nif user office –what’s new since the last user group meeting · the user office is here to...
TRANSCRIPT
LLNL-PRES-719798 This work was performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under contract DE-AC52-07NA27344. Lawrence Livermore National Security, LLC
NIFUserOffice– what’snewsincethelastUserGroupmeetingPresentedtotheNIF/JLFUserGroupmeeting
KevinB.FournierNIFUserOfficeDirector
February 6, 2017
2LLNL-PRES-XXXXXX
§ UserOfficeStaffandMission
§ Responseto2016UserGrouprecommendations
§ Updatestouserexperience:training,process,andsoftwaretools
§ NewFacilityCapabilities
§ Web-baseddocumentationandresources
Outline
3LLNL-PRES-XXXXXX
KimHallock hastransitionedtoanewjobinthelablookingforfreshchallenges…
ThankstoKimforallshe’sdonetostandupandsupporttheUserOffice!
4LLNL-PRES-XXXXXX
UserOfficeStaffandkeyusersupportpersonnel
TheUserOfficeisheretohelpwithexperimentaldesign,experimentalreviews,shotset-upsoftwareanddataarchiveandvisualizationsoftware,andscheduleoptimization
Dan KalantarSenior Scientist
Gayatri GururanganExpert Groups
Bob BurrScheduling
Essex BondShot Processes
Allan CaseyData Systems
Bob EhrlichTarget Diag.
5LLNL-PRES-XXXXXX
UserOfficeStaff
TheUserOfficeisheretohelpwithexperimentalproposalworkflow,LLNLandNIFsiteaccess,NIFshotRItraining,shotreviewtracking,andadministrativesupport
Peggy SharpVisitors
Mat SnyderReviews
Erin RhodesUser Support
Rich ZachariasProject Liaison
Derrick LassleScheduling
6LLNL-PRES-XXXXXX
§ UserOfficeStaffandMission
§ Responseto2016UserGrouprecommendations
§ Updatestouserexperience:training,process,andsoftwaretools
§ NewFacilityCapabilities
§ Web-baseddocumentationandresources
Outline
7LLNL-PRES-XXXXXX
§ EncourageproposalswithacademicPIsandfromnewteams
§ Makeclearwhatplatformsanddiagnosticswillbeavailable— DesignateasinglepersonatLLNLwhowouldberesponsibleforhaving
accurateinformationonavailabilityofplatformsanddiagnosticsofinteresttoteamswhoareproposing
— RequiresinglePOCforeachproposingteamtocheckwiththispersonandtransmitaccurateinformationtoproposingteam
§ RequireLOIswithenoughinformationtoenablefeedback
§ GivefeedbacktoproposingteamsinresponsetotheirLOIs(aswasthecaseinthe2014awardprocess)
Actionsinresponsetotherecommendationsfromthe2016UserGroupmeeting(proposals)
✔
✔
✔
✔
(Kevin Fournier in this iteration)
(All communications to the PI of record, cc to liaison)
(Done, helpful for the final proposal and to screen initial submissions)
(Feedback from Dan Kalantar, Gayatri Gururangan, Kevin Fournier, Bob Ehrlich)
(Bruce Remington et al. have been enthusiastically spreading the word)
Text verbatim from Don Lamb’s 2016 slide
8LLNL-PRES-XXXXXX
§ Academicteamsdonothavetheresourcestobeginfinalexperimentdesignuntiltheyhaveapprovedshotdays;timeforthisshouldbebuiltintothecycle.
§ Timeneededforfinalexperimentaldesignisatleast6-9monthsfornew/novelexperimentsthatarenotcloselyrelatedtoprogrammaticexperiments,andmaybeforthosethatare;timeneededforfollow-onexperimentscanbeshorter.
§ Shotdaysneedtobenomorefrequentthaneverysixmonthstoallowchangesintheexperimentaldesign.
§ Whilefollow-onproposalsmayormaynotsucceed,theawardprocessshouldexpectthemandbedesignedsothefollow-onexperimentsgosmoothly.
