north pole high school window replacement …fnsb.us/gs/pastbiddocuments/18037 drawings 11 x...

12
FAIRBANKS NORTH STAR BOROUGH NORTH POLE HIGH SCHOOL WINDOW REPLACEMENT FNSB Project Number: 16-NPHPRJ-1 601 NPHS Boulevard, North Pole, AK 99705 IFB#: 18037 2 G-001 LOCATION MAP NOT TO SCALE SCALE: FEBRUARY 23, 2018 100% CONSTRUCTION DOCUMENTS RICHARDSON HIGHWAY HOMESTEAD DR S A N T A C L A U S L N PROJECT LOCATION G-001 TITLE SHEET & PROJECT INDEX EJD -- GG -- NPHS BOULEVA RD N THIS PROJECT 1 G-001 VICINITY MAP NOT TO SCALE SCALE: N G-001 TITLE SHEET & PROJECT INDEX G-002 SITE ACCESS PLAN A-101 EXISTING OVERALL PLANS A-102 EXISTING OVERALL ROOF PLAN A-111 ENLARGED FIRST FLOOR PLAN A-112 ENLARGED SECOND FLOOR PLAN A-121 ENLARGED ROOF PLAN & DETAILS A-122 ENLARGED ROOF PLAN & DETAILS A-131 ENLARGED GREEN HOUSE PLANS, ELEVATIONS & DETAILS A-201 BUILDING ELEVATIONS A-501 WINDOW SCHEDULES & DETAILS A-502 DETAILS SHEET INDEX O L D RI CH A R D SON H W Y By Revision Date Stamped: Date Project: Date Checked Drawn Project Mgr. Sheet Contents: Sheet No.: STANTEC W.O. 2046069300 NORTH POLE HIGH SCHOOL 725 East Fireweed Lane, Suite 200 Anchorage, Alaska 99503 (907) 276-4245 544 4th Avenue, Suite 102 Fairbanks, Alaska 99701 (907) 452-2128 351 W. Parks Highway Suite 200 Wasilla, Alaska 99654 (907) 376-7815 DUKES 02/23/2018 02/23/2018 100% CONSTRUCTION DOCUMENTS www.stantec.com WINDOW REPLACEMENT Fairbanks, Alaska, 99701 907 Terminal St. Project No: 16-NPHPRJ-1 IFB #: 18037 Fairbanks North Star Borough THIS DRAWING IS HALF-SIZE AT 11X17 Certificate of Authorization No: 116460 Erik J. Dukes No. 107233 VIEW NUMBER VIEW TITLE VIEW SCALE NORTH ARROW HEAVY LINE INDICATED NORTH DIRECTION ELEVATION SYMBOL VIEW NUMBER ARROW INDICATES DIRECTION OF ELEVATION SHEET NUMBER WHERE DRAWN DETAIL CALLOUT VIEW NUMBER SHEET NUMBER WHERE DRAWN SIM. SIMILAR OR TYPICAL ROOM TAG ROOM NAME ROOM NUMBER SHEET NOTE OR KEYNOTE NUMBER SECTION CALLOUT VIEW NUMBER SHEET NUMBER WHERE DRAWN SIM. SIMILAR OR TYPICAL 1 G-001 VIEW TITLE SCALE: 2 A-101 2 A-101 2 A-101 X WORK 106 X WINDOW TYPE TAG WINDOW TYPE LABEL DRAWING SYMBOLS PROJECT SCOPE BASE BID: REPLACE ALL EXTERIOR WINDOWS REPLACE (3) METAL-FRAMED SKYLIGHT SYSTEMS REPLACE GREENHOUSE GLAZING PANES ALTERNATES: 1. PAINT GREENHOUSE FRAMING ASSEMBLY ABBREVIATIONS ARCH BLDG BLK CONST CONT DEMO DIM DWG ARCHITECTURAL BUILDING BLOCKING CONSTRUCTION CONTINUOUS DEMOLITION DIMENSION DRAWING EA EQ EQUIP EX GA GALV GWB HM HMI EACH EQUAL EQUIPMENT EXISTING GAUGE GALVANIZED GYPSUM WALL BOARD HOLLOW METAL HOLLOW METAL INSULATED MFR NIC NTS OC PLWD PT MANUFACTURER NOT IN CONTRACT NOT TO SCALE ON CENTER PLYWOOD PRESSURE TREATED RO SPEC SQ STRUC TYP VR W/ ROUGH OPENING SPECIFICATION SQUARE STRUCTURAL TYPICAL VAPOR RETARDER WITH SYMBOL DEFINITION APPLICABLE CODES IBC 2015 IECC 2015 IP INSULATED PANEL

Upload: hanhu

Post on 30-Jun-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

FAIRBANKS NORTH STAR BOROUGHNORTH POLE HIGH SCHOOLWINDOW REPLACEMENT

FNSB Project Number: 16-NPHPRJ-1601 NPHS Boulevard, North Pole, AK 99705IFB#: 18037

2G-001

LOCATION MAPNOT TO SCALESCALE:

FEBRUARY 23, 2018100% CONSTRUCTION DOCUMENTS

RICHARDSONHIGHWAY

HO

ME

STEAD

DR

SA

NTA

CLA

US

LN

PROJECT LOCATION

G-001

TITLE SHEET& PROJECTINDEX

EJD --

GG --

NPHS BOULEVARD

N

THISPROJECT

1G-001

VICINITY MAPNOT TO SCALESCALE:

N

G-001 TITLE SHEET & PROJECT INDEXG-002 SITE ACCESS PLAN

A-101 EXISTING OVERALL PLANSA-102 EXISTING OVERALL ROOF PLANA-111 ENLARGED FIRST FLOOR PLANA-112 ENLARGED SECOND FLOOR PLANA-121 ENLARGED ROOF PLAN & DETAILSA-122 ENLARGED ROOF PLAN & DETAILSA-131 ENLARGED GREEN HOUSE PLANS, ELEVATIONS

& DETAILSA-201 BUILDING ELEVATIONSA-501 WINDOW SCHEDULES & DETAILSA-502 DETAILS

SHEET INDEX

OLD

RIC

HARDSO

NHW

Y

ByR

evis

ion

Date Stamped:

Dat

e

Project:

Date

Checked

Drawn

Project Mgr.

Sheet Contents:

Sheet No.:

STANTEC W.O. 2046069300

NORTH POLEHIGH SCHOOL

725 East Fireweed Lane,Suite 200Anchorage, Alaska 99503(907) 276-4245

544 4th Avenue,Suite 102Fairbanks, Alaska 99701(907) 452-2128

351 W. Parks HighwaySuite 200Wasilla, Alaska 99654(907) 376-7815

DUKES

02/23/2018

02/23/2018

100% CONSTRUCTION DOCUMENTS

www.stantec.com

WINDOWREPLACEMENT

Fairbanks, Alaska, 99701907 Terminal St.

