north america, ltd. trespa north american satin wood grain loft brown (nw-05) exposed fixing ts-110...

22
NORTH AMERICA, LTD. Phone: 1-800-4-TRESPA www.trespanorthamerica.com 12267 Crosthwaite Circle Poway, CA 92064 Local Rep: W.H. Steele Co., Inc. Phone: 909-930-0831 San Diego - North County Area Meteon® Installations University of California, San Diego, IT2 Bldg. Location: At corner of Voigt Dr & Engineers Drive, San Diego, CA Description: 22,000 sq.ft. Meteon Satin Metallic Aluminum Gray (M51.0.1/GL) Meteon Satin Metallic Graphite Gray (M21.8.1/ST) Concealed Fixing TM-400 Completed: March 2005 Architect: N.B.B.J. Architecture, San Francisco General Contractor: Gilbane Construction Installer: Tower Glass, Santee, CA University of California, San Diego, Rady School of Management Location: Scholars Drive, East of North Point Drive, San Diego, CA Description: 36,466 sq.ft. Meteon Satin Metallic Custom Colors Aluminum (PM05065/ST) Meteon Satin Metallic Custom Colors Dark Amber (PM05012/ST) Exposed and Concealed Fixing Water Barrier: WallShield by VaproShield Completed: Spring 2007 Architect: Ellerbe Becket, Minnesota & San Francisco General Contractor: PCL Construction Installer: Division Eight Glass, Lemon Grove, CA University of California, San Diego, UCSD TeleMedicine Center Location: 200 Campus Drive, San Diego, CA Description: 18,232 sq.ft. Meteon Satin Metallic Completed: January 2011 Architect: SOM, San Francisco, CA General Contractor: Swinterton Builders Installer: K.H.S.& S., San Diego, CA University of California, S.D., Sanford Consortium of Regenerative Medicine Location: 2880 Torrey Pines, La Jolla, CA 92037 Description: 20,097.02 sq.ft. Meteon Satin Metallic Water Barrier: WallShield by VaproShield Completed: January 2011 Architect: Davis Davis Architects, San Diego, CA General Contractor: Hensel Phelps Construction Installer: Tower Glass, San Diego, CA *Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 1 of 22 Updated 3/11/2011 W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007 Trespa North American Meteon® Façade Systems

Upload: vuongbao

Post on 13-Mar-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

NORTH AMERICA, LTD.Phone: 1-800-4-TRESPA

www.trespanorthamerica.com12267 Crosthwaite Circle

Poway, CA 92064Local Rep: W.H. Steele Co., Inc.

Phone: 909-930-0831

San Diego - North County Area Meteon® InstallationsUniversity of California, San Diego, IT2 Bldg.

Location: At corner of Voigt Dr & Engineers Drive, San Diego, CADescription: 22,000 sq.ft.

Meteon Satin Metallic Aluminum Gray (M51.0.1/GL)Meteon Satin Metallic Graphite Gray (M21.8.1/ST)

Concealed Fixing TM-400Completed: March 2005Architect: N.B.B.J. Architecture, San Francisco General Contractor: Gilbane ConstructionInstaller: Tower Glass, Santee, CA

University of California, San Diego, Rady School of ManagementLocation: Scholars Drive, East of North Point Drive, San Diego, CADescription: 36,466 sq.ft.

Meteon Satin Metallic Custom Colors Aluminum (PM05065/ST)Meteon Satin Metallic Custom Colors Dark Amber (PM05012/ST)

Exposed and Concealed Fixing Water Barrier: WallShield by VaproShieldCompleted: Spring 2007Architect: Ellerbe Becket, Minnesota & San Francisco General Contractor: PCL ConstructionInstaller: Division Eight Glass, Lemon Grove, CA

University of California, San Diego, UCSD TeleMedicine Center

Location: 200 Campus Drive, San Diego, CADescription: 18,232 sq.ft.

Meteon Satin Metallic Completed: January 2011 Architect: SOM, San Francisco, CA General Contractor: Swinterton Builders Installer: K.H.S.& S., San Diego, CA

University of California, S.D., Sanford Consortium of Regenerative Medicine Location: 2880 Torrey Pines, La Jolla, CA 92037 Description: 20,097.02 sq.ft.

Meteon Satin Metallic Water Barrier: WallShield by VaproShieldCompleted: January 2011 Architect: Davis Davis Architects, San Diego, CA General Contractor: Hensel Phelps Construction Installer: Tower Glass, San Diego, CA

*Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 1 of 22

Updated 3/11/2011

W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007

Trespa North American

Meteon® Façade Systems

San Diego North County Meteon® Installations, page 2Miramar College Classrooms

Location: 10440 Black Mountain Rd, San Diego, CADescription: 40,000 sq.ft.

Meteon Satin Natural Print Sierra Red (NA-08) Exposed Fixing

TS-110Water Barrier: WallShield by VaproShieldCompletion: Spring 2010Architect: NTD Architecture, San DiegoGeneral Contractor: Sundt ConstructionInstaller: La Mesa Glass, Lemon Grove, CA

Palomar College, Bldg S Location: 11990 Avenita Azul, San Marcos, CA (corner of Las Posas & Ave Azule)Description: 6,670 sq.ft.

Meteon Satin Mystic Silver Metallic Satin & Urban Grey metallic rockExposed Fixing

TS-210Water Barrier: WallShield by VaproShieldCompletion: Spring 2010Architect: Carrier Johnson, San DiegoGeneral Contractor: Swinerton Management Installer: Centex Glass, Lemon Grove, CA

Palomar College, Bldg IT Location: 1140 W. Mission Road, San Marcos, CA 92069Description: 10,814 sq. ft.

Meteon, Titanic NA10 Satin, Mahogany Red Satin Exposed Fixing

TS-210Water Barrier: WallShield by VaproShieldCompletion: January 2011Architect: Carrier Johnson, San DiegoGeneral Contractor: Jaynes Corporation Installer: Johnson Finch and McClure

Cal State University San Marcos, Social & Behavorial Sciences Bldg (SBSB)Location: 333 S. Twin Oaks Valley Rd, San Marcos, CA 92096Description: 9,000 sq.ft.

Meteon Satin Wood Grain Loft Brown (NW-05) Exposed Fixing

TS-110Water Barrier: Tyvek Commercial Wrap Completion: Spring 2010Architect: AC Martin Partners, Los AngelesGeneral Contractor: Edge Development Installer: Tower Glass, Santee, CA

Antin Residence

Location: 4016 Arroyo Sorrento Place, San Diego, CADescription: 600 sq.ft.

