no. 3... · 830' 840' 850' 860' 870' 880' 890' 900'...
TRANSCRIPT
770'
780'
790'
800'
810'
820'
830'
840'
850'
860'
870'
880'
890'
900'
910'
920'
930'
770'
780'
790'
800'
810'
820'
830'
840'
850'
860'
870'
880'
890'
900'
910'
920'
930'
-0+50A 0+00A 1+00A 2+00A 3+00A 4+00A 5+00A 6+00A 7+00A 8+00A
PROPOSED 30" D.I.
WATERLINE
(SEE NOTE #7)
PROPOSED ± 15' OF 30" D.I.
WATERLINE AND
48" STEEL CASING
(BY OPEN CUT METHOD)
(STA. 0+25A TO STA. 0+40A)
CONNECT TO
EXISTING 30" TEE
(SEE DETAIL A)
(SHEET 33 OF 36)
PROPOSED ±320 ' OF 30" D.I.
WATERLINE AND 48" STEEL CASING
(BY BORE AND JACK METHOD)
(STA. 7+85A TO 11+05A)
PROPOSED MAG
METER VAULT
(STA. 3+73A)
(SEE DETAIL B)
(SHEET 33 OF 36)
PROPOSED 30"
HORIZONTAL GATE
VALVE, MJ W/
MEGALUGS
(STA. 6+15A)
(SEE NOTE #5)
PROPOSED
30" X 18" REDUCER,
MJ W/ MEGALUGS
(STA.3+62A)
(STA. 3+83A)
PROPOSED ±275' OF
TWO (2) -
3
4
" COPPER
SAMPLING LINES
(SEE NOTE #9)
Caperton Trail
FILTER
BU
ILDIN
G
INTE
RM
ED
IATE
PU
MP
STA
TION
MEMBRANE
BUILDING
SEDIMENTATION
BASINS
WA
STE
WA
SH
-WA
TER
HO
LDIN
G
BA
SIN
CHEMICAL
BUILDING
FLOCCULATION
BASING
RIVER WATER
AND HIGH
SERVICE PUMP
STATIONS
RIVER
INTAKE
MONONGAHELA
RIVER
CLEARWELL
CLEARWELL
CLEARWELL
C
a
p
e
rto
n
T
ra
il
DON KNOTTS BLVD. (RT. 119) (SOUTH)
EROSION AND SEDIMENT CONTROL
A. CONTRACTOR SHALL SUBMIT TO THE OWNER AN E&S CONTROL PLAN
FOR REVIEW AND APPROVAL PRIOR TO STARTING THE WORK.
B. CONTRACTOR SHALL CONDUCT HIS WORK IN COMPLETE COMPLIANCE
WITH ALL RULES, REGULATIONS, AND REQUIREMENTS OF THE WEST
VIRGINIA DEPARTMENT OF ENVIRONMENTAL PROTECTION.
C. CONTRACTOR SHALL MAINTAIN A VEGETATIVE BUFFER ZONE BETWEEN
THE DISTURBED WORKING AREA AND ANY WATERCOURSE. IF A 100
FOOT BUFFER CANNOT BE MAINTAINED, SILT FENCE SHALL BE
INSTALLED.
D. DISTURBED AREAS SHALL BE STABILIZED AS QUICKLY AS POSSIBLE, BUT
NO LATER THAN SEVEN DAYS AFTER DISTURBED.
E. RIPRAP SHALL BE PLACED ON STREAM BANKS IMMEDIATELY AFTER ANY
STREAM CROSSING IS COMPLETED.
F. CONTRACTOR SHALL KEEP EXCAVATIONS FREE FROM WATER AT ALL
TIMES. SHOULD DEWATERING OF EXCAVATION BE REQUIRED, SEDIMENT
BAGS SHALL BE USED TO TRAP SEDIMENT.
830
8
4
0
SEE DETAIL A
(SHEET 33 OF 36)
COBUN
CREEK
PROPOSED
TEMPORARY TRAIL
RELOCATION #1
(SEE NOTE #3)
PROPOSED MAG
METER VAULT
(STA. 3+73A)
(SEE NOTE #6)
(SEE DETAIL B)
(SEE SHEET 33 OF 36)
PROPOSED ±320' OF 30" D.I.
WATERLINE AND 48"
STEEL CASING
(BY BORE AND JACK METHOD)
(STA. 7+85A TO 11+05A)
CITY OF MORGANTOWN
MORGANTOWN DISTRICT
TAX MAP 28 PAR. 134
(DB 1161 PG. 375)
DAVID HENDERSON TRUST
MORGANTOWN DISTRICT
TAX MAP 50 PAR. 1
(DB 1436 PG. 396)
PROPOSED ± 15' OF 30" D.I.
WATERLINE AND
48" STEEL CASING
(BY OPEN CUT METHOD)
(STA.0+25A TO STA. 0+40A)
PROPOSED
1 - 30" TEE, MJ W/ MEGALUGS
1 - 30" HORIZONTAL GATE
VALVE, MJ W/ MEGALUGS
2 - 30" FOSTER ADAPTERS, MJ
1 - 30" CAP, MJ
(SEE NOTE # 5)
(STA. 0+46A)
(O.P. = ±108 PSI)
0+
00A
1+00A
2+
00A
3+00A
4
+
0
0
A
5
+
0
0
A
6
+
0
0
A
7
+
0
0
A
8
+
0
0
A
9
+
0
0
A
1
0
+
0
0
A
PROPOSED 30"
D.I. WATERLINE
(SEE NOTE #7)
PROPOSED
TEMPORARY
JERSEY BARRIERS
(SEE NOTE #8)
PROPOSED 30"
HORIZONTAL GATE
VALVE, MJ W/
MEGALUGS
(STA. 6+15A)
(SEE NOTE #5)
PROPOSED
30" X 18" REDUCER,
MJ W/ MEGALUGS
(STA.3+62A)
(STA. 3+83A)
NOTES:
1. CONTRACTOR SHALL INSTALL THE WATERLINE IN A MANNER WHICH DOES NOT REQUIRE ANY
VERTICAL BENDS. ANY PIPE DEFLECTION SHALL BE WITHIN THE MANUFACTURER'S RECOMMENDED
LIMIT.
