25/2020 303 UTL RECST 0.000 IH 094 HUDSON - BALDWIN $0 - $99,999

STH 35 NORTH TO USH 12

UTL LEVEL OF EFFORT

BACKBONE NON-FEDERAL

2020 1020-06-42 01/25/2020 303 UTL RECST 4.330 IH 094 HUDSON - BALDWIN $0 - $99,999

STH 35 NORTH TO USH 12

UTL INT 201 C HUDSON SEWER

BACKBONE NON-FEDERAL

2020 1020-06-43 01/25/2020 303 UTL RECST 4.330 IH 094 HUDSON - BALDWIN $0 - $99,999

STH 35 NORTH TO USH 12

UTL INT 202 CITY HUDSON WATER

BACKBONE NON-FEDERAL

2020 1020-07-21 01/25/2020 303 R/E BRRPL 0.014 IH 094 HUDSON - BALDWIN $0 - $99,999

KINNEY ROAD BRIDGES B-55-0031,0032

REAL ESTATE/BRIDGE REPLACEMENT

BACKBONE NON-FEDERAL

2020 1020-07-22 01/25/2020 303 R/E BRRPL 0.020 IH 094 HUDSON - BALDWIN $0 - $99,999

100TH ST/TWIN LK RD BR B-55-0033,34

REAL ESTATE/BRIDGE REPLACEMENT

BACKBONE NON-FEDERAL

Page 66: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

332 2020-2023 FINAL STIP Project Listing Northwest Region

ST. CROIX

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2020 1021-00-78 11/10/2020 303 LET BRRPL 0.050 IH 094 BALDWIN - MENOMONIE $3,000,000 - $3,999,999

CTH NN BRIDGE EAST BOUND B-55-0271

CONSTRUCTION/BRIDGE REPLACEMENT

BACKBONE NATIONAL HIGHWAY PERF FAST

2020 1021-00-79 11/10/2020 303 LET BRRPL 0.050 IH 094 BALDWIN - MENOMONIE $4,000,000 - $4,999,999

CTH NN BRIDGE WEST BOUND B-55-0270

CONSTRUCTION/BRIDGE REPLACEMENT

BACKBONE NATIONAL HIGHWAY PERF FAST

2020 1021-00-98 07/25/2020 303 SFA MISC 0.000 IH 094 BALDWIN - MENOMONIE $0 - $99,999

CTH NN BRIDGE EAST BOUND B-55-0017

TRF MITIGATION CONSTR ID 1021-00-78

BACKBONE NON-FEDERAL

2020 1021-00-99 07/25/2020 303 SFA MISC 0.000 IH 094 BALDWIN - MENOMONIE $0 - $99,999

CTH NN BRIDGE WEST BOUND B-55-0270

TRF MITIGATION/CONSTR ID 1021-00-79

BACKBONE NON-FEDERAL

2020 1021-04-28 01/25/2020 303 R/E BRRPL 0.000 IH 094 BALDWIN - MENOMONIE $0 - $99,999

CARR CREEK WB BRIDGE B-55-0013

REAL ESTATE ACQ/BRIDGE REPLACEMENT

BACKBONE NON-FEDERAL

2020 1021-04-77 11/10/2020 303 LET BRRPL 0.121 IH 094 BALDWIN - MENOMONIE $4,000,000 - $4,999,999

CARR CREEK EB BRG B-55-0281 & 0285

CONSTRUCTION/BRIDGE REPLACEMENT

BACKBONE NATIONAL HIGHWAY PERF FAST

2020 1021-04-78 11/10/2020 303 LET BRRPL 0.037 IH 094 BALDWIN - MENOMONIE $6,000,000 - $6,999,999

CARR CREEK WB BRG B-55-0282 & 0286

Page 67: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

333 2020-2023 FINAL STIP Project Listing Northwest Region

ST. CROIX

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

CONSTRUCTION/BRIDGE REPLACEMENT

BACKBONE NATIONAL HIGHWAY PERF FAST

2021 1020-01-78 03/25/2021 303 MIS MISC 4.125 IH 094 HUDSON - BALDWIN $100,000 - $249,999

KINNICKINNIC RIV TO CTH T (EB & WB)

MIS CONSTR/PROCUREMENT ITS EQUIPMNT

BACKBONE NATIONAL HIGHWAY PERF FAST

2021 1020-01-97 03/25/2021 303 SFA MISC 4.125 IH 094 HUDSON - BALDWIN $0 - $99,999

KINNICKINNIC RIV TO CTH T (EB & WB)

