Page 1 Norridgewock Bridge Norridgewock, ME Project Description The historic, covered arch bridge in Norridgewock, Maine was replaced by a 300' cast-in-place concrete tied arch bridge that maintained the aesthetic features of the original structure. Owner Maine Department of Transportation Contractor Reed & Reed, Inc. Designer SEA Consultants Our Role McNary Bergeron & Associates provided construction engineering services including: Construction analysis for erection of the new arch structure. Erection plans & procedures Development & design of temporary arch shoring Demolition plan for existing arches, including demo shoring system Total Contract Value $21 million Timeline 2008 - 2011 Construction Method and Specifications Concrete tied arch w/ steel cable hangers Arch & tie girders are cast-in-place on falsework 300 span, approximately 60' high 42' roadway width 135' approach spans - prestressed concrete girders

Upload: others

Post on 03-Apr-2022

10 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Norridgewock Bridge - McNary Bergeron

Page 1

Norridgewock BridgeNorridgewock, ME

Project DescriptionThe historic, covered arch bridge in Norridgewock, Maine was replaced by a 300' cast-in-place concretetied arch bridge that maintained the aesthetic features of the original structure.

OwnerMaine Department of Transportation

ContractorReed & Reed, Inc.

DesignerSEA Consultants

Our RoleMcNary Bergeron & Associates provided constructionengineering services including:

Construction analysis for erection of the newarch structure.Erection plans & proceduresDevelopment & design of temporary archshoringDemolition plan for existing arches, includingdemo shoring system

Total Contract Value$21 million

Timeline2008 - 2011

C o n s t r u c t i o n M e t h o d a n dSpecifications

Concrete tied arch w/ steel cablehangersArch & tie girders are cast-in-place onfalsework300 span, approximately 60' high42' roadway width135' approach spans - prestressedconcrete girders