Meteon Satin Aluminum Grey Metallic (M 51.0.1/ST)*Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 2 of 22

Updated 3/11/2011

W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007

Exposed

FastenersFaçade

cladding on bridge portion of buildingCompleted: May, 2005 Water Barrier: WallShield by VaproShieldArchitect: Safdie Rabines Architects, San DiegoG.C. / Installer: Cavanaugh Construction, Coronado, CA

Hanna Fenichel Child Development Center, Solano Beach PreschoolLocation: 236 Sierra, Solano Beach, CA 92075Description: 450 sq.ft. 45 degree bevel between joints

Meteon Metallic Azurite Blue #M21.3.4STMetallic Mystic Silver Green #CM2642STLavender Blue #A20.5.2ST

Completion: August 2007Water Barrier: WallShield by VaproShieldArchitect: Steven Dalton Associates, San Diego, CAG.C.: Marcotte & Hearne Builders, San DiegoInstaller: Ideal Mechanical & Sheet Metal, Santee

San Diego – Downtown Area Meteon® InstallationsResMed Office Building

Location: 4773 Paramount Drive San Diego, CA Description: 29,400 sq.ft.

Meteon NA09 OxidationExposed Fixing

powder-coated to match panel colorWater Barrier: WallShield by VaproShieldCompleted: Spring 2008Architect: Davis Davis Architects & KMA Architects, San DiegoGeneral Contractor: Reno ConstructionInstaller: Division Eight Glass, Lemon Grove, CA

San Diego City College Vocational Tech Bldg (Carreer Training Center) Location: 1010 – 16th St, San Diego, CA Description: 9,600 sq.ft. 3/8” Aluminum Grey Metallic #M51.0.1 Exposed Fixing TS-110 Water Barrier: WallShield by VaproShieldCompleted: December 2009 Interior & Exterior Wall PanelsArchitect: Carrier Johnson, San Diego Installer: Division 8, San Diego, CA (Exterior Façade) & Lozano Casework (Interior Walls)

The Legend Restaurant @ the Ballpark Boardwalk Location: 325 - 7th Ave, San Diego, CA Description: 2,123 sq.ft. 3/8” Winter Grey #A21.1.0 Concealed Fixing TM-210 and Exposed TM-110Water Barrier: WallShield by VaproShieldCompleted: December 2006Architect: Perkins, Vancouver, British Columbia Installer: Starline Windows, San Diego, CA

Alta @ 6th & Market Location: Downtown, 6th & Market, San Diego, CA Description: 1,200 sq.ft. 3/8” Aluminum Grey Metallic #M51.0.1/ST Concealed Fixing TS-210Water Barrier: WallShield by VaproShieldCompleted: Spring 2007Architect: Perkins, Vancouver, British Columbia

*Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 3 of 22

Updated 3/11/2011

W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007

G.C.: DPR Construction, San Diego, CA Installer: Sunset Glass, San Diego, CA

The Nexus Office Building Location: 875 G Street @ corner of 9th, near Market, San Diego, CA Description: 400 sq.ft. 3/8” Meteon Carmine Red Satin #A 12.3.7/ST Exposed Fixing TS-110 Water Barrier: WallShield by VaproShieldCompleted: November 2006Architect: K.M.A., San DiegoInstaller: Johnson, Barnes & Finch, Lakeside, CA

San Diego Gas & Electric, Friars SubstationNear 163 Freeway & Friars Rd. @ corner of Mission Valley Rd. & Metropolitan Rd. (in Mission Valley Heights)

Location: 7550 Mission Valley Road, San Diego, CA 92108 Description: 2,288 sq.ft. 5/16” Metallic Azurite Blue #A12.3.7/ST & Carmine Red #A12.3.7/ST

Concealed Fixing TM-400 Adhesive, Reclad over existing concrete tilt-upCompleted: February 2000Architect: Hope Consulting, San Diego, CAGeneral Contractor: Roel Construction, San Diego, CAInstaller: Tierra Glass, Spring Valley, CA

Ocean Front Walk Residence Location: 3879 Ocean Front Walk, San Diego, CADescription: 1,400 sf Meteon Metallic Mystic Green #CM26.4.2 ST & Anthracite Grey #A25.8.1 ST

TS-110 Exposed Fasteners & TS-210 Concealed FastenersCompleted: December, 2009Water Barrier: WallShield by VaproShieldArchitect: Frontis & Young Architects, San DiegoDeveloper: Stevens DevelopmentG.C.: Four by Four ConstructionInstaller: Mayall Glass, San Diego, CA

Steiner ResidenceLocation: 830 Alameda Road, Coronado, CA 92118Description: 2,100 sq.ft. Meteon Sienna Brown, #AM06.4.1/ST

Red-Orange A10.1.8 / STPacific Board NW-04 / ST

Water Barrier: WallShield by VaproShieldCompletion: Summer 2009Architect: Laurie C. Fisher, AIA, San Diego, CAGeneral Contractor: Woodruff Construction, Coronado, CA

Georgia Street Apartments Location: 3907 Georgia St., San Diego, California 92103Description: 2,350 sq.ft. Steel Blue #A 24.4.1 Exposed Fasteners-Privacy Screens on steel posts Completed: March 2007Architect: A2 Studios, San Diego CAG.C.: Cantor Property Mngmt, San Diego CAInstaller: McCoy Construction Services, Colton, CA

San Diego – South County Area Meteon® InstallationsEl Cajon Public Safety Center

Location: 100 Civic Center Way, El Cajon, CADescription: 2,000 sq.ft. 3/8” Meteon Satin Metallic Aluminum Gray #M51.0.1/ST

Exposed Fixing TS-100 Installed over block wallWater Barrier: none needed over block wall Completed: Spring 2010

*Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 4 of 22

Updated 3/11/2011

W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007

Architect: K.M.A. Architecture and Engineering, San Diego, CAGeneral Contractor: Ledcor, San Diego, CAInstaller: Vision Systems, El Cajon, CA

Chula Vista Commerce CenterLocation: 680 “L” Street, @ Industrial Blvd., Chula Vista, CADescription: 1,022 sq.ft. 3/8” Meteon Satin Metallic Aluminum Gray (M51.0.1/ST)

Exposed Fixing TM-100 Installed over wood studsCompleted: November 2001Architect: Eric Davy Architects, San Diego, CAGeneral Contractor: Pacific General, San Diego, CAInstaller: Tower Glass, Santee, CA

San Ysidro Fire Station #29 (Interstate 5 to Via de San Ysidro, Left (North) to San Ysidro Blvd., Left to fire station (L. side)

Location: 198 W. San Ysidro Blvd., San Ysidro, CADescription: 1,741 sq.ft. Meteon Satin Terra Cotta (A10.3.4/ST)

Exposed Fastener TS-100 Powder coated blackWater Barrier: FoilSkin by Henry Co. Completed: February 2005Architect: C.C.B.G, San Diego, CAGeneral Contractor: Echo Pacific Construction, Escondido, CA Installer: Centex Glazing, La Mesa, CA

S.R. 125 Toll Booths & Control Operations CenterLocation: State Route 125, just north of Mexican Border, Chula Vista, CADescription: 5,197 sq.ft. Meteon Metallic Amber, #M06.4.1/ST on front side of panels

White # A03.0.0 on back side of panels for Toll Booths1,123 sq.ft. Meteon Metallic Amber, #M06.4.1/ST - Contr. Ops Ctr mechanical screens

Water Barrier: none needed for mechanical screens Completion: December 2006Architect: LiberStudio Architects, Los Angeles, CAG.C. on Toll Booths: Dahl / Taylor, Santa Ana, CA Toll Booths Installer: ICON Structures, Fontana CA G.C. on Cont Ops Ctr: Cox Construction, San Diego, CA Cont Ops Ctr Installer: Simmons Sheet Metal, Oceanside, CA

Orange County Meteon® InstallationsBiola University, School of Business Bldg.

