NigerStar 7 A Leading Nigerian EPCI Contractor 1 Page 21-Mar-13 www.NigerStar7.com

Upload: others

Post on 10-Jul-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NigerStar 7Year: 2011 – 2012 Contract value: ~$210m Vessels: Acergy Polaris, Acergy Antares, Seven Inagha The MPN Satellite Field Development Project consisted of: • installation

NigerStar 7gA Leading Nigerian

EPCI Contractor

1Page 21-Mar-13 www.NigerStar7.com

Page 2: NigerStar 7Year: 2011 – 2012 Contract value: ~$210m Vessels: Acergy Polaris, Acergy Antares, Seven Inagha The MPN Satellite Field Development Project consisted of: • installation

About usNigerStar 7

2Page 21-Mar-13 www.NigerStar7.com

Page 3: NigerStar 7Year: 2011 – 2012 Contract value: ~$210m Vessels: Acergy Polaris, Acergy Antares, Seven Inagha The MPN Satellite Field Development Project consisted of: • installation

OOur vision

To be the leading Nigerian offshore contractor g gserving the country’s offshore energy industry

with the capability and capacity of executing the l t d t l j t largest and most complex projects.

3Page 21-Mar-13 www.NigerStar7.com

Page 4: NigerStar 7Year: 2011 – 2012 Contract value: ~$210m Vessels: Acergy Polaris, Acergy Antares, Seven Inagha The MPN Satellite Field Development Project consisted of: • installation

S CNigerStar 7, a Nigerian EPCI contactor

• Joint venture company created • Joint venture company, created by Jagal and Subsea 7.

• NigerStar 7 is a majority owned Nigerian company.

4Page 21-Mar-13 www.NigerStar7.com

Page 5: NigerStar 7Year: 2011 – 2012 Contract value: ~$210m Vessels: Acergy Polaris, Acergy Antares, Seven Inagha The MPN Satellite Field Development Project consisted of: • installation

Main expertises

• Deepwater expertise (Subsea • Deepwater expertise (Subsea Umbilicals, Risers and Flowlines -SURF).

• Conventional field development projects and hook-up revamping.p j p p g

• Best provider of fleet rejuvenation and enhan ement in Nige ia and and enhancement in Nigeria and West Africa.

• Fabrication abilities with dedicated yards.

5Page 21-Mar-13 www.NigerStar7.com

Page 6: NigerStar 7Year: 2011 – 2012 Contract value: ~$210m Vessels: Acergy Polaris, Acergy Antares, Seven Inagha The MPN Satellite Field Development Project consisted of: • installation

S bNigerStar 7 combines

• Engineering • Engineering

• Fabrication (facilities in Lagos Port • Fabrication (facilities in Lagos, Port Harcourt and Warri)

• Installation and project management expertise of Globestar

6Page 21-Mar-13 www.NigerStar7.com

Page 7: NigerStar 7Year: 2011 – 2012 Contract value: ~$210m Vessels: Acergy Polaris, Acergy Antares, Seven Inagha The MPN Satellite Field Development Project consisted of: • installation

Capabilities and CapacitiesNigerStar 7

7Page 21-Mar-13 www.NigerStar7.com

Page 8: NigerStar 7Year: 2011 – 2012 Contract value: ~$210m Vessels: Acergy Polaris, Acergy Antares, Seven Inagha The MPN Satellite Field Development Project consisted of: • installation

C b l d CCapabilities and Capacities

• Workforce of over 3 000 • Workforce of over 3,000 experienced people located in Lagos, Port Harcourt and Warri.

• 2 fabrication yards in Lagos and Warri with the capacity to handle Warri, with the capacity to handle Nigeria’s largest offshore projects.

• Support of Subsea 7’s offshore construction fleet, one of the l t i th i d tlargest in the industry.

8Page 21-Mar-13 www.NigerStar7.com

Page 9: NigerStar 7Year: 2011 – 2012 Contract value: ~$210m Vessels: Acergy Polaris, Acergy Antares, Seven Inagha The MPN Satellite Field Development Project consisted of: • installation

C b l d C (C d )Capabilities and Capacities (Contd.)

NigerStar 7 carries out the engineering, construction, NigerStar 7 carries out the engineering, construction, installation and commissioning of:

• Platforms (jacket, piles & topsides), topside modules and flares(j , p p ), p

• Riser towers

• Manifolds

• Buoyancy tanks, offloading buoys

• Suction and anchor piles, PLETs, PLEMs, FLETs, FTA, ITA

• Double joints, pipe-in-pipe, reeled pipelines

• Jumpers and spools

FPSO d l h lid k• FPSO modules, helidecks

9Page 21-Mar-13 www.NigerStar7.com

Page 10: NigerStar 7Year: 2011 – 2012 Contract value: ~$210m Vessels: Acergy Polaris, Acergy Antares, Seven Inagha The MPN Satellite Field Development Project consisted of: • installation

Off h f bOffshore fabrication

• Largest fabrication facility in West • Largest fabrication facility in West Africa.

D li d ll j b b d t • Delivered all jobs on budget, time, quality, and safety.

