NORTH CAMPUS N1 North Eagleville Road Infrastructure Repairs & Upgrades N2 Northwest Science Quad Infrastructure Phase I N3 Gant Science Complex Renovations N4 Central Utility Plant Equipment Replacements & Upgrades HERITAGE DISTRICT H1 Wilbur Cross Reading Room Renovations H2 Infrastructure Repairs at Koons, Family Studies & Manchester H2 Hawley Office Renovations CORE CAMPUS C1 Central Campus Infrastructure Upgrades C2 Student Recreation Center C3 Jim Calhoun Way Utilities C4 Central Campus Parking C5 Gampel Security Bollards C6 Fairfield Circle Reconstruction C7 Babbidge Library Electrical Upgrades C8 History Museum Renovations (May) SOUTH CAMPUS S1 Alumni Residence Halls Renovations S2 Fine Arts Production Facility S3 Southeast Campus Infrastructure OTHERS O1 Mansfield Road Sealcoating (mid Aug) O 2 Alumni Drive Resurfacing (mid/late June) O3 Interior LED Retrofitting O4 SW Campus Infrastructure (TBD) ---- IT Backbone Cable Pulls ---- Wayfinding Implementation CONSTRUCTION ACTIVITY Significant Projects | Summer 2018 North Garage Student Union Central Warehouse Rome Commons Nathan Hale Inn Mirror Lake EO Smith High School Public Safety Gampel Pavilion McMahon Residence Hall South Garage Fine Arts Complex Visitor Center Library Benton Museum UPDATED June 1, 2018 Subject to change Building / Site Project Infrastructure Project Great Lawn SOUTH CAMPUS CORE CAMPUS Dodd Center North Campus & Northwest Residence Halls WB Young Building HERITAGE DISTRICT S Lot X Lot Lot 8 Y Lot Jorgensen Center Bookstore Admissions Werth Residence Tower NORTH CAMPUS N1 N2 N3 N4 N1 O3 O3 O3 O3 H2 C4 H1 C2 O2 C6 O3 C7 H3 O1 H2 S2 S3 S1 C3 C8 C1 C5 C5 C2 C5 C5 O4 O4

Upload: others

Post on 26-Jul-2020

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NORTH N1 CAMPUS O3 - University of Connecticut · jorgensen center bookstore admissions werth residence tower. north campus. n1 n3 n2 n4 n1 o3 o3 o3 o3 h2 c4 h1 c2 o2 c6 o3 c7 h3

NORTH CAMPUS

N1 North Eagleville Road Infrastructure Repairs & UpgradesN2 Northwest Science Quad Infrastructure Phase IN3 Gant Science Complex RenovationsN4 Central Utility Plant Equipment Replacements & Upgrades

HERITAGE DISTRICT

H1 Wilbur Cross Reading Room RenovationsH2 Infrastructure Repairs at Koons, Family Studies & ManchesterH2 Hawley Office Renovations

CORE CAMPUS

C1 Central Campus Infrastructure UpgradesC2 Student Recreation CenterC3 Jim Calhoun Way UtilitiesC4 Central Campus ParkingC5 Gampel Security BollardsC6 Fairfield Circle ReconstructionC7 Babbidge Library Electrical UpgradesC8 History Museum Renovations (May)

SOUTH CAMPUS

S1 Alumni Residence Halls RenovationsS2 Fine Arts Production FacilityS3 Southeast Campus Infrastructure

OTHERS

O1 Mansfield Road Sealcoating (mid Aug)O2 Alumni Drive Resurfacing (mid/late June)O3 Interior LED RetrofittingO4 SW Campus Infrastructure (TBD)---- IT Backbone Cable Pulls---- Wayfinding Implementation

CONSTRUCTION ACTIVITYSignificant Projects | Summer 2018

NorthGarage

StudentUnion

CentralWarehouse

RomeCommons

NathanHale Inn

MirrorLake

EO SmithHigh School

PublicSafety

GampelPavilion

McMahonResidence

Hall

SouthGarage

Fine ArtsComplex

VisitorCenter

Library

BentonMuseum

UPDATED June 1, 2018Subject to change

Building / Site Project

Infrastructure Project

GreatLawn

SOUTH CAMPUS

CORE CAMPUS

DoddCenter

North Campus & Northwest Residence

Halls

WB Young Building

HERITAGE DISTRICT

S Lot

X Lot

Lot 8

Y Lot

JorgensenCenter

Bookstore

Admissions

Werth Residence

Tower

NORTH CAMPUS

N1

N2N3N4

N1

O3O3

O3

O3

H2

C4

H1

C2

O2 C6O3

C7

H3

O1

H2

S2S3

S1

C3

C8

C1

C5C5C2

C5

C5

O4

O4

Page 2: NORTH N1 CAMPUS O3 - University of Connecticut · jorgensen center bookstore admissions werth residence tower. north campus. n1 n3 n2 n4 n1 o3 o3 o3 o3 h2 c4 h1 c2 o2 c6 o3 c7 h3

