THE FOLLOWING HFO POWER PLANT IS AVAILABLE FOR SALE WITH US WITH IMMEDIATE DELIVERY:
1 No. – 106 MW Wartsila make, HFO fired Power plant as per the following technical specifications:
Manufacturer : Wartsila
Manufacturer's type : 7 x 18V46 HFO
Made in year : 2000
Capacity : 106 MW
Power factor : 0.8
Efficiency : 0.97 (at rated output, 50 Hz and power factor 0.8)
Application : Base Load Power Generation
Engine type : 18V46 HFO
Engine rated ISO output : 17.55 kWm
Specific fuel consumption : 200 grams @ fuel LCV of 9800 kcal/Kg
Alternator type : ABB AMG 1600 SS12 DSEB
Alternator out put : 20000 kVA, 11 kV, 50 Hz
Generator transformers (4 No.s) : BHEL 40 000 kVA, 110 / 11 kV
Lube oil separators (7 No.s) : Alfa Laval LOPX 710 SFD 34
Fuel oil separators (4 No.s) : Alfa Laval FOPX 614 TFD 24
Waste heat recovery boilers (3 No.s) : Alborg 4270 kg/h at 7 bar
2
NITIN CORPORATION 106 MW WARTSILA HFO POWER PLANT
Mumbai.
Details of Major Overhauls carried out and Current Run Hours
Engine.
No Engine.
Sl.No
12000 to 14000
Hours 24000 to 26000
Hours 36000 to 38000
Hours 48000 to 50000
hours 60000 to 62000
hours 72000 to 74000
hours Current
Run
hours
Hours
Run
after
Major
overhaul
Remarks
Date Run
Hrs. Date Run
Hrs. Date Run
Hrs. Date Hrs. Date Hrs. Date Hrs.
#1 91260 20.02.2003 13409 29.03.2006 26675 27.12.2007 37793 25.01.2010 50461 10.05.2012 61198 16.06.2016 72492 72492 0
#2 91315 26.09.2003 15238 10.07.2007 27302 25.07.2009 39254 25.10.2013 52328 58135 5807
#3 91316 21.01.2003 13300 20.11.2006 24702 29.04.2009 38505 20.12.2013 52542 56115 3573
#4 91317 29.09.2002 12150 29.11.2004 24925 22.11.2007 36891 18.12.2009 51424 09.10.2012 63187 16.06.2016 72128 72128 0
#5 91318 27.12.2002 12925 21.07.2005 26794 24.10.2007 38465 11.09.2009 51049 13.06.2011 61170 68532 7362
#6 91319 14.03.2003 13210 13.04.2007 26356 12.06.2009 38419 25.03.2013 49949 57289 7340
#7 91320 27.07.2003 14163 05.08.2007 26370 11.11.2009 39314 06.03.2014 52415 55490 3075
3
NITIN CORPORATION 106 MW WARTSILA HFO POWER PLANT
Mumbai.
Periodic Maintenance details.
1) Every 2000 Hours Checks as per OEM recommendation like
a) Cylinder Tightness check.
b) Engine performance monitoring.
c) Governor oil Change.
d) Cam shaft inspection.
e) Radiator Fins cleaning.
f) Exhaust Gas bellows inspection for any crack
g) Fuel oil and Lube Oil Filters cleaning.
h) Resilient mountings/ Engine base bolts tightness check.
i) Crankshaft web deflection and Flywheel Alignment.
j) Inlet and Exhaust Valves Tappet clearance checking, etc.
2) Every 3000 Hours Calibration of Fuel Injection Nozzles.
3) Every 4000 Hours Charge Air Coolers cleaning.
4) Every 4000 Hours Turbocharger rotors mechanical cleaning/ Exhaust Gas boiler tubes cleaning based on Fuel condition
frequency of cleaning will be decided.
5) Every 6000 Hours replacement of Fuel Injection Nozzles.
4
NITIN CORPORATION 106 MW WARTSILA HFO POWER PLANT
Mumbai.
5
NITIN CORPORATION 106 MW WARTSILA HFO POWER PLANT
Mumbai.
6
NITIN CORPORATION 106 MW WARTSILA HFO POWER PLANT
Mumbai.
7
NITIN CORPORATION 106 MW WARTSILA HFO POWER PLANT
Mumbai.