• Delivered a series of 1sts for Nigeria (Meji & Okan Platforms for Chevron).Chevron).

• 1st company in West Africa to get American Society for Mechanical American Society for Mechanical Engineering (ASME-U) stamp.

10Page 21-Mar-13 www.NigerStar7.com

Page 11: NigerStar 7Year: 2011 – 2012 Contract value: ~$210m Vessels: Acergy Polaris, Acergy Antares, Seven Inagha The MPN Satellite Field Development Project consisted of: • installation

Nigerian ContentNigerStar 7

11Page 21-Mar-13 www.NigerStar7.com

Page 12: NigerStar 7Year: 2011 – 2012 Contract value: ~$210m Vessels: Acergy Polaris, Acergy Antares, Seven Inagha The MPN Satellite Field Development Project consisted of: • installation

CNigerian Content

• In providing our services and investing in Nigeria’s oil industry, NigerStar 7 is committed to the development of Nigerian jobs and skills.

• NigerStar 7 is a major example of the effects of the Nigerian Content Act to build the nation’s industrial capability in the energy industry.

Jagal training school on Snake Island, Lagos

12Page 21-Mar-13 www.NigerStar7.com

Page 13: NigerStar 7Year: 2011 – 2012 Contract value: ~$210m Vessels: Acergy Polaris, Acergy Antares, Seven Inagha The MPN Satellite Field Development Project consisted of: • installation

CNigerian Content

• A dynamic project management • A dynamic project management and engineering capability at local level.

• Commitment to use Nigerian suppliers to support business suppliers to support business, in compliance with safety standards.

13Page 21-Mar-13 www.NigerStar7.com

Page 14: NigerStar 7Year: 2011 – 2012 Contract value: ~$210m Vessels: Acergy Polaris, Acergy Antares, Seven Inagha The MPN Satellite Field Development Project consisted of: • installation

Main referencesNigerStar 7

14Page 21-Mar-13 www.NigerStar7.com

Page 15: NigerStar 7Year: 2011 – 2012 Contract value: ~$210m Vessels: Acergy Polaris, Acergy Antares, Seven Inagha The MPN Satellite Field Development Project consisted of: • installation

S hSURF Erha

Client: ExxonMobilLocation: NigeriagYear: 2002 – 2005Contract value: ~$500mVessels: Acergy Polaris, Acergy Legend

The Erha Project included the engineering, procurement, g g, p ,commissioning and installation for:

• 16 rigid flowlines with SCRs(Steel Catenary Risers),

• Offshore loading buoy,

• 45 suctions anchors & mooring,

• 2 export lines,

• subsea structures and pilesfabricated in Warri yard.

15Page 21-Mar-13 www.NigerStar7.com

Page 16: NigerStar 7Year: 2011 – 2012 Contract value: ~$210m Vessels: Acergy Polaris, Acergy Antares, Seven Inagha The MPN Satellite Field Development Project consisted of: • installation

b SO dAgbami FPSO Topsides

Client: ChevronLocation: NigeriaLocation: NigeriaYear: 2005Asset: Lagos fabrication yard

The project included the fabrication of topside module 3S and STB playdown module 1S for the Agbami FPSO. The scope of work comprised:

• the fabrication engineering, procurement, fabrication of girder beams, construction, pipe works, painting load out and seafastening painting, load-out and seafastening of the 2 topside modules.

Topside packages totaling 1,150t.

16Page 21-Mar-13 www.NigerStar7.com

Page 17: NigerStar 7Year: 2011 – 2012 Contract value: ~$210m Vessels: Acergy Polaris, Acergy Antares, Seven Inagha The MPN Satellite Field Development Project consisted of: • installation

Sh ll SOShell Bonga FPSO

Client: Shell Nigeria Exploration & Production Company (Snepco)Location: Nigeria, Lagosg , gYear: 2005Asset: Lagos fabrication yard

• 620t of topside structural steel and pipe works for final p pintegration onto Bonga FPSO,

• manpower services for onsite fabrication,

• Construction & shop engineering,

• Procurement of materials,

• Blasting/painting,

• Hydro testing of pipe spools

• Upgrading the living

17Page 21-Mar-13 www.NigerStar7.com

• Upgrading the living accommodation and load-out.

Page 18: NigerStar 7Year: 2011 – 2012 Contract value: ~$210m Vessels: Acergy Polaris, Acergy Antares, Seven Inagha The MPN Satellite Field Development Project consisted of: • installation

Ch l fChevron Meji Platform

Client: ChevronLocation: NigeriaYear: 2005

The Chevron Escravos Gas Project Phase 3A involved the fabrication of the Meji and Okan platforms. The scope of work included:

• the fabrication of the Meji GGCPjjacket & piles,

• Meji GGCP flare bridge & supporttripod,

• Meji GGCP to Meji RP utilitybridge,

• Okan NWP jacket & piles

18Page 21-Mar-13 www.NigerStar7.com

• Okan NWP jacket & piles.