Project No: 16-NPHPRJ-1IFB #: 18037

Fairbanks North Star Borough

THIS

DR

AWIN

GIS

HALF-SIZE

AT

11X17

Certificate of Authorization No:116460

Erik J. DukesNo. 107233

VIEW NUMBER

VIEW TITLE

VIEW SCALE

NORTH ARROW

HEAVY LINE INDICATEDNORTH DIRECTION

ELEVATION SYMBOL

VIEW NUMBERARROW INDICATESDIRECTION OF ELEVATIONSHEET NUMBER WHERE DRAWN

DETAIL CALLOUT

VIEW NUMBER

SHEET NUMBER WHERE DRAWN

SIM. SIMILAR OR TYPICAL

ROOM TAG

ROOM NAME

ROOM NUMBER

SHEET NOTE OR KEYNOTE

NUMBER

SECTION CALLOUT

VIEW NUMBER

SHEET NUMBER WHERE DRAWN

SIM. SIMILAR OR TYPICAL

1G-001

VIEW TITLESCALE:

2A-101

2A-101

2A-101

X

WORK106

X

WINDOW TYPE TAG

WINDOW TYPE LABEL

DRAWING SYMBOLS

PROJECT SCOPE

BASE BID:

REPLACE ALL EXTERIOR WINDOWS

REPLACE (3) METAL-FRAMED SKYLIGHT SYSTEMS

REPLACE GREENHOUSE GLAZING PANES

ALTERNATES:

1. PAINT GREENHOUSE FRAMING ASSEMBLY

ABBREVIATIONS

ARCHBLDGBLKCONSTCONTDEMODIMDWG

ARCHITECTURALBUILDINGBLOCKINGCONSTRUCTIONCONTINUOUSDEMOLITIONDIMENSIONDRAWING

EAEQEQUIPEXGAGALVGWBHMHMI

EACHEQUALEQUIPMENTEXISTINGGAUGEGALVANIZEDGYPSUM WALL BOARDHOLLOW METALHOLLOW METAL INSULATED

MFRNICNTSOCPLWDPT

MANUFACTURERNOT IN CONTRACTNOT TO SCALEON CENTERPLYWOODPRESSURE TREATED

ROSPECSQSTRUCTYPVRW/

ROUGH OPENINGSPECIFICATIONSQUARESTRUCTURALTYPICALVAPOR RETARDERWITH

SYMBOL DEFINITION

APPLICABLE CODES

IBC 2015

IECC 2015

IP INSULATED PANEL

ByR

evis

ion

Date Stamped:

Dat

e

Project:

Date

Checked

Drawn

Project Mgr.

Sheet Contents:

Sheet No.:

STANTEC W.O. 2046069300

NORTH POLEHIGH SCHOOL

725 East Fireweed Lane,Suite 200Anchorage, Alaska 99503(907) 276-4245

544 4th Avenue,Suite 102Fairbanks, Alaska 99701(907) 452-2128

351 W. Parks HighwaySuite 200Wasilla, Alaska 99654(907) 376-7815

DUKES

02/23/2018

02/23/2018

100% CONSTRUCTION DOCUMENTS

www.stantec.com

WINDOWREPLACEMENT

Fairbanks, Alaska, 99701907 Terminal St.

Project No: 16-NPHPRJ-1IFB #: 18037

Fairbanks North Star Borough

THIS

DR

AWIN

GIS

HALF-SIZE

AT

11X17

Certificate of Authorization No:116460

Erik J. DukesNo. 107233

G-002

SITE ACCESSPLAN

EJD --

GG --

FIREACCESS

AISLE- MAINTAIN

AT ALL TIMES

NPHS BOULEVARD

SITEACCESS

1G-002

SITE AERIAL PHOTONOT TO SCALESCALE:

N

1. EXISTING SKYLIGHTS

2. POTENTIAL CRANE ACCESS POINT FORHOISTING SKYLIGHT MATERIAL.CONTRACTOR TO VERIFY ANDCOORDINATE WITH OWNER.

KEY NOTES:X

1. CONTRACTOR TO COORDINATE WITHOWNER ACCESS TO SITE AND CLASSROOMSPACES SO AS NOT TO DISTURB EXISTINGSUMMER SCHOOL FUNCTIONS.

2. CONTRACTOR IS RESPONSIBLE FORBECOMING FAMILIAR WITH EXISTINGCONDITIONS AND VERIFICATION OFEXISTING CONSTRUCTION. IF EXISTINGCONDITIONS VARY FROM THEREQUIREMENT OF THE CONTRACTDOCUMENTS, CONTRACTOR SHALL NOTIFYTHE OWNER BEFORE COMMENCING THEWORK.

GENERAL NOTES:

SCHOOL PARKING- DO

NOT USE

1

1

1

2

MAINT. AREA

DONOT USE

CONTRACTOR

STAGINGAREA

CONTRACTOR

STAGING

AREA

FIRE ACCESS AISLE

- MAINTAIN

AT ALLTIM

ES

FIRE ACCESS AISLE

- MAINTAIN

AT ALLTIM

ES

CHOIR183

OFFICE184OFFICE

184A

185B

STORAGE186E

BAND186STOR.

186A

STOR.186B

STOR.186C

OFFICE186D

STOR.183B

STOR.F204

OFFICE182

STORAGE188C

NURSE188

188A

OFFICE187A

OFFICE187B

OFFICE187C

OFFICE187D

OFFICE187E

OFFICE187F

CLASSROOM189

CLASSROOM190

CLASSROOM191

CLASSROOM192

OFFICE189B

OFFICE189A

OFFICE190A

PREP191A

OFFICE193

CUSTODIAN194D

ELEC.194C

BIOLOGY194 STORAGE

194F

PREP194E

STOR.F314

PREP194H

STOR.F315

PREP194G

OFFICE194B

PREP194A

BIOLOGY195

VEST.F304

CLASSROOM165

FITTING161

LAUNDRY160

STOR.157

OFFICE158

CLASSROOM159

CULINARY156

STOR.155

PANTRY154 VEST.

