LOCKOUT / TAGOUT PROCEDURAL GUIDE Rich Paul Industries 29 CFR 1910.147 & ANSI Z244.1-2003 Nashville, Tennessee C-A-U-T-I-O-N SERVICING OR MAINTENANCE IS NOT PERMITTED UNLESS THIS EQUIPMENT IS ISOLATED FROM ALL HAZARDOUS ENERGY SOURCES. THIS IS THE EXCLUSIVE RESPONSIBILITY OF ‘DESIGNATED’ AUTHORIZED EMPLOYEES WHO MUST FOLLOW THE COMPLETE LOCKOUT/TAGOUT PROCEDURE AS PUBLISHED BY RICH PAUL INDUSTRIES, NASHVILLE OPERATIONS, NASHVILLE,TENNESSEE." This document was developed by Premier Safety, LLC of Clarksville, Tennessee. It is the Confidential Property of Rich Paul Industries, Nashville Operations, Nashville, Tennessee and shall not be reproduced or copied, in whole or in part, or used on behalf of others outside the specific facility it was produced for without the express written permission of Premier Safety, LLC. It is provided solely for the purpose of performing lockout/tagout on equipment designated in this procedure and is not intended to be utilized for any other purpose. No warranties, guarantees or representations, express or implied are made as to the utilities or effectiveness of the procedures described herein when utilized for the lockout/tagout of machine(s) or equipment not identified in this written procedure. Equipment Description - Nissan Fork Lift DEPARTMENT: Facility VERSION #: Initial - 2009 REFERENCE #: 206 POINT OF CONTACT: Supervisor Hazardous Energy Type Magnitude E1/E2 Electrical 12 volts LPG1 Gas 30 psi Hydraulics 750 psi Temperature 200 degrees F Gravity Required Safety Equipment Tagout Tag(s) (3) Interlocking Hasp(s) (3) Padlock(s) (3) Cord Plug Canister(s) (2) Gate Valve Lockout(s) (1) Approved Safety Brace(s) (1) main service disconnect (Located on under the seat – battery cables) gravity LPG1 positive E1 E2 negative Key CTL main service disconnect (Located on under the seat – battery cables) H H gravity LPG1 LPG1 positive E1 E1 E2 E2 negative Key CTL CTL

Upload: vuxuyen

Post on 24-Feb-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Nissan Fork Lift - Premier Safety Truck LOTO 2009.pdf · LOCKOUT / TAGOUT PROCEDURAL GUIDE Rich Paul Industries 29 CFR 1910.147 & ANSI Z244.1-2003 Nashville, Tennessee 2 Reference

LOCKOUT / TAGOUT PROCEDURAL GUIDE Rich Paul Industries29 CFR 1910.147 & ANSI Z244.1-2003 Nashville, Tennessee

C-A-U-T-I-O-N

“SERVICING OR MAINTENANCE IS NOT PERMITTED UNLESS THIS EQUIPMENT IS ISOLATED FROM ALL HAZARDOUS ENERGY SOURCES. THIS IS THE EXCLUSIVE RESPONSIBILITY OF ‘DESIGNATED’

AUTHORIZED EMPLOYEES WHO MUST FOLLOW THE COMPLETE LOCKOUT/TAGOUT PROCEDURE AS PUBLISHED BY RICH PAUL INDUSTRIES, NASHVILLE OPERATIONS, NASHVILLE,TENNESSEE."

This document was developed by Premier Safety, LLC of Clarksville, Tennessee. It is the Confidential Property of Rich Paul Industries, Nashville Operations, Nashville, Tennessee and shall not be reproduced or copied, in whole or in part, or used on behalf of others outside the specific facility it was produced for without the express written permission of Premier Safety, LLC. It is provided solely for the purpose of performing lockout/tagout on equipment designated in this procedure and is not intended to be utilized for any other purpose. No warranties, guarantees or representations, express or implied are made as to the utilities or effectiveness of the procedures described herein when utilized for the lockout/tagout of machine(s) or equipment not identified in this written procedure.

Equipment Description - Nissan Fork Lift

DEPARTMENT:Facility

VERSION #:Initial - 2009

REFERENCE#: 206

POINT OF CONTACT:Supervisor

Hazardous EnergyType MagnitudeE1/E2 Electrical 12 voltsLPG1 Gas 30 psiHydraulics 750 psiTemperature 200 degrees FGravity

Required Safety EquipmentTagout Tag(s) (3)Interlocking Hasp(s) (3)Padlock(s) (3)Cord Plug Canister(s) (2)Gate Valve Lockout(s) (1)Approved Safety Brace(s) (1)

main service disconnect

(Located on under the seat – battery cables)

H gravity

LPG1

positive

E1 E2

negative

Key CTL

main service disconnect

(Located on under the seat – battery cables)

HH gravity

LPG1LPG1

positive

E1E1 E2E2

negative

Key CTLCTL

Page 2: Nissan Fork Lift - Premier Safety Truck LOTO 2009.pdf · LOCKOUT / TAGOUT PROCEDURAL GUIDE Rich Paul Industries 29 CFR 1910.147 & ANSI Z244.1-2003 Nashville, Tennessee 2 Reference

LOCKOUT / TAGOUT PROCEDURAL GUIDE Rich Paul Industries29 CFR 1910.147 & ANSI Z244.1-2003 Nashville, Tennessee

2

Reference #: 206

Machine: Nissan Fork Lift

I. Shut Down Procedures:(a). Notify all affected employees that a lockout or tagout system is going to be utilized and the reason for its

application. The authorized employee shall know the type and magnitude of energy that the machine or equipment utilizes and shall understand the associated hazards.