TRAFFIC MITIGATION 1020-01-77

BACKBONE NON-FEDERAL

2021 1020-02-83 12/14/2021 303 LET BRRHB 0.050 IH 094 HUDSON - BALDWIN $1,000,000 - $1,999,999

CARMICHAEL ROAD BRIDGE B-55-0118

CONSTRUCTION/BRIDGE REHABILITATION

BACKBONE NATIONAL HIGHWAY PERF FAST

2021 1021-04-97 02/25/2021 303 SFA MISC 0.000 IH 094 CARR CREEK BRGS B-55-0281 & 0282 $0 - $99,999

BALDWIN - MENOMONIE

TRAFFIC MITIGATION/1021-04-77 & 78

BACKBONE NON-FEDERAL

2023 1021-00-96 07/25/2023 303 SFA MISC 0.000 IH 094 HUDSON - BALDWIN $0 - $99,999

RUSH RIVER BRIDGE WB B-55-0262

TRF MITIGATION CONSTR ID 1021-00-76

BACKBONE NON-FEDERAL

2023 1021-00-97 07/25/2023 303 SFA MISC 0.000 IH 094 HUDSON - BALDWIN $0 - $99,999

RUSH RIVER BRIDGE EB B-55-0045

TRF MITIGATION CONSTR ID 1021-00-77

Page 68: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

334 2020-2023 FINAL STIP Project Listing Northwest Region

ST. CROIX

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

BACKBONE NON-FEDERAL

2022 8999-00-65 01/11/2022 206 LET RECST 0.150 LOC STR V NORTH HUDSON, WISCONSIN ST NORTH $250,000 - $499,999

6TH STREET NORTH TO 3RD ST NORTH

CONST/RECST

STP URBAN 20,000 - 50,000 STBG 5-200K POP FASTG

2022 8940-00-17 01/25/2022 290 LLC MISC 0.000 NON HWY

C NEW RICHMOND, CTH A BIKE TRAIL $750,000 - $999,999

W RICHMOND WAY TO W 4TH STREET

CONSTR/PAVED BIKE PED TRAIL/TAP

BICYCLE AND PEDESTRIAN FACILITIES TAP AREAS 5K-200K MAP21-EX

2020 7200-02-44 01/25/2020 303 UTL MISC 0.054 STH 035 C RIVER FALLS, STH 35 AND STH 65 $0 - $99,999

DIVISION ST/CTH M (HOFFMAN PLACE)

UTILITY/LEVEL OF EFFORT

STATE 3R NON-FEDERAL

2020 7200-02-73 05/12/2020 303 LET RECST 0.104 STH 035 C RIVER FALLS, STH 35 AND STH 65 $2,000,000 - $2,999,999

DIVISION ST/CTH M (HOFFMAN PLACE)

