www.invc.co.uk Top 10 Noise Control Solutions Noise Management Best Practice noise Industrial Noise and Vibration Centre: www.invc.co.uk

Upload: duonganh

Post on 12-Jun-2018

228 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Top 10 Noise Control Solutions

Noise Management Best Practice

noise

Industrial Noise and Vibration Centre: www.invc.co.uk

Page 2: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Noise Control Instead of Ineffective PPE…

PPE does not work well in the real world HSE research proving that hearing protection is not effective across most industrial applications provides a gold plated opportunity for the legal profession to drive a coach and horses through hearing damage claim defences based on PPE use.

Minimising Hearing Damage Risk Consequently, as real-world PPE performance is so compromised, the best way to guarantee low levels of risk at low cost is to reduce noise levels as far as practical.

How to Recommend Self-financing Noise Control The Noise Control Audit Process A guide that demonstrates how occupational health and other professionals can add value to noise risk assessments by linking to best practice in engineering noise control to reduce the risks of hearing damage dramatically.

Page 3: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

The “You must control Noise at Work Regulations”

HSE Quotes

• Health surveillance can be regarded as a tax on the failure to control risk…

• The most important thing about the risk assessment is that it identifies, in an Action Plan, what needs to be done to protect employees from noise.

• Employers would be expected to use the information and Action Plan produced by the risk assessment to set about managing noise risks…

HSE: “…if solutions have been identified “stop assessing and start controlling…..”

Page 4: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

The “You must control Noise at Work Regulations”

• Hearing protection cannot be used for long term risk management unless it can be proved that noise control is impractical

• Companies should not repeat risk assessments that do not include useful and practical information on noise control

• Companies should carry out a Noise Control Audit assess the noise control options using the best of current technology generate cost v noise reduction trade-offs for each item of noisy plant plan the most practical and cost effective noise control programme

HSE “…these regulations are concerned with controlling noise, not measuring it ..."

Paraphrasing HSE research: “most noise assessments aren’t worth the paper they are written on…”

Page 5: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

“Get a quote…”

• “We have a noise problem. Get a few quotes from silencer and

enclosure manufacturers”. Unfortunately, variations on this theme are common in meetings across the land…

• The audit process itself involves treating machines as collections of noise sources and not as monolithic "noisy black boxes". In each case, the potential noise sources for each item of plant are listed and their relative contributions ranked. Unless this has been done, the choice of potential noise control measures is based on guesswork.

Page 6: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

The Measurement Industry…

An assessment every 2 years is not a regulatory requirement

biannually review noise assessment requirements

Over-reliance on dosimetry

Badly written, heavily padded reports

no Action Plan

nothing on noise control

simplistic attitude to PPE

Page 7: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

The objective is to implement "Best Practice" for each of these elements.

1. Define company policy and procedures - documentation

2. Training/education: managers, supervisors, operators, staff

3. Assessments: surveys by competent person

4. Hearing Protection: implement effective Hearing Conservation programme

5. Noise Control: implement programme to reduce noise where practical

6. Buying Policy: control noise from new plant

7. Audiometry: pre-employment, motivational

8. Audit Programme: monitor effectiveness of elements and enforce policy

Training (at all levels), customised documentation and engineering support are all available from the INVC.

Noise Management Programme Elements

…and competent reporting. Most Noise Assessment Reports are not of merchantable quality….

?

Page 8: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Real World PPE

Noise Management Best Practice

noise

Industrial Noise and Vibration Centre www.invc.co.uk/noise/noise-assessment/occupational-noise-assessment/

Page 9: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

80-85

Hearing protection advised. Implement education. Protectors must be available.

85-95

Hearing protection mandatory. Most protectors from reputable suppliers provide adequate protection.

95-105

Only high quality protectors, carefully used, can provide sufficient protection.

105+

Protection cannot be guaranteed without very stringent controls and checks.

dB(A) Requirements

In an imperfect real-world the actual performance of PPE may be very low (wear-rate being the most crucial factor)

Conservation v Noise Level

Page 10: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Protector Rating (ref BS EN 458 : 2004)

Effective Noise Level dB(A) (Mean - 1 SD)

Protector Rating

Over 85 Insufficient

> 80 to 85 Acceptable

>75 to 80 Good

70 to 75 Acceptable

Below 70 Overprotection*

* The wearer may feel isolated, miss warnings, etc

Hearing Conservation Programme

Calculator for sufficient theoretical PPE performance @ www.hse.gov.uk/noise

Page 11: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

PPE in the Real World – HSE Research

Issuing PPE is not a simple or reliable solution...