Warning: This machine has a manufacture's established written Shut Down procedure, which should be followed to avoid damage to the equipment or possible injury prior to commencinglockout procedures.

Warning: Position the powered industrial truck in a location that does not present a hazard. Lower the forks to the full down position or install safety braces to support the mast.

(b). Electrical:Rotate the "IGNITION" switch to "OFF" to de-energize the machine & remove the key.

II. Isolation Procedures:(a). Electrical: E1 (Positive) Located under the drivers seat.

Disconnect the battery cable to isolate the electrical POWER.E2 (Negative) Located under the drivers seat.

Disconnect the battery cable to isolate the electrical POWER.

(b). Gas: LPG1 Located on the rear of the machine.Rotate the main gas valve to the “CLOSED” position to block the LPG service.

(c). Hydraulics:Note: Hydraulic pressure automatically bleeds down when POWER is removed.

Note: Refer to the Material Safety Data Sheet (MSDS) for information regarding the physical and chemical hazards and personal protective equipment requirements for this machine.

(d). Temperature:Allow the lift trucks motor to cool to a safe temperature.

III. Lockout Procedures:(a). Electrical:

Lockout the (2) battery cables with cord plug canisters, interlocking hasps, padlocks, and tagout tags.

(b). Gas:Lockout the gas service valve using a gate valve lockout, interlocking hasp, padlock, and tagout tag.

Page 3: Nissan Fork Lift - Premier Safety Truck LOTO 2009.pdf · LOCKOUT / TAGOUT PROCEDURAL GUIDE Rich Paul Industries 29 CFR 1910.147 & ANSI Z244.1-2003 Nashville, Tennessee 2 Reference

LOCKOUT / TAGOUT PROCEDURAL GUIDE Rich Paul Industries29 CFR 1910.147 & ANSI Z244.1-2003 Nashville, Tennessee

3

Reference #: 206

Machine: Nissan Fork Lift

IV. Verification Procedures:(a). Electrical:

“Try” the machine start controls (e.g. by switching the "ON/OFF" switch to the “ON” or “START”position and observing that the machine does not operate) after lockout/tagout to make sure the correctisolation device has been secured and that the device is in the open or safe position. Switch the"ON/OFF" or “START” switch to the “OFF” position.

(b). Gas:Verify isolation and dissipation of the gas service by observing the gas pressure gauge indicates "ZERO".

(c). Hydraulics:Warning: Maintenance personnel noted that residual hydraulic pressure may still exist, consult

operator’s/maintenance manual for correct procedure to relieve pressure.

(d). Temperature:Verify cool down of the motor by observing the temperature gauge or probe indicates a lowering of the temperature to safe levels.

V. Returning to Service:(a). Check the machine and the immediate area around the machine to ensure that nonessential items have

been removed and that the machine components are operationally intact.

(b). Check the work area to ensure that all employees have been safely positioned or removed from the workarea.

Warning: This machine has a manufacture's established written Restart procedure, which should be followed to avoid damage to the equipment or possible injury.

(c). Electrical:Remove the tagout tags, padlock, interlocking hasps, and cord plug canisters from the (2) batterycables and reconnect the cables to the battery.

(d). Gas:Remove the tagout tag, padlock, interlocking hasp and gate valve lockout from the gas service line and rotate the air service valve to the “OPEN” position.

(e). Blocks & Braces:Remove Safety Blocks or Braces if installed.

(f). Notify affected employees that the maintenance is completed and the vehicle is ready for use.

Page 4: Nissan Fork Lift - Premier Safety Truck LOTO 2009.pdf · LOCKOUT / TAGOUT PROCEDURAL GUIDE Rich Paul Industries 29 CFR 1910.147 & ANSI Z244.1-2003 Nashville, Tennessee 2 Reference

LOCKOUT / TAGOUT PROCEDURAL GUIDE Rich Paul Industries29 CFR 1910.147 & ANSI Z244.1-2003 Nashville, Tennessee

4

Reference #206Machine: Nissan Fork Lift

ELECTRICALEnergy Isolation Source

12 Volts DC

E1LOCKOUT HERE

www.premier-safety.com

Reference #206Machine: Nissan Fork Lift

ELECTRICALEnergy Isolation Source

12 Volts DC

E1LOCKOUT HERE

www.premier-safety.com

Reference #206Machine: Nissan Fork Lift

ELECTRICALEnergy Isolation Source

12 Volts DC

E2LOCKOUT HERE

www.premier-safety.com

Reference #206Machine: Nissan Fork Lift

ELECTRICALEnergy Isolation Source

12 Volts DC

E2LOCKOUT HERE

www.premier-safety.com

Reference #206Machine: Nissan Fork Lift

LIQUID PROPANEEnergy Isolation Source

30 Psi

LPG1LOCKOUT HERE

www.premier-safety.com

Reference #206Machine: Nissan Fork Lift

LIQUID PROPANEEnergy Isolation Source

30 Psi