Actionsinresponsetotherecommendationsfromthe2016UserGroupmeeting(scheduling)
(Done, experiments to start 12 to 15 months after award)
(Done, readiness is actively tracked anddates adjusted; Rich Zacharias, Kalantar, Target Fab, Bob Burr)
✔
✔
✔
✔
(Done)
Text verbatim from Don Lamb’s 2016 slide
Zacharias, Kalantar, Burr and the scheduling committee)(Done, implemented by
9LLNL-PRES-XXXXXX
§ Platforms:— ARC— MIFEDS
§ Diagnostics:— Protonradiography— X-ray— Gamma-ray— TSdiagnosticemploying3ωlight,andeventually, 4ω
and5ωlight
TherecommendationsfornewNIFplatformsanddiagnosticsforDSfromthe2016meeting
Text verbatim from Don Lamb’s 2016 slide
(See following charts, Dave Martinez’s talk)
(Many new capabilities, see following charts)
(in progress, following charts, Steve Ross’s talk)
(Done)
(New GCD brought online, see following)
(under study in our Target Diagnostics organization)
10LLNL-PRES-XXXXXX
§ UserOfficeStaffandMission
§ Responseto2016UserGrouprecommendations
§ Updatestouserexperience:training,process,andsoftwaretools
§ NewFacilityCapabilities
§ Web-baseddocumentationandresources
Outline
11LLNL-PRES-XXXXXX
TheproposalprocessforNIFtimehasbeenformalizedbasedonUserfeedback
Proposing Experiments
(1)Log into NIF User Portal
(2)Select relevant call for proposal and press the Create Proposal button.
(3)Submit title, abstract, and completed letter of intent by the date listed in the call.
Letter of Intent
(4)Submit full proposal by due date listed in the call.
(5)Present proposal to review committee (by invitation).
Webex
(6)Receive decision of any awarded facility time from the NIF director.
See the poster Proposing and Planning Experiments at the NIF by Essex Bond in Wednesday’s poster session
12LLNL-PRES-XXXXXX
§ CreatedaSinglePointofContact:NIFUserOffice(NUO),coordinatedbyMatSnyder
§ Anewintroductoryonlinetrainingmoduleisnowoffered:NP1313-W— Replacestwoface-to-facetrainingmodules(IntroductionandUserOffice)— AvailableasanintroductiontoPIsandcampaignRIswhodonotwishto
completefullshotRItraining— Sometopicscoveredare:
• NIFconfigurationandcapabilities• Rolesandresponsibilities• Experimentallifecycle• Expertgroupsandfacilitystakeholders
§ Requestformisnowavailableviatheweb:https://lasers2.llnl.gov/forms/shot_ri_training.php
NewPIsawardedfacilitytimewilltakeadvantageofupdatestostreamlineShotRITraining
3
10
1
1 1 1 1
CurrentShotRITraineesbyOrganization
AWE LLNL U.York
U.S.NRL U.Edinburgh GA
Sandia
14LLNL-PRES-XXXXXX
§ Checklistforreview/assessmentgatesandshotRIresponsibilities –version1.0,staytuned
§ Pre-reviewsofallscheduledshots
§ Targetrequestsanddesignreviews
§ Wheretogoforhelp
Theshotplanningprocesshasbeenrefined
ProjectEngineersandUserOfficestaffareheretohelp!
Process development led by Essex BondPOCs: Rich Zacharias, Dan Kalantar, GayatriGururangan
See the poster Proposing and Planning Experiments at the NIF by Essex Bond in Wednesday’s poster session
Proposal Scheduling Planning Implementation
Process
RollingPeriodofTime
Timeline
T-6months ShotDateVariesbyProgram
2x/year T-6weeks
Closure
T-3months
15LLNL-PRES-XXXXXX
Proposal Scheduling Planning Implementation
Process
RollingPeriodofTime
Timeline
T-6months ShotDateVariesbyProgram
2x/year T-6weeks
Closure
T-3months
EngagingtheDSexperimentalteamsearlierintheplanningphasehasresultedinimprovedshotreadiness
• At T-6 months, a set of slides containing high-level information about the experiment configuration are requested for all new DS experiments.
— The submitted information fosters communication between facility and the experimental team and allows the facility to plan follow-on work.