NO NORTH-SOUTH ROUTE THROUGH CAMPUS – USE SR195• SOUTH GARAGE IS A “DEAD END”, NO THROUGH TRAFFIC• RTE 195 IS PREFERRED ROUTE TO SOUTH CAMPUS FROM NORTH, AND TO NORTH CAMPUS FROM SOUTH• DELIVERIES BY EXTERNAL VENDORS TO BUILDINGS IN RESTRICTED AREAS SHOULD DELIVER TO CENTRAL WAREHOUSE• EVENTS & PROGRAMS MAY CONTACT TRANSPORTATION SERVICES FOR ARRANGING SHUTTLES AND SPECIAL ACCOMMODATIONS• ALLOW FOR TRAVEL DELAYS

Visiting Campus and Access to Parking GaragesFROM POINTS NORTH AND WEST SR195 to SR44 to Discovery Drive; Access to North and South Garages – Follow signsFROM POINTS SOUTH AND EAST SR195 to Bolton Road; Access to South Garage ONLY – Follow signsTOWN (LOCAL) ROADS Construction Vehicles Not Permitted; Event Traffic Discouraged

Summary of Road Closures & Vehicular RestrictionsALUMNI DRIVE Alternating Direction between Hillside Road and Husky Circle (mid-late June)

AUDITORIUM ROAD & EXTENSION Closed; Access to Gant loading dock coordinated with project upon request

BENTON SERVICE DRIVE Service, Emergency & Special Permit Vehicles Only

COVENTRY ROAD Closed at Maple Lane

FAIRFIELD WAY Emergency or Special Permit Access Only

GAMPEL SERVICE DRIVE Closed between Jim Calhoun Way and Temporary Administrative Building (through late June)Restricted to Local Traffic & Trucks Only, Regular Delays

GLENBROOK ROAD Right turn only at North Eagleville Road

SUMMER CONSTRUCTION AND TRAFFIC UPDATEUPDATED June 1, 2018 | Subject to Change

Page 3: NORTH N1 CAMPUS O3 - University of Connecticut · jorgensen center bookstore admissions werth residence tower. north campus. n1 n3 n2 n4 n1 o3 o3 o3 o3 h2 c4 h1 c2 o2 c6 o3 c7 h3

Summary of Road Closures & Vehicular Restrictions (cont’d)HILLSIDE ROAD Closed between Glenbrook Road and Gilbert Road

Accommodations upon Request to Student Union, Fieldhouse and McMahon Hall NorthAccessible Drop-Off at McMahon Hall SouthRestricted Access to Bookstore Loading DockEmergency Vehicle Access – Coordinated with Projects, Staging Apparatus as Necessary

JIM CALHOUN WAY Closed between Gampel Service Drive & Hillside Road (No Access to Hillside Road)Turnaround behind Champions Center (through late June)Loop around Champions Center (late June-Aug)Through Trucks use Gampel Service Drive to Glenbrook Road

JORGENSEN ROAD No Truck Access or Through Traffic to Auditorium RoadAccessible Drop-Off & Turnaround for Events

MANSFIELD ROAD Open to All TrafficAlternating Direction & Partial Closure 3 days/nights (mid August)

MANSFIELD WAY Open to Emergency Vehicles Only

MAPLE LANE Alternating direction during utility work

NORTH EAGLEVILLE ROAD Open One-Way (Eastbound) between Discovery Drive and Glenbrook Road to Local TrafficOpen Two-Way between SR195 and Glenbrook Road to All Traffic

WHITNEY ROAD & EXTENSION No Through Traffic to Gilbert RoadTurnaround at Dodd Center

SUMMER CONSTRUCTION AND TRAFFIC UPDATEUPDATED June 1, 2018 | Subject to Change

Page 4: NORTH N1 CAMPUS O3 - University of Connecticut · jorgensen center bookstore admissions werth residence tower. north campus. n1 n3 n2 n4 n1 o3 o3 o3 o3 h2 c4 h1 c2 o2 c6 o3 c7 h3

TRAFFIC PATTERNSProbable Impacts | June 2018

NORTH CAMPUS

1. North Eagleville Road One-Way Eastbound between Discovery Drive and Glenbrook Road

2. Driveway between Atwater and Pharmacy-Biology Building Closed (June)

3. North Campus Residence Hall Driveway Closed (early June)

4. Northwest Residence Hall Driveway Closed (mid-June)

5. Auditorium Road & Extension Closed

HERITAGE DISTRICT

1. Mansfield Way Restrictions2. Benton Service Drive Restrictions

CORE CAMPUS

1. Hillside Road Partial Closure and Restrictions

2. Fairfield Way Restrictions3. Jim Calhoun Way Partial Closure and

Restrictions4. Gampel Service Drive Restrictions5. South Garage Access6. Turnaround behind Champions Center7. Whitney Road Restrictions8. Alumni Drive Alternating Direction

(mid-late June)