2. CONTRACTOR SHALL INSTALL THE WATERLINE WITH A MINIMUM COVER OF FIVE (5) FEET.
3. BEFORE CONSTRUCTION OF WATERLINE AT STA. 0+00A, CONTRACTOR SHALL TEMPORARILY
RELOCATE PORTION OF CAPERTON RAIL FOR TRAIL. TEMPORARY RAIL FOR TRAIL SHALL HAVE 6"
CRUSHED STONE BASE WITH 2" OF HOT LAID BITUMINOUS CONCRETE WEARING COURSE.
TEMPORARY TRAIL SHALL BE LOCATED AT SAME ELEVATION AND SAME WIDTH AS EXISTING TRAIL.
TEMPORARY TRAIL SHALL BE REMOVED AND SEEDING SHALL BE REPLACED. THIS WORK IS
INCIDENTAL TO THE WATERLINE BID ITEM.
4. CONTRACTOR SHALL NOT IMPEDE ANY FOOT OR VEHICLE TRAFFIC ON THE WALKING TRAIL.
5. CONTRACTOR SHALL COORDINATE WITH ENGINEER FINAL LOCATION OF PROPOSED VALVES.
6. CONTRACTOR SHALL COORDINATE WITH ENGINEER FINAL LOCATION OF MAG METER VAULT.
7. FROM STA. 0+00A TO STA. 21+48A, THIS SECTION OF WATERLINE SHALL BE REFEREED TO AS "LINE 1".
8. CONTRACTOR SHALL INSTALL TEMPORARY CONCRETE OR PLASTIC WATER-FILLED JERSEY BARRIERS
BETWEEN THE CONSTRUCTION AREA AND BOTH TEMPORARY AND PERMANENT TRAILS. THESE
BARRIERS SHALL REMAIN IN PLACE UNTIL BORE AND JACK UNDERNEATH RT. 119 AND ALL
RESTORATION FROM STA. 0+00A TO 7+85A IS COMPLETE. THIS WORK IS INCIDENTAL TO THE
WATERLINE BID.
9. CONTRACTOR SHALL INSTALL 2 - 3/4 " COPPER SAMPLING LINES IN SAME DITCH AS PROPOSED RAW
WATERLINE. SAMPLING LINES SHALL HAVE A MINIMUM OF 3' OF COVER. SAMPLING LINES SHALL BE
INSTALLED TO EXISTING SAMPLING LINES AND STOPPED. OWNER WILL MAKE FINAL CONNECTION TO
EXISTING SAMPLING LINES. CONTRACTOR SHALL INSTALL 2" X 4" BOARD AT END OF SAMPLING LINES
AND BOARD SHALL BE EXPOSED ABOVE GROUND. THIS WORK IS INCIDENTAL TO THE WATERLINE BID.
10. AFTER CONTRACTOR HAS INSTALLED THE 30" RAW WATERLINE AND RESTORED EXISTING GROUND
BACK TO PRIOR CONDITION FROM STA. 0+00A TO 0+20A, CONTRACTOR SHALL INSTALL TEMPORARY
TRAIL RELOCATION #2. TEMPORARY RAIL FOR TRAIL SHALL HAVE 6" CRUSHED STONE BASE WITH 2"
OF HOT LAID BITUMINOUS CONCRETE WEARING COURSE. TEMPORARY TRAIL SHALL BE LOCATED AT
SAME ELEVATION AND SAME WIDTH AS EXISTING TRAIL. TEMPORARY TRAIL SHALL BE REMOVED AND
SEEDING SHALL BE REPLACED. THIS WORK IS INCIDENTAL TO THE WATERLINE BID ITEM.
11. UPON COMPLETION OF BORE AND JACK UNDERNEATH DON KNOTTS BLVD (RT. 119), CONTRACTOR
SHALL REPAIR CAPERTON RAIL FOR TRAIL AND REMOVE TEMPORARY RAIL FOR TRAILS AND BRING
GROUND BACK TO EXISTING CONDITIONS. ALL WORK ASSOCIATED WITH REPAIR OF CAPERTON TRAIL
SHALL BE PAID UNDER BID ITEM SURFACE RESTORATION - RAIL FOR TRAIL. ANY WORK ASSOCIATED
WITH THE REMOVAL OF THE TEMPORARY TRAIL RELOCATIONS SHALL BE INCIDENTAL TO THE
WATERLINE BID ITEM.
PROPOSED ±275' OF
TWO (2) -
3
4
" COPPER
SAMPLING LINES
(SEE NOTE #9)
PROPOSED
1 - 30" TEE, MJ W/ MEGALUGS
1 - 30" HORIZONTAL GATE
VALVE, MJ W/ MEGALUGS
2 - 30" FOSTER ADAPTERS, MJ
1 - 30" CAP, MJ
(SEE NOTE #5)
(STA. 7+82A)
(O.P. = ±108 PSI)
PROPOSED
TEMPORARY TRAIL
RELOCATION #2
(SEE NOTE #10)
PROPOSED
TEMPORARY TRAIL
RELOCATION #2
(SEE NOTE #10)
SURFACE RESTORATION TABLE
N
SCALE: 1" = 50'
SCALE: 1" = 30'
STATIONING
FROM
LENGTH
SURFACE RESTORATION
TYPE
DETAIL
SECTION
TO
0+00A 0+25A 25'
0+40A 15'
1+03A 63'
1+07A 4' SIDEWALK SPEC 021
3+08A 201'
3+10A 2' STREET - STONE SPEC 003
3+21A 11'SPEC 001
3+32A 11'SPEC 003
5+39A 207'
7+85A 246'SPEC 003
11+05A 320' BORE AND JACK
SEEDING
1+03A
1+07A
3+08A
3+10A
3+21A
3+32A
5+39A
7+85A
SEEDING
SEEDING
STREET - ASPHALT
SEEDING
0+25A
0+40A
STREET - STONE
STREET - STONE
SPEC 001STREET - ASPHALT
770'
780'
790'
800'
810'
820'
830'
840'
850'
860'
870'
880'
890'
900'
910'
920'
930'
770'
780'
790'
800'
810'
820'
830'
840'
850'
860'
870'
880'
890'
900'
910'
920'
930'
8+00A 9+00A 10+00A 11+00A 12+00A 13+00A 14+00A 15+00A 16+00A
770'
780'
790'
800'
810'
820'
830'
840'
850'
860'
870'
880'
890'
900'
910'
920'
930'
770'
780'
790'
800'
810'
820'
830'
840'
850'
860'
870'
880'
890'
900'
910'
920'
930'
8+00A 9+00A 10+00A 11+00A 12+00A 13+00A 14+00A 15+00A 16+00A
NOTE:
5. STREAM CHANNEL CONSTRUCTION SHALL BE COMPLETED IN DRY CONDITIONS. CONTRACTOR SHALL INSTALL, MAINTAIN, AND OPERATE ALL COFFER DAMS, CHANNELS, FLUMES, SUMPS, AND ALL OTHER TEMPORARY DIVERSIONS
AND PROTECTIVE WORKS NEEDED TO DIVERT STREAM FLOW AND OTHER SURFACE WATER THROUGH OR AROUND THE PROJECT SITE.