No Protection • 40% of PPE users got no protection whatsoever • real world performance of a substantial proportion of the remaining 60% was inadequate • even in companies with generally effective PPE use, 14% did not wear them when and where required

Factors • peer group pressure / group behaviour; reluctance to enforce • need to hear traffic, radios - communication problems • attitude - imposition without consultation • incorrect fitting (plugs); inadequate protector provision • use of PPE as the sole control measure without a comprehensive noise control programme HSE Research Report RR720: INVC summary: www.invc.co.uk/profile/resources/technical-notes/#hseppe

Page 12: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

PPE – Real World Performance

In real use the performance of hearing protection is dramatically less than predicted by the manufacturers data. To estimate the performance of hearing protectors, the HSE recommendation to allow for imperfect fitting and condition has been to apply a field correction factor of 4dB - but...

Muffs – additional losses in performance… • 6dB loss after 1 month of use (headband stretch) • 2 - 10dB due to glasses, goggles, dust masks • 14 - 21dB worn over clothing (hoods etc)

Plugs • >50% of compressed foam plugs not inserted correctly • attenuation as low as 9dB if not properly fitted • banded ear-canal caps - negligible protection under band pressure

HSE Research Report RR720: INVC summary: www.invc.co.uk/profile/resources/technical-notes/#hseppe

Page 13: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

PPE – Performance v Wear Rate

Page 14: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Measurement Errors

Noise Management Best Practice

noise

Industrial Noise and Vibration Centre www.invc.co.uk/noise/noise-assessment/occupational-noise-assessment/

Page 15: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Dosemeter Practicalities

Dosemeter readings are nearly always higher than hand-held SLM readings due to body reflections, speech, impacts – and human nature… Where there is a difference between dosemeter values and SLM values, the dosemeter is always wrong by definition. The risk statistics were all compiled using SLMs.

Beware high peak levels as mechanical impacts can simulate events. If in doubt, measure peak levels separately with a hand-held meter or compare with other dosemeter results.

Page 16: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Dosemeter Practicalities

Dosemeter assessments are very time consuming and do not provide you with vital operational information required for risk evaluation (activities, events, potential improvements etc).

They can, however, generate a lot of data, providing you with a host of pretty graphs to pad out a report!

In many circumstances, SLM assessments are much quicker and provide higher quality assessments.

Page 17: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Reporting

Noise Management Best Practice

noise

Industrial Noise and Vibration Centre

Page 18: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Check Box Mentality

Health and Safety meeting on noise: order an assessment every year or two…

This tells you what you already know – that you still have a problem…

This is easier than actually doing something to minimise the risks.

Paraphrasing HSE research: “most noise assessments aren’t worth the paper they are written on…”

Page 19: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Placebo Assessments

Ask yourself …

• Why do we repeat risk assessments?

• Why do we repeat risk assessments assessments?

• Are we inflicting PPE on the workforce unnecessarily?

• Can we eliminate PPE and audiometry?

• Can we automate future assessments?

• Can we guarantee no future hearing damage claims – ever?

• Have we quantified the costs and benefits of noise control?

Page 20: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Factory assessment by consultants. This much report - the rest is a library of octave bands, dose logs and other padding.

No Action Plan, no noise control options - and no-one has ever read it! Imagine trying to extract useful information in 5 years time to defend a hearing damage claim ....

"Write only" Noise Assessments…

2002 HSE figures 63% of noise assessments were deemed "inadequate" i.e. a reassessment would be required to bring them up to the necessary standard

Page 21: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

• Working document for manager(s) • Short and as simple as possible - loose the techno-babble and

interminable pages of overly detailed results! • Content - Conclusions and Action Plan summary - Brief review of risk areas/plant by Action Value - Noise Control Audit results costs, benefits and options for best practice noise control

- Short term recommended actions PPE zones; signs; training; noise control ....

- Longer term recommendations noise control; Buy Quiet; management practices .....