Location: 13800 Biola Ave, La Mirada, CA Description: 6,140 sq.ft.

Meteon Metallic Satin Aluminum Grey (M51.0.1/ST) Exposed Fasteners TM-100, painted to match panel color

Completed: Summer 2006Water Barrier: WallShield by VaproShieldArchitect: Gensler, Santa Monica, CA G.C.: Cannon Builders, PlacentiaInstaller: Custom Metal Fabricators, Orange, CA

Biola University, Studio B Renovation Location: 13800 Biola Ave, La Mirada, CADescription: 800 sq.ft. Panels curved with a 182’ radius.

5/16” Meteon A08.4.5 ST Rusty RedTS 110 Exposed Fastener with ½” spacers.

Water Barrier: WallShield by VaproShieldCompleted: August 2008Architect: Gensler, Santa Monica, CA

*Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 5 of 22

Updated 3/11/2011

W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007

G.C.: Cannon Builders, PlacentiaInstaller: Custom Metal Fabricators, Orange, CA

Tustin LibraryLocation: 345 E. Main Street, Tustin, CADescription: 2,100 sq.ft. Exposed Fasteners

Meteon Garnet Red Metallic (M12.4.2ST)Completed: March 2009Water Barrier: WallShield by VaproShieldArchitect: Field Paoli Architects, San FranciscoConstr. Mngr: GKK Works, IrvineG.C. P. H. HagopianInstaller: Eberhard Sheet Metal, Van Nuys

Providence Medical Office Building, Phases 1, 2 & 3Location: 1950 Sunnycrest Rd, Fullerton, CA Description: 5,800 sq.ft., exterior entry walls & interior 1st, thru 3rd floors

Meteon English Cherry NW-10 ST Exposed Fasteners TS-110

Completed: 2007 & 2008Water Barrier: WallShield by VaproShieldArchitect: Sterns Arch., Laguna Beach & Ewing Cole, IrvineG.C.: GMIWall Panel Installer: Seeley Bros, Brea (Phase 1)Wall Panel Installer: McCoy Construction Services, Colton (Phases 2 & 3)Elevator Installer: Leading Concepts, Glendora

Sun Cal Corporate Offices Corner of Morse Ave and McCabe Way, 1 block East of Von Karman, North side of I-405.

Location: 2392 Morse, Irvine, CADescription: 2,600 sq.ft. Installed over existing wood siding

3/8” Meteon Metallic Satin, Azurite Blue #M21.3.4/STTS 100 Exposed Fastener modified with some adhesive fasteners.

Rivets powder-coated to match Metallic Azurite Blue.SFS # GAZ 803 Stainless Decorative Fasteners

Completed: September 2003Architect: Sherman Gabus, Long Beach, CAGeneral Contractor: Turelk Construction, Long Beach, CAInstaller: Centex Glazing, El Cajon, CA

Bank & Office Bldg, Interior Lobby and Exterior Entry Location: 1666 N. Main St., Santa AnaDescription: 1,100 sf interior & 900 sf exterior

Meteon Metallic Amber #06.4.1 ST Concealed Fasteners TS-210 & TS-2000

Completed: July 2007Water Barrier: W.R. Grace Ice & Water Shield Architect: Sautter Architecture, ClaremontDesigner: Fluri Design, Studio CityG.C.: Richardson Group, Santa AnaInstaller: Tahiti Cabinets, Anaheim

Orange County Meteon® Installations, page 2 Whole Foods Market, Canopies at Entry

Location: 7881 Edinger Ave, Huntington Beach, CA 92647*Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 6 of 22

Updated 3/11/2011

W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007

Description: 300 SQ.FT

Meteon 5/16” NW16 Milano TerraCompleted: October 2010Water Barrier: none needed for canopyArchitect: D.L. English Design G.C.: Savant Construction Installer: McCoy Construction

Pacific City Discovery Center Sales Office and Canopy (Across street and just south of Huntington Beach Pier)

Location: 120 Pacific Coast Highway, Huntington Beach, CADescription: 1,880 sq.ft. cladding / 260 sq.ft. canopy

5/16” Meteon White (A03.0.0/ST)Exposed Fasteners TM-100Screws powder-coated to match panelsChannels and joint closures powder-coated Aquamarine

Completed: November 2003Architect: DMJM/H+N, Orange, CAGeneral Contractor: Snyder Langston, Irvine, CAInstaller: Custom Metal Fabricators, Orange, CA

Collier Residence Location: 5216 River Ave. Newport Beach, CA 92626Description: 2,100 sq.ft.

Meteon Aquamarine (A28.2.1) & Spring Green (A37.2.3 ST)Exposed

FastenersWater Barrier: WallShield by VaproShieldCompleted: Fall, 2006Architect: Bruce Bolander Architects, MalibuG.C. / Installer: J.T. Builders, Newport Beach

Los Angeles – West Side Meteon® InstallationsWest Los Angeles Community College, Science & Math Building (2 bldgs, 5 stories)

Location: 9000 Overland Ave, Culver City, CA 90404Description: 42,035 sq.ft. exterior façade

Meteon Rusty Red (A08.4.5/ST)Meteon Aluminum Grey Metallic (M51.0.1/ST)Exposed Fixing TS-110

Water Barrier: WallShield by VaproShield Completed: Spring, 2009Design Architect: HOK, Culver City, CA Arch of Record: CWA, BurbankG.C.: Sinanian Development, Tarzana, CAInstaller: McCoy Construction Services, Colton, CA

Ocean Avenue. Travelodge Location: 1515 Ocean Avenue, Santa Monica, CA 90401Description: 18,082 sq. ft. Exterior façade Exposed Fixing TS-110

Meteon NW08 Italian WalnutWater Barrier: WallShield by VaproShield Completed: Spring, 2011Architect: Gensler, Santa Monica

*Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 7 of 22

Updated 3/11/2011

W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007

G.C.: Morley Construction Installer: Van Nuys Sheet Metal

L.A. Harbor College Library and Resource Learning Center Location: 1111 Figueroa Place, Wilmington, CA 90744Description: 16,000 sq.ft. exterior façade & 11,000 sq. ft. Interior

Meteon NW10 English Cherry & Meteon NW07 Montreaux Sunglow Exposed Fixing TS-110

Water Barrier: WallShield by VaproShield Completed: Summer 2011Design Architect: DLR/W.W.C.O.T. Santa Monica, CA G.C.: Edge Development Installer: Custom Metal Fabricators, Orange, CA

Airport Marina Bldg #1-Corbus Video Bldg Reclad and Bldg #2Bldg #1 - 12959 Coral Tree Pl., Marina del Rey, CA (near corner of Alla)Bldg #2 - 5340 Alla, Marina del Rey, CA (at the corner of Coral Tree Pl.)

