north grounds athletics master plan...soccer soccer +580 soccer +570 +556 baseball +hp=590 26’...

43
NORTH GROUNDS ATHLETICS MASTER PLAN UNIVERSITY OF VIRGINIA | 2018 DUMONTJANKS HOK

Upload: others

Post on 04-Aug-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

NORTH GROUNDS ATHLETICS MASTER PLANUNIVERSITY OF VIRGINIA | 2018

DUMONTJANKSHOK

Page 2: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

NORTH GROUNDS ATHLETICS MASTER PLAN

Page 3: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

EXECUTIVE SUMMARY

Page 4: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

The University of Virginia initiated the North Grounds Athletics Mater Plan for two primary reasons: First, to establish a bold vision that guides long-term development within the athletics area that builds upon the North Grounds Planning Study. Second, to develop a detailed building program that sets a new standard for what a collegiate scholar-athlete experience should be at UVA.The athletics area is currently home to training and competition facilities, administrative and operations space, as well as the supporting amenities of parking, public plaza space, and a network of major roads. The 82-acre site is characterized by significant topography, ecological and hydrological systems, which over time have evolved to the current patterns of land uses, network of streets and infrastructure. The site is a critical link between North Grounds and Central Grounds. Therein lies a great opportunity, on many fronts to realize the University’s aspirations:

The site presents a tremendous opportunity to integrate

INTRODUCTION

Existing Site Conditions Aerial View Separation from Central Grounds Disconnected Mobility Lack of Cohesive Identity, Aged Facilities

North Grounds

Central Grounds

Ivy Corridor

Ivy Corri

Ivy Garden

Copeley Residential

Athletics Facilities

West Grounds

Athletics Area

The site is the western gateway to the Historic Grounds, a World

Investigate the programmatic needs for all student athletes,

The athletics area seeks to create an environment that

Develop an implementation strategy that allows for flexibility to

Strengthen and promote multimodal connectivity between

Preserve and restore the ecological resources as a powerful

unites North and Central Grounds.

academic and athletics around a bold connectivity idea that

Heritage Site. The idea and the final result must recognize the need to serve as introduction to the university.

coaches, staff and athletic administrators that sets up for the long term success and growth.

supports nationally competitive and successful teams, attract and retain the highest quality student-athletes, and contributes to a goal of fostering collegiality and collaboration between student-athletes, faculty and staff.

meet long term needs and aspirations and maintains the integrity of a cohesive idea.

North and Central Grounds.

unifying landscape.

McCUE

WELSH

JPJ ARENA

UNIVERSITY HALL

ONESTY

HALL

THE

CAGE

Page 5: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

DESIGN IDEA : STRENGTHEN CONNECTIONS AND IDENTITY

The master plan proposes a bold new vision that unites the aspirations of a unique scholar-athlete program with the enabling physical facilities to support that vision. The plan proposes a new complex of indoor facilities around a new Sports Promenade that unites North Grounds with the athletics district. This promenade idea becomes the iconic identity to the district and iconic home of UVA sports; for athletes, coaches, and fans alike.

The master plan encourages interdisciplinary collaboration between athletics and academic uses. It promotes flexibility to allow for future program needs and phasing. The landscape seeks to create an exceptional environment that fosters dialogue and transparency, and promotes active and engaged learning. It improves the overall arrival experience to Grounds and promotes safe multimodal mobility.

Proposed Long Term Master Plan Aerial View Restore the woodland stream and Virginia landscape as a powerful unifying preserve

Move toward connected, enclaves of academic, residential, and athletic use surrounding the preserve