F305

CORR.F307

CAD CLASS149

STUDIO148

VEST.F401

GREENHOUSE145

STOR.144G

WORKROOM103

CLASSROOM112

WORKROOM175

GYM133

VEST.134

135

CUSTODIAN136

STORAGE137

COMMONS170

STORAGE169

STAGE174

AUDITORIUM173

DRAMA181

F208

T-1

178179

B -1

G-1

STOR.F216

STOR.F214F213F211

OFFICE197

OFFICE197A

OFFICE197B

OFFICE197F

OFFICE197H

OFFICE197I

OFFICE197G

OFFICE197E

STOR.F309

FACULTY LOUNGE196

B -2 G-2

FACULTY196C

FACULTY/WORK ROOM196B

ELEC.168D

STOR.196A

STOR.168CWALK-IN COOLER

168A

FREEZER168B

KITCHEN168

168F

SERVING167

B -3 G-3

STORAGE133

OFFICE164

STOR.163

PRINT162

CLASSROOM153

CLASSROOM152

IT151A

CLASSROOM151

DIGITAL CAFE150

B -6

G-6

HALL150B

VEST.144A

OFFICE144D

LIB.144E

AUTO TECH144

STOR.143A

PARTS143C

TOOLS143B

VEST.F400

METAL143

MULTI-PURPOSE LAB142

CLASSROOM144F

TIRES146METAL STORAGE

147

ROTC STOR.141C

OFFICE141D

LOCKERS141EGENERATOR

106

ELEC.109

CUST.110

DUST COLL.283A

OFFICE105

STOR.106

RECEIVING102

EQUIP.101

BOILER107

STORAGE111

STOR.113

SHOWERS117B

LOCKER ROOM117

114

115

116

118

119

120

121

LAUNDRY125

SHOWERS122B

LOCKER ROOM122

ROTC LARGE141B

ROTC SMALL141

STOR.127

STOR.128

STOR.126

MAT ROOM129

STOR.130

STOR.131

STOR.132

ROTC STOR.141A

CUST.J3

CLASSROOM210

CLASSROOM209

CLASSROOM224

CLASSROOM225

CLASSROOM226

CLASSROOM227

CLASSROOM230

CLASSROOM231

CLASSROOM232

CLASSROOM233

CLASSROOM234

CLASSROOM235

CLASSROOM243

CLASSROOM244

CLASSROOM245

CLASSROOM246

CLASSROOM247

CLASSROOM248

CLASSROOM249

CLASSROOM250

CLASSROOM242

CLASSROOM241

CLASSROOM240

CLASSROOM236

CLASSROOM228

CLASSROOM229

CLASSROOM229A

CLASSROOM220

CLASSROOM221

CLASSROOM222

CLASSROOM223

211

210D

210C

210B

B -5 G-5

271

270H

270I

270

270A

270B

270C270D

270E270F

270G

265

264263262

261

267

266

268

260D

260C

260A

260

B -4

G-4

202203

206

206A

206B

206C

206D

206E

206F

205 207 208

204

ByR

evis

ion

Date Stamped:

Dat

e

Project:

Date

Checked

Drawn

Project Mgr.

Sheet Contents:

Sheet No.:

STANTEC W.O. 2046069300

NORTH POLEHIGH SCHOOL

725 East Fireweed Lane,Suite 200Anchorage, Alaska 99503(907) 276-4245

544 4th Avenue,Suite 102Fairbanks, Alaska 99701(907) 452-2128

351 W. Parks HighwaySuite 200Wasilla, Alaska 99654(907) 376-7815

DUKES

02/23/2018

02/23/2018

100% CONSTRUCTION DOCUMENTS

www.stantec.com

WINDOWREPLACEMENT

Fairbanks, Alaska, 99701907 Terminal St.

Project No: 16-NPHPRJ-1IFB #: 18037

Fairbanks North Star Borough

THIS

DR

AWIN

GIS

HALF-SIZE

AT

11X17

Certificate of Authorization No:116460

Erik J. DukesNo. 107233

A-101

EXISTINGOVERALL PLANS

EJD --

GG --

N

2A-101

OVERALL SECOND FLOOR PLAN1/32"=1'-0"SCALE:

N

1A-101

OVERALL FIRST FLOOR PLAN1/32"=1'-0"SCALE:

5A-201

1A-111

1A-112

4A-201

AA

PLANNORTH

PLANNORTH

ByR

evis

ion

Date Stamped:

Dat

e

Project:

Date

Checked

Drawn

Project Mgr.

Sheet Contents:

Sheet No.:

STANTEC W.O. 2046069300

NORTH POLEHIGH SCHOOL

725 East Fireweed Lane,Suite 200Anchorage, Alaska 99503(907) 276-4245

544 4th Avenue,Suite 102Fairbanks, Alaska 99701(907) 452-2128

351 W. Parks HighwaySuite 200Wasilla, Alaska 99654(907) 376-7815

DUKES

02/23/2018

02/23/2018

100% CONSTRUCTION DOCUMENTS

www.stantec.com

WINDOWREPLACEMENT

Fairbanks, Alaska, 99701907 Terminal St.

Project No: 16-NPHPRJ-1IFB #: 18037

Fairbanks North Star Borough

THIS

DR

AWIN

GIS

HALF-SIZE

AT

11X17

Certificate of Authorization No:116460

Erik J. DukesNo. 107233

A-102

EXISTINGOVERALL ROOFPLAN

EJD --

GG --

N

1A-102

OVERALL EXISTING ROOF PLAN1/32"=1'-0"SCALE:

1A-121

1A-131

PLANNORTH

186A

STORAGE188C

NURSE188

188A

OFFICE187A

OFFICE187B

OFFICE187C

OFFICE187D

OFFICE187E

OFFICE187F

CLASSROOM189

CLASSROOM190

CLASSROOM191

CLASSROOM192

OFFICE189B

OFFICE189A

OFFICE190A

PREP191A

OFFICE193

CUSTODIAN194D

ELEC.194C

BIOLOGY194 STORAGE

194F

PREP194E

STOR.F314

PREP194H

STOR.F315

PREP194G

OFFICE194B

PREP194A

BIOLOGY195

VEST.F304

CLASSROOM165

FITTING161

LAUNDRY160

STOR.157

OFFICE158

CLASSROOM159

CULINARY156

STOR.155

PANTRY154 VEST.

F305

CORR.F307

CAD CLASS149

STUDIO148

VEST.F401

YM133

VEST.134

135

CUSTODIAN136

STORAGE137

COMMONS170

STORAGE169

173

T-1

178179

B-1

G-1

STOR.F216

STOR.F214F213F211

OFFICE197

OFFICE197A

OFFICE197B

OFFICE197F

OFFICE197H

OFFICE197I

OFFICE197G

OFFICE197E

STOR.F309

FACULTY LOUNGE196

B-2 G-2

FACULTY196C

FACULTY/WORK ROOM196B

ELEC.168D

STOR.196A

STOR.168CWALK-IN COOLER

168AFREEZER

168B

KITCHEN168

168F

SERVING167

B-3 G-3

STORAGE133

OFFICE164

STOR.163

PRINT162

CLASSROOM153

CLASSROOM152

IT151A

CLASSROOM151

DIGITAL CAFE150

B-6

G-6

HALL150B

VEST.144A

OFFICE

STOR.143A

PARTS143C

OLS3B

METAL143

MULTI-PURPOSE LAB142

ROTC STOR.141C

OFFICE141D

LOCKERS141E

119

120

121

SHOWERS122B

LOCKER ROOM122

ROTC LARGE141B

ROTC SMALL141

ROTC STOR.141A

CUST.J3

ByR

evis

ion

Date Stamped:

Dat

e

Project:

Date

Checked

Drawn

Project Mgr.

Sheet Contents:

Sheet No.:

STANTEC W.O. 2046069300

NORTH POLEHIGH SCHOOL

725 East Fireweed Lane,Suite 200Anchorage, Alaska 99503(907) 276-4245

544 4th Avenue,Suite 102Fairbanks, Alaska 99701(907) 452-2128

351 W. Parks HighwaySuite 200Wasilla, Alaska 99654(907) 376-7815

DUKES

02/23/2018

02/23/2018

100% CONSTRUCTION DOCUMENTS

www.stantec.com

WINDOWREPLACEMENT

Fairbanks, Alaska, 99701907 Terminal St.