- Factory plan summary and tables of results mobile plant: use a database table

- Technical appendices

Assessment Report Evaluation

Page 22: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

• Audit the noise control options (options, costs, benefits and priorities) and evaluate existing noise control measures

• Short term: PPE zones and signs; types and availability of PPE; employee training requirements…

• Longer Term: noise control programme; Buy Quiet policy; company procedures / responsibilities; health surveillance

Assessment Reports: Action Plan

Page 23: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Noise Management - Best Practice

Effective Assessment DNA and Corporate Amnesia

noise

Industrial Noise and Vibration Centre

Page 24: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Digital Noise Assessment “best practice” report based on 25 years of reporting refinements to create the industry benchmark template.

• customisable template Word document covering all the regulatory requirements

Action Plan summary • editable managers’ Action Plan summary to track implementation of

risk management recommendations

Technical Notes • up-to-date technical notes: regulations, PPE, dose calculation, health

surveillance, Buy Quiet policy, noise control, training

Example Report • pdf report example including factory plan or tabular (mobile plant)

noise levels

DNA Report Template

Page 25: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Digital Noise Assessment (DNA)

Use assessment data to create a register of noisy plant on each site

86

8383

83 8484

86

83

82

81

82

81

84 84 83 8282

8888

(84 not tumbling)(84 not tumbling)

868483

83

80

8183

83

8383

84

82

88

88

90 tipping84 otherwise

alarm99max

denotes fixed operator position

8484

77

75

76

12-hour shift report

Page 26: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Assessment Data Storage: Mobile Plant

The best way to store mobile plant noise data is in a database including:-

• plant details • operating conditions (tooling etc) • operator noise level (worst ear) • working time for Action Levels • "safe" distance for PPE

This information can also be stored in a common database with associated HAV data.

Stickers can be printed for each item of plant which include the "safe" working distance i.e. PPE mandatory within X metres.

Page 27: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Mobile Tools - Noise (and HAV) Database

Page 28: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Risk Number Analysis - RNA

80dB(A) - 84.9dB(A): risk rating (RR) is 1. Above 85dB(A), risk proportional to energy, i.e. every 3dB increase, the RR increases by x2. Risk Number (RN) = RR x no. staff

Page 29: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Risk Number Analysis – RNA Report

Page 31: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Placebo Silencers

Page 32: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

The Noise Control Audit

The audit is available as an add-on to conventional risk assessments. Objectives

• generate cost v noise reduction trade-offs for each item of noisy plant

• assess the noise control options across the company using the best

of current technology

• plan the most practical and cost effective noise control programme

possible across the company

The results of the Audit also take into account factors such as:-

• hygiene: access / maintenance

• productivity

Where the audit proves that control is impractical, it also provides certification so that PPE can be used for long term risk control.

Page 33: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Site Audits: Noise Control Project Benefits

Cadbury conservatively estimate that the noise control programme will pay for itself within 7 years......

Page 34: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Self-Financing Noise Control

One company had spent £1,600,000 on acoustic enclosures.The Noise Control Audit and subsequent testing proved that using BPM would have saved over £1,000,000 and noise levels would have been substantially lower and operating costs would be significantly reduced (down-time).

doubled through-put

higher efficiency, no cleaning

cleaning down-time reduced

avoided being shut-down...

no enclosures, reduced down-time

0 20 40 60 80 100

vibrators

fans

weighing

burners

presses

Pay-back Period

4 weeks

1 year

3 years

1 minute...

2 years

Noise control costs - £000's conventional best practice

Noise source category

Page 35: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Chocolate enrober vibrator • Re-design eliminated fatigue cracking;

improved control of coating thickness – 10% chocolate savings…

Vibratory Feeders • Food: noise control project doubled

throughput and eliminated blockage issues

• Pharma plastics: 27dB(A) reduction plus elimination of fatigue cracking and blockages

Moulding Vibrators • Chocolate weight s.d. across moulds

reduced from 1.2gms to 0.2gms/sweet

Productivity Improvements and Cost Savings

wash line <85, lower cost, improved drying

Page 36: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

BPM Noise Control Audit Steps

• List all the potential noise sources on each piece of noisy plant

• Rank the sources

• Assess all the noise control options for the dominant source potential reduction in noise from this source operational, productivity, hygiene constraints operator acceptance cost

• If engineering control is not practical for the dominant source, then you have proved that screening / enclosure etc are the only options

The results are used to generate cost v noise reduction trade-offs for each item of noisy plant and to plan the most practical and cost effective noise control programme possible across the company.