Connect all with an integrated multimodal mobility system

McCUEWELSH

JPJ ARENA

ATHLETICS COMPLEX

GARAG

E& M

IXED

-USE

MIX

ED-USE

MIXED-USE

MIXED-USE

GARAGE& MIXED-USE

Page 6: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

INTRODUCTION

ContextSite Analysis

Page 7: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

Copeley Residential clearing

Parking Expansion

Copeley Housing Complete

Darden, Law School and JAG

Ivy Garden Expansion

Copeley Residential clearing

Parking Beginning

Parking Complete

Darden Beginning

Darden Complete

Beginning U-Hall

FaulknerResidential

DSDarden, Law School and JAG

ParkinExpan

Copeley HoComplete

Ivy GardenExpansion

g sion

ousing

D d

Parking Beginning

Darden Beginning

FaulknerResidential

Darden Complete Parking

Complete

CopeleyResidenclearing

y ntial g

CopeleyResidenclearing

BeginnU-Hall

y ntial g

ing

MARCH 1963 MARCH 1964 MARCH 1968

MARCH 1977 MAY 1994 MARCH 2017

Ivy Garden BeginningIvy GardenBegBeB inning

Rt 29 Clearing

HISTORIC DEVELOPMENT

DECEMBER 1959

MARCH 1972

U-Hall

Cavalier Inn

Copeley Complete

Page 8: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

GROUNDS AND CONTEXT

The University of Virgina, established in 1819, comprises 1,135 Acres in the Piedmont region of Virginia. At the time of its founding, this land, one mile west of Charlottesville, consisted of farm fields and woodlands amidst the rolling countryside of Albermarle County. Today, the University and the City of Charlottesville are intertwined, and much of the land is developed. As the geographic center of Grounds and University land-holdings, the development of the athletics area has the potential to unite Central and North Grounds in a profound way.

Athletics Site Boundary

University of Virginia Property

WEST GROUNDSCENTRAL GROUNDS

Ivy Road

Emm

et S

treet

University Ave

Jefferson Park Ave

Jefferson Park Ave

29

250

adIvy Road

EmEmEmEmEmEmEmEmEmm

em

em

em

em

em

em

em

em

ettttt t t t t S

tStStStStStStStStrerererererererere

etetetetetetetetet

EmEmEmEmEm

em

em

em

em

ettttStStStStSt

eererereeetetet

NORTH GROUNDS

ATHLETICS AREA

Page 9: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

Existing Streams in Pipes

Mt Jefferson

Lewis Mtn.

Copeley Hill

Carr’s Hill

Monroe Hill

Ivy Road

Emm

et S

treet

University Ave

Jefferson Park Ave

Jefferson Park Ave

29

250

As part of the Piedmont region of Virginia, the topography of Grounds and the athletics area is defined by a series of dramatic hills and valleys with a connective pattern of streams and tributaries.

TOPOGRAPHY AND HYDROLOGY

Ivy Road

mEmEmEmEmm

em

em

em

em

ettt t S

tStStStSrererere

etetetet

Site Boundary

Existing Open Streams

Higher Elevation

Lower Elevation

Page 10: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

MASSIE RD

IVY RD

OLD IVY RD

COPE

LEY

RD

EMM

ET S

T

Site Boundary

Existing Open Streams

Existing Forest

Higher Elevation

Lower Elevation

+504

+552

+588+588

+488

+494

+508

Lacrosse

+520Football

+520Field Hockey

+528U-hall

+538+552

+560

+534

+559Track & Field

+565Soccer

Soccer

+580Soccer

+570Baseball+556

+HP=590

26’ Drop

Sloping Down(66’ Drop)5% Slope

+LP=468

The site presents significant topography with a grade elevation change of 100’ from the western edge of the athletics area to Emmet street. The site program and amenities are organized on a series of flat terraces. The site also offers a significant hydrological feature. Three regional facilities were implemented as a result of a comprehensive Meadow Creek Stormwater Master Plan. One of the three regional facilities is located in the athletics area that serves 300 acres of watershed and provides storm water quantity and quality benefits.

PHYSICALCONDITIONS

MASSIE RD

IVY RD

COPE

LEY

RD

EMM

ET S

TEM

MET

ST

++++++5+5+5+5+55+55+50505505050+5050++++5+5+5+5+5+5555+5005050+5+5+55550505050505050+5+55505050+555050+500++5+550+50+55050+550+++5+++5+++++ 0+ 00+50++++504444444444444444444444444444444444444444444444444444444444444444444444444444+

+5+5+5++5+5+5+5+5+55+55555+5+5+5+5+55+555++55+5+5+5555+555555++5+5555555555552222222222222

+5++58+++58+58+58+58+58+58+5888+++58+58+58++58+585888888888888888888++58+58+5+58++5858+585858+58858+58+588+58888++58+585858+58888+58+55858+5558+58588588888888888888888

