 SIX WEEKS INDUSTRIAL TRAINING PROJECT REPORT ON DELHIMETRO-FIR  Completed At DELHI METRO RAIL CORPORATION (A JOINT VENTURE OF GOVT. OF INDIA AND GOVT. OF DELHI) METRO BHAWAN, BARAKHAMBA ROAD NEW- DELHI Submitted to DELHI METRO RAIL CORPORATION IT-DEPARTMENT Under the Guidance of: Submitted By: MR. V.P. SINGH NIHARIKA TYAGI MR. AMIT RANJAN

Upload: vig-shruti

Post on 07-Apr-2018

227 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Nihar Report

8/3/2019 Nihar Report

http://slidepdf.com/reader/full/nihar-report 1/20

  SIX WEEKS INDUSTRIAL TRAINING PROJECT REPORT

ON

DELHIMETRO-FIR 

  Completed At

DELHI METRO RAIL CORPORATION (A JOINT VENTURE OF

GOVT. OF INDIA AND GOVT. OF DELHI)

METRO BHAWAN, BARAKHAMBA ROAD NEW-DELHI

Submitted to

DELHI METRO RAIL CORPORATION

IT-DEPARTMENT

Under the Guidance of: Submitted By:

MR. V.P. SINGH NIHARIKA TYAGI

MR. AMIT RANJAN

Page 2: Nihar Report

8/3/2019 Nihar Report

http://slidepdf.com/reader/full/nihar-report 2/20

Acknowledgement

It’s a great pleasure to present this report of summer training in Delhi Metro Rail

Corporation (A Joint Venture of Govt. Of India and Govt. Of Delhi) in partial

fulfilment of B.Tech Programme under  R.C.V Institute of Technology, Ghaziabad

affiliated to Gautam Buddha Technical University (U.P.). At the outset, I would like to

express my immense gratitude to my training guide, Mr. V.P. Singh, guiding me right

from the inception till the successful completion of the training. I am falling short of 

words for expressing my feelings of gratitude towards him for extending their valuable

guidance, through critical reviews of project and the report and above all the moral

support he had provided me with all stages of this training.

Page 3: Nihar Report

8/3/2019 Nihar Report

http://slidepdf.com/reader/full/nihar-report 3/20

CERTIFICATE

This is to certify that this report of O nline dmrc fir form embodies the original work 

done by NIHARIKA TYAGI no part of it has been submitted for any other degree

 purpose or published in any other from till date.

Page 4: Nihar Report

8/3/2019 Nihar Report

http://slidepdf.com/reader/full/nihar-report 4/20

ABSTRACT

The website has been developed for DELHI METRO RAIL CORPORATION in an

effort to make it easy to lodge the fir complaints made along with the fir id and registered

and it is the main responsibility of the admin to update the records. This is basically a

web-based application that has been designed to facilitate management of fir complaints

lodged against any offence or theft. It's purpose is to record or maintain information

regarding occurrence of offence.

The working of the project is as follows.

The first page is an online fir form where complaints can be registered

After having the complaint submitted or registered three links are being provided:

• Search any fir complaint.

• Update the fir complaint lodged.

• Show all the fir complaints.

It keeps track of the date and time of occurrence of offence, the name of the accused or 

suspected along with all the details like address, telephone number and background

details of the person.

It also contains information about the particulars of property stolen and the value of the

stolen property. The site plan can also be enclosed in the form if available.

Page 5: Nihar Report

8/3/2019 Nihar Report

http://slidepdf.com/reader/full/nihar-report 5/20

  Table Of Contents

1. Introduction

2. Project Objective

3. Company Profile

4. Scope and conclusion

5. Screenshots

6. References

 

Page 6: Nihar Report

8/3/2019 Nihar Report

http://slidepdf.com/reader/full/nihar-report 6/20

INTRODUCTION

1.1 Overview

A website is a collection of Web pages,  images, videos and other digital assets that is

hosted on one or several Web server,  usually accessible via the Internet , cell phone or a

LAN .

The pages of websites can usually be accessed from a common root  URL called the

homepage,  and usually reside on the same physical server. The URLs of the pages

organize them into a hierarchy, although the hyperlinks  between them control how the

reader perceives the overall structure and how the traffic flows between the different

 parts of the sites.

A website requires attractive design and proper arrangement of links and images, which

enables a browser to easily interpret and access the properties of the site. Hence it

 provides the browser with adequate information and functionality about the organization,

community, network etc.

1.2 Problem Statement

The main project problem here is to provide a reliable means for Management of fir 

complaints lodged .It ushers an environment which will be easy, fast and user-friendly.

Some of the main features include:

• Can submit their complaints through web.

• Can view, search and register the complaints easily.

•   Can update, create, delete the record of membership as per requirement

Page 7: Nihar Report

8/3/2019 Nihar Report

http://slidepdf.com/reader/full/nihar-report 7/20

• Can easily access and maintain the database. 