A. DIVERSION OF SURFACE WATER SHALL BE CONTINUOUS DURING THE PERIOD THAT DAMAGE TO THE CONSTRUCTION WORK COULD OCCUR. UNLESS OTHERWISE SPECIFIED, DIVERTED SURFACE WATER SHALL BE DIVERTED TO
THE SAME DRAINAGE WAY THAT THE WATER WOULD HAVE REACHED BEFORE BEING DIVERTED.
B. CONTRACTOR IS RESPONSIBLE TO DETERMINE THE NUMBER AND SIZES OF PUMPS NECESSARY TO COMPLETE THE DEWATERING PROCESS.
PROPOSED ±320' OF 30" D.I.
WATERLINE AND 48" STEEL CASING
(BY BORE AND JACK METHOD)
(STA. 7+85A TO 11+05A)
PROPOSED 30"
D.I. WATERLINE
(SEE NOTE #3)
MONONGAHELA
RIVER
DO
N K
NO
TT
S B
LV
D. (R
T. 119) (S
OU
TH
)
DO
N K
NO
TT
S B
LV
D. (R
T. 119) (N
OR
TH
)
UN
IVE
RS
ITY
TO
YO
TA
C
O
B
U
N
C
R
E
E
K
Caperton T
rail
PROPOSED 24" D.I.
WATERLINE
(SEE SHEET 31 OF 36)
PROPOSED 30"
22.5° BEND, MJ W/
MEGALUGS
(STA. 11+22A)
(O.P. = ±108 PSI)
8
3
0
8
4
0
8
5
0
8
6
0
8
7
0
8
8
0
8
9
0
9
0
0
910
9
2
0
8
2
0
830
840
8
5
0
8
6
0
870
880
8
2
0
8
3
0
8
3
0
840
NOTES:
1. CONTRACTOR SHALL INSTALL THE WATERLINE IN A MANNER WHICH DOES
NOT REQUIRE ANY VERTICAL BENDS. ANY PIPE DEFLECTION SHALL BE
WITHIN THE MANUFACTURER'S RECOMMENDED LIMIT.
2. CONTRACTOR SHALL INSTALL THE WATERLINE WITH A MINIMUM COVER OF
FIVE (5) FEET.
3. FROM STA. 0+00A TO STA. 21+48A, THIS SECTION OF WATERLINE SHALL BE
REFEREED TO AS "LINE 1".
4. CONTRACTOR SHALL INSTALL TEMPORARY CONCRETE OR PLASTIC
WATER-FILLED JERSEY BARRIERS BETWEEN THE CONSTRUCTION AREA
AND BOTH TEMPORARY AND PERMANENT TRAILS. THESE BARRIERS SHALL
REMAIN IN PLACE UNTIL BORE AND JACK UNDERNEATH RT. 119 AND ALL
RESTORATION FROM STA. 0+00A TO 7+85A IS COMPLETE. THIS WORK IS
INCIDENTAL TO THE WATERLINE BID.
PROPOSED ±320' OF 30" D.I.
WATERLINE AND 48"
STEEL CASING
(BY BORE AND JACK METHOD)
(STA. 7+85A TO 11+05A)
EROSION AND SEDIMENT CONTROL
A. CONTRACTOR SHALL SUBMIT TO THE OWNER AN E&S CONTROL PLAN
FOR REVIEW AND APPROVAL PRIOR TO STARTING THE WORK.
B. CONTRACTOR SHALL CONDUCT HIS WORK IN COMPLETE COMPLIANCE
WITH ALL RULES, REGULATIONS, AND REQUIREMENTS OF THE WEST
VIRGINIA DEPARTMENT OF ENVIRONMENTAL PROTECTION.
C. CONTRACTOR SHALL MAINTAIN A VEGETATIVE BUFFER ZONE BETWEEN THE
DISTURBED WORKING AREA AND ANY WATERCOURSE. IF A 100 FOOT
BUFFER CANNOT BE MAINTAINED, SILT FENCE SHALL BE INSTALLED.
D. DISTURBED AREAS SHALL BE STABILIZED AS QUICKLY AS POSSIBLE, BUT NO
LATER THAN SEVEN DAYS AFTER DISTURBED.
E. RIPRAP SHALL BE PLACED ON STREAM BANKS IMMEDIATELY AFTER ANY
STREAM CROSSING IS COMPLETED.
F. CONTRACTOR SHALL KEEP EXCAVATIONS FREE FROM WATER AT ALL
TIMES. SHOULD DEWATERING OF EXCAVATION BE REQUIRED, SEDIMENT
BAGS SHALL BE USED TO TRAP SEDIMENT.