48488888488888888888888888888888888888888+++4+44+++++++

+494+

+508

Lacrosse

+52+5252525225252252222220000000000000000000FooFooFooFooFooFooFooFooFooFooFooFoooFFFFooo tbatbatbatbatbatbatbababatbatbabatbabaaab llllllllllll

+52+52+52+52+52+52+5252+52+52++5+ 2000000000FieFieFieFieFieFieFieeFieFieFieFieFFieeeeeeeldldddddd HocHocHoHoHoHoHoHoHoHoHoo keykeyeyeyyyyyyyyyy

++++++5+52+52++5+5+5+5++5++5++++++++5++5++++++5++++++++++++++++ 88UUUUU-U-UUUUUUU-UUU-UUU-UUU-UU-U-U-UU-U-UUUUU---hahahahalhalhalhahahahahahhahahaahahhahahhahhhhhhhhhhhhhahhhaaaaaaaa llll

+53+535353533333333333335335335333353333333+533533353553338888888888888888888888888888888888882+55+55+5++55+55555555555+5555+55+55555555222222222

+56+56+56+56+56+5+5+5+56566566++5666+56+++566++++ 000000000000000

+5+5+53+53+53+53+5353++53+53+533333535 44444444444444444

+55+5+55+55+55+55+55+55+55+55+55555599999TraTraTraTTraTraTraTraTraTraTraTraTraTT aaT ck ckckckkckckckckckckckccc & F& F&&&& & & & F& & FF& FFFFF& ieieieielielieliei ddddddddddddd

++++56+56+ 55SSocSocSoSocS cercerer

Soccer

+58+585858585858585858588855 000000000000SSocSocSocooSoSSSoSoSSoSoooSoSSS cerceeeeereeee

7777777777700000000000sebaebaaaaaaaaaallllllllllll

2622626’2626’26’26’6’’2626’2626’2626’622262626’2626’26626’2662 26 DrDDrDrDrDrrorororororororoooroDDroDrooroDroppppppppppppppp

SloSloloSloSloSloSloSloSloolooloolooooSlSlooopinpinpinpinpinpinpinpinpinppininninninnpinninipipipippppp g Dg Dg Dg DDg Dg Dg Dg Dg Dg Dg Dg Dg DDgg Dg Dgg DDg Dg DDDg Dg DDggggg DDgg ownownownownownownownownownownownownwnoowownoownoownownwownownowwownoownwnwnwnwn(66(66(66(66(66(66(6666(66(666666(66(66(66(66(66(66(666(66(66(6(6666(66(66((6(6(666666’ D’ D’ D’ D’ D’ D’ D’ D’ D’ D DD’’ D’ D DDDDDDDDDroproproproproproproproroproproproproproproproproropopropoproprooppopopoproopppoopppppp))))))))))))))))))))))))))))))5%5% 5%5%5%5% 5%5%5%5%5%%%%%%%%% SloSlSloSloSloSloSloSloSloSloSloSlooSloloSlooSloloSlSlooS opepepeepepeepepepeepepepepepepepepeepeepeepepep

+LP+++ =468

66666666666600000000000

++++++++++++’’’’’’’’’’’’’’’’’ DDDDDroDroDroDrorororoooooDrorooroDroDrooDDroororooroDrD oopppppppppppppppppppppppppppppp

Rail

EXISTING FOREST

EXISTING

FOR

EST

Page 11: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

MASSIE RD

IVY RD

COPE

LEY

RD

EMM

ET S

T

Amount of Total Acreage=82.35 acresEXISTING USES

4

2

3

1

Site Boundary

A

B

C

DE

F

G

Existing Building ProgramMcCue Center: Football Program; Coaches Offices; Central Athletics AdministrationWelsh Indoor Football Practice Facility:Indoor Practice Facility for Football and Other SportsUniversity Hall ( Former On-Campus Arena):· Home to the Following Teams: Field Hockey; M&W Lacrosse; M&W Soccer; M&W Track & Field; M&W CROSS Country; Softball· Training Center in Some Capacity for Other Sports and for Facility OperationsOnesty Hall:Wrestling, including practice facilities. Also includes a visiting locker room and storage.The Cage: Indoor Training Space for Track & Field, along with Other Sports.Sports Medicine Building:Sports Medicine for Sports other than Football in the Precinct.John Paul Jones Arena Basketball Home Venue:M&W Basketball team facilities; Academic Services; Student-Athlete Dining Facility; Central Video Operations