1.3 PROJECT OBJECTIVE

The objective of this project is to:

1. Provide easy to use reliable web-based fir form.

2. Provide a platform so that staff can easily process the fir complaints.

3. Provide an environment which is easy to access, fast and user-friendly.

4. Provide a platform which makes it easy to centrally manage long list of complaints.

5. Device a means to easily provide information about the lodged or registered

complaints.

Page 8: Nihar Report

8/3/2019 Nihar Report

http://slidepdf.com/reader/full/nihar-report 8/20

1.4

Company Profile

Introduction

For implementation and subsequent operation of Delhi MRTS, a company

under the name DELHI METRO RAIL CORPORATION was registered

on 03-05-95 under the Companies Act, 1956. DMRC has equal equity

 participation from GOI and GNCTD.

Structure

• Chairman – Shri Navin Kumar 

• Managing Director - Dr. E. Sreedharan

• Total No. of Directors - 16

•  Nominee of Govt. of India - 5

•  Nominee of Govt. of NCTD - 5 (Including MD)

•  No. of full-time functional Directors at present including MD - 7

• The corporate office of the company is located at Metro Bhawan,

Fire Brigade Lane, Barakhamba Road New Delhi - 110001, India.

Page 9: Nihar Report

8/3/2019 Nihar Report

http://slidepdf.com/reader/full/nihar-report 9/20

Mission

• To cover the whole of Delhi with a Metro Network by the year 

2021.

• Delhi Metro to be of world class standards in regard to safety,

reliability, punctuality, comfort and customer satisfaction.

• Metro to operate on sound commercial lines obviating the need for 

Government support.

Corporate culture

• We should be totally dedicated and committed to the Corporate

Mission.

• Personal integrity should never be in doubt, we should maintain

full transparency in all our decisions and transactions.

• The Organization must be lean but effective.

• The Corporation must project an image of efficiency, transparency,

courtesy and “we mean business” attitude.

Page 10: Nihar Report

8/3/2019 Nihar Report

http://slidepdf.com/reader/full/nihar-report 10/20

• Our construction activities should not inconvenience or endanger public

life nor should lead to ecological or environmental degradation.

• All our structures should be aesthetically planned and well maintained.

• Safety of Metro users is our paramount responsibility.

• Our stations and trains should be spotlessly clean.

• Our staff should be smartly dressed, punctual, polite and helpful to the

customers.

•Employees should discharge their responsibilities with pride, perfection

and dignity

Page 11: Nihar Report

8/3/2019 Nihar Report

http://slidepdf.com/reader/full/nihar-report 11/20

Screenshots

(1)Online fir form to lodge complaints.

Page 12: Nihar Report

8/3/2019 Nihar Report

http://slidepdf.com/reader/full/nihar-report 12/20

(2)On clicking the submit button, fir complaint is registered in the database. 

Page 13: Nihar Report

8/3/2019 Nihar Report

http://slidepdf.com/reader/full/nihar-report 13/20

(3)Links to perform database operations

Page 14: Nihar Report

8/3/2019 Nihar Report

http://slidepdf.com/reader/full/nihar-report 14/20

(4)Search the database via the above link.

Page 15: Nihar Report

8/3/2019 Nihar Report

http://slidepdf.com/reader/full/nihar-report 15/20

(5)Member login to update the fir complaint lodged

Page 16: Nihar Report

8/3/2019 Nihar Report

http://slidepdf.com/reader/full/nihar-report 16/20

(6) Update form to edit or update the complaints registered

Page 17: Nihar Report

8/3/2019 Nihar Report

http://slidepdf.com/reader/full/nihar-report 17/20

(7)All records in the database via link show database.

Page 18: Nihar Report

8/3/2019 Nihar Report

http://slidepdf.com/reader/full/nihar-report 18/20

Page 19: Nihar Report

8/3/2019 Nihar Report

http://slidepdf.com/reader/full/nihar-report 19/20

SCOPE AND CONCLUSION

SOFTWARE SCOPE

• Extensibility: This software is extendable in ways that its original developers may not

expect. The following principles enhance extensibility like hide data structure, avoid

traversing multiple links or methods, avoid case statements on object type and distinguish

 public and private operations.

• Reusability: Reusability is possible as and when require in this application. We can

update its next version. Reusable software reduces design, coding and testing cost by

amortizing effort over several designs. Reducing the amount of code also simplifies

understanding, which increases the likelihood that the code is correct. We follow up both

types of reusability:

o Sharing of newly written code within a project

o reuse of previously written code on new projects.

Understandability: A method is understandable if someone other than the creator of the

method can understand the code (as well as the creator after a time lapse). We use the

method, which is small and coherent that helps to accomplish this.

• Cost-effectiveness: Its cost is under the budget and make within given time period. It is

desirable to aim for a system with a minimum cost subject to the condition that it must

satisfy the entire requirements.

Scope of this document is to put down the requirements, clearly identifying the information

needed by the user, the source of the information and outputs expected from the system.

Page 20: Nihar Report

8/3/2019 Nihar Report

http://slidepdf.com/reader/full/nihar-report 20/20

REFERENCES