CONSTRUCTION/SAFETY/RECONSTRUCT

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG

2020 8080-05-40 11/25/2020 303 UTL MISC 0.830 STH 035 VILLAGE NORTH HUDSON, 6TH STREET $0 - $99,999

LAKE MALLALIEU BRIDGE - SOMMERS ST

UTILITY/LEVEL-OF-EFFORT

STATE 3R NON-FEDERAL

2020 8080-07-20 01/25/2020 303 R/E RECST 2.453 STH 035 CITY OF HUDSON, SECOND STREET $100,000 - $249,999

VINE STREET TO WILLOW RIVER

REAL ESTATE ACQ/RECONSTRUCTION

STATE 3R NON-FEDERAL

2021 8060-00-20 06/25/2021 303 R/E PVRPLA 1.227 STH 035 SOMERSET - ST CROIX FALLS $0 - $99,999

CTH C TO LASER DRIVE

Page 69: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

335 2020-2023 FINAL STIP Project Listing Northwest Region

ST. CROIX

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

2021 8080-02-60 01/12/2021 303 LET RSRF10 0.820 STH 035 CITY OF HUDSON, SECOND STREET $1,000,000 - $1,999,999

FRONT STREET TO VINE STREET

CONSTR/RESURF/PCC REPAIR & OVERLAY

STATE 3R STBG 5-200K POP FASTG

2021 8080-02-61 01/12/2021 303 LET MISC 0.820 STH 035 C HUDSON, SECOND STREET $750,000 - $999,999

FRONT STREET TO VINE STREET

CONSTRUCTION/SANITARY SEWER

STATE 3R NON-FEDERAL

2021 8080-02-72 01/12/2021 303 LET RSRF10 0.002 STH 035 CITY OF HUDSON, SECOND STREET $250,000 - $499,999

COULEE RD/BUCKEYE ST INTERSECTION

CONSTRUCTION/SAFETY

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

2021 8080-02-73 01/12/2021 303 LET MISC 0.156 STH 035 V NORTH HUDSON, 6TH STREET NORTH $250,000 - $499,999

SOMMERS STREET TO NORTH END ROAD

CONSTRUCTION/SFTY/TWLTL

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

2021 8080-05-70 01/12/2021 303 LET RECST 0.880 STH 035 VILLAGE NORTH HUDSON, 6TH STREET $4,000,000 - $4,999,999

LAKE MALLALIEU BRIDGE - SOMMERS ST

CONSTRCUTION/RECONSTRUCTION

STATE 3R STBG <5K POP FAST

2021 8080-05-72 01/12/2021 303 LET RECST 0.887 STH 035 VILLAGE NORTH HUDSON, 6TH STREET $750,000 - $999,999

LAKE MALLALIEU BRIDGE - SOMMERS ST

CONSTRUCTION/SANITARY SEWER & WATER

STATE 3R NON-FEDERAL

2021 8080-07-40 01/25/2021 303 UTL RECST 0.800 STH 035 CITY OF HUDSON, SECOND STREET $0 - $99,999

VINE STREET TO WILLOW RIVER

Page 70: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

336 2020-2023 FINAL STIP Project Listing Northwest Region

ST. CROIX

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

UTL/LEVEL-OF-EFFORT/8080-07-70

STATE 3R NON-FEDERAL

2021 8080-07-70 01/12/2021 303 LET RECST 0.800 STH 035 CITY OF HUDSON, SECOND STREET $3,000,000 - $3,999,999

VINE STREET TO WILLOW RIVER

CONSTRUCTION/RECONSTRUCTION

STATE 3R STBG 5-200K POP FASTG

2021 8080-07-72 01/12/2021 303 LET RECST 1.620 STH 035 CITY OF HUDSON, SECOND STREET $750,000 - $999,999

VINE STREET TO WILLOW RIVER

CONSTR/RECST/SANITARY SEWER & WATER

STATE 3R NON-FEDERAL

2023 8060-00-70 01/10/2023 303 LET PVRPLA 1.228 STH 035 SOMERSET - ST CROIX FALLS $3,000,000 - $3,999,999

CTH C TO LASER DRIVE

CONSTRUCTION/PAVEMENT REPLACEMENT

STATE 3R NATIONAL HIGHWAY PERF FAST

2023 8060-00-72 01/10/2023 303 LET MISC 1.227 STH 035 SOMERSET - ST CROIX FALLS $1,000,000 - $1,999,999

CTH C TO LASER DRIVE

CONSTR/SANITARY SEWER & WATER MAIN

STATE 3R NON-FEDERAL

8110-03-04 303 I/E MISC 0.530 STH 064 STILLWATER - NEW RICHMOND $0 - $99,999

STH 35/CTH C WEST BND RAMP TERMINAL

DESGN/MISCELLANEOUS/TRAFFIC SIGNALS

STATE 3R NON-FEDERAL

2021 8110-01-76 04/13/2021 303 LET MISC 0.028 STH 064 C NEW RICHMOND, STH 64 $500,000 - $749,999

STH 64 AND STH 65 INTERSECTION

CONSTR/SAFETY/TURN LANE REALIGNMENT

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

2020 1540-02-26 06/25/2020 303 R/E RSRF20 2.119 STH 065 RIVER FALLS - NEW RICHMOND $0 - $99,999

IH 94 TO USH 12 WEST

Page 71: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

337 2020-2023 FINAL STIP Project Listing Northwest Region

ST. CROIX

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

REAL ESTATE/RESURFACING

STATE 3R NON-FEDERAL

8650-00-04 303 I/E COLD20 7.900 STH 128 ELMWOOD - STH 64 $100,000 - $249,999

USH 12 TO STH 170

DESIGN/CIR/RESURFACE

STATE 3R STBG <5K POP FAST

2022 7620-00-70 11/08/2022 303 LET COLD10 5.830 STH 128 ELMWOOD - STH 64 $2,000,000 - $2,999,999

STH 29 TO USH 12

CONSTRUCTION/CIR/RESURFACE

STATE 3R STBG <5K POP FAST