Total park spaces = 2,327Surface parking spaces = 1,595

A

B

C

D

E

F

G

Parking

Fields

5

6

7

8

Football Outdoor Practice FieldLacrosse Practice FieldPartial Length Soccer Practice FieldField Hockey Stadium - Practice and Home Venue for Field HockeyKlockner Stadium - Home Venue for Soccer and LacrosseSoccer Practice Field - Future Softball FacilityDavenport Field at Disharoon Park - Home Venue and Team Facility for BaseballLannigan Field - Outdoor Practice & Home Venue for Track & Field

12345678

MASSIE RD

COPE

LEY

RD

EMM

ET S

T

4

2

3

1

A

B

CC

DE

F

G5

66

7

8

Rail

EXISTING FOREST

EXISTING

FOR

EST

Page 12: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

CONNECTIVITY GOALS

Existing ConnectivityLack of Connectivity

Site Boundary

Congestion

Congestion

Lack of Connectivity

Emmet/IvyIntersection

MASSIE RD

IVY RD

COPE

LEY

RD

EMM

ET S

T

Intersection

Page 13: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

PROGRAM

Summary of Stakeholder DiscussionsProgram Summary

Page 14: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

SUMMARY OF STAKEHOLDER DISCUSSIONS

UVA Athletic Teams are collectively performing at a very high level

Success should be celebrated in a collective way, the number of championships by all teams is impressive when viewed together

Existing Athletic Facilities are typically undersized and in need of improvement

New facility should be focused on the Impact to Student-Athletes – “We want them arriving and wanting to be the best that they can be.”

Building should reflect the Values of UVA Athletics and UVA as an institution

With any new facility, maintain areas that bring student-athletes and coaches together - Academic Services and Dining Facilities at JPJ are current examples of this

Coaches were collectively enthusiastic about a central facility bringing sports together – a Center for 650 Student-Athletes

Administrators expressed a strong desire to provide improved resources to help student-athletes be as successful as possible - Sports Nutrition prefers a centralized hub, convenient to a majority of student-athletes - Sports Medicine is to remain convenient and familiar to student-athletes, with more space than current facility - New Orthopedic Center opening near the precinct in 2020 will offer specialized care to student-athletes - Strength & Conditioning needs to grow for the number of student-athletes served, with improved analytical capabilities - Academic Support Facility is undersized for number served, but staff does a great job

Access to convenient parking was a common concern of coaches

Existing Field Inventory provides challenges with overuse and shared field time – ideal inventory would be: - Football=2 outdoor fields + Welsh Indoor - Soccer=1 dedicated field each for Men & Women – 2 total - Lacrosse=1 dedicated field each for Men & Women – 2 total - Field Hockey=1 field (performance & practice)

Coaches take great efforts to manage fields and share facilities as efficiently as possible

The Field Hockey Stadium currently lacks convenient access to locker rooms and fan amenities, but offers a top-notch field

Coaches find that recruits really value the academic quality of UVA

A key focus for coaches is preparing student-athletes for life after UVA

Page 15: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

Shared Student-Athlete Resources

30,693 GSFFootball Team Training

61,719 GSF

Olympic Sports Training

105,210 GSF

Athletic Grounds & Support

5,544 GSF

Virginia Athletic Foundation &

External Relations

16,069 GSF

Student Development Center

30,108 GSF

Building Support

13,548 GSF

EXIS

TIN

G P

ROG

RAM

PR

OP

OS

ED

PR

OG

RA

M

11%

6%

5%

12%24%

40%

2%

PROGRAM SUMMARY

NEAR-TERM FIELD INVENTORY FIELD QUANTITY

FOOTBALL OUTDOOR PRACTICE FIELD 2WELSH INDOOR FOOTBALL 1LACROSSE PRACTICE FIELD 1SOCCER PRACTICE FIELD 2FIELD HOCKEY STADIUM 1