• A T-3 months, for new platforms, we have a target design review• We have also instituted a bi-weekly meeting dedicated to tracking and discussing open
issues for DS experiments.— This is very important between T-6 and T-3 months where consensus needs to be reached
on requirements for new capability, e.g. unique target gas fill.
Facilitate More Communication
16LLNL-PRES-XXXXXX
§ InternallinktoNIFapplications:https://nifit.llnl.gov
§ Specificlinktothenew shotsetuptool,i.e.,SST:https://nifit.llnl.gov/sst/
Newtoolsarehavebeendevelopedinthelastyeartohelpwithrequestingandsettingupshots
Proposal Scheduling Planning Implementation
Process
RollingPeriodofTime
Timeline
T-6months ShotDateVariesbyProgram
2x/year T-6weeks
Closure
T-3months
SRT CMT à SST
See the poster Shot Set up Tool Plans and Status by Doug Speck and Allan Casey in Wednesday’s poster session
17LLNL-PRES-XXXXXX
DataSystems- TransitionStrategyBetweenCMT(old)andSST(new)shotsetuptools
§ Run both editors in parallel during transition (most of 2017)
§ Through periodic releases, migrate data groups from old to new editor• Start simple – a few stand-alone TD systems in initial releases (i.e.,
not the laser, not the DIMs)• Receive user feedback at earliest stages of implementation
§ A data group will be editable in only one editor at a time• Users will have access to a unified view of entire experiment from either
editor
18LLNL-PRES-XXXXXX
AbilitytosetupEXHIandFFLEXdiagnosticsinShotSetupToolformallyreleasedinJanuary
TANDMandDIMsupportplannedforSpring/Summer2017DiagnosticsandCommonDataModelsupportSummer/Fall2017
Setup is defined at the Data Group level like ApprovalManager e.g. FFLEX. Facilitates multiple users editing experiments simultaneously
19LLNL-PRES-XXXXXX
AbilitytosetupEXHIandFFLEXdiagnosticsinShotSetupToolformallyreleasedinJanuary
TANDMandDIMsupportplannedforSpring/Summer2017DiagnosticsandCommonDataModelsupportSummer/Fall2017
Loads individual experiments from multiple campaigns rather than a single campaigns for quicker startup and editing times
20LLNL-PRES-XXXXXX
AbilitytosetupEXHIandFFLEXdiagnosticsinShotSetupToolformallyreleasedinJanuary
TANDMandDIMsupportplannedforSpring/Summer2017DiagnosticsandCommonDataModelsupportSummer/Fall2017
Responsive Web based tool; no need to download a clientand it is easier for developers to maintain and update
21LLNL-PRES-XXXXXX
§ Industryuses2secondsforapageloadasabenchmark
§ ApprovalMangerpagesloadinunder1.2secondsonaverage— Over10timesfasterthanthistimelastyear
§ ArchiveViewerpagesloadinunder1secondonaverage— About5timesfasterthanthistimelastyear
§ ShotPlannerexperimentandcalendarpagesloadinunder2s
§ EliminatedslowdownsindropdownmenusinShotRequesttoolwhenmultipleexperimentsareopen
§ Webbasedsetupreportsloadabout10timesfaster— Comparedwiththistimelastyear
SignificantperformanceupdateshavebeenmadetoUserTools
Monitoringisinplacetocontinuetoensureperformancelevelaremaintained
22LLNL-PRES-XXXXXX
§ UserOfficeStaffandMission
§ Responseto2016UserGrouprecommendations
§ Updatestouserexperience:training,process,andsoftwaretools
§ NewFacilityCapabilities— Laser— TargetArea(diagnostics,positioners,etc.)