2022 8650-00-23 06/25/2022 303 R/E COLD10 6.140 STH 128 ELMWOOD - STH 64 $0 - $99,999

STH 170 TO STH 64

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

2023 7620-00-21 07/25/2023 303 R/E COLD10 5.830 STH 128 ELMWOOD - STH 64 $0 - $99,999

STH 29 TO USH 12

REAL ESTATE/CIR/RESURFACE

STATE 3R NON-FEDERAL

2023 8650-00-50 10/25/2023 303 R/R COLD10 0.000 STH 128 ELMWOOD - STH 64 $250,000 - $499,999

WCL RR XING 693015C MP 396.24

RR OPS/INSTALL SIGNALS AND GATES

STATE 3R STBG <5K POP FAST

2023 8650-00-51 10/25/2023 303 R/R COLD10 0.000 STH 128 ELMWOOD - STH 64 $0 - $99,999

WCL RR XING 693015C MP 396.24

RR OPS/INSTALL NEW CROSSING SURFACE

STATE 3R STBG <5K POP FAST

2023 8650-00-72 11/14/2023 303 LET MISC 0.113 STH 128 GLENWOOD CITY - STH 64 $250,000 - $499,999

CULVERTS C-55-0NEW AND C-55-0037

Page 72: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

338 2020-2023 FINAL STIP Project Listing Northwest Region

ST. CROIX

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

CONST/MISC/CULVERT REPLACEMENT

SHR BRIDGES SURFACE TRANSP BLOCK GRTS-

2023 8650-00-73 11/14/2023 303 LET COLD10 6.140 STH 128 ELMWOOD - STH 64 $3,000,000 - $3,999,999

STH 170 TO STH 64

CONSTRUCTION/CIR/RESURFACE

STATE 3R STBG <5K POP FAST

8949-00-03 303 I/E BRRHB 0.000 USH 012 HUDSON - BALDWIN $0 - $99,999

CNW RR BRDIGE B-55-0076

DESIGN/BRIDGE REHABILITATION/REDECK

SHR BRIDGES STBG <5K POP FAST

2020 8949-00-21 09/25/2020 303 R/E COLD10 8.660 USH 012 HUDSON - BALDWIN $0 - $99,999

STH 65 NORTH TO USH 63 NORTH

REAL ESTATE ACQUISITION/TLE

STATE 3R NON-FEDERAL

2020 8949-02-42 05/25/2020 303 UTL RSRF20 5.300 USH 012 HUDSON - BALDWIN $0 - $99,999

CTH U TO WEST JUNCTION STH 65

UTL/LEVEL-OF-EFFORT/8949-02-61

STATE 3R NON-FEDERAL

2021 8949-00-40 12/25/2021 303 UTL RSRF20 8.660 USH 012 HUDSON - BALDWIN $0 - $99,999

STH 65 NORTH TO USH 63 NORTH

UTL/LEVEL-OF-EFFORT/8949-00-71

STATE 3R NON-FEDERAL

2021 8949-00-71 12/14/2021 303 LET RSRF20 8.620 USH 012 HUDSON - BALDWIN $5,000,000 - $5,999,999

STH 65 NORTH TO USH 63 NORTH

CONSTRUCTION/RESURFACING

STATE 3R SURFACE TRANSP BLOCK GRTS-

2021 8949-00-74 12/14/2021 303 LET RSRF10 0.590 USH 012 HUDSON - BALDWIN $250,000 - $499,999

USH 63 NORTH TO USH 63 SOUTH

Page 73: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

339 2020-2023 FINAL STIP Project Listing Northwest Region

ST. CROIX

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

CONSTRUCTION/RESURFACE/RSRF10

STATE 3R SURFACE TRANSP BLOCK GRTS-

2021 8949-02-61 01/12/2021 303 LET RSRF20 5.300 USH 012 HUDSON - BALDWIN $3,000,000 - $3,999,999

CTH U TO WEST JUNCTION STH 65

CONSTRUCTION/RESURFACING

STATE 3R SURFACE TRANSP BLOCK GRTS-

2021 8949-02-62 01/12/2021 303 LET MISC 5.300 USH 012 HUDSON - BALDWIN $100,000 - $249,999

CTH U TO WEST JUNCTION STH 65

CONS/SFTY/WIDN PAVD SHLDR/RUMBLSTRP

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

2020 1550-02-50 05/25/2020 207 R/R MISC 0.000 USH 063 V BALDWIN, USH 63 $100,000 - $249,999

UNION PACIFIC RR XING 183863C

RR OPS/RAIL-HIGHWAY CROSSING REPAIR

RAILROAD CROSSING REPAIR NON-FEDERAL

Page 74: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

2020-2023 FINAL STIP Project ListingNorthwest Region

STATEWIDE

340340 2020-2023 FINAL STIP Project Listing Northwest Region

STATEWIDE

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2021 1000-18-21 05/11/2021 305 LET TOPM 0.000 VAR HWY NW REGION, PAVEMENT MARKING 2021 $1,000,000 - $1,999,999

VARIOUS HIGHWAYS, NW REGION WIDE

CONST/TRF/PVMT MRK/STN ANNUAL PLN

STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANSP BLOCK GRTS-

2022 1000-18-23 05/09/2022 305 LET TOPM 0.000 VAR HWY NW REGION, PAVEMENT MARKING 2022 $1,000,000 - $1,999,999

VARIOUS HIGHWAYS, NW REGION WIDE

CONST/TRF/PVMT MRK/STN ANNUAL PLN

STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANSP BLOCK GRTS-

Page 75: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

2020-2023 FINAL STIP Project ListingNorthwest Region

TAYLOR

341341 2020-2023 FINAL STIP Project Listing Northwest Region

TAYLOR

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2022 8888-08-76 03/08/2022 206 LET RECST 1.030 CTH O STH 64 - ECL $2,000,000 - $2,999,999