Project No: 16-NPHPRJ-1IFB #: 18037

Fairbanks North Star Borough

THIS

DR

AWIN

GIS

HALF-SIZE

AT

11X17

Certificate of Authorization No:116460

Erik J. DukesNo. 107233

A-111

ENLARGEDFIRST FLOORPLAN

EJD --

GG --

N

1A-111

ENLARGED FIRST FLOOR DEMOLITION PLAN1/16"=1'-0"SCALE:

1. INTERIOR FINISH CONSISTS OF GYPSUMBOARD WITH WALL COVERINGS.

2. DEMO EXISTING SECURITY SCREENS.PATCH AND PAINT WALL TO MATCHEXISTING.

3. NEW WINDOWS TO RECEIVE MONOLITHICPOLYCARBONATE SECURITY GLAZING.SEE DETAIL 3/A-502.

4. SALVAGE EXISTING FIBERGLASSWINDOWS TO OWNER.

KEY NOTES:X

D

D D D D D

EEE E

D

E

E

E

DDE

E

DDD

E

D

E

E

DDE

D

E

E

DD

1

1

3

1. CONTRACTOR TO DEMO EXISTING WOODCASEMENT WINDOWS AND INSTALLFIBERGLASS WINDOW UNITS ANDASSOCIATED BLINDS. SEE WINDOW TYPESON SHEET A-501.

2. CONTRACTOR TO FIELD VERIFY EXISTINGFIELD CONDITIONS BEFORECOMMENCEMENT OF WORK.

3. ALL WINDOW UNITS TO RECEIVEHORIZONTAL BLINDS. ONE BLIND PERWINDOW PANE.

4. BASE WALL CONDITION IN CLASSROOMS ISPAINTED GYPSUM BOARD. SEE KEYNOTESFOR VARIATIONS.

GENERAL NOTES:

2

KEY PLAN

3" 0" 1" 2" 3"

GRAPHIC SCALE1"=1' 1/2"=1' 3/8"=1' 1/8"=1' 1"=40' 1"=60'

1"=30'1"=20'1"=10'1/4"=1'3/4"=1'1-1/2"=1'

PLANNORTH

1A-201

2,3A-201

6A-201

3 4

2

CLASSROOM210

CLASSROOM209

CLASSROOM224

CLASSROOM225

CLASSROOM226

CLASSROOM227

CLASSROOM230

CLASSROOM231

CLASSROOM232

CLASSROOM233

CLASSROOM234

CLASSROOM235

CLASSROOM243

CLASSROOM244

CLASSROOM245

CLASSROOM246

CLASSROOM247

CLASSROOM248

CLASSROOM249

CLASSROOM250

CLASSROOM242

CLASSROOM241

CLASSROOM240

CLASSROOM236

CLASSROOM228

CLASSROOM229

CLASSROOM229A

CLASSROOM220

CLASSROOM221

CLASSROOM222

CLASSROOM223

211

210D

210C

210B

B-5 G-5

271

270H

270I

270

270A

270B

270C270D

270E270F

270G

265

264263262

261

267

266

268

260D

260C

260A

260

B-4

G-4

202203

206A206F

ByR

evis

ion

Date Stamped:

Dat

e

Project:

Date

Checked

Drawn

Project Mgr.

Sheet Contents:

Sheet No.:

STANTEC W.O. 2046069300

NORTH POLEHIGH SCHOOL

725 East Fireweed Lane,Suite 200Anchorage, Alaska 99503(907) 276-4245

544 4th Avenue,Suite 102Fairbanks, Alaska 99701(907) 452-2128

351 W. Parks HighwaySuite 200Wasilla, Alaska 99654(907) 376-7815

DUKES

02/23/2018

02/23/2018

100% CONSTRUCTION DOCUMENTS

www.stantec.com

WINDOWREPLACEMENT

Fairbanks, Alaska, 99701907 Terminal St.

Project No: 16-NPHPRJ-1IFB #: 18037

Fairbanks North Star Borough

THIS

DR

AWIN

GIS

HALF-SIZE

AT

11X17

Certificate of Authorization No:116460

Erik J. DukesNo. 107233

A-112

ENLARGEDSECOND FLOORPLAN

EJD --

GG --

N

1A-112

ENLARGED SECOND FLOOR PLAN1/16"=1'-0"SCALE:

A

A A A A A

BB

B

B

A

B

B

B

AA

B

AAA

B

A

B

B

AAA

BB

B

A

B

B

AACCF F

X2 X2

C

C

F

F

2

2

2

1. INTERIOR FINISH CONSISTS OF GYPSUMBOARD WITH WALL COVERINGS.

2. SKYLIGHTS ABOVE

3. REMOVE AND REINSTALL SUSPENDEDARTWORK ON NEW SKYLIGHT ALUMINUMSTRUCTURE.

KEY NOTES:X

1

111

1

11

1

11

1. CONTRACTOR TO DEMO EXISTING WOODCASEMENT WINDOWS AND INSTALLFIBERGLASS WINDOW UNITS ANDASSOCIATED BLINDS. SEE WINDOW TYPESON SHEET A-501.

2. CONTRACTOR TO FIELD VERIFY EXISTINGFIELD CONDITIONS BEFORECOMMENCEMENT OF WORK.

3. ALL WINDOW UNITS TO RECEIVEHORIZONTAL BLINDS. ONE BLIND PERWINDOW PANE.

4. BASE WALL CONDITION IN CLASSROOMS ISPAINTED GYPSUM BOARD. SEE KEYNOTESFOR VARIATIONS.

GENERAL NOTES:

3

KEY PLAN

3" 0" 1" 2" 3"

GRAPHIC SCALE1"=1' 1/2"=1' 3/8"=1' 1/8"=1' 1"=40' 1"=60'

1"=30'1"=20'1"=10'1/4"=1'3/4"=1'1-1/2"=1'

PLANNORTH

1A-201

2,3A-201

6A-201

B

B

ROOF ACCESS

ByR

evis

ion

Date Stamped:

Dat

e

Project:

Date

Checked

Drawn

Project Mgr.

Sheet Contents:

Sheet No.:

STANTEC W.O. 2046069300

NORTH POLEHIGH SCHOOL

725 East Fireweed Lane,Suite 200Anchorage, Alaska 99503(907) 276-4245

544 4th Avenue,Suite 102Fairbanks, Alaska 99701(907) 452-2128

351 W. Parks HighwaySuite 200Wasilla, Alaska 99654(907) 376-7815

DUKES

02/23/2018

02/23/2018

100% CONSTRUCTION DOCUMENTS

www.stantec.com

WINDOWREPLACEMENT

Fairbanks, Alaska, 99701907 Terminal St.

Project No: 16-NPHPRJ-1IFB #: 18037

Fairbanks North Star Borough

THIS

DR

AWIN

GIS

HALF-SIZE

AT

11X17

Certificate of Authorization No:116460

Erik J. DukesNo. 107233

A-121

ENLARGEDROOF PLAN &DETAILS

EJD --

GG SC

N

1A-121

SKYLIGHT STRUCTURAL PLAN1/8"=1'-0"SCALE:

3" 0" 1" 2" 3"

GRAPHIC SCALE1"=1' 1/2"=1' 3/8"=1' 1/8"=1' 1"=40' 1"=60'

1"=30'1"=20'1"=10'1/4"=1'3/4"=1'1-1/2"=1'

PLANNORTH

SKYLIGHT A

SKYLIGHT B

SKYLIGHT C

ABCBA

ABCBA

D D

F GF

E

D

C

B

A

E

D

D E F

B C D E F

G

A

B

C

C

B

A

A

B

C

C

B

A

D

D

SKYLIGHT A - MAXIMUM REACTIONS (lbs)

CONNECTIONLOCATION

VERTICALDOWNWARD

VERTICALUPLIFT LATERAL

A 3500 200 700B 1000 900 -C 2400 1000 700D 2500 1100 700E 1000 700 -F 2100 300 700G 800 100 -H 600 300 700

SKYLIGHT B - MAXIMUM REACTIONS (lbs)

CONNECTIONLOCATION

VERTICALDOWNWARD

VERTICALUPLIFT LATERAL

A 2100 400 700B 900 800 -C 2300 1000 700D 800 500 -

SKYLIGHT C - MAXIMUM REACTIONS (lbs)

CONNECTIONLOCATION

VERTICALDOWNWARD

VERTICALUPLIFT LATERAL

A 2000 300 700B 700 500 -

C 1700 700 700D 800 500 -

H

C

C

2A-121

TYP.