CITY OF MORGANTOWN
MORGANTOWN DISTRICT
TAX MAP 28 PAR. 134
(DB 1161 PG. 375)
DAVID HENDERSON TRUST
MORGANTOWN DISTRICT
TAX MAP 50 PAR. 1
(DB 1436 PG. 396)
PROPOSED
STREAM
CROSSING #2
CLAYDON, LLC
MORGAN DISTRICT
TAX MAP 9 PAR. 3
(DB 1226 PG. 554)
CITY OF MORGANTOWN
MORGANTOWN DISTRICT
TAX MAP 48A PAR. 6
(DB 548 PG. 471)
PROPOSED
STREAM
CROSSING #1
PROPOSED
STREAM
CROSSING #3
PROPOSED 30"
22.5° BEND, MJ W/
MEGALUGS
(STA. 15+73A)
(O.P. = ±104 PSI)
5+
00A
6+
00A
7+
00A
8+
00A
9+
00A
10+
00A
11+
00A
1
2
+
0
0
A
1
3
+
0
0
A
1
4
+
0
0
A
1
5
+
0
0
A
16+00A
17+
00A
18+
00A
1
9
+
0
0
A
1+
00B
2+00B
PROPOSED
STREAM
CROSSING #4
PROPOSED 30"
D.I. WATERLINE
(SEE NOTE #3)
PROPOSED
TEMPORARY
JERSEY BARRIERS
(SEE NOTE #4)
N
SCALE: 1" = 50'
SCALE: 1" = 30'
SURFACE RESTORATION TABLE
STATIONING
FROM
LENGTH
SURFACE RESTORATION
TYPE
DETAIL
SECTION
TO
7+85A 11+05A 320'
11+57A
38'
BORE AND JACK
20+10A
14'SPEC 015
853' SEEDING
STREAM CROSSING11+43A
11+57A
11+05A11+43A
SEEDING
830'
840'
850'
860'
870'
880'
890'
900'
910'
920'
930'
940'
950'
960'
970'
980'
990'
830'
840'
850'
860'
870'
880'
890'
900'
910'
920'
930'
940'
950'
960'
970'
980'
990'
80+00A 81+00A 82+00A 83+00A 84+00A 85+00A 86+00A 87+00A 88+00A
NOTE:
7. STREAM CHANNEL CONSTRUCTION SHALL BE COMPLETED IN DRY CONDITIONS. CONTRACTOR SHALL INSTALL, MAINTAIN, AND OPERATE ALL COFFER DAMS, CHANNELS, FLUMES, SUMPS, AND ALL OTHER TEMPORARY DIVERSIONS
AND PROTECTIVE WORKS NEEDED TO DIVERT STREAM FLOW AND OTHER SURFACE WATER THROUGH OR AROUND THE PROJECT SITE.
A. DIVERSION OF SURFACE WATER SHALL BE CONTINUOUS DURING THE PERIOD THAT DAMAGE TO THE CONSTRUCTION WORK COULD OCCUR. UNLESS OTHERWISE SPECIFIED, DIVERTED SURFACE WATER SHALL BE
DIVERTED TO THE SAME DRAINAGE WAY THAT THE WATER WOULD HAVE REACHED BEFORE BEING DIVERTED.
B. CONTRACTOR IS RESPONSIBLE TO DETERMINE THE NUMBER AND SIZES OF PUMPS NECESSARY TO COMPLETE THE DEWATERING PROCESS.
PROPOSED 30"
D.I. WATERLINE
M
U
B
S
h
o
p
E
n
t
r
a
n
c
e
G
r
e
e
n
b
a
g
R
o
a
d
(
R
t
.
8
5
7
)
C
O
B
U
N
C
R
E
E
K
9
0
0
910
920
920
9
2
0
9
3
0
900
9
1
0
UNITED STATES OF AMERICA
MORGAN DISTRICT
TAX MAP 17 PAR. 5
(DB 616 PG. 576)
CITY OF MORGANTOWN
MORGANTOWN DISTRICT
TAX MAP 48A PAR. 4
(DB 678 PG.631)
WEST VIRGINIA
CROSSROADS, LLC
MORGAN DISTRICT
TAX MAP 10 PAR. 3.1
(DB 1477 PG. 531)
PROPOSED 30"
D.I. WATERLINE
PROPOSED
STREAM
CROSSING #5
PROPOSED 30"
45° BEND, MJ W/
MEGALUGS
(STA. 84+47A)
(O.P. = ±76 PSI)
EROSION AND SEDIMENT CONTROL
A. CONTRACTOR SHALL SUBMIT TO THE OWNER AN E&S CONTROL PLAN
FOR REVIEW AND APPROVAL PRIOR TO STARTING THE WORK.
B. CONTRACTOR SHALL CONDUCT HIS WORK IN COMPLETE COMPLIANCE
WITH ALL RULES, REGULATIONS, AND REQUIREMENTS OF THE WEST
VIRGINIA DEPARTMENT OF ENVIRONMENTAL PROTECTION.
C. CONTRACTOR SHALL MAINTAIN A VEGETATIVE BUFFER ZONE BETWEEN THE
DISTURBED WORKING AREA AND ANY WATERCOURSE. IF A 100 FOOT
BUFFER CANNOT BE MAINTAINED, SILT FENCE SHALL BE INSTALLED.
D. DISTURBED AREAS SHALL BE STABILIZED AS QUICKLY AS POSSIBLE, BUT NO
LATER THAN SEVEN DAYS AFTER DISTURBED.
E. RIPRAP SHALL BE PLACED ON STREAM BANKS IMMEDIATELY AFTER ANY
STREAM CROSSING IS COMPLETED.
F. CONTRACTOR SHALL KEEP EXCAVATIONS FREE FROM WATER AT ALL
TIMES. SHOULD DEWATERING OF EXCAVATION BE REQUIRED, SEDIMENT
BAGS SHALL BE USED TO TRAP SEDIMENT.
PROPOSED
FUTURE
DEVELOPMENT
PROPOSED 30"
45° BEND, MJ
W/ MEGALUGS
(STA. 83+37A)
(O.P. = ±77 PSI)
PROPOSED
TEMPORARY
CULVERT
(SEE NOTE #4)
7
6
+
0
0
A
77+
00A
7
8
+
0
0
A
7
9
+
0
0
A
80+
00A
81+
00A
8
2
+
0
0
A
8
3
+
0
0
A
8
4
+
0
0
A
85+
00A
86+00A
87+00A
88+
00A
89+
00A
90+
00A
9
1
+
0
0
A
9
2
+
0
0
A
PROPOSED
ACCESS ROAD
(SEE NOTE #3)
PROPOSED 30"
11.25° BEND, MJ
W/ MEGALUGS
(STA. 81+04A)
(O.P. = ±69 PSI)
PROPOSED 40'
TEMPORARY
CONSTRUCTION
EASEMENT
(SEE NOTE #5)
PROPOSED
±2,525' OF CHAIN
LINK FENCE
(SEE NOTE #6)
NOTE
1. CONTRACTOR SHALL INSTALL THE WATERLINE IN A MANNER WHICH DOES NOT REQUIRE ANY
VERTICAL BENDS. ANY PIPE DEFLECTION SHALL BE WITHIN THE MANUFACTURER'S RECOMMENDED
LIMIT.