GIBSON STREET TO STH 13

CONSTRUCTION/RECONSTRUCTION

STP RURAL STBG <5K POP FAST

2020 1610-01-64 02/25/2020 303 LFA BRPVTV 0.000 STH 013 MEDFORD - PRENTICE $100,000 - $249,999

TRIB TO BLACK RIVER B-60-0147

CONSTRUCTION/LFA/CULVERT LINING

STATE 3R NON-FEDERAL

2022 1610-01-26 11/25/2022 303 R/E RSRF20 1.570 STH 013 ABBOTSFORD - MEDFORD $0 - $99,999

CTH O TO TAYLOR STREET

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

2023 1610-01-76 11/14/2023 303 LET RSRF20 1.580 STH 013 ABBOTSFORD - MEDFORD $1,000,000 - $1,999,999

CTH O TO TAYLOR STREET

CONSTRUCTION/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

8220-00-06 303 I/E RSRF20 1.105 STH 064 GILMAN - MEDFORD $100,000 - $249,999

NATIONAL AVE TO STH 13

DESIGN/RESURFACE

STATE 3R STBG <5K POP FAST

2020 8220-03-73 03/10/2020 303 LET BRNEW 0.100 STH 064 GILMAN - MEDFORD $500,000 - $749,999

HAY CREEK BRIDGE B-60-0148

CONSTR/NEW BRIDGE REPLACES CULVERT

SHR BRIDGES STBG <5K POP FAST

2023 8220-00-70 11/14/2023 303 LET BRRHB 0.020 STH 064 GILMAN - MEDFORD $2,000,000 - $2,999,999

BLACK RIVER BRIDGE B-60-0001

CONSTRUCTION/BRIDGE REHABILITATION

SHR BRIDGES STBG <5K POP FAST

Page 76: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

342 2020-2023 FINAL STIP Project Listing Northwest Region

TAYLOR

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2023 8220-00-76 11/14/2023 303 LET RSRF20 1.105 STH 064 GILMAN - MEDFORD $750,000 - $999,999

NATIONAL AVE TO STH 13

CONSTRUCTION/RESURFACE

STATE 3R STBG <5K POP FAST

2020 9535-00-75 11/10/2020 303 LET PVRPLA 1.640 STH 097 STRATFORD - GOODRICH $1,000,000 - $1,999,999

SOUTH COUNTY LINE TO STH 64

CONSTRUCTION/PAVEMENT REPLACEMENT

STATE 3R STBG <5K POP FAST

Page 77: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

343 2020-2023 FINAL STIP Project Listing Northwest Region TREMPEALEAU

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2020 7146-00-71 02/11/2020 205 LET BRRPL 0.019 CTH D ECL - ETTRICK $500,000 - $749,999

S FORK OF BEAVER CREEK BR B610230

CONST/BRRPL

LOCAL BRIDGES SURFACE TRANSP BLOCK GRTS-

2022 7146-00-72 03/08/2022 205 LET BRRPL 0.004 CTH D ETTRICK - WHITEHALL $250,000 - $499,999

IRVIN CREEK BRIDGE B-61-0NEW

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

2021 7157-00-70 04/13/2021 205 LET BRRPL 0.008 CTH G STH 35 - STH 93 $250,000 - $499,999

TAMARACK CREEK BRIDGE B-61-0241

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

2021 7176-00-70 03/09/2021 205 LET BRRPL 0.004 CTH OO CTH E - STRUM $250,000 - $499,999

BR N BR ELK CREEK BRIDGE B-61-0240

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

2022 1022-00-99 07/25/2022 303 SFA MISC 0.000 IH 094 CTH NN TO EAST COUNTY LINE $100,000 - $249,999

EAU CLAIRE - OSSEO

TRF MITIGATION CONSTR ID 1022-00-79

BACKBONE NON-FEDERAL

2023 1022-00-79 01/10/2023 303 LET PVRPLA 3.680 IH 094 EAU CLAIRE - OSSEO $17,000,000 - $19,999,999

CTH NN TO EAST COUNTY LINE

CONSTRUCTION/PAVEMENT REPLACEMENT

BACKBONE NATIONAL HIGHWAY PERF FAST

2020 7281-00-72 02/11/2020 205 LET BRRPL 0.000 LOC STR T ETTRICK, DOPP ROAD $250,000 - $499,999

SMIKRUD COULEE CR BRIDGE B610232

CONST/BRRPL

LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG

Page 78: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

344 2020-2023 FINAL STIP Project Listing Northwest Region TREMPEALEAU

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2021 7276-00-73 11/09/2021 205 LET BRRPL 0.019 LOC STR T ARCADIA, PYKA ROAD $250,000 - $499,999

NORTH CREEK BRIDGE B-61-0242

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

2022 7276-00-74 03/08/2022 205 LET BRRPL 0.006 LOC STR T ARCADIA, RAINEY VALLEY ROAD $100,000 - $249,999

RAINEY VALLEY CREEK BRIDGE B610NEW

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

2022 7281-00-73 03/08/2022 205 LET BRRPL 0.008 LOC STR T ETTRICK, JOE COULEE ROAD $250,000 - $499,999

NF BEAVER CREEK BRIDGE B-61-0NEW

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

2022 7281-00-74 03/08/2022 205 LET BRRPL 0.015 LOC STR T ETTRICK, HAGESTAD ROAD $250,000 - $499,999

NF BEAVER CREEK BRIDGE B-61-0NEW

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

2022 7283-00-70 02/08/2022 205 LET BRRPL 0.004 LOC STR T HALE, KOWAHL ROAD $250,000 - $499,999

N BR ELK CREEK BRIDGE B-61-0NEW

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

2022 7286-00-70 01/11/2022 205 LET BRRPL 0.006 LOC STR T PRESTON, BRADLEY ROAD $100,000 - $249,999

SILVA COULEE CREEK BRIDGE B-61-0248

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

7140-00-01 303 I/E BRRPL 0.000 STH 035 LA CROSSE - TREMPEALEAU $0 - $99,999

TANK CREEK BRIDGE B-61-0019

DESIGN/BRIDGE REPLACEMENT/BRRPL

STATE 3R STBG <5K POP FAST

Page 79: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

345 2020-2023 FINAL STIP Project Listing Northwest Region TREMPEALEAU

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2020 7160-04-22 01/25/2020 303 R/E BRRPL 0.000 STH 035 TREMPEALEAU - FOUNTAIN CITY $0 - $99,999