TYP.

TYP.

4A-121

TYP.

TYP.

TYP.

4A-121

2A-121

2A-121

4A-121

3A-121

TYP.

TYP. TYP.

3A-121

3A-121

2A-121

DEMO DETAIL1 1/2"=1'-0"SCALE:

3A-121

PLATE INSTALLATION DETAIL1 1/2"=1'-0"SCALE:

(E) 4" CHANNELCURB

4A-121

PLATE INSTALLATION DETAIL AT CORNERS1 1/2"=1'-0"SCALE:

1/2" PLATE, TYP.

2'-0

"

1'-0"

2'-0"

(E) 4" CHANNEL CURB

TYPICAL @ CORNERS,GRIND SMOOTH

CENTERLINE OF SKYLIGHTPURLIN

4"TY

P.

8"TY

P.

REMOVE CON'TPLATE,

STIFFENERPLATE AND

METAL ANGLE.

(E) 4" CHANNELCURB

(E) 4" CHANNEL CURB

1/2" X 12" X 24" PLATE CENTERED ON SKYLIGHTPURLIN. (5) 5/8" Ø X 1 1/2" LONG WELDED

THREADED STUDS ON CENTERLINE OF PLATEAND (E) 4" CHANNEL. FIELD DRILL 13/16" HOLES

IN (E) 4" CHANNEL.

4"4"

4"4"

4"

EQ. EQ.

AAA

1. SKYLIGHT REACTIONS SHALL NOT APPLYA HORIZONTAL THRUST LOAD IN ANYLOCATION.

2. PLATE SHALL BE ASTM A36.

3. WELDED THREADED STUDS SHALL BE BYNELSON FASTENER SYSTEMS ORAPPROVED EQUAL.

4. ALL FABRICATION SHALL BE ACCORDINGTO AISC STANDARDS.

5. ALL WELDING SHALL BE ACCORDING TOAWS D1.1

GENERAL NOTES

4"

5/8" DIA. WELDEDTHREADED STUDS, TYP.FIELD DRILL 13/16" Ø HOLESON CENTER LINE OF (E) 4"CHANNEL

ByR

evis

ion

Date Stamped:

Dat

e

Project:

Date

Checked

Drawn

Project Mgr.

Sheet Contents:

Sheet No.:

STANTEC W.O. 2046069300

NORTH POLEHIGH SCHOOL

725 East Fireweed Lane,Suite 200Anchorage, Alaska 99503(907) 276-4245

544 4th Avenue,Suite 102Fairbanks, Alaska 99701(907) 452-2128

351 W. Parks HighwaySuite 200Wasilla, Alaska 99654(907) 376-7815

DUKES

02/23/2018

02/23/2018

100% CONSTRUCTION DOCUMENTS

www.stantec.com

WINDOWREPLACEMENT

Fairbanks, Alaska, 99701907 Terminal St.

Project No: 16-NPHPRJ-1IFB #: 18037

Fairbanks North Star Borough

THIS

DR

AWIN

GIS

HALF-SIZE

AT

11X17

Certificate of Authorization No:116460

Erik J. DukesNo. 107233

A-122

ENLARGEDROOF PLAN &DETAILS

EJD --

GG --

N

1A-122

ENLARGED SKYLIGHT PLAN1/8"=1'-0"SCALE:

16'-0"

41'-0

"

16'-0"

16'-0

"

43'-0

"

43'-0"

16'-0

"

27'-0"

2A-122

DEMO

DEMO

DEMO

1. DEMO AND REPLACE METAL FRAMEDSKYLIGHT SYSTEMS - DETAILS ANDDIMENSIONS BASED ON KALWALLSKYLIGHT SYSTEM.

KEY NOTES:X

11

1

3" 0" 1" 2" 3"

GRAPHIC SCALE1"=1' 1/2"=1' 3/8"=1' 1/8"=1' 1"=40' 1"=60'

1"=30'1"=20'1"=10'1/4"=1'3/4"=1'1-1/2"=1'

ROOFACCESSPOINT

3A-122

NEW

NEW

NEW2

A-122

EXISTING SKYLIGHT CURB DETAIL1 1/2"=1'-0"SCALE:

EXISTING BUR ROOFASSEMBLY TO REMAIN

DEMO EXISTING GWBFLUSH WITH INVERTED "C"CHANNEL

DEMO EXISTING SKYLIGHTGLAZING AND FRAME

DEMO EXISTING METALFLASHING

PLANNORTH

3A-122

NEW SKYLIGHT CURB DETAIL1 1/2"=1'-0"SCALE:

PAINTED POPLAR TRIM

INSULATED EAVE STRUTFROM MANUFACTURER

3A-122

2A-122

2A-122

3A-122

4A-122

NEW SKYLIGHT CURB DETAIL AT SUPPORT1 1/2"=1'-0"SCALE:

DEMO EXISTING WOODPARAPET AND PLYWOOD

DEMO GUSSET PLATE ANDBENT METAL ANGLE

WOOD BLOCKING AS REQ'D

2X WOOD BLOCKING

TERMINATION BAR FROMMANUFACTURER

.060 EPDM MEMBRANEFROM SKYLIGHTMANUFACTURER

2 3/4" FIBERGLASSSANDWICH PANEL

ALUM.CHANNELBEYOND

TERMINATION BAR FROMMANUFACTURER

SELF ADHEARINGMEMBRANE PAPAPET WRAP

PAINTED POPLAR TRIM

INSULATED EAVE STRUTFROM MANUFACTURER

WOOD BLOCKING AS REQ'D

2X WOOD BLOCKING

TERMINATION BAR FROMMANUFACTURER

.060 EPDM MEMBRANEFROM SKYLIGHTMANUFACTURER

2 3/4" FIBERGLASSSANDWICH PANEL

TERMINATION BAR FROMMANUFACTURER

1/2" X 12" X 24" METAL PLATE. FASTENTO "C" CHANNEL PER STRUCTURAL

4A-122

NEW

NEW

4A-122

NEW

4A-122

1. CONTRACTOR TO PROVIDE TEMPORARYROOFING PROTECTION FOR DURATIONOF THE WORK. ROOF PROTECTION TOINCLUDE 1/2" PLYWOOD SHEATHING OROTHER SUITABLE MATERIAL TO PREVENTDAMAGE TO ROOF FROM EITHERPERSONNEL, EQUIPMENT OR MATERIALS.

