nigerstar 7year: 2011 – 2012 contract value: ~$210m vessels: acergy polaris, acergy antares, seven...
TRANSCRIPT
NigerStar 7gA Leading Nigerian
EPCI Contractor
1Page 21-Mar-13 www.NigerStar7.com
About usNigerStar 7
2Page 21-Mar-13 www.NigerStar7.com
OOur vision
To be the leading Nigerian offshore contractor g gserving the country’s offshore energy industry
with the capability and capacity of executing the l t d t l j t largest and most complex projects.
3Page 21-Mar-13 www.NigerStar7.com
S CNigerStar 7, a Nigerian EPCI contactor
• Joint venture company created • Joint venture company, created by Jagal and Subsea 7.
• NigerStar 7 is a majority owned Nigerian company.
4Page 21-Mar-13 www.NigerStar7.com
Main expertises
• Deepwater expertise (Subsea • Deepwater expertise (Subsea Umbilicals, Risers and Flowlines -SURF).
• Conventional field development projects and hook-up revamping.p j p p g
• Best provider of fleet rejuvenation and enhan ement in Nige ia and and enhancement in Nigeria and West Africa.
• Fabrication abilities with dedicated yards.
5Page 21-Mar-13 www.NigerStar7.com
S bNigerStar 7 combines
• Engineering • Engineering
• Fabrication (facilities in Lagos Port • Fabrication (facilities in Lagos, Port Harcourt and Warri)
• Installation and project management expertise of Globestar
6Page 21-Mar-13 www.NigerStar7.com
Capabilities and CapacitiesNigerStar 7
7Page 21-Mar-13 www.NigerStar7.com
C b l d CCapabilities and Capacities
• Workforce of over 3 000 • Workforce of over 3,000 experienced people located in Lagos, Port Harcourt and Warri.
• 2 fabrication yards in Lagos and Warri with the capacity to handle Warri, with the capacity to handle Nigeria’s largest offshore projects.
• Support of Subsea 7’s offshore construction fleet, one of the l t i th i d tlargest in the industry.
8Page 21-Mar-13 www.NigerStar7.com
C b l d C (C d )Capabilities and Capacities (Contd.)
NigerStar 7 carries out the engineering, construction, NigerStar 7 carries out the engineering, construction, installation and commissioning of:
• Platforms (jacket, piles & topsides), topside modules and flares(j , p p ), p
• Riser towers
• Manifolds
• Buoyancy tanks, offloading buoys
• Suction and anchor piles, PLETs, PLEMs, FLETs, FTA, ITA
• Double joints, pipe-in-pipe, reeled pipelines
• Jumpers and spools
FPSO d l h lid k• FPSO modules, helidecks
9Page 21-Mar-13 www.NigerStar7.com
Off h f bOffshore fabrication
• Largest fabrication facility in West • Largest fabrication facility in West Africa.
D li d ll j b b d t • Delivered all jobs on budget, time, quality, and safety.
• Delivered a series of 1sts for Nigeria (Meji & Okan Platforms for Chevron).Chevron).
• 1st company in West Africa to get American Society for Mechanical American Society for Mechanical Engineering (ASME-U) stamp.
10Page 21-Mar-13 www.NigerStar7.com
Nigerian ContentNigerStar 7
11Page 21-Mar-13 www.NigerStar7.com
CNigerian Content
• In providing our services and investing in Nigeria’s oil industry, NigerStar 7 is committed to the development of Nigerian jobs and skills.
• NigerStar 7 is a major example of the effects of the Nigerian Content Act to build the nation’s industrial capability in the energy industry.
Jagal training school on Snake Island, Lagos
12Page 21-Mar-13 www.NigerStar7.com
CNigerian Content
• A dynamic project management • A dynamic project management and engineering capability at local level.
• Commitment to use Nigerian suppliers to support business suppliers to support business, in compliance with safety standards.
13Page 21-Mar-13 www.NigerStar7.com
Main referencesNigerStar 7
14Page 21-Mar-13 www.NigerStar7.com
S hSURF Erha
Client: ExxonMobilLocation: NigeriagYear: 2002 – 2005Contract value: ~$500mVessels: Acergy Polaris, Acergy Legend
The Erha Project included the engineering, procurement, g g, p ,commissioning and installation for:
• 16 rigid flowlines with SCRs(Steel Catenary Risers),
• Offshore loading buoy,
• 45 suctions anchors & mooring,
• 2 export lines,
• subsea structures and pilesfabricated in Warri yard.
15Page 21-Mar-13 www.NigerStar7.com
b SO dAgbami FPSO Topsides
Client: ChevronLocation: NigeriaLocation: NigeriaYear: 2005Asset: Lagos fabrication yard
The project included the fabrication of topside module 3S and STB playdown module 1S for the Agbami FPSO. The scope of work comprised:
• the fabrication engineering, procurement, fabrication of girder beams, construction, pipe works, painting load out and seafastening painting, load-out and seafastening of the 2 topside modules.