PINE CREEK BRIDGE B-61-0029

REAL ESTATE ACQ/BRIDGE REPLACEMENT

SHR BRIDGES NON-FEDERAL

2021 7140-00-20 06/25/2021 303 R/E COLD20 6.140 STH 035 LA CROSSE - TREMPEALEAU $0 - $99,999

LA CROSSE/TREMP CO LN TO 10TH ST

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

2021 7160-04-72 05/11/2021 303 LET BRRPL 0.430 STH 035 TREMPEALEAU - FOUNTAIN CITY $6,000,000 - $6,999,999

TREMP RVR E CHANNEL BRG B-61-0285

CONSTRUCTION/BRIDGE REPLACEMENT

SHR BRIDGES SURFACE TRANSP BLOCK GRTS-

2021 7160-04-73 05/11/2021 303 LET BRRPL 0.063 STH 035 TREMPEALEAU - FOUNTAIN CITY $5,000,000 - $5,999,999

TREMP RVR W CHANNEL BRG B-61-0286

CONSTRUCTION/BRIDGE REPLACEMENT

SHR BRIDGES SURFACE TRANSP BLOCK GRTS-

2022 7140-00-70 11/08/2022 303 LET COLD20 6.140 STH 035 LA CROSSE - TREMPEALEAU $3,000,000 - $3,999,999

LA CROSSE/TREMP CO LN TO 10TH ST

CONSTRUCTION/CIR/RESURFACE

STATE 3R SURFACE TRANSP BLOCK GRTS-

2022 7150-00-70 12/13/2022 303 LET RSRF20 4.900 STH 035 TREMPEALEAU - FOUNTAIN CITY $2,000,000 - $2,999,999

STH 93 TO BUFFALO/TREMP COUNTY LINE

CONSTRUCTION/RESURFACE

STATE 3R STBG <5K POP FAST

2020 7550-02-41 12/25/2020 303 UTL MISC 0.130 STH 054 GALESVILLE - MELROSE $0 - $99,999

CTH AA AND SILVER CREEK RD INTERS

UTL INT 10/RIVERLAND ENERGY COOP

STATE 3R NON-FEDERAL

Page 80: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

346 2020-2023 FINAL STIP Project Listing Northwest Region TREMPEALEAU

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2021 7150-01-71 11/09/2021 303 LET BRRHB 0.200 STH 054 WINONA - GALESVILLE $750,000 - $999,999

BEAVER CREEK BRIDGE B-61-0048

CONSTR/BRIDGE REHABLITATION

SHR BRIDGES STBG <5K POP FAST

2022 7550-00-73 12/13/2022 303 LET RSRF20 5.310 STH 054 WINONA - GALESVILLE $3,000,000 - $3,999,999

STH 93 TO WINNEBAGO ROAD

CONSTRUCTION/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

2020 7130-00-73 11/10/2020 303 LET COLD10 8.050 STH 093 CENTERVILLE - INDEPENDENCE $4,000,000 - $4,999,999

STH 35 TO SWENSON LANE

CONSTRUCTION/RESURFACE

STATE 3R STBG <5K POP FAST

2020 7130-00-83 11/10/2020 303 LET MISC 8.050 STH 093 CENTERVILLE - INDEPENDENCE $250,000 - $499,999

STH 35 TO SWENSON LANE

CONSTR/SFTY/WDN PVD SHLDRS/RMBLSTRP

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

2020 7130-01-23 07/25/2020 303 R/E RECST 0.240 STH 093 C ARCADIA, STH 93 $500,000 - $749,999

STH 95 INTERSECTION

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

2021 7130-08-24 07/25/2021 303 R/E BRRPL 0.000 STH 093 INDEPENDENCE - ELEVA $0 - $99,999

TROUT CREEK BRIDGE B-61-0039

REAL ESTATE ACQUISITION/BRRPL

STATE 3R NON-FEDERAL

2022 7130-01-43 05/25/2022 303 UTL RECST 0.210 STH 093 C ARCADIA, STH 93 $0 - $99,999

STH 95 INTERSECTION

UTILITIES /LEVEL OF EFFORT

STATE 3R NON-FEDERAL

Page 81: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

347 2020-2023 FINAL STIP Project Listing Northwest Region TREMPEALEAU

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2020 7735-01-61 03/10/2020 303 LET RSRF20 14.570 STH 121 GILMANTON - INDEPENDENCE $6,000,000 - $6,999,999