§ Web-baseddocumentationandresources
Outline
23LLNL-PRES-XXXXXX
MainlaserperformanceandARCcommissioninghavereceivedemphasisthisyear§ Thefacilityisdedicatingmoretimetolaser-systemshotstoconfirmandupdatemodelperformance— The1ωpartofthemodelwasverifiedinthesummerof2016andthemodel
updated— The3ωpartofthemodelwasupdatedinDecember,andperformanceisbeing
activelytracked— Wearecontinuingtofindthenecessarybalancebetweenfacilityoperationsand
userexperimentstomaintainthefacility’soptimumperformance
§ AnIntegratedExperimentsTeam(IET)wasstooduptocommissionARCat30 ps forprogramshots— Laserperformanceissueswithrespecttocontrastbeforethemainpulsewere
addressedbylaserscientistsontheARCdiagnostictable— TargetdesignissuesforARCmicrowire x-raysourceswereaddressedbyHED
physicistsandtargetfabricators— IntegrationissuesbetweenARCandmain-laserbeamswereaddressedbyasystems
approachinthechamber,addressingdebris,unconvertedlightandalignmenttolerances
Capabilitiescontinuetobedevelopedaccordingtoprogrammaticpriorities,benefitingallusers
24LLNL-PRES-XXXXXX
ARCisakilojoule-classlaserdeliveringhighintensityshortpulsestotarget
Pointingaccuracy,energy,andbandwidthhavebeencharacterized,pre-pulsehasbeensuppressed,andbeamlets areco-timedwithapproximately10ps jitter
A total of 16 ARC compressor gratings are used for the 4 beamlets
The dual regens and split beam injection produce 2 beamlets with independent timing
See Dave Martinez’s talk on Wednesday
25LLNL-PRES-XXXXXX
TheARCsystemhasbeenoptimizedoverthelast12monthsbyanIntegratedExperimentsTeam
Suppressionofregenleakageandimprovedcontrastbetweentheprepulse andmainpulsehasledtoafactor-of-twogaininx-rayfluxfromARC-drivenbacklighters
Oct/Nov 2015 shots July shot with improved PP contrast
2 J > 70 keV 4 J > 70 keV
Measured (>70 keV) & Calculated* x-ray C.E.
Credit to Dan Kalantar, Mark Hermann, Dave Martinez, Riccardo Tommasini, Warren Hsing and many others
26LLNL-PRES-XXXXXX
TheradiographfromaNIFexperimentshotinDecember2016incorporatedallthatwaslearnedaspartoftheplatformdevelopmentforanHEDprogramcampaign
Issueswithunconvertedlightfromthemaindrive,blow-byfromtheARCbeams,plasmaformationfrompre-pulse,alignment,andmanyotherchallengeswerealladdressedbytheIET
Exit Cone
TANDM
ARC beam path
Entrance Cone
35mm
N161207-001-999
See Dave Martinez’s talk on Wednesday
27LLNL-PRES-XXXXXX
Newcapabilitieswithtargetdiagnostics,targetpositioners,alignment,andmore
Capabilitiescontinuetobedevelopedaccordingtoprogrammaticpriorities,benefitingallusers
§ TANDM– Multifunctionpositionercapablefortargets(FY16)or(limited,passive)diagnostics(FY17)
§ ATLAS– laser-basedalignmentaid
§ Fiberdelaybacklighter – made“pushbutton”butstillrequiresearlyengagementwithlaser-systemmanagersforfibersnotcurrentlyininventory— Implementinganewwindowstrategythatwilldoawaywithfiberswaps. Availableinmid-to-latespring.