SOUTH CAMPUS

1. Coventry Road Partial Closure2. Maple Lane Restrictions3. Loop around Lot 8

NorthGarage

StudentUnion

DoddCenter

CentralWarehouse

JorgensenCenter

RomeCommons

NathanHale Inn

MirrorLake

EO SmithHigh School

PublicSafety

GampelPavilion

McMahonResidence

Hall

VisitorCenter

Library

BentonMuseum

Fine ArtsComplex

North Campus Residence Halls

WB Young Building

UPDATED June 1, 2018Subject to change

S Lot

X Lot

Y Lot

Lot 8

SouthGarage

Admissions

Werth Residence

Tower

Occasional Delays

Frequent Delays

Restricted Access

Road Closed

Traffic Control Point

WilburCross

McHugh (Laurel)

Hall

NorthwestResidence Halls Great

Lawn

Bookstore

Page 5: NORTH N1 CAMPUS O3 - University of Connecticut · jorgensen center bookstore admissions werth residence tower. north campus. n1 n3 n2 n4 n1 o3 o3 o3 o3 h2 c4 h1 c2 o2 c6 o3 c7 h3

NorthGarage

CentralWarehouse

RomeCommons

NathanHale Inn

MirrorLake

EO SmithHigh School

PublicSafety

GampelPavilion

SouthGarage

Fine ArtsComplex

VisitorCenter

Library

BentonMuseum

UPDATED June 1, 2018Subject to change

McMahon Residence Hall to Bookstore• Follow sidewalk along same side of Hillside Rd• Enter Bookstore on left

Bookstore to Student Union• Cross Jim Calhoun Way at designated crossing• Cross Hillside Rd to School of Business side• Follow sidewalk to Student Union on right

Hilltop Residences to Bookstore• Follow ramp to Sherman Field• Along Sherman Field to breezeway at Natatorium• Through breezeway to Hillside Rd• Turn right to Bookstore

Bookstore to Library• Exit Bookstore on Hillside Rd and turn left• Cross Jim Calhoun Way at designated crossing• Cross Hillside Road to School of Business• Continue straight through quad behind School of

Business to Library

South Garage to Dodd Center• Exit stair tower, follow Jim Calhoun Way to Hillside Rd• Cross Hillside Rd to School of Business• Continue straight behind School of Business, through

quadrangle to Whetten Center• Turn right to Dodd Center

South Garage to Rome Commons• Exit stair tower, follow Jim Calhoun Way to Hillside Rd• Turn right on Hilliside Rd and follow to Gilbert Rd• Cross onto Gilbert Rd and follow to Rome Commons

South Garage to McMahon Residence Hall• Exit stair tower, follow Jim Calhoun Way to Hillside Rd• Turn right and follow Hillside Rd to McMahon

Residence Hall on right

North Garage to Jorgensen Center• Exit stair tower and turn right• Follow signs to Hillside Rd

Admissions

DoddCenter

North Campus & Northwest Residence

Halls

WB Young Building

Lot 8

S Lot

X Lot

PEDESTRIAN PATTERNSPreferred Event Routes | June 2018

• BE SAFE, STAY ALERT AT ALL TIMES• FOLLOW SIGNS & OBEY CROSSING GUARDS• CROSS ROADS ONLY AT CROSSWALKS

JorgensenCenter

StudentUnion

WilburCross

Bookstore

Y Lot

McMahonResidence

Hall

Engineering II

Werth Residence

Tower

McHugh (Laurel)

Hall

School of Business

Great Lawn

Page 6: NORTH N1 CAMPUS O3 - University of Connecticut · jorgensen center bookstore admissions werth residence tower. north campus. n1 n3 n2 n4 n1 o3 o3 o3 o3 h2 c4 h1 c2 o2 c6 o3 c7 h3

SUMMER CONSTRUCTION AND TRAFFIC UPDATEUPDATED June 1, 2018 | Subject to Change

MEMBERS

University Planning, Design and ConstructionConstruction sites and activitiesSean Vasington, Ian Dann, Ed Cotter, Lou Gaedt, Heather Schlink

Logistics AdministrationParking, transit, signage, warehouseDwight Atherton, Charlie Grab, Alex Karr

University CommunicationsCampus communication/outreachStephanie Reitz, Tom Breen

Public SafetyTraffic control, pedestrian safety, emergency managementChris Casa, Darren Cook, Chris Renshaw, Steve Garvin

Facilities Operations & Building ServicesTemporary facilities and controlsAris Ristau, Eric Kruger

University Events & Conference ServicesPrograms/Event coordinationCara Workman

FOR MORE INFORMATION ON CONSTRUCTION IMPACTS, PLEASE CONTACT SEAN VASINGTON AT [email protected]

RESOURCE GROUPCurrently coordinating implementation of traffic control points and bridging any communication gaps between campus stakeholders and project representatives. Convening weekly meetings throughout the summer to report activities/observations, monitor campus impacts and coordinate special accommodations.

COMMUNICATIONCheck for regular updates at uconn.edu/construction, Daily Digest and UConn Today