Page 37: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Useful Noise Generation Categorisation

Aerodynamic • fans • flow induced • pneumatics

- nozzles - exhausts

• combustion

Mechanical • impacts

- presses, stops etc - mechanical handling

• rotating machines - gears, pumps, motors - bearings - electrical forces

• friction forces - cutting tools, brakes

Page 38: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Addition of Multiple Sources

Unless the dominant source is treated first, the overall noise reduction will be very disappointing

Page 39: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Source Ranking Techniques

• Listen

• Run each source separately - may require manipulation of

interlocks etc

• Cover all sources and then uncover each in turn • Use narrow band frequency analysis for tonal noise and

correlate with mechanical components (gear-mesh, speed, blade pass etc) – free phone apps…

• Measure each source close in and predict contribution (close-microphone + 10log(area))

• Measure surface vibration velocity and calculate contribution

easy

Page 40: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Source Isolation Techniques

• Run each source separately - may require manipulation of interlocks etc

• Cover all sources and then uncover each in turn

Power press – aerodynamic source https://youtu.be/OzoktrFxT5w

Power press – mechanical sources https://youtu.be/UQ3YBExzWiw

Production line sources https://youtu.be/3vkZcT42YCQ

More diagnostic videos on the INVC Youtube Channel at:- https://www.youtube.com/user/INVCLimited

Page 41: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Vibratory Grader Diagnosis

MOTIVATION Client using the "Buy Quiet" standard.

• noise tests carried out during proving trials (in-house)

• new machine ordered subject to implementation of INVC noise control recommendations

• noise reduced from 99dB(A) down to 85dB(A) at £4k (£250k machine) without affecting hygiene, access or maintenance

If designed-in instead of retro-fit, £1k cost + £25k saved on supplier enclosure…

Page 42: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Source Identification – Frequency Analysis

How else could you diagnose and rank the sources?

Narrow band frequency analysis - correlate tones with mechanical components (gear-mesh, speed, blade pass etc) – free phone apps…

Page 43: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

115T Bliss Press

Noise tones match flywheel vibration. Dynamic vibration absorbers designed and fitted to flywheel inside existing guards.

• 10dB(A) noise reduction • £20 materials; 1 day fitter time

Page 44: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Press Noise Control Audit

102dB(A) total – down to 87dB(A) 1: tooling modifications – 97dB(A); 2: clutch – 95dB(A); 3: fan – 92dB(A); 4: cyclone 90dB(A); 5: out-feed 87dB(A)

Page 45: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Quiet Tape

• quiet tape uses stronger glue - generating more tension • may have to adjust machines to use the new tape

Page 46: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Innovative Noise Control Materials

We are at the forefront in developing applications for new and innovative hygienic noise control materials. The two materials that have had most impact on our work are:-

• High hygiene acoustic absorbent existing guarding and enclosures room acoustics (walls and ceilings)

• Laminated steel – sound deadened steel sheet looks like stainless steel, sounds like rubber…

These materials have provided us with two additions to our armoury in developing the next generation of hygienic noise control techniques.

Page 47: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Top 10 Noise Control Solutions

Noise Management Best Practice

noise

Industrial Noise and Vibration Centre: www.invc.co.uk

Page 48: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Top 10 Noise Control Solutions

Vibration Control 1 Vibration damping 2 Vibration isolation pads

Fans 3 Fan installation / efficiency 4 Aerodynamic noise control – Quiet Fan technology

Pneumatics 5 Pneumatic exhausts 6 Pneumatic nozzles

Machines 7 Chains and timing belts 8 Electric motors 9 Hydraulic power packs

Existing machine guards 10 Convert to acoustically effective guards

Page 49: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

1 - Damping Thin Plates

unconstrained layer of damping material

damping material in sandwich construction

sheet metal

damping material

damping material deforms only near bends

damping material made to shear over whole area

Page 50: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Panel Vibration Reduction

damped

undamped

Total 8dB(A) noise reduction under chiller (damping + absorbent)

Page 51: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Weighing Machine Enclosures

• 94dB(A) with enclosure • 82dB(A) with enclosure removed • PPE unnecessary; improved

productivity, cleaning, access, maintenance ...

