northern beaches hospital road connectivity and …€¦ · frenchs forest road intersection ......

6
The NSW Government is planning to upgrade roads around the new Northern Beaches Hospital with work planned to be completed in time for the hospital opening in 2018. These upgrades would provide customers with a better travel experience, increase the capacity of the road network and improve access through the area, including for pedestrians and cyclists. Roads and Maritime Services is planning to deliver the road in two stages: • Stage 1 Connectivity Work would provide essential access to the Northern Beaches Hospital • Stage 2 Network Enhancement Work would help increase capacity of the road network and reduce congestion. Roads and Maritime received planning approval on 29 June 2015 for the Concept Proposal and Stage 1 Connectivity Work in accordance with Part 5.1 of the Environmental Planning and Assessment Act 1979. Further information on the project’s approval is available on the NSW Department of Planning and Environment’s website at www.planning.nsw.gov.au Project update Following a competitive tendering process Roads and Maritime contracted Ferrovial York Joint Venture (FYJV) to construct the road upgrades around the Northern Beaches Hospital. Site investigations have started in order to progress our detailed design for the project. Construction milestones Construction of the Stage 1 Connectivity Work is scheduled to begin later this year. Work will be constructed in four zones: 1. Frenchs Forest Road intersection – intersection of Frenchs Forest Road and Wakehurst Parkway 2. Frenchs Forest Road West – Frenchs Forest Road West from Rabbett Street to Gladys Avenue 3. Naree Road to Forest Way 4. Frenchs Forest Road East – Frenchs Forest Road East from Skyline Place to Warringah Road. Northern Beaches Hospital Road Connectivity and Network Enhancement Project October 2015

Upload: lehanh

Post on 28-Apr-2018

218 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Northern Beaches Hospital Road Connectivity and …€¦ · Frenchs Forest Road intersection ... Early investigation work ... north/northern-beaches-hospital If you need help understanding

The NSW Government is planning to upgrade roads around the new Northern Beaches Hospital with work planned to be completed in time for the hospital opening in 2018. These upgrades would provide customers with a better travel experience, increase the capacity of the road network and improve access through the area, including for pedestrians and cyclists.

Roads and Maritime Services is planning to deliver the road in two stages:

• Stage 1 Connectivity Work would provide essential access to the Northern Beaches Hospital

• Stage 2 Network Enhancement Work would help increase capacity of the road network and reduce congestion.

Roads and Maritime received planning approval on 29 June 2015 for the Concept Proposal and Stage 1 Connectivity Work in accordance with Part 5.1 of the Environmental Planning and Assessment Act 1979. Further information on the project’s approval is available on the NSW Department of Planning and Environment’s website at www.planning.nsw.gov.au

Project updateFollowing a competitive tendering process Roads and Maritime contracted Ferrovial York Joint Venture (FYJV) to construct the road upgrades around the Northern Beaches Hospital.

Site investigations have started in order to progress our detailed design for the project.

Construction milestonesConstruction of the Stage 1 Connectivity Work is scheduled to begin later this year. Work will be constructed in four zones:

1. Frenchs Forest Road intersection – intersection of Frenchs Forest Road and Wakehurst Parkway

2. Frenchs Forest Road West – Frenchs Forest Road West from Rabbett Street to Gladys Avenue

3. Naree Road to Forest Way

4. Frenchs Forest Road East – Frenchs Forest Road East from Skyline Place to Warringah Road.

Northern Beaches Hospital Road Connectivity and Network Enhancement Project October 2015

Page 2: Northern Beaches Hospital Road Connectivity and …€¦ · Frenchs Forest Road intersection ... Early investigation work ... north/northern-beaches-hospital If you need help understanding

What to expect?

Early investigation work

Early investigation work for the Stage 1 Connectivity Work started in August 2015. The work will continue until the start of construction for the Stage 1 Connectivity Work later in the year. The early investigation work includes:

• Establishing the project site compound on the north eastern corner of the intersection of Warringah Road and Wakehurst Parkway

• Pot holing work

• Surveying

• Stormwater and drainage investigations

• Geotechnical investigations

• Investigating the locations of utilities and services like electricity, water, gas and telecommunications

• Ongoing development of the project’s detailed design.