LONG-TERM FIELD INVENTORY FIELD QUANTITY

FOOTBALL OUTDOOR PRACTICE FIELD 2WELSH INDOOR FOOTBALL 1LACROSSE PRACTICE FIELD 2SOCCER PRACTICE FIELD 2FIELD HOCKEY STADIUM 1

UVAFOOTBALL & OLYMPIC TRAINING FACILITYPROPOSED SF

Page 16: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

MASTER PLAN

Civic FrameworkNear Term & Long Term PlansDetailed Exploration of Master Plan

Page 17: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

The Civic Framework principles embody the strategic goals from the university to enable a dynamic, economically viable development that supports the university’s mission and connectivity. It is driven by an organized framework of pedestrian corridors, re-imagines Massie road as a prominent corridor that enhances the arrival experience. Additionally, the potential exists for bridges to connect across the Railroad track to future buildings in the Ivy Corridor site.

CIVIC FRAMEWORK

Fields & VenuesGreen Space

Pedetrian ConnectivityVehicle Circulation

Parking

Vehicle CirculationBuilding

Vehicle CirculationBuilding

Fields & VenuesGreen Space

Existing Buildings

Mobility

Proposed Buildings

Fields & Green Space

Page 18: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

4

6

3

21

5

MASSIE RD

IVY RD

COPE

LEY

RD

EMM

ET S

T

McCUE

JPJ

OLYMPICS

FOOTBALL

WELSH

The near term plan sets up an organizing framework that addresses the programmatic needs for a majority of the UVA sports program, and also outlines an implementation process that expedites and accomplishes immediate needs. The program addresses the needs as a daily home for a majority of UVA’s sports programs, and is generally divided into the football program and shared resources by other sports program.

The program and site amenities are organized along a pedestrian promenade and is envisioned to create an enhanced arrival experience for students, spectators, and visitors. The plan capitalizes on the topography and organizes the program in a series of stepped terraces of athletic fields and new facilities. Practice Facilities for UVA sports programs include a collection of enhanced outdoor practice fields along with:1. An improved Wrestling Practice Facility2. A replacement to the existing Cage, offering an indoor track and a turf training area.3. A dedicated Rowing Practice Facility in the precinct,

Massie road is re-imagined as a prominent entry corridor that promotes multimodal mobility and enhances the arrival experience towards University Grounds.

MASTER PLAN - NEAR TERM

Site Boundary

supplementing facilities at the Boat House.

Page 19: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

4

6

3

21

5

7

MASTER PLAN - LONG TERM

Site Boundary

MASSIE RD

IVY RD

COPE

LEY

RD

EMM

ET S

T

McCUEOLYMPICS

FOOTBALL

WELSH

Future Uses

The long term plan seeks to strengthen the civic identity along Massie road with potential uses that foster inter-disciplinary collaboration. The intersection of Copeley and Massie Road is envisioned to be a new pulse of vitality anchored with active uses. The future buildings proposed along the street are scaled appropriately and setback from the street edge to respond to the surrounding context. The future buildings shall include parking below grade to replace surface parking spaces and meet future needs. The plan also recommends the relocation and additions to the field hockey stadium to the east side of the Copeley Road and closer to the competition venues. Additionally, the potential exists for bridges to connect across the railroad track to future buildings in the Ivy Corridor site.