Problem • typically 87- 98B(A) - high hygiene

Conventionally: Enclosure • Enclosures – c 5dB(A) reduction usually increases operator noise

level by c 3dB(A) under platform! c£8000+ capital + access / hygiene / maintenance problems

BPM - engineering control • engineering source modifications • 10 - 12dB(A) at <<50% of the cost • x4 performance + no effect on

access or hygiene • maintenance and cleaning

simplified

Page 52: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Power Station – 600hp Water Pumps

• New water pumps generated 95 dB(A) – the subject of a dispute with the supplier re the agreed noise levels – my pump, your motor….

• Dispute based on expense of noise control measures (acoustic barriers and partial enclosures) and considerable issues re access.

• Detailed vibration analysis proved the required noise reduction could be achieved simply via constrained layer damping plus laminated close shields.

• Installed to provide a 12dB(A) noise reduction with no effect on access, operation or maintenance – and at a fraction of the cost of the dispute process.

Page 53: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

2 - Vibration Isolation

Tico pad

load-spreading steel washer

m/c foot

Tico pad

bolt bolt NO ISOLATION EFFECTIVE

ISOLATION

Page 54: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Verso Press – Isolating Base

Problem High speed strip fed press at 101dB(A) in a quiet area

Conventional Manufacturer supplied "acoustic guards" gave only 3dB(A) reduction. Full enclosure suggested.

BPM Noise Control Audit showed dominant source to be fabricated press legs. Tico isolation fitted between frame and legs tuned to give natural frequency of 65Hz for both legs (different loads) 9dB(A) noise reduction at closest operator position. £45 materials, 1 man day to fit

isolation pads

Page 55: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Fan System Noise Control Options

Aerodynamic Noise Control at Source • award winning Quiet Fan technology

• cf F1 / aerospace CFD - design retro-fit aerodynamic aids

• reduce noise and increase efficiency

• improves efficiency by c 20% over many conventional silencers

• self financing, green, highly profitable…

Only if the above is not practical should you consider… • Silencing

• Enclosures

• Lagging

• Barriers

• Building modifications

Conventionally, these high cost palliative techniques have been the only measures that are considered….

www.invc.com/noise/noise-control/fan-noise-reduction/#qft

Page 56: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Centrifugal Fan Installation

high pressure

low pressure NOISY

QUIET

Page 57: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Axial Fan Installations

NOISY QUIETER

Page 58: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Axial Fan Installations

>2-3 duct diameters

NOISY QUIETER

Page 59: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Fan: Outlet dampers

Page 60: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Efficiency: Fan Speed v Noise

10% 2 20% 5 30% 8 40% 11 50% 15

noise reduction dB speed reduction

• Variable speed drives • Two speed motors (day and night) • Proportional control systems

Page 61: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

4 - Aerodynamic Fan Noise Control

modified fan

Problem Occupational + environmental tonal noise

Conventional • silencers, lagging and enclosures • capital cost > c£35000 +

maintenance costs

Aerodynamic Noise Control • internal fan modification reduced

tones by 23dB and overall noise by 22dB(A) using Quiet fan technology

• cost c £3000 - no maintenance costs (lasts the lifetime of the fans despite passage of cans)

www.invc.co.uk/noise/noise-control/fan-noise-reduction/

Page 62: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Yoghurt-Based Noise Control - Boiler Burner

16dB tonal noise reduction

Page 63: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

5 / 6 - Pneumatic Silencers and Nozzles

Silencer Solutions • zero back-pressure

silencers • standardise on 3

sizes • fix piped silencers to

machine and manifold multiple exhausts

Entraining Nozzles • c10dB quieter for the

same thrust • use c 20% less air • pay for themselves very

quickly • intrinsically "safe" • reduce air pressure....

