Night Covers on Open Vertical Cases

Provisional UES Proposal Presentation to the Regional Technical Forum

August 30, 2011

1

Page 2: Night Covers on Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30, 2011 1

Thanks to All Participants

2

Page 3: Night Covers on Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30, 2011 1

Measure Summary

• Retrofitting night covers to existing medium temperature open multi-deck cases

• Provisional savings estimate 44 kWh/lin ft and 5 therms/lin ft

• Based on a calibrated DOE2.2r simulation

• Requesting Provisional UES Status

3

Page 4: Night Covers on Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30, 2011 1

4

Measure History• Night Covers (first version):

– Previously RTF-approved: March 2, 2009– Includes separate savings values for applying night

covers to vertical and horizontal refrigerated display cases

– Calculation methodology: uncalibrated engineering calculations

• Vertical Night Covers– Updated UES to replace existing value, which is out-

of-compliance

Page 5: Night Covers on Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30, 2011 1

5

UES Analysis Summary

Page 6: Night Covers on Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30, 2011 1

Appendix A: Provisional UES Checklist

6

Page 7: Night Covers on Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30, 2011 1

7

Appendix B: UES Measure Summary

Page 8: Night Covers on Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30, 2011 1

8

Page 9: Night Covers on Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30, 2011 1

9

Page 10: Night Covers on Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30, 2011 1

10

Page 11: Night Covers on Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30, 2011 1

11

Page 12: Night Covers on Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30, 2011 1

Implementation and Product Standards

12

• No night cover may be present in baseline

• Minimum 1 year manufacturer’s warranty

• Minimum application of 6 hours/ 24 hour period

Page 13: Night Covers on Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30, 2011 1

Estimation Procedure

13

• Modeled using DOE 2.2R to capture interactive effects

• “Typical” store was built using GrocerSmart Audit Data

• Multiplex Baseline assumes Floating Head Pressure, T8 lamps, and EC motors are in place.

• Stand-alone system baseline assumes T8 lamps and EC motors.

• Infiltration, conduction, and radiation load based on manufacturer data, the ASHRAE Refrigeration Handbook, and SCE lab test report

Page 14: Night Covers on Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30, 2011 1

Model Calibration: Whole Building

14

Page 15: Night Covers on Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30, 2011 1

Model Calibration:Compressor Energy Use

15

Page 16: Night Covers on Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30, 2011 1

Model Calibration- Baseline:Case Refrigeration Load

16

Total case load based on ANSI/ASHRAE 72 testing = 1600 btu/hr-ft

ASHRAE data used to disaggregate load components

Page 17: Night Covers on Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30, 2011 1

Model Calibration- Efficient Case: Case Refrigeration Load

17

Page 18: Night Covers on Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30, 2011 1

18

Cost Estimates

• Cost estimate: $36/ft

• Unchanged from previously accepted cost value

• Supported by invoice levels observed by program

Page 19: Night Covers on Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30, 2011 1

19

Measure Effective Useful Life

• EUL: 5 years

• Unchanged from previously accepted EUL

• Supported by 1 year warranty requirement

Page 20: Night Covers on Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30, 2011 1

20

Reliable Efficient Case Data

Page 21: Night Covers on Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30, 2011 1

Calibration Plan• Collect Metered Data

– Rack: Volts, Amps, PF– Condenser: Volts, Amps, PF– Hourly Natural Gas via Utility Interval Meter– Hourly Outside Air Temperature

• Minimum 3 weeks baseline • Minimum 3-weeks post

– This is a direct load measure. We expect less seasonal interaction than system measures like floating head pressure.

21

Page 22: Night Covers on Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30, 2011 1

Calibration Plan• Develop regressions for daily or hourly

refrigeration use correlated to ambient temperature

• Annualize using TMY data– Pre, Post and Savings (Pre minus Post)

22

Page 23: Night Covers on Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30, 2011 1

Calibration Plan

• Collect DOE2.2r inputs per data collection specifications• Use inputs to run DOE2.2r for Baseline & Post estimates

of total refrigeration energy• Compare estimates of Baseline, Post & Savings

estimates of refrigeration energy to best-practice estimates

• Modify DOE2.2r models and iterate tests until both baseline energy use, post energy use and energy savings at all sites are reasonable and there is no significant bias.

23

Page 24: Night Covers on Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30, 2011 1

Proposed Provisional UES Value

Measure

Site Savings (kWh)

Site Savings (therms)

Measure Life

(years)

Capital Cost

($/unit)

TRC B/C

Ratio

Night Covers- Retrofit to Open Vertical Case on Multiplex - Seattle, WA 42.0 5.5 5 $36 1.5

Night Covers- Retrofit to Open Vertical Case on Stand-alone - Seattle, WA 44.7 5.5 5 $36 1.6

Night Covers- Retrofit to Open Vertical Case on Multiplex - Spokane, WA 41.6 5.2 5 $36 1.5

Night Covers- Retrofit to Open Vertical Case on Stand-alone - Spokane, WA 44.0 5.2 5 $36 1.5

Night Covers- Retrofit to Open Vertical Case on Multiplex - Billings, MT 45.7 4.9 5 $36 1.5

Night Covers- Retrofit to Open Vertical Case on Stand-alone - Billings, MT 47.8 4.9 5 $36 1.6

Night Covers- Retrofit to Open Vertical Case - Average 44.3 5.2 5 $36 1.6

Page 25: Night Covers on Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30, 2011 1

RTF Proposed Motion:

“I _________ move that the RTF approve the UES for Night covers on Open Vertical Refrigerated Display Cases under provisional status with a sunset date of August 31st, 2013.