STH 88 TO STH 93

CONSTRUCTION/RESURFACE

STATE 3R STBG <5K POP FAST

2020 7735-01-62 03/10/2020 303 LET MISC 9.630 STH 121 GILMANTON - INDEPENDENCE $0 - $99,999

CTH BB WEST JUNCTION TO STH 93

CONS/SFTY/WIDN PAVD SHLDR/RUMBLSTRP

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

2020 1535-07-23 02/25/2020 303 R/E RSRF20 0.924 USH 010 MONDOVI - OSSEO $0 - $99,999

W JCT USH 53 TO C OSSEO,EAST STREET

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

2023 1535-07-73 11/14/2023 303 LET PVRPLA 0.924 USH 010 MONDOVI - OSSEO $3,000,000 - $3,999,999

NELSON RD TO ROSE LN

CONSTRUCTION/PAVEMENT REPLACEMENT

STATE 3R STBG <5K POP FAST

2023 1535-07-74 11/14/2023 303 LET MISC 0.924 USH 010 MONDOVI - OSSEO $1,000,000 - $1,999,999

NELSON RD TO ROSE LN

CONST/SANITARY SEWER AND WATER MAIN

STATE 3R NON-FEDERAL

2020 1630-00-21 01/25/2020 303 R/E MISC 0.207 USH 053 GALESVILLE - WHITEHALL $0 - $99,999

CULVERTS C-61-8301 & C-61-8302

REAL ESTATE/MISC/CULVRT REPLACEMENT

SHR BRIDGES NON-FEDERAL

2020 1630-01-74 12/08/2020 303 LET RECST 0.013 USH 053 GALESVILLE - WHITEHALL $100,000 - $249,999

STH 95 EAST JUNCTION

CONST/SFTY/OFFSET RIGHT TURN LANE

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

Page 82: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

348 2020-2023 FINAL STIP Project Listing Northwest Region TREMPEALEAU

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2021 1632-03-20 01/25/2021 303 R/E RSRF20 0.015 USH 053 LA CROSSE - GALESVILLE $0 - $99,999

SOUTH COUNTY LINE TO HARRIS ROAD

REAL ESTATE/RESURFACING

STATE 3R NON-FEDERAL

2022 1630-00-40 04/25/2022 303 UTL MISC 0.207 USH 053 GALESVILLE - WHITEHALL $0 - $99,999

CULVERTS C-61-8301 & C-61-8302

UTL/LEVEL OF EFFORT/1630-00-71

SHR BRIDGES NON-FEDERAL

2022 1630-00-71 04/12/2022 303 LET MISC 0.220 USH 053 GALESVILLE - WHITEHALL $500,000 - $749,999

CULVERTS C-61-8301 & C-61-8302

CONST/MISC/CULVERT REPLACEMENT

SHR BRIDGES STBG <5K POP FAST

2022 1632-03-70 12/13/2022 303 LET RSRF20 3.441 USH 053 LA CROSSE - GALESVILLE $3,000,000 - $3,999,999

SOUTH COUNTY LINE TO HARRIS ROAD

CONSTRUCTION/RESURFACING

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 83: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

349 2020-2023 FINAL STIP Project Listing Northwest Region

WASHBURN

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2021 8814-00-70 03/09/2021 206 LET PVRPLA 1.980 CTH D SARONA - BIRCHWOOD $500,000 - $749,999

CTH T SOUTH TO CTH T NORTH

CONSTRUCTION/PAVEMENT REPLACEMENT

STP RURAL STBG <5K POP FAST

2021 8130-00-72 11/09/2021 303 LET MISC 0.015 STH 070 SPOONER - STONE LAKE $500,000 - $749,999

CRYSTAL BROOK CULVERT

CONSTRUCTION/CULVERT REPLACEMENT

SHR BRIDGES STBG <5K POP FAST

2021 8130-01-70 11/09/2021 303 LET COLD20 6.320 STH 070 SPOONER - STONE LAKE $3,000,000 - $3,999,999

USH 53 TO SOUTH JUNCTION CTH M

CONSTRUCTION/RESURFACE/CIR

STATE 3R STBG <5K POP FAST

8550-00-01 303 I/E BRRHB 0.000 STH 077 MINONG - HAYWARD $0 - $99,999

SOO LINE BRIDGE B-65-0006

DESIGN/BRRHB/CONCRETE OVERLAY

SHR BRIDGES STBG <5K POP FAST

2021 8550-02-22 06/25/2021 303 R/E COLD20 6.930 STH 077 MINONG - HAYWARD $0 - $99,999

CTH I TO CTH G

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

1196-01-02 303 I/E PVRPLA 4.890 USH 053 MINONG - SOLON SPRINGS $1,000,000 - $1,999,999

BUS 53 (MINONG) TO CTH T (NB)

DESIGN/PAVEMENT REPLACEMENT

BACKBONE NATIONAL HIGHWAY PERF FAST

1196-02-00 303 I/E RSRF20 0.000 USH 053 SPOONER - MINONG $100,000 - $249,999

WHALEN LAKE RD TO BUS 53 (SB)