Location: Marina del Rey, CADescription: 5,000 sq.ft. Bldg #1 & 8,500 sq.ft. Bldg #2

½” Meteon Metallic Satin Azurite Blue (M21.3.4/ST) Exposed Fixing TM-101Reclad over existing redwood siding and concrete tilt-up

Completed: Bldg #1 – July 2000 - Bldg #2 – March 2001Architect: Gensler Associates, Santa Monica, CA General Contractor: Matt Construction, Santa Fe Springs, CAInstaller: Interstate Glass, El Cajon, CA

Los Angeles – West Side Meteon® Installations (cont.)Cloverfield Service Center (Homeless Shelter)

Location: Corner of 26th & Michigan St, Santa Monica (one block north of 10 fwy) Santa Monica Description: 3,809 sq.ft.

Meteon Wood Grain Montreux Amber #NW-06/STWater Barrier: WallShield by VaproShieldCompletion: Spring 2006Architect: Killefer Flammang Arch, Santa Monica, CAGeneral Contractor: Mackone Development, Culver City, CA Installer: Custom Metal Fabricators, Orange, CA

JCB Music StudioLocation: 2800 1630 Euclid St. Santa Monica, CA 90404Description: 1,700 sq.ft. exterior façade

NW-09 Wenge wood grain, Exposed Fixing TS-1106,300 sq.ft. of interior wall (3/8”) & ceiling panels (1/4”)

#NW-04 Pacific Board& NW-09 Wenge1,600 sq.ft. of casework, tops & cabinet doors

#A25.8.1 Anthracite Grey & #A05.0.0 Pure White, Gloss FinishWater Barrier: WallShield by VaproShield Completed: December, 2006Architect: Studio 440, Hollywood, CA G.C.: Race Point Construction, Studio City, CAWall Panel Installer: McCoy Construction Services, Colton, CA Casework Installer: SMI Cabinets, Santa Ana, CA

Condo’s at Superior & Venice Blvds Location: 1107 Venice Boulevard, Venice, CADescription: 6,800 sq.ft. Exposed Fixing TS-110

3/8” Meteon Elegant Oak NW-02*Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 8 of 22

Updated 3/11/2011

W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007

Water Barrier: WallShield by VaproShieldCompleted: Spring 2009 Architect: Kanner Architects, Santa MonicaG.C.: Advanced Building GroupInstaller: Tinco Sheet Metal, Los Angeles, CA

Magnolia Hi-Fi Stores Location: 2800 Wilshire Blvd, Santa Monica, Ca 90404 Description: 570 sq.ft. Exposed Fixing TM-101

At entry off parking lot, and small facades on 2 corners on Wilshire3/8” Meteon Metallic Satin Copper Yellow (M53.0.2/ST) Reclad over existing redwood siding and concrete tilt-up

Completed: September 2003Architect: Callison ArchitectsInstaller: B.T. Mancini, Milpitas, CA

Office Remodel Location: 3611 Motor Ave., Los Angeles, CA 90036Description: 1,000 sq.ft. Exposed Fixing TS-101

At entry off parking lot, and entry off Motor Ave, and interior area in courtyard5/16” Meteon NW-04 Pacific BoardReclad over existing stucco

Water Barrier: WallShield by VaproShieldCompleted: February 2011 Architect: Dvoretzky Bardovi Bunnell ArchitectsInstaller: R.B. Olson, Redlands, CA

Los Angeles – West Side Meteon® Installations (cont.)Geek Squad Stores

Location: 2800 Wilshire Blvd, Santa Monica, Ca 90404 Description: 500 sq.ft. Exposed Fixing TM-101

At entry off parking lot 3/8” Meteon Custom Color Orange, Satin Reclad over existing stucco siding

Completed: October 2005Architect: Callison ArchitectsG.C. / Installer: Boyd Inc., El Segundo, CA

Marina Tae Kwon Do Martial Arts StudioLocation: 13203 W. Washington Blvd., Culver City, CA Description: 500 sq.ft. Exposed Fixing TS-110

3/8” Meteon Metallic Aluminum Grey Rock (M51.0.1/RT)Completed: Summer 2006Architect: Twichell Studio, Culver City G.C. / Installer: Roger Wilson Construction, Marina Del Rey, CA

Kelly Residence Location: 660 Tiger Tail Road, Brentwood, CADescription: 4,218 sq.ft. Exposed Fixing TS-110

Meteon Wood Grain Satin Wenge (#NW-09)Completed: May, 2006Water Barrier: WallShield by VaproShieldArchitect: Abramson Teiger Architects, Culver CityG.C. / Installer: 44 West Construction, Topanga, CA

Bennett Residence Location: 1156 Napoli St, LA, CA 90272 (Pacific Palisades)

*Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 9 of 22

Updated 3/11/2011

W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007

Description: 1,500 sq.ft. Exposed Fixing TS-110

Meteon Italian Walnut (NW-08 ST)Completed: Fall 2006Water Barrier: WallShield by VaproShieldArchitect: Abramson Teiger, Culver City, CAG.C. / Installer: AJ Engineering & Construction, Tarzana

Gillis ResidenceLocation: 710 N. Arden Drive, Beverly Hills, Ca 90212Description: 3,400 sq. ft. Exposed Fastening

Aluminum Gray Metallic M51.0.1Used as Mechanical Screen over Cinderblock Wall

Completed: Summer ‘07Water Barrier None specified over block wallArchitect: Ed NilesG.C / Installer: B.S.I. ConstructionFabricator: SSC

Los Angeles – West Side Meteon® Installations (cont.)Lushing Residence

Location: 850 Linda Flora Dr, Los Angeles, CADescription: 2,000 sq.ft. Exposed Fixing TS-110

NW-08 Italian WalnutWater Barrier: WallShield by VaproShieldCompleted: Spring 2009 Architects: Kovac Architects, Los Angeles, CAG.C.: BalCorp Construction, Los Angeles, CAInstaller: McCoy Construction Services, Colton

Shapiro Residence Location: 6000 Philip Ave, Malibu, CADescription: 9,125 sq.ft. Exposed Fixing TS-112 with stainless trim insert between panels

Meteon Spring Green #A37.2.3 ST & Aluminum Grey Metallic #M51.0.1 STCompleted: July, 2007Water Barrier: WallShield by VaproShieldArchitect: Levitt & Moss, Santa MonicaG.C.: Leishman

Construction, Los AngelesInstaller: McCoy Construction Services, Colton

Aret Kociglu Residence Location: 3833 Paseo Hidalgo Road, Malibu, CADescription: 150 sq.ft. Exposed Fixing TS-110

Meteon Deep Red Brown Satin (A14.7.2/ST)Façade

cladding around entry Completed: Spring, 2006Water Barrier: WallShield by VaproShieldArchitect: Tact Design, Malibu G.C. / Installer: Deck Doctor, Malibu

