Nombre Parque EólicoNombre Parque Eólico Wind FarmWind Farm
Expansion of current Wind FarmExpansion of current Wind Farm
Evolution and present statusEvolution and present status
©2007 Nombre del cliente– CONFIDENTIAL – Nombre Parque Eólico
Project criteria for existing Wind Farm
2
Best available technology
selection
• 12 Neg-Micon NM 900/52/55 IEC Class II, 900 KW. Total: 10.8 MW
• Maximum compliance with environmental constraints during construction and operation
• Future expansions are taken into consideration when M26 was conceived
©2007 Nombre del cliente– CONFIDENTIAL – Nombre Parque Eólico
Project criteria for the project Wind Farm
3
Best available technology14 x 2,750 KW turbines
Total power deployed: 38.5 MW Total production: 150,805 MWh/year 3,917 net equivalent hours Power line: already existing (ready for 100 MW) Power Transfer Station: already existing (minor
modifications) Total natural area affected: 7.9 ha
©2007 Nombre del cliente– CONFIDENTIAL – Nombre Parque Eólico
Best available technology
Current turbine900 KW
Projected turbine2.750 KW
0 ft
148 ft
302 ft
466 ft
157 ft32
8 ft
4©2007 Nombre del cliente– CONFIDENTIAL – Nombre Parque Eólico
Wind Farm Power Station Minor modifications to adapt to new requirements:
Adition of 3 new power cells (building ready)
Replacement of trafo protection cell 20/66 kV by 2.000 AReplacement of trafo protection cell 20/66 kV by 2.000 A
New cells for M27New cells for M27
5©2007 Nombre del cliente– CONFIDENTIAL – Nombre Parque Eólico
6
Substitution of traditional electricity production methods responsible for ‘greenhouse effect’
Comparison against a coal fuelled plant(Source: Energy National Comission)
Energy balance
M
Annual production MWh 150,805
Dwellings supplied 45,512
CO2 avoided t 147,913
SO2 avoided t 3,868
NOx avoided t 546
©2007 Nombre del cliente– CONFIDENTIAL – Nombre Parque Eólico
Wind farm Power Station Slight modifications
Replacement of current transformer (ground structure already in place)
7©2007 Nombre del cliente– CONFIDENTIAL – Nombre Parque Eólico
Alternatives consideredComplaint solving (II)
8
July 2004Public enquiry for Expansion
December 1999Administrative approval10,8 MW
July 2002Expansion request to49,3 MW
July 2003Expansion request publication
December 2003begins operation
December 2002Power Line Administrativeapproval
©2007 Nombre del cliente– CONFIDENTIAL – Nombre Parque Eólico
Complaint solving (II)
Access track layout changes
Minimization of affection to gypsum soils and shrubs
New track layout through cultivated land
Minimization of the visual impact by retracing of tracks through endorreic valleys
9
July 2004Public enquiry for Expansion
December 1999Administrative approval10,8 MW
July 2002Expansion request to49,3 MW
July 2003Expansion request publication
December 2003begins operation
December 2002Power Line Administrativeapproval
©2007 Nombre del cliente– CONFIDENTIAL – Nombre Parque Eólico
Complaint solving (II)
Land use changes as a result of compensatory measures
9.5 ha of land are removed from cultivation and left to natural regeneration
10
July 2004Public enquiry for Expansion
December 1999Administrative approval10,8 MW
July 2002Expansion request to49,3 MW
July 2003Expansion request publication
December 2003begins operation
December 2002Power Line Administrativeapproval
©2007 Nombre del cliente– CONFIDENTIAL – Nombre Parque Eólico
Project timeline
July 2002Request for power expansion to 49,3 MW
July 2003Expansion request published officially
July 2004Official Bulletin publication and public enquiry period
2002 2003 2004
11
Since July 2005, the Wind Farm is awaiting administrative
approval. This authorisation does not relate to the resolution of
issues regarding the connection to the electricity grid.
July 2005Approval and publication in Official bulletin
Awaiting administrative approval
2005 2006 2007