2. CONTRACTOR TO PROVIDE TEMPORARYWEATHER PROTECTION DURINGREPLACEMENT OF SKYLIGHTS.

3. CONTRACTOR'S MODIFICATIONS TO THESKYLIGHT CURB SYSTEM SHALL NOTVOID THE PRESENT WARRANTY ON THEBUR ROOF SYSTEM. CONTRACTOR IS TOBE AUTHORIZED BY THE ROOFINGMANUFACTURER TO MAKEMODIFICATIONS TO THE ROOF.

4. SKYLIGHT SYSTEM SHALL CONFORM TOCLASS A ROOF COVERINGREQUIREMENTS

GENERAL NOTESOUTSIDE FRAME

OUTSIDE FRAME OUTSIDE FRAME

OU

TSID

EFR

AM

EO

UTS

IDE

FRA

ME

OU

TSID

EFR

AM

E

OU

TSID

EFR

AM

E

45°

45°

8"

8"

12"

MIN

.12

"M

IN.

Z

3

GREENHOUSE145

STOR.144G

LIB.144E

CLASSROOM144F

Z

3

Z 3

Z43

ByR

evis

ion

Date Stamped:

Dat

e

Project:

Date

Checked

Drawn

Project Mgr.

Sheet Contents:

Sheet No.:

STANTEC W.O. 2046069300

NORTH POLEHIGH SCHOOL

725 East Fireweed Lane,Suite 200Anchorage, Alaska 99503(907) 276-4245

544 4th Avenue,Suite 102Fairbanks, Alaska 99701(907) 452-2128

351 W. Parks HighwaySuite 200Wasilla, Alaska 99654(907) 376-7815

DUKES

02/23/2018

02/23/2018

100% CONSTRUCTION DOCUMENTS

www.stantec.com

WINDOWREPLACEMENT

Fairbanks, Alaska, 99701907 Terminal St.

Project No: 16-NPHPRJ-1IFB #: 18037

Fairbanks North Star Borough

THIS

DR

AWIN

GIS

HALF-SIZE

AT

11X17

Certificate of Authorization No:116460

Erik J. DukesNo. 107233

A-131

ENLARGEDGREENHOUSEPLANS,ELEVATIONS &DETAILS

EJD --

GG --

1. DEMOLISH AND REPLACE EXISTING GLAZINGPANES WITH NEW GLAZING UNITS. REMOVEAND REINSTALL THE GREENHOUSE FRAMESYSTEM AS NECESSARY TO ACCOMPLISHTHE WORK.

2 DEMOLISH AND REPLACE EXISTING ROOFGLAZING PANES WITH NEW GLAZING UNITS.REMOVE AND REINSTALL THE GREENHOUSEFRAME SYSTEM AS NECESSARY TOACCOMPLISH THE WORK.

3. DEMOLISH AND REPLACE EXISTING GLAZINGPANES WITH METAL FACED INSULATINGUNITS. REMOVE AND REINSTALL THEGREENHOUSE FRAME SYSTEM ASNECESSARY TO ACCOMPLISH THE WORK.

BASE BID COLOR - MATCH EXISTING FRAMEALTERNATE #1 COLOR - PATRIOT RED

4. ALTERNATE #1 DO NOT PAINT MECHANICALUNITS.

5. ALTERNATE #1: PREP AND PAINT ENTIREEXISTING GREENHOUSE GLAZINGASSEMBLY. PAINT ATTACHED CONDUIT ANDUNISTRUT TO MATCH - COLOR PATRIOT RED.

6. CONTRACTOR TO REMOVE AND REINSTALLUPPER FLASHING AS NECESSARY TOACCOMPLISH THE WORK.ALTERNATE #1 - PAINT FLASHING PATRIOTRED

7. ALTERNATE #1 - PAINT EXISTING DOORPATRIOT RED

KEY NOTES:X

1. CONTRACTOR TO FIELD VERIFY EXISTINGFIELD CONDITIONS BEFORECOMMENCEMENT OF WORK.

GENERAL NOTES:

N

1A-131

ENLARGED GREENHOUSE PLAN1/8"=1'-0"SCALE:

PLANNORTH

N

2A-131

ENLARGED GREENHOUSE ROOF PLAN1/8"=1'-0"SCALE:

PLANNORTH

5A-131

GREENHOUSE WEST ELEV.3/32"=1'-0"SCALE:

6A-131

GREENHOUSE NORTH ELEV.3/32"=1'-0"SCALE:

3 IP-1 1GZ4

4

4A-131

GREENHOUSE EAST ELEVATION1/32"=1'-0"SCALE:

3A-131

GREENHOUSE SOUTH ELEVATION1/32"=1'-0"SCALE:

3IP-1

2GZ

5A-131

1GZ

3A-131

4A-131

3A-131

4A-131

1GZ

2GZ

6A-131

3

33

1

1

1

5

5

55

6 6

2GZ

2 GZ

7A-131

GREENHOUSE GLAZING UNIT3"=1'-0"SCALE:

SEALANT AS REQ'D

REUSE EXISTING GLAZINGSTOPS/GASKETING

REMOVE AND REINSTALLEXISTING ALUMINUMGLAZING ASSEMBLY ASNECESSARY TOACCOMPLISH THE WORK

OUTSIDE INSIDEGLAZING SYSTEM:(GZ-1) OUTBOARD LITE: 1/4" TEMPERED SAFETY GLAZINGLOW "E" COATING - (#2 SURFACE)11/16 MILL ALUMINUM SPACER W/ SEALANT(GZ-2) INBOARD LITE: 9/16 CLEAR LAMINATED, HEAT-STRENGTHENEDGLAZING

8A-131

GREENHOUSE INSULATED PANEL3"=1'-0"SCALE:

SEALANT AS REQ'D

REUSE EXISTING GLAZINGSTOPS/GASKETING

REMOVE AND REINSTALLEXISTING ALUMINUMGLAZING ASSEMBLY ASNECESSARY TOACCOMPLISH THE WORK

OUTSIDE INSIDERABBITED INSULATED METAL PANEL

4"

7

1/2" x 12" METAL TRIMFASTENED 1'-0" O.C. PAINTTRIM AND FASTENERS TOMATCH FRAME.

8 10 12 14 16 18 19 206543

NQRUVXYZ

J I GKM

L O 2 181920

ByR

evis

ion

Date Stamped:

Dat

e

Project:

Date

Checked

Drawn

Project Mgr.

Sheet Contents:

Sheet No.:

STANTEC W.O. 2046069300

NORTH POLEHIGH SCHOOL

725 East Fireweed Lane,Suite 200Anchorage, Alaska 99503(907) 276-4245

544 4th Avenue,Suite 102Fairbanks, Alaska 99701(907) 452-2128

351 W. Parks HighwaySuite 200Wasilla, Alaska 99654(907) 376-7815

DUKES

02/23/2018

02/23/2018

100% CONSTRUCTION DOCUMENTS

www.stantec.com

WINDOWREPLACEMENT

Fairbanks, Alaska, 99701907 Terminal St.