2. CONTRACTOR SHALL INSTALL THE WATERLINE WITH A MINIMUM COVER OF FIVE (5) FEET.
3. CONTRACTOR SHALL BE RESPONSIBLE FOR BUILDING A STONE ACCESS ROAD. CONTRACTOR SHALL
USE ROAD AS SOLE ACCESS ONTO THE PROPERTY OF THE MORGANTOWN FEDERAL CORRECTION
INSTITUTE. ALL EQUIPMENT, MATERIAL AND PERSONNEL SHALL ENTER UPON THE MORGANTOWN
FEDERAL CORRECTION INSTITUTE UPON ACCESS ROAD. THE ROAD SHALL BE 15 FEET IN WIDTH. THE
CENTERLINE OF THE PROPOSED ACCESS ROAD SHALL COINCIDE WITH THE CENTERLINE OF THE
PROPOSED WATERLINE FROM APPROXIMATELY STA. 83+42A TO STA. 94+00A. CONTRACTOR SHALL BE
RESPONSIBLE FOR DESIGN, CONSTRUCTION AND MAINTENANCE OF THE ACCESS ROAD THROUGH THE
DURATION OF THE CONTRACT. THE STONE ACCESS ROAD SHALL REMAIN IN PLACE UPON COMPLETION
OF CONTRACT. CONTRACTOR SHALL INSTALL NECESSARY CULVERTS UNDER ACCESS ROAD TO
MAINTAIN DRAINAGE. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE SIZE
OF THE CULVERTS AND KEEP THE CULVERTS MAINTAINED DURING CONSTRUCTION. ALL WORK
ASSOCIATED WITH THE ACCESS ROAD SHALL BE INCIDENTAL TO THE WATERLINE BID.
4. CONTRACTOR SHALL INSTALL +/- 20' OF 24" TEMPORARY HDPE STORM CULVERT UNDER PROPOSED
ACCESS ROAD. CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLATION AND KEEPING CULVERT
FREE OF DEBRIS DURING DURATION OF CONTRACT. THE STORM CULVERT AND SECTION OF ACCESS
ROAD SHALL BE REMOVED AFTER ALL USE FOR THE ACCESS HAS BEEN COMPLETED. THIS WORK IS
INCIDENTAL TO THE WATERLINE BID.
5. CONTRACTOR SHALL MAINTAIN ALL EQUIPMENT AND MATERIAL WITHIN THE TEMPORARY
CONSTRUCTION RIGHT-OF-WAY. NO INGRESS/EGRESS PROVIDED FOR WATERLINE CONSTRUCTION
OTHER THAN TEMPORARY CONSTRUCTION RIGHT-OF-WAY UNLESS AGREED UPON BY LAND OWNER
AND ENGINEER.
6. CONTRACTOR SHALL COORDINATE INSTALLATION OF CHAIN LINK FENCE WITH OWNER AND THE
MORGANTOWN FEDERAL CORRECTION INSTITUTE (FCI). CONTRACTOR SHALL ABIDE BY THE RULES
AND REGULATIONS ESTABLISHED BY THE FCI. AT NO TIME DURING THE CONSTRUCTION OF THE
WATERLINE IS THE CONTRACTOR PERMITTED ON THE ADJACENT SIDE OF THE FENCE. THE FENCE
SHALL REMAIN IN PLACE UPON COMPLETION OF THE INSTALLATION OF THE WATERLINE. THIS WORK
SHALL BE PAID UNDER THE CHAIN LINK FENCE BID ITEM. SEE SPEC 038.
N
SURFACE RESTORATION TABLE
STATIONING
FROM
LENGTH
SURFACE RESTORATION
TYPE
DETAIL
SECTION
TO
82+88A243' SEEDING
83+23A 35'SPEC 015
83+42A 19' SEEDING
SPEC 003
STREAM CROSSING
SCALE: 1" = 50'
SCALE: 1" = 30'
80+45A 72' STREET - ASPHALT79+73A
80+45A
82+88A
83+23A
94+00A 1,058' ACCESS ROAD83+42A
830'
840'
850'
860'
870'
880'
890'
900'
910'
920'
930'
940'
950'
960'
970'
980'
990'
830'
840'
850'
860'
870'
880'
890'
900'
910'
920'
930'
940'
950'
960'
970'
980'
990'
88+00A 89+00A 90+00A 91+00A 92+00A 93+00A 94+00A 95+00A 96+00A
PROPOSED 30"
D.I. WATERLINE
(SEE NOTE #3)
COBUN CREEK
PROPOSED 30"
22.5° BEND, MJ
W/ MEGALUGS
(STA. 93+68A)
(O.P. = ±75 PSI)
9
0
0
9
1
0
9
2
0
9
3
0
9
4
0
9
5
0
9
0
0
9
1
0
PROPOSED
FUTURE
DEVELOPMENT
PROPOSED 30"
D.I. WATERLINE
(SEE NOTE #3)
C
O
B
U
N
C
R
E
E
K
EROSION AND SEDIMENT CONTROL
A. CONTRACTOR SHALL SUBMIT TO THE OWNER AN E&S CONTROL PLAN
FOR REVIEW AND APPROVAL PRIOR TO STARTING THE WORK.
B. CONTRACTOR SHALL CONDUCT HIS WORK IN COMPLETE COMPLIANCE
WITH ALL RULES, REGULATIONS, AND REQUIREMENTS OF THE WEST
VIRGINIA DEPARTMENT OF ENVIRONMENTAL PROTECTION.
C. CONTRACTOR SHALL MAINTAIN A VEGETATIVE BUFFER ZONE BETWEEN THE
DISTURBED WORKING AREA AND ANY WATERCOURSE. IF A 100 FOOT
BUFFER CANNOT BE MAINTAINED, SILT FENCE SHALL BE INSTALLED.
D. DISTURBED AREAS SHALL BE STABILIZED AS QUICKLY AS POSSIBLE, BUT NO
LATER THAN SEVEN DAYS AFTER DISTURBED.
E. RIPRAP SHALL BE PLACED ON STREAM BANKS IMMEDIATELY AFTER ANY
STREAM CROSSING IS COMPLETED.
F. CONTRACTOR SHALL KEEP EXCAVATIONS FREE FROM WATER AT ALL
TIMES. SHOULD DEWATERING OF EXCAVATION BE REQUIRED, SEDIMENT
BAGS SHALL BE USED TO TRAP SEDIMENT.