JPJ

Page 20: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

MASTER PLAN NEAR TERM - WEST VIEW

+508 +508

+520

+520

+540

+552+550

+505 +504

+488

WELSH

McCUE

EMMET ST

MASSIE RD

+534

+504A A

B B+520

+526

ATHLETICS COMPLEX JPJ ARENA

Page 21: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

SECTION AA - WEST VIEW

+508

SidewalkRailMassie Road

Parking LotEmmet/Ivy Garage

+520

WELSH

Promenade Lacrosse FieldPerry Field

+540

+550

+5+555080808080

+5+5+55+52020202022220

+5+52626+5+53434

+5+5++5+++5040404040404+505

+5+5+5+5+5+++5+5+55202020202020202

+55555540040404040

+5+5+5+5++555525252525225++5+5++++++5550505050550555055

+5+520

+508

McCUE

ATHLETICS COMPLEX

MASSIE RD

JPJ ARENA

Page 22: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

+505+505+520+520

+505

SidewalkRailMassie Road

Emmet/Ivy Garage

+5+5+5050505+520WELSH Lobby Lobby

Practice/Track

Underground ParkingField Hockey

+540

+550

+5+52626+5+534344

+5++5+55+5+5+5+5++5202020202020022

+540

+5+5+5+5+5+5555552525252225225+5+5+5+5+++5+5555505050505055550

+5+520

SECTION BB - WEST VIEW

JPJ ARENA

McCUEMASSIE RD

Page 23: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

MASTER PLAN NEAR TERM - SOUTH VIEW

+552+540

+540+505

+520

+526

+534

+540

+5 +520+508

+508

+488

AA

WELSH

EMMET ST

EMMET ST

COPELEY RD

JPJ ARENA

McCUE ATHLETICSCOMPLEX

Page 24: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

PROPOSED NEAR TERM - SOUTH VIEWSECTION AA - SOUTH VIEW

+520

Sidewalk SidewalkWelsh Indoor

Practice FacilitiesSidewalk SidewalkParkingCopeley

RoadEmmet Street

Lacrosse Field

Football Fields

+540

EMMET ST

CO

PELE

Y RD

+5+5+5+5++5++55404040444444

5+5+5+5+505050505550550050555555+555202020200020

+5+5+5+5262622+5+5+5+5+5+++5+5+5++55+ 4044404444440400+5+5+55+5+508080808

+4+4+++ 88+5+5+55252525252522525252525

JPJ ARENA

McCUE ATHLETICSCOMPLEX

Page 25: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

AERIAL VIEW - NEAR TERM

IVY RD

EMMET ST

MASSI

E RD

COPELEY RD

McCUE

WELSH

OLYMPICSPORTS

JPJ ARENA

FOOTBALLFACILITY

Page 26: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

AERIAL VIEW - LONG TERM

EMMET ST

MASSI

E RD

MIX

ED-USE

MIXED-USE

MIX

ED-U

SE

PARKING& MIXED-USE

PARK

ING

& M

IXED

-USE

McCUE

JPJ ARENA

WELSH

COPELEY RD

FOOTBALLFACILITY

OLYMPICSPORTS

Page 27: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

GOODWINPLAZA

Existing View Looking Northwest

A new pedestrian plaza is proposed that anchors the Goodwin Bridge and New Sports Promenade in the athletics area overlooking the new practice fields and facilities.

Page 28: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

PROMENADELOOKING NORTHWEST

Existing View Looking Northwest

A vibrant new sports promenade that celebrates UVA Sports history connects Central Grounds and athletics facilities and venues. It is envisioned to enhance the student, visitor, and gameday experiences.

Page 29: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

MASSIE ROADLOOKING NORTHWEST

Existing View Looking Northwest

Massie road is re-imagined as a new prominent entry corridor with street trees, wide pedestrian walks, enhanced site lighting to create a safe and continuous pedestrian connection.

Page 30: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

NEAR TERM BUILDING

262,891 sf

LONG TERM BUILDING

458,000 sf+ 196,269 sf

Building Coverage=11.55 acresProposed Building gsf = 262,891 sf

New Building New Building

Building Coverage=16.52 acres

EXISTING BUILDING

Building Coverage=11.94 acres

Page 31: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

NEAR TERM PARKING LONG TERM PARKING

New Parking New Parking

EXISTING PARKING

Surface Parking =1,595Total Parking = 2,327

Surface Parking =1,650Total Parking = 2,553

Surface Parking =529Total Parking = 3,164

Basement171

2 floors + basement

684

basement175

4 floors873

2,5532,327 3,164+ 611+ 226

Basement171

2 floors + basement

684

basement175

4 floors873

Page 32: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

NEAR TERM OUTDOOR FIELDS LONG TERM OUTDOOR FIELDSEXISTING OUTDOOR FIELDS

A Soccer Practice FieldB Klockner Stadium C Davenport Field at Disharoon Park D Lannigan Field E Field Hockey Stadium