Goodman Residence Location: 645 East Milwood Ave, Venice, CA 90291-3862Description: 1,786 sq.ft. Exposed Fixing TS-110

Meteon Mustard Yellow (#M40.4.3 ST)Completed: Summer, 2009Water Barrier: WallShield by VaproShieldArchitect: Abramson Teiger, Culver City G.C.: John Oliver Construction

*Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 10 of 22

Updated 3/11/2011

W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007

Installer: McCoy Construction Services, Redlands

Seehoff Residence Location: 3701 Dellvale Place, Encino, CA 91434Description: 856 sq. ft. Exposed Fixing TS-110

Meteon NW-05 Loft BrownCompleted: December 2010Water Barrier: WallShield by VaproShieldArchitect: Abramson Teiger, Culver City G.C.: A&J Engineering Installer: A&J Engineering

Big Blue Bus Maintenance FacilityLocation: 1620 6th Street - Santa Monica, CA 90401Description: 2,500 sq.ft. Site Wall / Privacy Wall in Curtain Wall Frame

Meteon Aluminum Grey Metallic (#M51.0.1 ST)Completed: Summer, 2009Architect: H.O.K., Culver City G.C.: Morley Construction Installer: Steel City, Costa Mesa

Hollywood Meteon® Installations“The Hollywood” Condo’s (54 units)

Location: 6750 Yucca Blvd, Hollywood, 1 block east of Highland / 1 block north of Hollywood BlvdDescription: 8,580 sq.ft. - Exposed Fixing TS-110

1/2” Meteon Italian Walnut #NW-08Water Barrier: Double layer, WallShield by VaproShield Completed: November, 2007 Architect: Kanner Architects, Santa Monica G.C.: Hy-Max Construction, NewhallInstaller: McCoy Construction Services, Colton CA

Best Western, Hollywood Location: 6141 Franklin Avenue Description: 1,000 sq. ft., TS-110 Exposed Fixing

Meteon Black A90.0.0 – Perforated Sun ShadesWater Barrier: none needed for awningsCompleted: March, 2011 Architect: Koning Eizenberg Architects, Santa Monica G.C.: City ConstructorsInstaller: McCoy Construction Services, Colton CA

Musician’s Institute, Campus HollywoodLocation: Hollywood Blvd., Hollywood, CA @ McCadden Place 1 block east of Highland Description: 1,200 sq.ft. - Exposed Fixing TS-110

3/8” Meteon Metallic Aluminum Gray Satin (M51.0.1/ST)Water Barrier: WallShield by VaproShield Completed: November, 2006Architect: Twichell Studio, Culver City, CA G.C.: Essex Construction, Torrance, CA Installer: McCoy Construction Services, Colton CA

Java Detour Location: 8900 Santa Monica Blvd, West Hollywood Description: 1,500 sq.ft. Exposed Fixing TS-110

5/16” Meteon Wood Grain Satin Wenge (NW-09/ST) Water Barrier: WallShield by VaproShieldCompleted: November, 2007Architect: Little Diversified, Costa Mesa, CAInstaller: McCoy Construction Services, Colton

Shoreham Villas Location: 8788 Shoreham Dr, West Hollywood, CA 90061

*Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 11 of 22

Updated 3/11/2011

W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007

Description: 8,210 sq.ft. - Exposed Fixing TS-110

5/16” Meteon Wood Grain Satin Pacific Board (NW-04/ST) Completed: Summer 2006Water Barrier: WallShield by VaproShieldArchitect: Design X, Hollywood, CA G.C. / Installer: CalCon Construction, Los Angeles, CA

Cahuenga Universal ApartmentsLocation: 3408 Cahuenga Blvd, Los Angeles (Corner of Universal Studios Blvd & Cahuenga Blvd) Description: 2,400 sq.ft. – Balcony Railing Panels

Meteon Stone Beige #A05.1.1 / ST)Water Barrier: none needed for balcony panels Completed: Summer 2007Architect: Nadel Architects, Santa Monica, CAG.C.: American

Constructors, Huntington Beach, CA Installer: S.S.C., Newbury Park, CA

*Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 12 of 22

Updated 3/11/2011

W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007

Downtown L.A. Area Meteon® InstallationsLA USD ES #6, South Region (3 Buildings)

Location: 123 West 59th Street, Los Angeles, CADescription: 11,929 sq.ft.

Meteon Gold Yellow A 04.1.7 ST, Graphite Grey M21.8.1 ST Completed: March 2011 Water Barrier: WallShield by VaproShieldArchitect: Dougherty & Dougherty, Costa Mesa, CA

G.C. Suffolk Education Contractor Installer: Action Sheet Metal, Los Angeles, CA

LA USD ES #10, South Region Location: Los Angeles, CADescription: 5,000 sq.ft.

Meteon Metallic Azurite Blue Completed: Summer 2011 Water Barrier: WallShield by VaproShieldArchitect: Dougherty & Dougherty, Costa Mesa, CA

G.C. Tai-Sai Construction, Cypress, CA Installer: Aragon Sheet Metal, Pomona, CA

East LA Community College E3/E5 Replacement BuildingLocation: 1301 Avenida Ceasar Chavez, Monterey Park, CADescription: 5,000 sq.ft.

English Red #A 11.4.4, Stone Beige #A 05.1.1

Completed: Summer 2010 Water Barrier: WallShield by VaproShieldArchitect: W.W.C.O.T., Los Angeles, CA

G.C. Diffenbaugh GC Installer: Aragon Sheet Metal, Pomona, CA

GRATTS EEC Primary Elementary School Location: 474 S. Hartford Street, Los Angeles, CA (West of Harbor Freeway, near Fifth Street) Description: 1,100 sq.ft.

Dark Blue A20.7.2Deep Red Brown A14.7.2Moss Green A40.5.1 Ochre A06.3.5

Water Barrier: None needed for decorative screen wallCompleted: Fall 2010 Architect: Jubany NAC Architecture

G.C. Summit Builders Installer: Performance Contracting Group, Anaheim, CA

Fred Roberts Recreation Center Gym Location: 4700 S. Honduras Avenue, Los Angeles, CA 90011 Description: 2,900 sq. ft.

Mustard Yellow M40.4.3Water Barrier: WallShield by VaproShieldCompleted: September 2010 Architect: City of Los Angeles Architecture, Bureau of Engineering

G.C. A.W.I. Builders Installer: Tinco Sheet Metal, East Los Angeles, CA

*Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 13 of 22

Updated 3/11/2011

W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007

Gilbert Lindsey Rec. Center

Location: 429 E. 42nd Place, So. Los Angeles, CADescription: 1,886 sq.ft. M 53.0.2 Trespa Meteon Copper Yellow Metallic. Completed: Spring 2009 Water Barrier: WallShield by VaproShieldArchitect: City of Los Angeles, Los Angeles, CA

G.C. Los Angeles Engineering Installer: McCoy Construction Services, Redlands, CA

Lamp Village (from the Movie “The Soloist”)Location: 526 S. San Pedro St, Los Angeles, CA (across Street from Union Rescue Mission)Description: 1,200 sq.ft. - Gold Yellow # A 04.1.7 ST Completed: December 2009 Water Barrier: WallShield by VaproShieldArchitect: Killefer Flammang, Santa Monica, CA

G.C. Dreyfuss Construction Installer: Allied Sheet Metal, Pomona, CA

Charles R. Drew / MLK University, Research & Nursing Education BuildingLocation: 1748 E. 118th St, Los Angeles, CADescription: 4,600 sq.ft.