UNITED STATES OF AMERICA
MORGAN DISTRICT
TAX MAP 17 PAR. 5
(DB 616 PG. 576)
WEST VIRGINIA
CROSSROADS, LLC
MORGAN DISTRICT
TAX MAP 10 PAR. 3.1
(DB 1477 PG. 531)
PROPOSED 30"
22.5° BEND, MJ W/
MEGALUGS
(STA. 90+01A)
(O.P. = ± 75PSI)
85+
00A
86+00A
87+00A
88+
00A
89+
00A
90+
00A
9
1
+
0
0
A
9
2
+
0
0
A
93+
00A
9
4
+
0
0
A
9
5
+
0
0
A
96+
00A
9
7
+
0
0
A
9
8
+
0
0
A
9
9
+
0
0
A
1
0
0
+
0
0
A
PROPOSED
ACCESS ROAD
(SEE NOTE #4)PROPOSED ±40'
TEMPORARY
CONSTRUCTION
EASEMENT
(SEE NOTE #5)
CONSTRUCTION LIMITS
(SEE NOTE #6)
PROPOSED 30"
22.5° BEND, MJ
W/ MEGALUGS
(STA. 91+55A)
(O.P. = ±75 PSI)
PROPOSED
±2,525' OF CHAIN
LINK FENCE
(SEE NOTE #7)
NOTES:
1. CONTRACTOR SHALL INSTALL THE WATERLINE IN A MANNER WHICH DOES NOT REQUIRE ANY VERTICAL BENDS. ANY PIPE DEFLECTION SHALL
BE WITHIN THE MANUFACTURER'S RECOMMENDED LIMIT.
2. CONTRACTOR SHALL INSTALL THE WATERLINE WITH A MINIMUM COVER OF FIVE (5) FEET.
3. THE CONTRACTOR SHALL ABIDE BY THE RULES AND REGULATIONS ESTABLISHED BY THE MORGANTOWN FEDERAL CORRECTION INSTITUTE
(FCI) WHILE INSTALLING THE WATERLINE ON THE PROPERTY. ALL EQUIPMENT, MATERIAL AND PERSONNEL SHALL CHECK IN WITH PROPER
INSTITUTE PERSONNEL PRIOR TO START OF THE CONSTRUCTION DAY. EQUIPMENT AND MATERIAL SHALL NOT BE LEFT UNATTENDED AT ANY
TIME. ANY OPEN DITCH SHALL BE PROPERLY BACKFILLED AND COMPACTED PRIOR TO COMPLETION OF THE CONSTRUCTION DAY. NO
CONCRETE TRUCKS SHALL BE PERMITTED ON TO THE PROPERTY OF THE MORGANTOWN FCI.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR BUILDING A STONE ACCESS ROAD. CONTRACTOR SHALL USE ROAD AS SOLE ACCESS ONTO THE
PROPERTY OF THE MORGANTOWN FEDERAL CORRECTION INSTITUTE. ALL EQUIPMENT, MATERIAL AND PERSONNEL SHALL ENTER UPON THE
MORGANTOWN FEDERAL CORRECTION INSTITUTE UPON ACCESS ROAD. THE ROAD SHALL BE 15 FEET IN WIDTH. THE CENTERLINE OF THE
PROPOSED ACCESS ROAD SHALL COINCIDE WITH THE CENTERLINE OF THE PROPOSED WATERLINE FROM APPROXIMATELY STA. 83+42A TO
STA. 94+00A. CONTRACTOR SHALL BE RESPONSIBLE FOR DESIGN, CONSTRUCTION AND MAINTENANCE OF THE ACCESS ROAD THROUGH THE
DURATION OF THE CONTRACT. THE STONE ACCESS ROAD SHALL REMAIN IN PLACE UPON COMPLETION OF CONTRACT. CONTRACTOR SHALL
INSTALL NECESSARY CULVERTS UNDER ACCESS ROAD TO MAINTAIN DRAINAGE. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
DETERMINE THE SIZE OF THE CULVERTS AND KEEP THE CULVERTS MAINTAINED DURING CONSTRUCTION. ALL WORK ASSOCIATED WITH THE
ACCESS ROAD SHALL BE INCIDENTAL TO THE WATERLINE BID.
5. CONTRACTOR SHALL MAINTAIN ALL EQUIPMENT AND MATERIAL WITHIN THE TEMPORARY CONSTRUCTION RIGHT-OF-WAY. NO INGRESS/EGRESS
PROVIDED FOR WATERLINE CONSTRUCTION OTHER THAN TEMPORARY CONSTRUCTION RIGHT-OF-WAY UNLESS AGREED UPON BY LAND
OWNER AND ENGINEER.
6. AT NO TIME WHILE THE CONTRACTOR IS INSTALLING THE WATERLINE ON THE PROPERTY OF MORGANTOWN FEDERAL CORRECTION INSTITUTE
SHALL THEY PERMITTED BEYOND THE CONSTRUCTION LIMITS.
7. CONTRACTOR SHALL COORDINATE INSTALLATION OF CHAIN LINK FENCE WITH OWNER AND THE MORGANTOWN FEDERAL CORRECTION
INSTITUTE (FCI). AT NO TIME DURING THE CONSTRUCTION OF THE WATERLINE IS THE CONTRACTOR PERMITTED ON THE ADJACENT SIDE OF
THE FENCE. THE FENCE SHALL REMAIN IN PLACE UPON COMPLETION OF THE INSTALLATION OF THE WATERLINE. THIS WORK SHALL BE PAID
UNDER THE CHAIN LINK FENCE BID ITEM. SEE SPEC 038.
N
SURFACE RESTORATION TABLE
STATIONING
FROM
LENGTH
SURFACE RESTORATION
TYPE
DETAIL
SECTION
TO
SCALE: 1" = 50'
SCALE: 1" = 30'
94+00A 1,058' ACCESS ROAD83+23A
119+21A2,521 SEEDING94+00A
860'
870'
880'
890'
900'
910'
920'
930'
940'
950'
960'
970'
980'
990'
1000'
1010'
1020'
860'
870'
880'
890'
900'
910'
920'
930'
940'
950'
960'
970'
980'
990'
1000'
1010'
1020'
96+00A 97+00A 98+00A 99+00A 100+00A 101+00A 102+00A 103+00A 104+00A
PROPOSED 30"
D.I. WATERLINE
(SEE NOTE #3)
C
O
B
U
N
C
R
E
E
K
MORGANTOWN
FEDERAL
CORRECTION
INSTITUTE
9
2
0
9
3
0
9
4
0
9
5
0
9
6
0
9
7
0
9
8
0
900
9
1
0
9
2
0
9
3
0
940
P
A
V
E
D
R
O
A
D
UNITED STATES OF AMERICA
MORGAN DISTRICT
TAX MAP 17 PAR. 5
(DB 616 PG. 576)
PROPOSED 30"
D.I. WATERLINE
(SEE NOTE #3)
EROSION AND SEDIMENT CONTROL
A. CONTRACTOR SHALL SUBMIT TO THE OWNER AN E&S CONTROL PLAN
FOR REVIEW AND APPROVAL PRIOR TO STARTING THE WORK.
