north 1:250 @a1
TRANSCRIPT
_1
PROJECT:
DRAWING TITLE:
ARCHITECTS
PROJECT NUMBER: ISSUE:
SCALE: CHECKED:
DRAWING NUMBER:
DA 1501
KEY PLAN
CLIENT
NORTH POINT
PROJECT MANAGER
DESCRIPTION OF CHANGE DATEREV DRAWN CHECK
P: 02 9978 5402F: 02 8904 1377W:www.hinfra.health.nsw.gov.au
77 PACIFIC HIGHWAYNORTH SYDNEYNSW 2060
P: 02 9955 2300F: 02 9955 5574W:www.capitalinsight.com.au
77 BERRY STREETNORTH SYDNEYNSW 2060
CAPITAL INSIGHT
CONSULTANT
P: 02 9928 2330W: www.skmconsulting.com
100 CHRISTIE STREETST LEONARDSNSW 2065
SINCLAIRKNIGHT MERZ
QUANTITY SURVEYOR
P: 02 9956 8822W: www.davislangdon.com/ANZ/
L5 100 PACIFIC HIGHWAYNORTH SYDNEYNSW 2060
GA ELEVATIONSELEVATIONS - SHEET 01
PHASE 1
CONTRACTORS
P: 02 9770 7600F: 02 9770 7601W:www.capitalinsight.com.au
LEVEL6, 15 BOURKE RDMASCOTNSW 2060
teamwork://rdbim01/10509 MASTER Wagga WaggaA4A1 A2 A3
A4
WAGGA WAGGA BASE REDEVELOPMENTSTAGES 1A, 1B & 2AEDWARD STREETWAGGA WAGGA, NSW, 2650
110 WALKER STREET | NORTH SYDNEY 2060T: 02 9956 2666 | F: 02 9959 [email protected] | www.ricedaubney.com.au
the rice daubney group (nsw) pty ltd - abn: 77 001 350 769rice daubney trading trust - abn: 56 880 304 993
ANALYSING CREATING ANDIMPLEMENTING ARCHITECTURE
10509
AS SHOWN
THIS DOCUMENT IS THE COPYRIGHT OF RICE DAUBNEY (NSW) Pty. Ltd.ALL INFORMATION ILLUSTRATED ON THIS DOCUMENT IS TO BE CHECKED AND VERIFIED ON SITE.IN THE EVENT OF DISCREPANCIES REFER TO ARCHITECT PRIOR TO COMMENCEMENT OF THE WORK.DO NOT SCALE DRAWINGS MANUALLY OR ELECTRONICALLY.
A1
AMENDEDLEGEND
A BRICKWORK COLOUR: RED
B CFC CLADDING COLOUR: WHITE
C CFC CLADDING COLOUR: DARK GREY
F ALUMINIUM PERFORATED SUNSCREENS POWDER COATED COLOUR: TBC 40% TO 50% PERFORATIONS WITH Æ7 MM G ANODISED ALUMINIUM AIRFOIL LOUVRES COLOUR: SPANISH SILVER
H METAL LOUVRES POWDER COATED COLOUR: GUN METAL GREY
I FRITTED GLAZING TO BALCONIES
K SHOPFRONT GLAZING WITH SHADOW BOX HEAD PANEL POWDER COATED ALUMINIUM FRAME
L GLAZED DOORS WITH CFC HEAD PANEL POWDER COATED ALUMINIUM FRAME
M SHOPFRONT GLAZING WITH CFC HEAD PANEL ALLOW 20% OF PANELS TO BE IN TRANSLUCENT GLASS POWDER COATED ALUMINIUM FRAME
R SOLID FENCING COLOUR : WHITE
S MESH FENCING COLOUR : TBC T METAL ROOFING IN KLIP-LOCK 700 COLOUR : WINDSPRAY
U GLAZED HIGH LEVEL WINDOWS POWDER COATED ALUMINIUM FRAME
V GLASS BALUSTRADE WITH S/S HANDRAIL AND STAUNCHION
Y SINGLE PLY MEMBRANE ROOF COLOUR : TBC
Z SILL PANEL COLOUR : TO MATCH HEAD PANEL
AMENDED 30.09.11
A KS JS 29.08.11ISSUED FOR PART 3APROJECT APPLICATION PHASE 1
X22 X21 X20 X19 X18 X17 X16 X15 X14 X13 X12 X11 X10 X9 X8 X7 X6 X5 X4
RL 195.780
8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400
RL 193.120RL 192.035
RL 192.970
RL 197.835
RL 191.535RL 191.035
FFL 187.370
FFL 183.545
FFL 191.885
EXISTING
MHU GROUND
MHU LEVEL 01
PLANT LEVEL 02
MH / ED LINK PHASE 2 (FUTURE APPLICATION) BEYOND EXISTING CLINICAL SERVICES BUILDING
EXISTING WARD BLOCK EXISTING IMAGING
PHASE 2(FUTURE APPLICATION)
PROPOSED MENTAL HEALTH UNIT
T
R G
A
K ZB F C (BEYOND) M G C AM
U
M BEYOND
BCTH
KF
B
X4 X5 X6 X7 X8 X9 X10 X11 X12 X13 X14 X15 X16 X17 X18 X19 X20 X21 X22
RL 195.780
RL 192.035
RL 183.750
8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400 8 400
RL 193.120
RL 197.835
RL 192.970
FFL 187.370
FFL 183.545
FFL 191.885
EXISTING
MHU GROUND
MHU LEVEL 01
PLANT LEVEL 02
EXISTING LEWIS HOUSE IN FOREGROUND PHASE 2 (FUTURE APPLICATION) PROPOSED MENTAL HEALTH UNIT
RL 191.535
RL 190.870
PHASE 2(FUTURE APPLICATION)
TBA C V (BEYOND)C B RC K MF A
THC
GT
ELEVATION 01NORTH 1:250 @A1
1
ELEVATION 02SOUTH 1:250 @A1
2
NOTE: ALL SITE LEVELS SUBJECT TO DETAIL SURVEY
KS / JS
A