Garnet Red # M12.4.2/ST on exterior / White A03.0.0 ST on interiorSpandrel Panels in Curtain Wall System

Completed: December 2009 Water Barrier: none needed Architect: HOK, Culver City, CA

G.C. GKK Works, Pasadena Installer: Romanowski Glass, CALexington Avenue School (F.K.A. Marshall Primary School)

(1 blk. No. of Santa Monica Blvd, 2 blks. E of Vermont, 1 blk. W of Virgil, corner of Westmoreland)Location: 4564 Lexington Ave., Los Angeles, CADescription: 2,220 sq.ft.

Meteon Satin Pale Yellow (#A04.0.2/ST)Stair & Balcony Rail in-Fill Panels, 3/8” thick double sided color

Completion: Spring 2006Architect: Studio Works, Los Angeles General Contractor:Woodcliff Construction, Los Angeles, CA Installer: C & H

Chan Yaffe Residence Location: 1925 Avon Street, Echo Park, CADescription: 500 sq.ft. - Exposed Fixing TM-101, including channels and fasteners.

½” & 1/4” Meteon Uni-Color Black Satin (A90.0.0/ST) Completed: Summer 2003Architect: Central Office of Architects, Los Angeles, CAG.C. / Installer: Roman Janczak Construction, Studio City

Roquebrune Residence Location: 4800 Nob Hill Drive, Los Angeles, CA 90065Description: 1,500 sq.ft. 5/16” Meteon, Wood Grain, Satin finish (NW09 Wenge) Water Barrier: WallShield by VaproShieldCompleted: November, 2007Architect: DE Architects, Santa Monica, CA G.C. / Installer: R2 Studio, Los Angeles, CA

Long Beach & South Bay Meteon® InstallationsGXK Properties*Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 14 of 22

Updated 3/11/2011

W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007

Location: 1706 W. 130th Street, Gardena, CaDescription: 1,004 sq.ft. Meteon Various Colors Exposed Fasteners, painted to matchWater Barrier: WallShield by VaproShieldCompletion: Spring 2008Architect: Miyoshi Morioka General Contractor: Pacific National Group Installer: McCoy Construction Services, Colton, Ca

Los Angeles Fire Station #36Location: 1005 N. Gaffey St., San Pedro, CADescription: 2,945 sq.ft. Meteon Garnet Red #M12.4.2/ST

Exposed Fasteners, painted to matchWater Barrier: WallShield by VaproShieldCompletion: Spring 2007Architect: Killefer Flammang Arch, Santa Monica, CAGeneral Contractor: Royal Construction, Arcadia, CA Installer: Weiss Sheet Metal, Los Angeles, CA

Miller Children’s Hospital, Memorial Hospital Group Location: 2801 Atlantic Av., Long Beach, Ca 90806Description: 2,000 sq.ft. approx. Meteon Lagoon #J24.3.3 (Meteon custom color from Virtuon)

Exposed Fasteners, Parapet, Elevator Cabs, and Handrail infill Panels.Water Barrier: WallShield by VaproShieldCompletion: Spring 2009Architect: Taylor & Associates, Arch, Newport Beach, CaGeneral Contractor: Turner Construction, Anaheim, CA Elevator Cab Dlr: Travertine Elevators InteriorsVaproShield Installer:Best Waterproofing (Best Contracting Svc.), Gardena, Ca.Trespa Installer: Carmel Architectural Sales, Anaheim, CA

San Fernando Valley Meteon® InstallationsFlorentine Condo’s

Location: 5440 N Tujunga, North Hollywood (Between Cumpton and West of Lankershim) Description: 1,300 sq.ft. Meteon Montreux Amber NW-06 ST , In Lobby AreaWater Barrier: WallShield by VaproShieldCompleted: September 2007Architect: DE Architects, Santa MonicaG.C.: JSM Companies, North HollywoodInstaller: McCoy Construction Services, Colton

Magnolia Hi-Fi Stores Location: 21603 Victory Blvd, Canoga Park, CA 818-346-1703 (west of Canoga Ave.)Description: 1,248 sq.ft. 3/8” Meteon Metallic Satin Copper Yellow (M53.0.2/ST)

Exposed Fixing TM-101Reclad over existing siding and concrete tilt-up

Completed: September 2003Architect: Callison ArchitectsInstaller: B.T. Mancini, Milpitas, CA

Target Store / Westfield Shopping Center Location: 6600 Topanga Canyon Blvd, Topanga, CA Description: 1,455 sq.ft. 1/2” Meteon Carmine Red Satin (A12.3.7/ST)

Concealed Fixing TM-210Water Barrier: none needed as this was installed on the interior of the Mall Completed: Summer 2006

*Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 15 of 22

Updated 3/11/2011

W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007

Architect: Westfield Shopping Centers G.C.: Whiting Turner, IrvineInstaller: G.E.S. Sheet Metal, Pomona, CA

Santa Clarita Community Center / Train StationLocation: 22421 Market Street, Santa ClaritaDescription: 750 sq.ft. Meteon Garnet Red #M12.4.2/ST

Exposed Fasteners, painted to matchWater Barrier: WallShield by VaproShieldCompleted: October 2005Architect: R.R.M. Design Group, San Luis ObispoGeneral Contractor: S.J. Amaroso, Orange County, CA Installer: Custom Metal Fabricators, Orange, CA

LAVC Robert Hertzberg Library Los Angeles Valley College

Location: 5800 Fulton Ave, Van Nuys, CADescription: 16,500 sq.ft. Meteon (4 Colors) Mahogany Red #A09.6.4 / Dark Brown #A08.8.1 /

Silver Grey # A03.4.0. / Mid Grey # A21.5.1.Exposed

Fasteners, painted to matchWater Barrier: WrapShield by VaproShieldCompleted: Summer 2011Architect: Pfeiffer Partners, Los Angeles, CAGeneral Contractor: Diffenbaugh General Contractors, CA Installer: F. Rodgers, CA

Ventura County Meteon® InstallationsCalabasas Business Park

Location: 23801 Calabasas Rd, Calabasas, CA 91302 Description: 2,100 sq.ft. - Concealed Fasteners TS-210-134

Meteon #NW-03 Harmony Oak Water Barrier: WallShield by VaproShieldCompleted: December 2009Architect: Harley Ellis Devereaux Architects Installer: Seeley Brothers, Brea, CA

Ventura Co Community College Dist. – Fire & Sheriff Training Academy (VCCCD)