1 Football Field2 Lacrosse Field3 Soccer Field

1 Football Field2 Football Field3 - 5 Natural Turf Practice Field

1 Football Field2 Football Field3 - 6 Natural Turf Practice Field

A SoftballB Klockner Stadium C Davenport Field at Disharoon Park D Lannigan Field E Field Hockey Stadium

A SoftballB Klockner Stadium C Davenport Field at Disharoon Park D Lannigan Field E Field Hockey Stadium

108 11+ 1+ 2

AB

C

D

E

AB

C

D

E

AB

C

D E

11 1

3 3

5

5

6

4 4

2 2

2

3

AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAABBBBBBBBBBBBBBBBBBBBBB

CCC

DDDDDDDDD

EEEEEEEEEEEEEEEEEEEEEEEEEE

1

2

3

AAAAAAAAAAAABBBBBBBBBBBBBBBBBBBBBBB

CCCCCCCCCCC

DDDDDDDDDD

EEEE

1

3

5

4

2

AAAAAAAAAAABBBBBBBBBBBBBBBBBBBBBBBBBBB

CCCCCCCC

DDDDDDD EEEEEEEEEEE1

3

5

6

4

2

Page 33: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

NEAR TERM PERVIOUS AREA LONG TERM PERVIOUS AREAEXISTING PERVIOUS AREA

Pervious Area Coverage = 50.83 acresPercentage of Total Site Area = 61.7%

Pervious Area Coverage = 54.92 acresPercentage of Total Site Area = 66.7%

Pervious Area Coverage = 58.32 acresPercentage of Total Site Area = 70.8%

50.83 acres 54.92 acres 58.32 acres61.7% 66.7% 70.8%

+3.4 acres+4.1 acres

+5% +4.1%

Page 34: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

PROPOSED TOPOGRAPHY

IVY RD

COPE

LEY

RD

OLD IVY RD

Site BoundaryLow Elevation

High Elevation

Sit

MASSIE RDMASSIE RD

IVY RD

COPE

LEY

RD

EMM

ET S

T

OLD IVY RD

Site BoundaryLow Elevation

High Elevation

EXISTING TOPOGRAPHY

EY R

D

SIE RD

+526+540

+540

+504+486

+520

+508+520

+532

MASSIE RDEL

EY R

D

ET S

TET

ST

+550

+540

+522

+486

+520

+508+520

Page 35: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

PROPOSED HYDROLOGY

IVY RD

COPE

LEY

RD

EMM

ET S

T

OLD IVY RD

Site BoundaryLow Elevation

High Elevation

Existing Open StreamsPipeFlow Direction

SitExPF

JPJ ARENAServes 300 acres of watershed

IVY CORRIDORServes 200 acres of watershed

EMM

ET S

TM

ETST

J ARErves 3

JPJSer

MASSIE RDMASSIE RD

IVY RD

COPE

LEY

RD

EMM

ET S

T

OLD IVY RD

Site BoundaryLow Elevation

High Elevation

Existing Open StreamsPipeFlow DirectionPF

MASSIE RD JPJ ARENAServes 300 acres of watershed

IVY CORRIDORServes 200 acres of watershed

EXISTING HYDROLOGY

COPE

LEY

RDRD

PEL

Page 36: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

EXISTING PEDESTRIAN CIRCULATION

IVY RD

Site Boundary

No clear pedestrian connectivity around/through athletics.

Pedestrian conflicts around athletics with parking.

COPE

LEY

RD

EMM

ET S

T

OLD IVY RD

MASSIE RD

COPE

LEY

RD

EMM

ET S

TM

ETST

VY RDRDR

MASSIE RD

PROPOSED PEDESTRAIN CIRCULATION

IVY RD

Pedestrain WalksRail

Road

IVYIVYIVYVY RDDRDRDRDIVY RD

COPE

LEY

RD

EMM

ET S

T

OLD IVY RD

MASSIE RD

Site Boundary

EMM

ET S

VY

COPE

LEY

RD

EMM

ETST

VY RD

MASSIE RD

RailPedestrain WalksRoad

Page 37: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

MASSIE RD

IVY RD

COPE

LEY

RD

EMM

ET S

T

OLD IVY RD

EXISTING BIKE ROUTES

Lack of connection and limited access.