Page 64: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Problem • 94dB(A) from cooling pipes for

sealed tube ends - rapid cooling a necessity

Conventional Solution • enclosure - high cost with hygiene

and productivity issues

BPM Solution • Coanda effect linear nozzles 12dB(A) noise reduction (82dB(A)) improved performance (less

turbulence disturbing tubes) 20% less air consumption - pay for

themselves very quickly no effect on access or operation

Filler Cooling Pipes

Page 65: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Air-Lances: Reduce Noise and Energy

15dB quieter, compressed air savings, payback 1 week

Page 66: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

7 - Chains and Timing Belts

• replace noisy chains with belts

• use quiet tooth profiles on toothed belts

• chevron tooth pattern – ultra quiet

• replace wide toothed belts with a par of narrower belts

• toothed belt noise is very sensitive to belt tension

5 – 20dB noise reductions are possible

Timing belt drives

Page 67: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

8 - Motor Noise

Page 68: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

9 - Hydraulic Power Packs

Page 69: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Hydraulic Power Pack

Looking at the diagnostic procedure for this power pack:-

Page 70: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

10 - Existing Guards

Minimise gaps • Halving the open area will reduce the

noise radiated by 3dB • Reduce opening by 90% - 10dB noise

reduction

Acoustic Absorbent • Fitting an appreciable area of acoustic

absorbent inside the guards will reduce the noise within by 5dB or more…

Guard Vibration • Radiated as noise – use damping…

Test mock-ups

Page 71: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Effect of Leaks on Transmission Loss

% open

0.1

1

10

50

Page 72: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Common Enclosure Problems

Enclosure issues https://youtu.be/2T4XBxyOIB4

Page 73: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Industrial Noise and Vibration Centre: www.invc.co.uk

Noise Management - Best Practice

Buy Quiet

Purchasing Policy

noise

Page 74: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Buy Quiet Noise Control

Probably the single most cost effective long term noise control measure that a company can take. BUT - attitude.... Do not allow your suppliers to spend your money on noise control without close scrutiny and written evidence that they have followed diagnostic best practice. Also applies to post installation retro-fit when you didn’t have a policy…

Most suppliers do not have technical expertise in engineering noise control and usually buy-in proprietary materials, enclosures, silencers etc as palliatives with no guarantee that they constitute Best Practicable Means with current technology.

Page 75: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Buy Quiet BPM Standards

Require that your suppliers meet specific and measurable standards re noise

• defined target noise levels • defined measurement procedure - lay down the measurement

procedure, operating conditions etc in detail

Results format • define the format of the results (use a standard form)

BPM diagnostic procedure

• insist that they follow the BPM procedure when considering noise control - they must be able to supply you with a ranked list of sources with noise control options - c.f. Quality and testing standards for suppliers

Page 76: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Remote Control of Noise

video sound photos

email -internet

Specialised modelling and analysis

database

experience

@ efficient aerodynamic solutions

Page 77: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Remote Control of Noise

BP Refinery: $1.25m conventional silencers: $0.25m via engineering – no impact on efficiency, no site visit

Page 78: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Noise Control Best Practice Elements

• Attitude

• Noise Control Audit based on detailed diagnosis and costing of the options and benefits

using the best of current technology

• Develop detailed noise control recommendations for each category of occupational plant implement as retro-fit on the first of each type of machine / plant

• Implement Noise Control Programme based on the results of the audit

• Update Noise Assessment de-regulate areas; reduced PPE costs ...

• Buy Quiet purchasing policy This approach can produce noise control measures that actually improve productivity and reduce costs - in contrast to reliance on conventional enclosures and acoustic guarding.

Page 79: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Noise Control Instead of Ineffective PPE…

PPE does not work well in the real world HSE research proving that hearing protection is not effective across most industrial applications provides a gold plated opportunity for the legal profession to drive a coach and horses through hearing damage claim defences based on PPE use.

Minimising Hearing Damage Risk Consequently, as real-world PPE performance is so compromised, the best way to guarantee low levels of risk at low cost is to reduce noise levels as far as practical.

How to Recommend Self-financing Noise Control The Noise Control Audit Process A guide that demonstrates how occupational health and other professionals can add value to noise risk assessments by linking to best practice in engineering noise control to reduce the risks of hearing damage dramatically.

Page 80: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Questions

Page 81: Noise Management Best Practice noise - Home » … · Noise Management Best Practice noise . ... plan the most practical and cost effective noise control programme ... Get a few quotes

ww

w.in

vc.c

o.uk

Contact us for copies of:- Top 10 Noise Control Solutions Guide

Digital Noise Assessment (DNA) template

Peter Wilson: +44 1753 698800 [email protected]

Top 10 Noise Control Solutions

Industrial Noise and Vibration Centre: www.invc.co.uk