DESIGN/RESURFACING

BACKBONE NATIONAL HIGHWAY PERF FAST

Page 84: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

350 2020-2023 FINAL STIP Project Listing Northwest Region

WASHBURN

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

1198-02-35 303 I/E PSRS30 6.620 USH 053 SPOONER - MINONG $0 - $99,999

CTH H TO WHALEN LAKE ROAD (NB & SB)

DESIGN/RDMTN/CONCRETE REPAIRS

BACKBONE NON-FEDERAL

2020 1195-01-76 12/08/2020 303 LET RECST 0.004 USH 053 MINONG - SOLON SPRINGS $1,000,000 - $1,999,999

STH 77 INTERSECTION

CONST/SFTY/RECONFIGUR MEDIAN/U-TURN

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

2020 1197-00-40 01/25/2020 303 UTL BRNEW 1.600 USH 053 SPOONER - MINONG $250,000 - $499,999

TREGO INTERCHANGE

UTILITY/LEVEL-OF-EFFORT

BACKBONE NON-FEDERAL

2020 1197-00-50 01/25/2020 303 MIS MISC 1.600 USH 053 SPOONER - MINONG $0 - $99,999

TREGO INTERCHNG/WGN RR XING 184524U

MISC/RR X-ING RELOCATE/STATE OWNED

BACKBONE NON-FEDERAL

2020 1197-00-51 01/25/2020 303 MIS MISC 0.023 USH 053 SPOONER - MINONG $0 - $99,999

TREGO INTERCHNG/WGN RR XING NEW

MISC/RR X-ING INSTALLATION

BACKBONE NON-FEDERAL

2020 1197-00-70 12/08/2020 303 LET BRNEW 1.600 USH 053 SPOONER - MINONG $20,000,000 - $24,999,999

TREGO INTERCHANGE

CONSTR/EXPANSION/NEW BRDG B-65-0NEW

BACKBONE NATIONAL HIGHWAY PERF FAST

2021 1197-00-72 04/25/2021 303 MIS MISC 1.892 USH 053 SPOONER - MINONG $0 - $99,999

TREGO INTERCHANGE

MISC CONTRUCTION/PURCHASE ITS

BACKBONE NATIONAL HIGHWAY PERF FAST

Page 85: Northwest Region Projects - Wisconsin Department of ... · 2020-2023 FINAL STIP Project Listing Northwest Region ASHLAND 2020-2023 FINAL STIP Project Listing 268 268 Northwest Region

351 2020-2023 FINAL STIP Project Listing Northwest Region

WASHBURN

Year Project Schd Dt Pgm Contract

Type CONCEPT Net

Miles Route Project Description WISDOT Program

Estimate Anticipated Funding

2021 1197-00-90 03/25/2021 303 SFA MISC 1.600 USH 053 SPOONER - MINONG $100,000 - $249,999

TREGO INTERCHANGE

TRF MITIGATION CONSTR ID 1197-00-70

BACKBONE NON-FEDERAL

2022 1197-18-77 11/08/2022 303 LET PVRPLA 6.410 USH 053 NEW AUBURN - SPOONER $15,000,000 - $16,999,999

PINE GROVE RD TO WILDCAT RD (NB&SB)

CONSTRUCTION/PAVEMENT REPLACEMENT

BACKBONE NATIONAL HIGHWAY PERF FAST

2023 1196-00-62 02/14/2023 303 LET PSRS20 3.040 USH 053 MINONG - SOLON SPRINGS $1,000,000 - $1,999,999

BUS 53 (MINONG) TO LAKESIDE RD (NB)

CONST/CONCRETE/JOINT REPAIR

BACKBONE NATIONAL HIGHWAY PERF FAST

2023 1197-18-78 12/12/2023 303 LET PVRPLA 6.470 USH 053 NEW AUBURN - SPOONER $17,000,000 - $19,999,999

WILDCAT RD TO CTH A (NB & SB)

CONSTRUCTION/PAVEMENT REPLACEMENT

BACKBONE NATIONAL HIGHWAY PERF FAST

2020 1560-00-20 01/25/2020 303 R/E RECST 0.805 USH 063 SPOONER - HAYWARD $0 - $99,999

STH 70 TO POPLAR STREET

REAL ESTATE ACQ/RECONSTRUCTION

STATE 3R NON-FEDERAL

2021 1560-00-70 01/12/2021 303 LET RECST 1.025 USH 063 SPOONER - HAYWARD $5,000,000 - $5,999,999

GREENWOOD AVE TO POPLAR STREET

CONSTRUCTION/PAVEMENT REPLACEMENT

STATE 3R NATIONAL HIGHWAY PERF FAST

2021 1560-00-80 01/12/2021 303 LET RECST 1.025 USH 063 SPOONER - HAYWARD $750,000 - $999,999

GREENWOOD AVE TO POPLAR STREET

CONS/RECST/SANITARY & WATER/LCL100%

STATE 3R NON-FEDERAL