Construction activities

Construction activities for the Stage 1 Connectivity Work will start in November 2015 and will include:

• Clearing vegetation

• Relocating utilities and services including electricity, water, gas and telecommunications

• Installing boundary fencing around work areas to ensure safe separation of construction activity from traffic, pedestrians and cyclists

• Removing existing curbs, footpaths, road barriers and median strips

• Adjustments to private properties including realigning driveways to fit in with the widened roads

• Removing structures and clearing land

• Moving soil and rock to create the foundations for the new road

• Driving piles (structural poles)

• Constructing new sections of road including laying pavement, building new curbs, footpaths, road barriers, median strips and installing new traffic lights

• Landscaping

• Finishing work including line marking, testing traffic signals, restoring areas used temporarily during construction

• Improvements to The Forest High School.

Some noise is likely to be involved in this work.

Stage 1 Connectivity Work

Indicative construction timeframe for Stage 1

2015 2016 2017

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

Detailed design

Early work

Site compound establishment

Frenchs Forest Road intersection

Frenchs Forest Road West

Naree Road and Forest Way

Frenchs Forest Road East

WE ARE HERE

Page 3: Northern Beaches Hospital Road Connectivity and …€¦ · Frenchs Forest Road intersection ... Early investigation work ... north/northern-beaches-hospital If you need help understanding

Managing impacts during constructionThere will be some disruption while we complete this work including changed traffic conditions, noise, vibration, dust, lighting during night time work and access to property. Construction activities will be carried out in accordance with the project’s Construction Environmental Management Plan. We will make every effort to minimise impacts by:

• Notifying residents in advance of work

• Carrying out work during standard construction hours wherever possible

• Servicing and maintaining machinery and equipment to limit noise and emissions.

Construction hoursConstruction of the Stage 1 Connectivity Work will generally be carried out during standard construction hours including:

7am to 6pm Monday to Friday

8am to 1pm Saturdays.

Some work will need to be carried out at night time to maintain safety measures, to lessen impacts on the road network and to maintain the service continuity of utilities including electricity when they are being relocated. All work outside of standard construction hours will be carried out in accordance with the relevant approvals and residents and businesses will be notified in advance of any night work being carried out.

Temporary project information centre A temporary project information centre has been established. Information about the project is available for you to view and members of the project team are available to answer questions.

Visit us:

9am – 5pm, Monday – Friday Level 3, Building 1, 14 Aquatic Drive Frenchs Forest NSW 2086

Visitor parking is available and can be accessed by using the intercom at the parking gate.

The permanent FYJV project site compound and project information centre will be located on the north eastern corner of the intersection Warringah Road and Wakehurst Parkway. This office will be established when construction of the Stage 1 Connectivity Work starts later in the year and will be in place for the duration of the construction.

Community and Environment ForumWe are establishing a Community and Environment Forum to enable members of the community to discuss the project and provide feedback to the project team on key environmental and project issues. Please contact the project team to register your interest in getting involved with the forum.

Stage 2 Network Enhancement updateRoads and Maritime has prepared an Environmental Impact Statement for the Stage 2 Network Enhancement Work. The Environmental Impact Statement was displayed from 22 July to 21 August 2015 and a submissions report is now being prepared which will respond to all issues raised in formal submissions. The proposed Stage 2 Network Enhancement Work will then be considered for approval by the NSW Minister for Planning. You can view the full Environmental Impact Statement via the NSW Department of Planning and Environment website at www.majorprojects.planning.nsw.gov.au

Contact us We are committed to minimising the impacts of construction on the community and will continue to keep you informed as the project progresses. For more information, to register for project updates or to speak to a member of the project team contact the FYJV:

1800 014 307 (free call line available 24 hours)

[email protected]

Northern Beaches Hospital Road Connectivity and Network Enhancement Project PO Box 6040, Frenchs Forest NSW 2086.

www.rms.nsw.gov.au/projects/Sydney-north/northern-beaches-hospital

If you need help understanding this information, please contact the Translating and Interpreting Service on 131 450 and ask them to call us on 1800 014 307.

October 2015 RMS 15.321

Privacy Roads and Maritime Services (“RMS”) is subject to the Privacy and Personal Information Protection Act 1998 (“PPIP Act”) which requires that we comply with the Information Privacy Principles set out in the PPIP Act. All information in correspondence is collected for the sole purpose of assisting in the assessment of this proposal/delivering this project. The information received, including names and addresses of respondents, may be published in subsequent documents unless a clear indication is given in the correspondence that all or part of that information is not to be published. Otherwise RMS will only disclose your personal information, without your consent, if authorised by the law. Your personal information will be held by RMS at insert office address. You have the right to access and correct the information if you believe that it is incorrect.