Topside packages totaling 1,150t.
16Page 21-Mar-13 www.NigerStar7.com
Sh ll SOShell Bonga FPSO
Client: Shell Nigeria Exploration & Production Company (Snepco)Location: Nigeria, Lagosg , gYear: 2005Asset: Lagos fabrication yard
• 620t of topside structural steel and pipe works for final p pintegration onto Bonga FPSO,
• manpower services for onsite fabrication,
• Construction & shop engineering,
• Procurement of materials,
• Blasting/painting,
• Hydro testing of pipe spools
• Upgrading the living
17Page 21-Mar-13 www.NigerStar7.com
• Upgrading the living accommodation and load-out.
Ch l fChevron Meji Platform
Client: ChevronLocation: NigeriaYear: 2005
The Chevron Escravos Gas Project Phase 3A involved the fabrication of the Meji and Okan platforms. The scope of work included:
• the fabrication of the Meji GGCPjjacket & piles,
• Meji GGCP flare bridge & supporttripod,
• Meji GGCP to Meji RP utilitybridge,
• Okan NWP jacket & piles
18Page 21-Mar-13 www.NigerStar7.com
• Okan NWP jacket & piles.
l SO dTotal Usan FPSO Topsides
Client: TotalLocation: NigeriaYear: 2008
• Includes a FPSO vessel with a storage capacity of 2m bbl of oil,
• Fabrication of over 7,500 tons of structural steel components,
• Modules P1 and S1,Modules P1 and S1,
• 15 sets of pressure vessels,
• Flare tower,
• Fabrication of the helideck,
• Mooring protection structures.
19Page 21-Mar-13 www.NigerStar7.com
f ld f bUsan Manifold fabrication
Client: Cameron for TotalLocation: Nigeria Warri fabrication yardLocation: Nigeria, Warri fabrication yardYear: 2008 – 2011Contract value: ~$200m
• 8x Production Manifolds• 8x Production Manifolds,
• 8x Manifold support structures,
• 8x Suction piles,
• 43x Tree guide bases,
• 23x Well jumpers.
20Page 21-Mar-13 www.NigerStar7.com
C kEPC4A Hook-up
Client: ExxonMobilLocation: NigeriagYear: 2008 – 2010Contract value: ~$30mVessels: Acergy Polaris
EPC4A Project included the transportation and installation of:p
• 3 jackets,
• 3 decks,
• 3 bridges,
• 2 flare towers adjacent to the existing Idoho and Ubit platforms to support new flares.
21Page 21-Mar-13 www.NigerStar7.com
b l hMobil Erha Deepwater Buoy
Client: ExxonMobilLocation: NigeriaLocation: NigeriaYear: 2008 – 2011Contract value: $200m
For the catenary anchor leg mooring buoy, the project included:y, p j
• fabrication and integration of the turn table platform,
• blasting/painting • blasting/painting,
• full testing,
• pre-mechanical completion,
• load out and sea-fastening.
Buoy’s diameter: 23m, height: 10mand total weight:1 420t
22Page 21-Mar-13 www.NigerStar7.com
and total weight:1,420t.
Ch G 3Chevron EGP3B
Client: ChevronLocation: NigeriagYear: 2009 – 2012Contract value: >$200mVessels: Acergy Polaris, Acergy Orion, Acergy Hawk
For the catenary anchor leg mooring buoy, the project included:y, p j
• fabrication and integration of the turn table platform,
• blasting/painting • blasting/painting,
• full testing,
• pre-mechanical completion,
• load out and sea-fastening.
Buoy’s diameter: 23m, height: 10mand total weight:1 420t
23Page 21-Mar-13 www.NigerStar7.com
and total weight:1,420t.
O kOso Re Hook-up revamping
Client: ExxonMobilLocation: NigeriagYear: 2010 – 2011Contract value: ~$200mVessels: Acergy Polaris, Acergy Antares, Acergy Orion, Acergy Hawk
Oso Re Project included:
• the removal of old pipelines & • the removal of old pipelines & risers,
• the procurement & installation of new pipelinesof new pipelines.
24Page 21-Mar-13 www.NigerStar7.com
S ll ld h 2Satellite Field Phase 2
Client: ExxonMobilLocation: NigeriagYear: 2011 – 2012Contract value: ~$210mVessels: Acergy Polaris, Acergy Antares, Seven Inagha
The MPN Satellite Field Development Project consisted of:j
• installation of 3 new Wellhead platforms (Abang, Oyot and Itut),
• installation of 3 shallow water • installation of 3 shallow water pipelines, in depths ranging from 16m to 28m. The pipelines linked the new Wellhead platforms to the Host platforms (Usari and Ubit).
25Page 21-Mar-13 www.NigerStar7.com
Ni St 7
26Page 21-Mar-13 www.NigerStar7.com
www.NigerStar7.com