B. CONTRACTOR SHALL CONDUCT HIS WORK IN COMPLETE COMPLIANCE
WITH ALL RULES, REGULATIONS, AND REQUIREMENTS OF THE WEST
VIRGINIA DEPARTMENT OF ENVIRONMENTAL PROTECTION.
C. CONTRACTOR SHALL MAINTAIN A VEGETATIVE BUFFER ZONE BETWEEN THE
DISTURBED WORKING AREA AND ANY WATERCOURSE. IF A 100 FOOT
BUFFER CANNOT BE MAINTAINED, SILT FENCE SHALL BE INSTALLED.
D. DISTURBED AREAS SHALL BE STABILIZED AS QUICKLY AS POSSIBLE, BUT NO
LATER THAN SEVEN DAYS AFTER DISTURBED.
E. RIPRAP SHALL BE PLACED ON STREAM BANKS IMMEDIATELY AFTER ANY
STREAM CROSSING IS COMPLETED.
F. CONTRACTOR SHALL KEEP EXCAVATIONS FREE FROM WATER AT ALL
TIMES. SHOULD DEWATERING OF EXCAVATION BE REQUIRED, SEDIMENT
BAGS SHALL BE USED TO TRAP SEDIMENT.
PROPOSED 30"
22.5° BEND, MJ W/
MEGALUGS
(STA. 97+18A)
(O.P. = ± 69 PSI)
PROPOSED 30"
22.5° BEND, MJ W/
MEGALUGS
(STA. 102+12A)
(O.P. = ±63 PSI)
WEST VIRGINIA
CROSSROADS, LLC
MORGAN DISTRICT
TAX MAP 10 PAR. 3.1
(DB 1477 PG. 531)
PROPOSED
FUTURE
DEVELOPMENT
PROPOSED 30"
11.25° BEND, MJ
W/ MEGALUGS
(STA. 99+35A)
(O.P. = ± 68 PSI)
9
2
+
0
0
A
9
3
+
0
0
A
9
4
+
0
0
A
9
5
+
0
0
A
9
6
+
0
0
A
9
7
+
0
0
A
9
8
+
0
0
A
99+
00A
100+
00A
101+
00A
102+00A
1
0
3
+
0
0
A
1
0
4
+
0
0
A
1
0
5
+
0
0
A
1
0
6
+
0
0
A
1
0
7
+
0
0
A
1
0
8
+
0
0
A
CONSTRUCTION LIMITS
(SEE NOTE #5)
PROPOSED
±2,525' OF CHAIN
LINK FENCE
(SEE NOTE #4)
PROPOSED TWO
(2) - 10' CHAIN
LINK GATES
(SEE SPEC 038)
(SEE NOTE #6)
NOTE
1. CONTRACTOR SHALL INSTALL THE WATERLINE IN A MANNER WHICH DOES NOT REQUIRE ANY VERTICAL BENDS. ANY PIPE DEFLECTION SHALL BE WITHIN THE
MANUFACTURER'S RECOMMENDED LIMIT.
2. CONTRACTOR SHALL INSTALL THE WATERLINE WITH A MINIMUM COVER OF FIVE (5) FEET.
3. THE CONTRACTOR SHALL ABIDE BY THE RULES AND REGULATIONS ESTABLISHED BY THE MORGANTOWN FEDERAL CORRECTION INSTITUTE WHILE INSTALLING
THE WATERLINE ON THE PROPERTY. ALL EQUIPMENT, MATERIAL AND PERSONNEL SHALL CHECK IN WITH PROPER INSTITUTE PERSONNEL PRIOR TO START OF
EACH CONSTRUCTION DAY. EQUIPMENT AND MATERIAL SHALL NOT BE LEFT UNATTENDED AT ANY TIME. ANY OPEN DITCH SHALL BE PROPERLY BACKFILLED
AND COMPACTED PRIOR TO COMPLETION OF THE CONSTRUCTION DAY. NO CONCRETE TRUCKS SHALL BE PERMITTED ON THE PROPERTY OF THE
MORGANTOWN FCI.
4. CONTRACTOR SHALL COORDINATE INSTALLATION OF CHAIN LINK FENCE WITH OWNER AND THE MORGANTOWN FEDERAL CORRECTION INSTITUTE (FCI). AT NO
TIME DURING THE CONSTRUCTION OF THE WATERLINE IS THE CONTRACTOR PERMITTED ON THE ADJACENT SIDE OF THE FENCE. THE FENCE SHALL REMAIN IN
PLACE UPON COMPLETION OF THE INSTALLATION OF THE WATERLINE. THIS WORK SHALL BE PAID UNDER THE CHAIN LIKE FENCE BID ITEM. SEE SPEC 038.
5. AT NO TIME WHILE THE CONTRACTOR IS INSTALLING THE WATERLINE ON THE PROPERTY OF MORGANTOWN FEDERAL CORRECTION INSTITUTE SHALL THEY
PERMITTED BEYOND THE CONSTRUCTION LIMITS.
6. CONTRACTOR SHALL COORDINATE THE FINAL LOCATION OF THE CHAIN LINK GATE. THE FCI WILL BE RESPONSIBLE FOR SUPPLYING LOCKS AND KEYS FOR THE
GATE. COST OF THE GATE SHALL BE INCLUDED IN THE CHAIN LINK FENCE BID ITEM.
PROPOSED TWO
(2) - 10' CHAIN
LINK GATES
(SEE SPEC 038)
(SEE NOTE #6)
N
SCALE: 1" = 50'
SCALE: 1" = 30'
SURFACE RESTORATION TABLE
STATIONING
FROM
LENGTH
SURFACE RESTORATION
TYPE
DETAIL
SECTION
TO
119+21 2,521' SEEDING94+00A
860'
870'
880'
890'
900'
910'
920'
930'
940'
950'
960'
970'
980'
990'
1000'
1010'
1020'
860'
870'
880'
890'
900'
910'
920'
930'
940'
950'
960'
970'
980'
990'
1000'
1010'
1020'
104+00A 105+00A 106+00A 107+00A 108+00A 109+00A 110+00A 111+00A 112+00A
PROPOSED 30"
D.I. WATERLINE
(SEE NOTE #3 & 4)
PROPOSED 4"
COMBINATION AIR VALVE
(STA. 110+64A)
(SEE NOTE #7)
(SEE DETAIL G)
(SHEET 34 OF 36)
PROPOSED 30" D.I.