Project No: 16-NPHPRJ-1IFB #: 18037

Fairbanks North Star Borough

THIS

DR

AWIN

GIS

HALF-SIZE

AT

11X17

Certificate of Authorization No:116460

Erik J. DukesNo. 107233

A-201

BUILDINGELEVATIONS

EJD --

GG --

1A-201

SOUTH ELEVATION1/32"=1'-0"SCALE:

2A-201

EAST ELEVATION1/32"=1'-0"SCALE:

3A-201

EAST ELEVATION - CONTINUED1/32"=1'-0"SCALE:

C

F

F

C

F

F

A A A A A A A A A A A A AB B B B B

D D D D D D D D D D D DE E E

B

E

B

E

B

E

B

E

B

E

B B

E

B

E

B

E

B

E

B

E

B

E

A

D

A

D

A

D

A

D

C C

F F

4A-201

PARTIAL WEST ELEVATION3/32"=1'-0"SCALE:

5A-201

PARTIAL SOUTH ELEVATION3/32"=1'-0"SCALE:

BB BB BB D

6A-201

PARTIAL NORTH ELEVATION3/32"=1'-0"SCALE:

MATCH LINESEE 2/A-201

MATCH LINESEE 2/A-201

MATCH LINESEE 3/A-201

MATCH LINESEE 3/A-201

E ED D

BBAA

1. CONTRACTOR TO DEMO EXISTING WOODCASEMENT WINDOWS AND INSTALLFIBERGLASS WINDOW UNITS. SEE WINDOWSCHEDULE ON SHEET A-501.

2. CONTRACTOR TO FIELD VERIFY EXISTINGFIELD CONDITIONS BEFORECOMMENCEMENT OF WORK.

GENERAL NOTES:

7A-501

1. NO BLINDS INSTALLED IN THESEWINDOWS.

KEY NOTES:X

1 1

1 1

ByR

evis

ion

Date Stamped:

Dat

e

Project:

Date

Checked

Drawn

Project Mgr.

Sheet Contents:

Sheet No.:

STANTEC W.O. 2046069300

NORTH POLEHIGH SCHOOL

725 East Fireweed Lane,Suite 200Anchorage, Alaska 99503(907) 276-4245

544 4th Avenue,Suite 102Fairbanks, Alaska 99701(907) 452-2128

351 W. Parks HighwaySuite 200Wasilla, Alaska 99654(907) 376-7815

DUKES

02/23/2018

02/23/2018

100% CONSTRUCTION DOCUMENTS

www.stantec.com

WINDOWREPLACEMENT

Fairbanks, Alaska, 99701907 Terminal St.

Project No: 16-NPHPRJ-1IFB #: 18037

Fairbanks North Star Borough

THIS

DR

AWIN

GIS

HALF-SIZE

AT

11X17

Certificate of Authorization No:116460

Erik J. DukesNo. 107233

A-501

WINDOWSCHEDULES &DETAILS

EJD --

GG --

A B C D E F AA BB

4'-0

3/16

"

4'-0

3/16

"

4'-0

3/16

"

3'-0

3/16

"

3'-0

3/16

"

1'-2

1/2"

1'-7

1/2"

3'-0

3/16

"

7'-0 9/16" 4'-8 3/8" 2'-11 1/2"

7'-0 9/16" 4'-8 3/8"

2'-11 1/2"7'-5 1/2"

4'-8"

WINDOW TYPES

9A-501

CMU

1A-501

WOOD

1A-502

CMU

3A-501

WOOD

8A-501

CMU

2A-501

WOOD

2A-501

3A-501

1A-501

2A-501

3A-501

1A-501

2A-501

4A-502

1A-501 1

A-501

4A-502

1A-501

8A-501

2A-501 2

A-501

2A-501

9A-501

3A-501

3A-501

3A-501

1A-502

1. CONTRACTOR TO FIELD VERIFY EXISTINGFIELD CONDITIONS BEFORECOMMENCEMENT OF WORK.

2. FILL ALL AIR GAPS, CRACKS OR OTHERMISCELLANEOUS VOIDS WITH SPRAY FOAMINSULATION TO PROVIDE TIGHT AIR SEAL.

3. NO AS-BUILT DRAWINGS WERE PROVIDEDFOR THE EXISTING WINDOW DETAILS.EXISTING DETAILS SHOWN ARE ASSUMEDFIELD CONDITIONS. CONTRACTOR TOCOORDINATE WITH OWNER ANDARCHITECT VARIATIONS IN DETAILS THATDEVIATE SIGNIFICANTLY FROM WHAT ISSHOWN.

4. WINDOW COLOR AND ASSOCIATEDFLASHINGS TO BE ROYAL BLUE UNLESSOTHERWISE NOTED.

5. REFER TO ELEVATIONS ON SHEET A-201FOR OPERABLE PANE LOCATIONS

6. CONTRACTOR TO ENSURE CONTINUITY OFVAPOR RETARDER.

GENERAL NOTES:

*SEELOCATIONON 1/A-101

1A-501

WINDOW HEAD DETAIL AT WOOD FRAMED WALL1 1/2"=1'-0"SCALE:

DEMO NEW

2A-501

WINDOW JAMB AT WOOD FRAMED WALL1 1/2"=1'-0"SCALE:

DEMO NEW

3A-501

WINDOW SILL DETAIL AT WOOD FRAMED WALL1 1/2"=1'-0"SCALE:

DEMO NEW

4A-501

WINDOW SILL DETAIL AT CONCRETE CURB1 1/2"=1'-0"SCALE:

DEMO NEW

5A-501

WINDOW HEAD DETAIL AT CAD 1491 1/2"=1'-0"SCALE:

DEMO NEW

6A-501

WINDOW JAMB DETAIL AT CAD 1491 1/2"=1'-0"SCALE:

DEMO NEW

7A-501

WINDOW SILL DETAIL AT CAD 1491 1/2"=1'-0"SCALE:

DEMO NEW

8A-501

WINDOW HEAD AT CMU WALL1 1/2"=1'-0"SCALE:

DEMO NEW

9A-501

WINDOW JAMB AT CMU WALL1 1/2"=1'-0"SCALE:

DEMO NEW

NEW FIBERGLASS WINDOWUNIT

BACKER ROD AND SEALANT

WOOD SHIM AS REQ'D

STUCCO JAMB BEYONDSTUCCO JAMB BEYOND

DEMO EXISTING WOODWINDOW AND SHIMS.

EXISTING METAL FLASHINGTO REMAIN

DEMO EXISTING WOODTRIM

EXISTING GWB OR WALLCOVERING - DO NOTDISTURB

VERIFY VAPOR RETARDERSEAL TO WINDOW UNIT

NEW WINDOW SHADES -ONE PER WINDOW PANE.COORDINATE AND FIELDVERIFY SPACE FROMWINDOW

PAINTED POPLAR WOODTRIM

PAINTED WOODPOPLAR TRIM

NEW FIBERGLASSWINDOW UNIT

WOOD SHIM ASREQ'D

VERIFY VAPORRETARDER SEALTO WINDOW UNIT

SEALANT ANDBACKER ROD

STUCCO FINISH -DO NOT DISTURB

DEMO EXISTINGWOOD TRIM

DEMO EXISTINGWOOD WINDOWAND SHIMS

STUCCO FINISH -DO NOT DISTURB

EXISTING GWB ORWALL COVERING -DO NOT DISTURB

NEW FIBERGLASS WINDOWUNIT

STUCCO JAMB BEYOND

BACKER ROD AND SEALANT

NEW 20 GA. WINDOW SILLMETAL FLASHING, EXTENDUNDER WINDOW

NEW SILL BLOCKING

2X WOOD BLOCKING

PROVIDE NEW VAPORRETARDER SEAL

WOOD FURRING

PAINTED POPLAR WOODTRIM

STUCCO JAMB BEYOND

DEMO EXISTING WOODWINDOW

DEMO SILL BLOCKING ANDMETAL FLASHING

EXISTING METAL FLASHINGTO REMAIN

VERIFY EXISTING VAPORRETARDER. PREP FOR NEWFIBERGLASS WINDOWLOCATION.