Page 19: NigerStar 7Year: 2011 – 2012 Contract value: ~$210m Vessels: Acergy Polaris, Acergy Antares, Seven Inagha The MPN Satellite Field Development Project consisted of: • installation

l SO dTotal Usan FPSO Topsides

Client: TotalLocation: NigeriaYear: 2008

• Includes a FPSO vessel with a storage capacity of 2m bbl of oil,

• Fabrication of over 7,500 tons of structural steel components,

• Modules P1 and S1,Modules P1 and S1,

• 15 sets of pressure vessels,

• Flare tower,

• Fabrication of the helideck,

• Mooring protection structures.

19Page 21-Mar-13 www.NigerStar7.com

Page 20: NigerStar 7Year: 2011 – 2012 Contract value: ~$210m Vessels: Acergy Polaris, Acergy Antares, Seven Inagha The MPN Satellite Field Development Project consisted of: • installation

f ld f bUsan Manifold fabrication

Client: Cameron for TotalLocation: Nigeria Warri fabrication yardLocation: Nigeria, Warri fabrication yardYear: 2008 – 2011Contract value: ~$200m

• 8x Production Manifolds• 8x Production Manifolds,

• 8x Manifold support structures,

• 8x Suction piles,

• 43x Tree guide bases,

• 23x Well jumpers.

20Page 21-Mar-13 www.NigerStar7.com

Page 21: NigerStar 7Year: 2011 – 2012 Contract value: ~$210m Vessels: Acergy Polaris, Acergy Antares, Seven Inagha The MPN Satellite Field Development Project consisted of: • installation

C kEPC4A Hook-up

Client: ExxonMobilLocation: NigeriagYear: 2008 – 2010Contract value: ~$30mVessels: Acergy Polaris

EPC4A Project included the transportation and installation of:p

• 3 jackets,

• 3 decks,

• 3 bridges,

• 2 flare towers adjacent to the existing Idoho and Ubit platforms to support new flares.

21Page 21-Mar-13 www.NigerStar7.com

Page 22: NigerStar 7Year: 2011 – 2012 Contract value: ~$210m Vessels: Acergy Polaris, Acergy Antares, Seven Inagha The MPN Satellite Field Development Project consisted of: • installation

b l hMobil Erha Deepwater Buoy

Client: ExxonMobilLocation: NigeriaLocation: NigeriaYear: 2008 – 2011Contract value: $200m

For the catenary anchor leg mooring buoy, the project included:y, p j

• fabrication and integration of the turn table platform,

• blasting/painting • blasting/painting,

• full testing,

• pre-mechanical completion,

• load out and sea-fastening.

Buoy’s diameter: 23m, height: 10mand total weight:1 420t

22Page 21-Mar-13 www.NigerStar7.com

and total weight:1,420t.

Page 23: NigerStar 7Year: 2011 – 2012 Contract value: ~$210m Vessels: Acergy Polaris, Acergy Antares, Seven Inagha The MPN Satellite Field Development Project consisted of: • installation

Ch G 3Chevron EGP3B

Client: ChevronLocation: NigeriagYear: 2009 – 2012Contract value: >$200mVessels: Acergy Polaris, Acergy Orion, Acergy Hawk

For the catenary anchor leg mooring buoy, the project included:y, p j

• fabrication and integration of the turn table platform,

• blasting/painting • blasting/painting,

• full testing,

• pre-mechanical completion,

• load out and sea-fastening.

Buoy’s diameter: 23m, height: 10mand total weight:1 420t

23Page 21-Mar-13 www.NigerStar7.com

and total weight:1,420t.

Page 24: NigerStar 7Year: 2011 – 2012 Contract value: ~$210m Vessels: Acergy Polaris, Acergy Antares, Seven Inagha The MPN Satellite Field Development Project consisted of: • installation

O kOso Re Hook-up revamping

Client: ExxonMobilLocation: NigeriagYear: 2010 – 2011Contract value: ~$200mVessels: Acergy Polaris, Acergy Antares, Acergy Orion, Acergy Hawk

Oso Re Project included:

• the removal of old pipelines & • the removal of old pipelines & risers,

• the procurement & installation of new pipelinesof new pipelines.

24Page 21-Mar-13 www.NigerStar7.com

Page 25: NigerStar 7Year: 2011 – 2012 Contract value: ~$210m Vessels: Acergy Polaris, Acergy Antares, Seven Inagha The MPN Satellite Field Development Project consisted of: • installation

S ll ld h 2Satellite Field Phase 2

Client: ExxonMobilLocation: NigeriagYear: 2011 – 2012Contract value: ~$210mVessels: Acergy Polaris, Acergy Antares, Seven Inagha

The MPN Satellite Field Development Project consisted of:j

• installation of 3 new Wellhead platforms (Abang, Oyot and Itut),

• installation of 3 shallow water • installation of 3 shallow water pipelines, in depths ranging from 16m to 28m. The pipelines linked the new Wellhead platforms to the Host platforms (Usari and Ubit).

25Page 21-Mar-13 www.NigerStar7.com

Page 26: NigerStar 7Year: 2011 – 2012 Contract value: ~$210m Vessels: Acergy Polaris, Acergy Antares, Seven Inagha The MPN Satellite Field Development Project consisted of: • installation

Ni St 7

26Page 21-Mar-13 www.NigerStar7.com

www.NigerStar7.com