Dedicated Bike Route (Lanes/Sharrow)Moped Parking Location

Secondary Bike Route (Recommended Route, No Dedicated Lanes OR Sharrow)

UVA Rack LocationBike Rack Location

MASSIE RD

IVY RD

COPE

LEY

RD

EMM

ET S

T

OLD IVY RD

EXISTING BUS ROUTES

UTS Central Grounds

UTS Green GroundsUTS Collonade Route

UTS North RouteBus Stop

Cat Route 7

Bus stops in the parking areas, causing safety issues.

Consolidate bus stops along streets to enhance traffic flow.

Site Boundary Site Boundary

Page 38: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

OLYMPICSMcCUE NEW WELSH

FOOTBALLMCCUE OLYMPICS

FOOTBALL

WELSH

MCCUEOLYMPICS

FOO

TBA

LL

WELSH

SCENARIO EVALUATION

SCENARIO 1 SCENARIO 2 SCENARIO 3

Scenario 1 – The proposed Football and Olympic sports facilities are proposed to create a presence at the intersection of Massie road and Emmet street. A proposed entry court along Massie road organizes the new and existing buildings.

Scenario 2 – An interconnected proposed facility for football and Olympic sports with direct connections to existing facilities, McCue and Welch practice facility. The plan proposes strong pedestrian east-west connections from Central Grounds through the athletics area and tournament venues.

Scenario 3 – Plan proposes all new interconnected facilities for Football, New Welch, and Olympic facilities along Massie road.

Page 39: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

IVY RD

COPE

LEY

RD

EMM

ET S

T

OLD IVY RD

MASSIE RD

1

2

4

3

Softball Fields

Interim Modular UnitsPerry Fields

U-Hall Demolition1

23

4

INTERIM CONDITIONSEXISTING CONDITIONS

IVY RD

COPE

LEY

RD

EMM

ET S

T

MASSIE RD

WELSH

McCUEU-HALL

Page 40: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

PHASE 1 FIELDS AND PARKING

IVY RD

COPE

LEY

RD

EMM

ET S

T

OLD IVY RD

MASSIE RD

PHASE 2 VACATE INTERIM MODULAR UNITS

New Softball Fields

Temporary TrailersPerry Fields

U-Hall Demolition1

23

4

MASSIE RD

IVY RD

COPE

LEY

RD

EMM

ET S

T

OLD IVY RD

4

3

1

WELSH

McCUE

2 2

4

3

1

WELSH

OLYMPICS

FOOTBALL

McCUE

Page 41: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

NEAR TERM

IVY RD

COPE

LEY

RD

EMM

ET S

T

OLD IVY RD

MASSIE RD

LONG TERM

MASSIE RD

IVY RD

COPE

LEY

RD

EMM

ET S

T

OLD IVY RD

5

4

6

3

1

WELSH

OLYMPICS

FOOTBALL

McCUE

5

4

3

1

WELSH

OLYMPICS

FOOTBALL

McCUE

22

Football Field

Lacrosse FieldPerry Field

Football Field1

23

4

5 Soccer FieldField Hockey6

6 7

Football Field

Lacrosse FieldPerry Field

Football Field1

23

4

5 Women Lacrosse FieldField Hockey6

7 Soccer Field

Future Buildings

Page 42: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

TEAMUniversity of VirginiaDepartment of AthleticsMcCue Center - PO BOX 400846Charlottesville, VA 22904434.982.5100www.virginiasports.com

DUMONTJANKSLandscape Architects and Planners129 Kingston StreetBoston MA 02111617.275.2355www.dumontjanks.com

University of VirginiaOffice of the ArchitectO’Neil Hall445 Rugby RoadCharlottesville, VA 22903434.924.6015www.officearchitect.virginia.edu

HOKArchitects and Planners300 West 22nd StreetKansas City, MO 64108816.472.3360www.hok.com

Page 43: NORTH GROUNDS ATHLETICS MASTER PLAN...Soccer Soccer +580 Soccer +570 +556 Baseball +HP=590 26’ Drop Sloping Down(66’ Drop) 5% Slope +LP=468 The site presents significant topography

DUMONTJANKS