DEMO EXISTING WOODTRIM

NEW FIBERGLASS WINDOWUNIT

STUCCO JAMB BEYOND

BACKER ROD AND SEALANT, TYP.

NEW 20 GA. METAL WINDOWSILL FLASHING, EXTENDUNDER WINDOW

NEW SILL BLOCKING

2X WOOD BLOCKING

PROVIDE NEW VAPORRETARDER SEAL

WOOD FURRING

PAINTED POPLAR WOODTRIM

STUCCO JAMB BEYOND

DEMO EXISTING WOODWINDOW

DEMO SILL BLOCKING ANDMETAL FLASHING

EXISTING METAL FLASHINGTO REMAIN

VERIFY EXISTING VAPORRETARDER. PREP FOR NEWFIBERGLASS WINDOWLOCATION.

DEMO EXISTING WOODTRIM

DEMO EXISTINGCAULK. PREP FORNEW WINDOW

SALVAGEEXISTINGFIBERGLASSWINDOW TOOWNER

EXISTING GWBFINISH TO REMAIN- DO NOT DISTURB

NEW WINDOW SHADES -ONE PER WINDOW PANE

SEALANT AND BACKER RODAS REQ'D

NEW FIBERGLASS WINDOWUNIT

DEMO EXISTINGCAULK. PREP FORNEW WINDOW

SALVAGEEXISTINGFIBERGLASSWINDOW TOOWNER

EXISTING GWBFINISH TO REMAIN- DO NOT DISTURB

NEW FIBERGLASS WINDOWUNIT

SEALANT AND BACKER RODAS REQ'D

EXISTING GWB FINISH TOREMAIN - DO NOT DISTURB

DEMO EXISTINGCAULK. PREP FORNEW WINDOW

SALVAGEEXISTINGFIBERGLASSWINDOW TOOWNER

EXISTING SOLIDSURFACE SILL TOREMAIN

NEW FIBERGLASS WINDOWUNIT

SEALANT AND BACKER RODAS REQ'D

NEW WINDOW SHADES -ONE PER WINDOW PANE

PAINTED POPLAR TRIM

VERIFY EXISTINGVAPOR RETARDER

VERIFY EXISTINGVAPORRETARDER

VERIFY EXISTINGVAPORRETARDER

EXISTING CERAMIC TILE TOREMAIN

BACKER ROD AND SEALANT

NEW FIBERGLASS WINDOWUNIT

EXISTING CERAMICTILE TO REMAIN

DEMO EXISTINGWOOD TRIM

VERIFY EXISTINGVAPOR RETARDER

DEMO EXISTINGWOOD WINDOW

NEWFIBERGLASSWINDOW UNIT

CAULKING ANDSEALANT

PAINTEDPOPLAR TRIM

WOOD SHIM ASREQUIRED

DEMO EXISTINGWOOD TRIM

VERIFY EXISTINGVAPOR RETARDER

DEMO EXISTINGWOOD WINDOW

4A-501

CONC.

4A-501

CONC.WOOD

3"

3"3"

3"BACKER ROD AND SEALANT

SEALANT ANDBACKER ROD

BACKER ROD AND SEALANT

4A-502

OR

DIMENSIONS PROVIDED ARE FOR THE EXISTINGWOOD UNITS. ROUGH OPENING SIZES WILLDIFFER. CONTRACTOR TO FIELD VERIFYEXISTING DIMENSIONS AND UNIT SIZES.

SEALANT AND BACKER RODAS REQ'D

WOOD TRIM AS REQ'D

BACKER ROD AND SEALANT

SEALANT AND BACKER RODAS REQ'D

WOOD TRIM AS REQ'D

CAULKING ANDSEALANT

SEALANT AND BACKER RODAS REQ'D

SEALANT AND BACKER RODAS REQ'D

SEALANTAS REQ'D,TYP.

ByR

evis

ion

Date Stamped:

Dat

e

Project:

Date

Checked

Drawn

Project Mgr.

Sheet Contents:

Sheet No.:

STANTEC W.O. 2046069300

NORTH POLEHIGH SCHOOL

725 East Fireweed Lane,Suite 200Anchorage, Alaska 99503(907) 276-4245

544 4th Avenue,Suite 102Fairbanks, Alaska 99701(907) 452-2128

351 W. Parks HighwaySuite 200Wasilla, Alaska 99654(907) 376-7815

DUKES

02/23/2018

02/23/2018

100% CONSTRUCTION DOCUMENTS

www.stantec.com

WINDOWREPLACEMENT

Fairbanks, Alaska, 99701907 Terminal St.

Project No: 16-NPHPRJ-1IFB #: 18037

Fairbanks North Star Borough

THIS

DR

AWIN

GIS

HALF-SIZE

AT

11X17

Certificate of Authorization No:116460

Erik J. DukesNo. 107233

A-502

DETAILS

EJD --

GG --

1A-502

WINDOW SILL AT CMU WALL1 1/2"=1'-0"SCALE:

DEMO NEW

NEW FIBERGLASSWINDOW UNIT

BACKER ROD ANDCAULKING

NEW WOOD SILLBLOCKING

PAINTED POPLARTRIMEXISTING CERAMIC

TILE TO REMAIN

VERIFY EXISTINGVAPOR RETARDER

EXISTING METALFLASHING TO REMAIN

DEMO EXISTINGWOOD BLOCKING

DEMO EXISTINGMETAL FLAHSING

DEMO EXISTINGWOOD TRIM

DEMO EXISTINGWOOD WINDOW

2A-502

WINDOW JAMB AT ADJACENT WINDOW1 1/2"=1'-0"SCALE:

DEMO NEWDEMO EXISTINGWOOD WINDOW

DEMO EXISTINGFLASHING

NEW FIBERGLASSWINDOW UNIT

NEW METAL FLASHING

METAL FLASHING SILLBEYOND

BACKER ROD ANDSEALANT

PAINTED POPLARTRIM

3A-502

WINDOW SECURITY COVER12"=1'-0"SCALE:

3/8" DBL-SIDED TAPE -CONT.

1" WIDE AIR FILTER @18" O.C. LOCATED ATSILLS ONLY

FASTENER @ 9" O.C.

ALUMINUM FRAMECHANNEL

RUBBER GASKET

POLYCARBONITEGLAZING

NEW 20 GA. WINDOW SILLMETAL FLASHING

FIBERGLASS WINDOWUNIT

4A-502

WINDOW MULLING DETAIL12"=1'-0"SCALE:

MANUFACTURER'SSTANDARD EXTERIORWINDOW MULL COVER

MULLING CLIP

MANUFACTURER'SSTANDARD INTERIORWINDOW MULL COVER

FIBERGLASS WINDOWUNIT, TYP.

FIBERGLASS WINDOWUNIT, TYP.

WOOD SHIM AS REQ'D

BACKER ROD ANDCAULKING

SEALANT ASREQ'D, TYP.