Page 4: Northern Beaches Hospital Road Connectivity and …€¦ · Frenchs Forest Road intersection ... Early investigation work ... north/northern-beaches-hospital If you need help understanding

Key features of Stage 1 Connectivity Work

What are the key features of the Stage 1 Connectivity Work?

1 Widening and intersection upgrades along sections of Forest Way between Warringah Road and south of Adams Street, including providing a right turn bay for traffic turning from Forest Way into Naree Road.

2 Upgrading the existing bus bay fronting the Forestway Shopping Centre on Forest Way to allow two buses to stop within the bay.

3 Widening Naree Road/Frenchs Forest Road West from two to four lanes.

4 Widening Frenchs Forest Road East from Wakehurst Parkway to Allambie Road from two to four lanes.

5 Improvements to the intersection of Frenchs Forest Road East and Nandi Avenue, allowing left and right turns.

SkylineBusiness Park

Allambie GroveBusiness Park

Karingal Crescent

Warringah Road

Holland Crescent

RussellAvenue

Hilm

er S

tree

t

Ban

try

Bay

Roa

dB

antr

y B

ay R

oad

Wak

ehur

st P

arkw

ay

Wakehurst Parkw

ay

Aquatic Drive

Rodborough Road Alla

mbi

e R

oad

Dareen Street

Warringah Road

Pata

nga

Roa

d

Inve

rnes

s Av

enue

Har

mst

on A

venu

e

Hur

dis

Aven

ue

Rom

ford

Roa

d

Priv

ate

Roa

d

Alla

mbi

eR

oad

Nan

diAv

enue

Skyl

ine

Plac

e

Frenchs Forest Road East

Frenchs Forest Road WestNaree Road

Frenchs Forest Road West

Gla

dys

Aven

ue

Blu

egum

Cre

scen

t

Blu

egum

Cre

scen

t

Sylv

ia P

lace

Cob

b St

reet

Rab

bett

Stre

et

War

eham

Par

ade

Wareham

Parade

Grace Avenue

Grace Avenue

AdamsStreet

AdamsStreet D

undi

laR

oad

Forest Way

Jone

s St

reet

Iris StreetIris Street

LOADINGZONE

MAILZONE

BUSZONE

BUSZONE

MAILZONE

LOADINGZONE

DISABLEDPARKING

SHOP FRONT PARKINGTO BE REMOVED LOADING

ZONE

Right turn only for buses and garbage trucks(no general traffic)

METRES

50 1000

KeyUpgrade area

New hospital site

Median

Footway

Bus facility / bus lane

New stormwater pipe

Retaining wall

Raised concrete island

Site Compound & Project Information Centre (indicative only)

AAM Aerial photography under licence to Roads and Maritime Services by AAM 2014

1

2

36a

6b

Page 5: Northern Beaches Hospital Road Connectivity and …€¦ · Frenchs Forest Road intersection ... Early investigation work ... north/northern-beaches-hospital If you need help understanding

SkylineBusiness Park

Allambie GroveBusiness Park

Karingal Crescent

Warringah Road

Holland Crescent

RussellAvenue

Hilm

er S

tree

t

Ban

try

Bay

Roa

dB

antr

y B

ay R

oad

Wak

ehur

st P

arkw

ay

Wakehurst Parkw

ay

Aquatic Drive

Rodborough Road Alla

mbi

e R

oad

Dareen Street

Warringah Road

Pata

nga

Roa

d

Inve

rnes

s Av

enue

Har

mst

on A

venu

e

Hur

dis

Aven

ue

Rom

ford

Roa

d

Priv

ate

Roa

d

Alla

mbi

eR

oad

Nan

diAv

enue

Skyl

ine

Plac

e

Frenchs Forest Road East

Frenchs Forest Road WestNaree Road

Frenchs Forest Road West

Gla

dys

Aven

ue

Blu

egum

Cre

scen

t

Blu

egum

Cre

scen

t

Sylv

ia P

lace

Cob

b St

reet

Rab

bett

Stre

et

War

eham

Par

ade

Wareham

Parade

Grace Avenue

Grace Avenue

AdamsStreet

AdamsStreet D

undi

laR

oad

Forest Way

Jone

s St

reet

Iris StreetIris Street

LOADINGZONE

MAILZONE

BUSZONE

BUSZONE

MAILZONE

LOADINGZONE

DISABLEDPARKING

SHOP FRONT PARKINGTO BE REMOVED LOADING

ZONE

Right turn only for buses and garbage trucks(no general traffic)