WATERLINE
(SEE NOTE #3 & 4)
920
930
940
950
9
6
0
970
9
8
0
9
9
0
PAVED ROAD
UNITED STATES OF AMERICA
MORGAN DISTRICT
TAX MAP 17 PAR. 5
(DB 616 PG. 576)
EROSION AND SEDIMENT CONTROL
A. CONTRACTOR SHALL SUBMIT TO THE OWNER AN E&S CONTROL PLAN
FOR REVIEW AND APPROVAL PRIOR TO STARTING THE WORK.
B. CONTRACTOR SHALL CONDUCT HIS WORK IN COMPLETE COMPLIANCE
WITH ALL RULES, REGULATIONS, AND REQUIREMENTS OF THE WEST
VIRGINIA DEPARTMENT OF ENVIRONMENTAL PROTECTION.
C. CONTRACTOR SHALL MAINTAIN A VEGETATIVE BUFFER ZONE BETWEEN THE
DISTURBED WORKING AREA AND ANY WATERCOURSE. IF A 100 FOOT BUFFER
CANNOT BE MAINTAINED, SILT FENCE SHALL BE INSTALLED.
D. DISTURBED AREAS SHALL BE STABILIZED AS QUICKLY AS POSSIBLE, BUT NO
LATER THAN SEVEN DAYS AFTER DISTURBED.
E. RIPRAP SHALL BE PLACED ON STREAM BANKS IMMEDIATELY AFTER ANY
STREAM CROSSING IS COMPLETED.
F. CONTRACTOR SHALL KEEP EXCAVATIONS FREE FROM WATER AT ALL
TIMES. SHOULD DEWATERING OF EXCAVATION BE REQUIRED, SEDIMENT
BAGS SHALL BE USED TO TRAP SEDIMENT.
PROPOSED 30"
22.5° BEND, MJ W/
MEGALUGS
(STA. 109+73A)
(O.P. = ±51 PSI)
1
0
0
+
0
0
A
1
0
1
+
0
0
A
1
0
2
+
0
0
A
103+
00A
1
0
4
+
0
0
A
105+
00A
106+
00A
107+
00A
108+
00A
109+00A
110+
00A
1
1
1
+
0
0
A
1
1
2
+
0
0
A
1
1
3
+
0
0
A
1
1
4
+
0
0
A
1
1
5
+
0
0
A
NOTE
1. CONTRACTOR SHALL INSTALL THE WATERLINE IN A MANNER WHICH DOES NOT REQUIRE ANY VERTICAL BENDS. ANY PIPE DEFLECTION SHALL BE WITHIN THE MANUFACTURER'S RECOMMENDED LIMIT.
2. CONTRACTOR SHALL INSTALL THE WATERLINE WITH A MINIMUM COVER OF FIVE (5) FEET.
3. PROPOSED 30" WATERLINE FROM STA. 109+00A TO STA. 114+00A SHALL BE INSTALLED SO THAT TOP OF WATERLINE IS AT OR BELOW ELEVATION 952'.
4. THE CONTRACTOR SHALL ABIDE BY THE RULES AND REGULATIONS ESTABLISHED BY THE MORGANTOWN FEDERAL CORRECTION INSTITUTE WHILE INSTALLING THE WATERLINE ON THE PROPERTY. ALL EQUIPMENT,
MATERIAL AND PERSONNEL SHALL CHECK IN WITH PROPER INSTITUTE PERSONNEL PRIOR TO START OF EACH CONSTRUCTION DAY. EQUIPMENT AND MATERIAL SHALL NOT BE LEFT UNATTENDED AT ANY TIME. ANY OPEN
DITCH SHALL BE PROPERLY BACKFILLED AND COMPACTED PRIOR TO COMPLETION OF THE CONSTRUCTION DAY. NO CONCRETE TRUCKS SHALL BE PERMITTED ON THE PROPERTY OF THE MORGANTOWN FCI.
5. CONTRACTOR SHALL COORDINATE INSTALLATION OF CHAIN LINK FENCE WITH OWNER AND THE MORGANTOWN FEDERAL CORRECTION INSTITUTE (FCI). AT NO TIME DURING THE CONSTRUCTION OF THE WATERLINE IS THE
CONTRACTOR PERMITTED ON THE ADJACENT SIDE OF THE FENCE. THE FENCE SHALL REMAIN IN PLACE UPON COMPLETION OF THE INSTALLATION OF THE WATERLINE. THIS WORK SHALL BE PAID UNDER THE CHAIN LINK
FENCE BID ITEM. SEE SPEC 038.
6. AT NO TIME WHILE THE CONTRACTOR IS INSTALLING THE WATERLINE ON THE PROPERTY OF MORGANTOWN FEDERAL CORRECTION INSTITUTE SHALL THEY PERMITTED BEYOND THE CONSTRUCTION LIMITS.
7. CONTRACTOR SHALL COORDINATE WITH ENGINEER FINAL LOCATION OF PROPOSED VALVES.
8. CONTRACTOR SHALL COORDINATE THE FINAL LOCATION OF THE CHAIN LINK GATE. THE FCI WILL BE RESPONSIBLE FOR SUPPLYING LOCKS AND KEYS FOR THE GATE. COST OF THE GATE SHALL BE INCLUDED IN THE CHAIN
LINK FENCE BID ITEM.
CONSTRUCTION LIMITS
(SEE NOTE #6)
PROPOSED 4"
COMBINATION AIR VALVE
(STA. 110+64A)
(SEE NOTE #7)
(SEE DETAIL G)
(SHEET 34 OF 36)
PROPOSED
±2,525' OF CHAIN
LINK FENCE
(SEE NOTE #5)
PROPOSED TWO
(2) - 10' CHAIN
LINK GATES
(SEE SPEC 038)
(SEE NOTE #8)
PROPOSED TWO
(2) - 10' CHAIN
LINK GATES
(SEE SPEC 038)
(SEE NOTE #8)
PROPOSED ONE
(1) - 10' CHAIN
LINK GATES
(SEE SPEC 038)
(SEE NOTE #8)
N
SCALE: 1" = 50'
SCALE: 1" = 30'
SURFACE RESTORATION TABLE
STATIONING
FROM
LENGTH
SURFACE RESTORATION
TYPE
DETAIL
SECTION
TO
119+21A 2,521' SEEDING94+00A