Location: 103 Durley Ave, Camarillo, CA 93010Description: 10,600 sq.ft. - Exposed Fixing TS-110

3/8” MeteonCopper Red M53.0.1 Mustard Yellow M40.4.3

Water Barrier: WallShield by VaproShieldCompleted: Spring 2010Architect: Carrier Johnson Architects G.C.: S.M.C. ConstructionInstaller: Engineered Metal Systems

Lima Residence

Location: 1055 Cold Canyon Road, Calabasas, Ca 91302Description: 2,100 sq.ft. - Interior and Exterior - Exposed Fixing TS-110

5/16” Meteon #NW-08 Italian WalnutWater Barrier: WallShield by VaproShieldCompleted: Spring 2008

*Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 16 of 22

Updated 3/11/2011

W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007

Architect: Abramson Teiger Architects G.C.: A&J Engineering Installer: I.V. Construction

San Gabriel Valley Meteon® InstallationsCinema Lofts, 30 Condo’s

Location: 215 S. Marengo, Pasadena, CA @ Cordova, 1 block east of ArroyoDescription: 9,800 sq.ft. - Exposed Fixing TS-110

5/16” Meteon #NW-06 Montreux AmberWater Barrier: WallShield by VaproShield Completed: August 2007Architect: DE Architects, Santa Monica G.C.: Dalah Construction, Santa Monica

Installer: McCoy Construction Services, Colton CA

Hudson Terrace CondosLocation: 257 S. Hudson, PasadenaWater Barrier: WallShield by VaproShield Description: 8,800 sq.ft.

Meteon NW-09 WENGEExposed

Fasteners, painted to matchCompletion: Spring 2009General Contractor: Ballian ConstructionInstaller: McCoy Construction Services, Colton, CA

San Gabriel Valley Meteon® Installations, page 2Azusa Pacific University, Science Building

Location: (Old Azusa Drive In Theater) Corner of Rockvale Ave & Foothill, Azusa, CADescription: 5,200 sq.ft.

Meteon NW-08 Italian Walnut TS-110

Exposed Fasteners, painted to match for ceilingsTS-210 Concealed Fasteners for walls

Underlayment: Henry Air-Block 33Completion: Spring 2009Architect: AC Martin Partners, Los AngelesGeneral Contractor: C.W. Driver Installer: Custom Metal Fabricators, Orange, CA

Puente Hills Mall & Panera Bread Location: 17427 Colima Road, Rowland Heights, CA 91748-1612Description: 2,500 sq.ft.

Meteon NW-04 Pacific Board Meteon Moss Green #A-40.5.1 ST

TS-110 Exposed Fasteners, painted to match panels

TS-130 for Stand-off panels for Panera BreadWater Barrier: WallShield by VaproShield Completion: Summer 2009Architect: Perkowitz & Ruth, Long Beach General Contractor: 2H Construction

*Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 17 of 22

Updated 3/11/2011

W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007

Installer: McCoy Construction Services, Redlands, CA

Clifton Middle School, Monrovia Unified School District, Phases 1 & 23 Buildings with Rooftop Mechanical Screens on Canyon Ave. West of Myrtle Ave., South of Foothill Blvd

Location: 226 S. Ivy Ave., Monrovia, CA

Description: 1,300 sq.ft., Phase 1 Exposed Fasteners, attached to steel stud frame1,000 sq.ft., Phase 23/8” Meteon Iron Grey Satin (A25.7.1/ST)

Water Barrier: none needed for mechanical screens Completed: September 2003 & June 2004Architect: Osborn Architects, Glendale, CAG.C. / Installer: Phase 1: Neil Edwards Construction, Monrovia, CA

Phase 2: Harik Construction, Covina, CA.

Transportable Modular Ambulatory Care Center (TMACC)American Bio-Medical Services Corp., contact: Yale Misrahi 909-599-5800. Mobile Medical Clinic for quick response in emergencies.

Location: San Dimas, CA Description: 1,170 sq.ft. Exposed Fixing Stainless screws with ½” stainless spacer.

5/16” Meteon Metallic Graphite Grey Rock (M21.8.1/RT) 5/16” Meteon Uni-Color Carmine Red Satin (A12.3.7/ST)

Water Barrier: WallShield by VaproShield Completed: October 2003Architect (In-House): American Bio-Medical, San Dimas, CA G.C. / Installer: Profile Structures, Santa Fe Springs CA

Inland Empire Meteon® InstallationsUpland Christian High School (Now Western Christian HS)

Location: 85 N. Euclid Avenue, Upland, CA 91786 (corner of Euclid & A Street)Description: 11,000 sq.ft. Exposed Fasteners, painted to match

Meteon Satin, Silver Grey (A03.4.0/ST), Winter Grey (A21.1.0/ST), Lavender Blue (A20.5.2/ST)

Water Barrier: WallShield by VaproShieldCompleted: April 2006Architect: Williams / Chaio Architects, Upland, CA - Bonney Architects, Redlands, CA General Contractor: KBI General Contractors, Tustin, CA Installer: All Seasons Framing, Anaheim, CA

Unical Aviation Location: 680 S. Lemon Avenue, City of Industry, CA 91789Description: 7,100 sq. ft. TS-210 Concealed Fasteners

Meteon #M21.8.1 Graphite Grey Water Barrier: WrapShield by VaproShield Completion: July 2010 Architect: Withee Malcom Architects, Torrance, CA General Contractor: Oltmans Construction Installer: Emerald Metal Products, Signal Hill, CA

Indio Corporate YardLocation: 83-101 Avenue Forty Five, Indio, CADescription: 4,000 sq.ft. TS-110 Exposed Fasteners

Meteon #M51.0.2 Urban Grey Metallic RockWater Barrier: WallShield by VaproShield Completion: November 2009 Architect: Pitassi Architects, Rancho Cucamonga, CAGeneral Contractor: Edge Development, Temecula Installer: Progressive Roofing Services, San Diego

*Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 18 of 22

Updated 3/11/2011

W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007

Jurupa Hills High School (Fontana High #5 )Location: 10697 Oleander Ave, Fontana, California 92337, CADescription: 4,600 sq.ft. TS-110 Exposed Fasteners

Meteon White #A03.0Gold Yellow #A04.1.7Amethyst #M18.7.2

Water Barrier: WallShield by VaproShield Completion: January 2010 Architect: WLC Architects (Wolf, Lang, Christopher), Rancho Cucamonga, CAGeneral Contractor: Inland Building Company, San BernardinoInstaller: McCoy Construction Services, Redlands, CA

Temecula City Yard - Maintenance Facility & Corp YardLocation: City of Temecula, Maintenance Facility & Corp Yard, Temecula, CADescription: 4,900 sq.ft.