METRES

50 1000

KeyUpgrade area

New hospital site

Median

Footway

Bus facility / bus lane

New stormwater pipe

Retaining wall

Raised concrete island

Site Compound & Project Information Centre (indicative only)

AAM Aerial photography under licence to Roads and Maritime Services by AAM 2014

456c 6d7

89

14

15

6 New traffic lights with signalised pedestrian crossings at the intersections of:

a. Forest Way and Naree Road

b. Naree Road, Rabbett Street and Frenchs Forest Road West

c. Frenchs Forest Road West and the new access to the hospital opposite Gladys Avenue

d. Frenchs Forest Road East and Romford Road

e. Frenchs Forest Road East, Patanga Road and Allambie Road.

7 Widening and upgrading the intersection of Frenchs Forest Road with Wakehurst Parkway.

8 Widening Wakehurst Parkway from about 330 metres north of the intersection with Frenchs Forest Road to the intersection with Warringah Road.

9 New bus priority measures along approaches and departures to the Frenchs Forest Road intersection with Wakehurst Parkway.

Page 6: Northern Beaches Hospital Road Connectivity and …€¦ · Frenchs Forest Road intersection ... Early investigation work ... north/northern-beaches-hospital If you need help understanding

SkylineBusiness Park

Allambie GroveBusiness Park

Karingal Crescent

Warringah Road

Holland Crescent

RussellAvenue

Hilm

er S

tree

t

Ban

try

Bay

Roa

dB

antr

y B

ay R

oad

Wak

ehur

st P

arkw

ay

Wakehurst Parkw

ay

Aquatic Drive

Rodborough Road Alla

mbi

e R

oad

Dareen Street

Warringah Road

Pata

nga

Roa

d

Inve

rnes

s Av

enue

Har

mst

on A

venu

e

Hur

dis

Aven

ue

Rom

ford

Roa

d

Priv

ate

Roa

d

Alla

mbi

eR

oad

Nan

diAv

enue

Skyl

ine

Plac

e

Frenchs Forest Road East

Frenchs Forest Road WestNaree Road

Frenchs Forest Road West

Gla

dys

Aven

ue

Blu

egum

Cre

scen

t

Blu

egum

Cre

scen

t

Sylv

ia P

lace

Cob

b St

reet

Rab

bett

Stre

et

War

eham

Par

ade

Wareham

Parade

Grace Avenue

Grace Avenue

AdamsStreet

AdamsStreet D

undi

laR

oad

Forest Way

Jone

s St

reet

Iris StreetIris Street

LOADINGZONE

MAILZONE

BUSZONE

BUSZONE

MAILZONE

LOADINGZONE

DISABLEDPARKING

SHOP FRONT PARKINGTO BE REMOVED LOADING

ZONE

Right turn only for buses and garbage trucks(no general traffic)

METRES

50 1000

KeyUpgrade area

New hospital site

Median

Footway

Bus facility / bus lane

New stormwater pipe

Retaining wall

Raised concrete island

Site Compound & Project Information Centre (indicative only)

AAM Aerial photography under licence to Roads and Maritime Services by AAM 2014

6e

10

11

12

13

10 Widening Allambie Road to the north of the intersection with Warringah Road to include additional turning lanes into Frenchs Forest Road East from Allambie Road.

11 Widening and upgrading the intersection of Warringah Road and Allambie Road to include an additional right turn lane into Allambie Road from Warringah Road.

12 Widening Warringah Road from approximately 700 metres east of the intersection with Allambie Road and Courtley Street.

13 New traffic lights, to be triggered by buses only, to enable buses to cross the eastbound lanes of Warringah Road to enter Frenchs Forest Road East from the median lane on Warringah Road in the westbound direction.

14 A left-in and left-out access on Warringah Road opposite Hilmer Street to provide an additional access point to the hospital.