Meteon Pastel Grey (A 03.1.0) & Salmon (A 08.2.3)Water Barrier: WallShield by VaproShield Completion: Summer 2007Architect: Platt / Whitelaw, San Diego, CAGeneral Contractor: Tovey Shulz Construction, Lake ElsinoreInstaller: Shultz/Gephart Construction, Poway

Palm Springs Airport Outdoor CaféLocation: 3400 E. Tahquitz Canyon Way, Palm Springs, CADescription: 500 sq.ft. TS-110 Exposed Fasteners

Meteon #NW10 English CherryWater Barrier: WallShield by VaproShield Completion: February 2009 Architect: Gensler, Santa Monica , CAGeneral Contractor: Harbor Construction Installer: Atlas Sheet Metal, Irvine

Mid-California Meteon® InstallationsUniversity of California, Santa Barbara, Life Sciences Bldg.

Location: UCEN Rd, west of Lagoon Rd., on east side of Lot 7 Santa Barbara, CA Description: 8,000 sq.ft.

5/16” Meteon Metallic Satin Azurite Blue (M21.3.4/ST)Exposed Fasteners TM-100 with stainless steel spacers

Water Barrier: Ice and Water Shield by W.R. Grace Completed: October 2004Architect: N.B.B.J. Architecture, San FranciscoG.C.: Soltek Pacific, San DiegoInstaller: B.T. Mancini, Milpitas, CA

California State Polytechnic University (Cal Poly) San Luis ObispoSolar Decathlon Project

Location: Architecture Department, San Luis Obispo, CA Description: 1,000 sq.ft.

3/8” Meteon Wine Red Satin (#A12.6.3/ST) & Iron Grey (#A25.7.1/ST)Exposed Fasteners TS-110 with powder coated fasteners

Water Barrier: WallShield by VaproShield Completed: August 2005

*Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 19 of 22

Updated 3/11/2011

W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007

Architect: Cal Poly Architectural Department, San Luis ObispoG.C.: Maino Construction, San Luis Obispo Installer: Cal Poly Architecture Students, San Luis Obispo

Car Quest HeadquartersLocation: 7th Standard Rd @ Highway 65, off Hwy 99, Bakersfield, CADescription: 800 sq.ft. Concealed Fixing TM-200

3/8” Meteon Satin Metallic Azurite Blue (M21.3.1/ST)Water barrier: 5/8” dens-glass and steel studsCompleted: September 2001Architects: K.S.A. Architects, Bakersfield, CAGeneral Contractor: Colombo Construction, Bakersfield, CAInstaller: Bakersfield Glass, Bakersfield, CA

Greater Bakersfield Convention & Visitors Bureau Location: 515 Truxton Ave @ “T” Street, 93301, CADescription: 2,400 sq.ft.

5/16” Meteon Metallic Graphite Grey Rock (M21.8.1/RT)Exposed Fixing TM-100, Screws powder-coated to match panels

Water Barrier: WallShield by VaproShield Completed: December 2003Architects: Ordiz Melby Architects, Bakersfield, CAGeneral Contractor: Wallace & Smith Construction, Bakersfield, CAInstaller: Air Kool Mechanical Contractors, Bakersfield, CA

Wal-Mart Super Store #5134, Bakersfield Southwest

Location: 5075 Gosford Street, 93301, CADescription: 1,000 sq.ft.

Meteon Dark Brown #A08.8.1 STMeteon Custom Metallics “Center” #PM08092 STExposed Fixing TM-100,

Water Barrier: WallShield by VaproShield Completed: December 2009Architects: Perkowitz & Ruth, Long Beach, CAGeneral Contractor: Grant General Construction, Bakersfield, CAInstaller: Empire Sheet Metal, Ontario, CA

Wal-Mart Super Store #1624, Bakersfield Location: 2601 Fashion Place, Bakersfield, CA 93306Description: 5,124 sq. ft.

Meteon Dark Brown #A08.8.1 STMeteon Custom Metallics “Center” #PM08092 STExposed Fixing TM-100,

Water Barrier: WallShield by VaproShield Completed: January 2011Architects: Perkowitz & Ruth, Long Beach, CAGeneral Contractor: Installer: M.G. McGrath, Inc.

Palmdale Corporate Center

Location: 39115 & 39125 Trade Center DriveDescription: 5,000 sq.ft.

3/8” Meteon NW-04 Pacific Board Exposed Fixing TM-100, Screws powder-coated to match panels

*Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 20 of 22

Updated 3/11/2011

W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007

Water Barrier: WallShield by VaproShield Completed: Summer 2008Architects: Ware Malcomb, Irvine, CAGeneral Contractor: Oltmans Construction Installer: Aluma Wall, San Jose, CA

Northern California Meteon® InstallationsWest Placer Middle School Spandrel Panels

Location: Sacramento, CA Description: 10,000 sq.ft.

Meteon Alum Grey and Pastel Grey satin A03.1.0TJF Spandrel Panels

Completed: October 2008Architect: Perkins & Will, Los AngelesInstaller: Rose Glass & Aluminum, Manteca, CA

Edenvale Community Center & GymLocation: Community Park, San Jose, CA Description: 10,000 sq.ft. Meteon NW-14 French Walnut - Facade

5,000 sq.ft. Meteon NW-12 Natural Bagenda (Interior Walls)Completed: December 2009Architect: Carrier Johnson, SDInstaller: Air Systems Inc.

*Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 21 of 22

Updated 3/11/2011

W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007

Notable Meteon® Projects in Other Areas Oregon State University – Reser Football Statdium

Location: Corvallis, OregonDescription: 34,284 sq.ft.

Meteon Satin White (A 0.3.0.0/ST) for Facade Silver Grey (A 03.4.0/ST) for escalatorVirtuon Graphite Grey Metallic (J 21.8.1) for loge box dividers

Exposed and Concealed FastenersCompleted: August, 2005Architect: H.N.T.B. Sports, Los AngelesGeneral Contractor: Hunt-Wildish ConstructionInstaller: Crown Corr

Invesco Stadium-Denver Bronco Stadium

Location: Denver, CODescription: 14,000 sq.ft.

½” Meteon Satin Iron Grey (A25.7.1/ST)½” Meteon Satin Silver Grey (A034.0/ST)Exposed Fixing TM-100, Screening System

Completed: July 2001Architect: HNTB Sports Architecture & Fentress Bradburn Architects, Ltd., Denver, COGeneral Contractor: Turner/Empire/Alvarado Bronco Stadium TeamInstaller: Pect Metals

UNLV Student Union

Location: 4673 South Maryland Parkway, Las Vegas, NV 89154 Description: 25,620 sq.ft.

Exposed Fixing SS FastenersSatin Aluminum Grey (M51.0.1/ST)

Water Barrier: WrapShield by VaproShield Completed: September 2006 Architect: Tate Snyder Kimsey Architects General Contractor: Penta Building Group, Las Vegas, NV Installer: Mollerup Glass, Salt Lake City, UT

Westfield Shopping Center

Location: Franklin Park, OHIO Description: 14,000 sq.ft.

1/2” Meteon Metallic Copper Red Satin (M53.0.1/ST) Exposed Fixing TM-110

Completed: Summer 2005Architect: Westfield Corporation, Los AngelesG.C.: Westfield Construction ManagementInstaller: Harmon Inc., Ohio

*Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 22 of 22

Updated 3/11/2011

W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007