§ X-rayimaging— G-LEH– gatedlaserentranceholeimager— AXIS– detectorforComptonradiographyusingtheARClaser— KBOptics– Ahigh-magnification,narrowbandx-rayimagingsystem
§ X-rayspectrometers— Virgil– softx-rayspectrometeralongDANTElineofsight— NSS– surveyspectrometerfrom~10keV to~200keV— OpticalThomsonScatteringsystem– currentlybeingcommissionedfor3ω,willoperateat5ω— OpSpec – soft-x-rayimagingspectrometerforopacityexperiments
§ Gamma-raydetectionsystem
§ Neutronimagerlineofsight,time-of-flightspectrometer,totaldoseandactivationdiagnostics
§ Chargedparticledetection- NEPPS
28LLNL-PRES-XXXXXX
MultifunctionPositioner- TANDMfieldswarmtargetsorexistingdiagnostics
Cable tracks can be accessed through large maintenance doors
Mechanized vertical door provides access for installing diagnostics or a Target Manipulator (shown)
Hinged door allows access to patch panel for diagnostic and target manipulator cables along with target gas lines
Two DPV ports allow different flows for the different combinations of small and large doors open
Hinged rear door with port for optical line of sight down boom
500 mm NIF port
Warmtargetfielding,includinggas-filledtargets,hasbeenfullycommissioned
29LLNL-PRES-XXXXXX
TANDMalignmentaccuracyandstabilityhavebeencharacterized
Threeactivetargetpositionersiskeytoincreasingshotopportunities
CryoTarpos
TANDM
TARPOS
TAS
9/19/2016 1/3/2017
TANDM
TAS
30LLNL-PRES-XXXXXX
Previous Alignment Systems ATLAS Alignment System
ATLASprovidesflexibilityforpositioner-baseddiagnosticalignmentwithoutanopposedporttelescope
ATLAS: Advanced Tracker Laser Alignment System CIVS: Chamber Insertion Viewing System OPAS: Opposed Port Alignment System
ATLAS uses a laser tracker to locate and track retro reflectors mounted on each snout
Available field of view for alignment
Available field of view for alignment
31LLNL-PRES-XXXXXX
RCART– insitu flexibilityfor0or90○ rotationofGXDorDISCallowsformoreplannedshotopportunities
Integratedboat
Rotation stage
4ω FIDU mounting brackets
Cart side rails
Cart drive unit
Cable bucket
Cart rear mount plate
Universal airbox mounting brackets
32LLNL-PRES-XXXXXX
Newtargetdiagnostics
Ifyouwanttomakemodificationstohowasystemisrun,start≳ 18monthsearlywiththefacilitytoarrangeandassessyourrequest
Alldiagnosticshaverestrictionsontheirusebasedonhowtheyhavebeendesigned
33LLNL-PRES-XXXXXX
AXIS(ARCX-rayImagingSystem)- recordtemporallyresolved,two-dimensionalComptonRadiographsofICFimplosionsusingtheARClasersystem
N160919-001-999
LLNL-PRES-xxxxxx 24
Forthefirstdemonstra6onofCRontheNIF,aroundandsymmetricimplosionispreferable PQ of CR !
Solid HDC – ~500-1000 um radius
5 um layer – CH + 0.5% Ge doped
34 um layer – CH + 1% Ge doped
13 um layer – CH + 0.5% Ge doped
133 um layer – CH !• Targets are robust and well behaved!
• Low backgrounds: very low LPI from hohlraum, extremely low self emission!
!• Compton cross section dominates for hν > 30keV!!
High density region formed by convergent shocks!
CR will provide the first direct measurement of density using X-rays!
HDC or CH “Gbar” sphere targets are good candidates !
110 µm
34LLNL-PRES-XXXXXX
Virgilsoftx-rayspectrometerinstalledonDantecenterport
Design RI James Weaver, NRLImplementation Marilyn Schneider, LLNL
35LLNL-PRES-XXXXXX
VirgildataforL-shellx-raysourcesshowsfantasticspectralresolution
Data from two separate shots spliced together to show possible emission from a Xe gas pipe and Ag foam. Xe: N160126 and Ag: 160103
Xe: N160126 Ag: N160103
3G
3D
3G
3D
3C
3C
N=4-2
Data compilation from Daniel Thorn and Mark May, LLNL
36LLNL-PRES-XXXXXX
OTS(OpticalThomsonScattering)– aDIMbaseddiagnosticlookinginthedeepUVtounderstandplasmaconditions
For details, see talk by Steven Ross Wednesday
37LLNL-PRES-XXXXXX
OTSwasusedtomeasuretheUVbackgroundinanHDCSubscalehohlraum
EPWWavelength(nm)
Time(ns)
2.1
2.8
3.4
4.1
4.8
5.5
1.4
0.7
0.0
125140155170185200215 -50.00
0.00
50.00
100.00
150.00
200.00
250.00
300.00
0
1000
2000
3000
4000
5000
6000
7000
8000-0.1
0.9
1.9
2.9
3.9
4.9
OpticalThomsonScatteringDiagnosticImage
LaserPulse
Data
Time(ns)
Counts
LaserPower(TW)Additionalanalysisisunderway
For details, see talk by Steven
Ross Wednesday
38LLNL-PRES-XXXXXX
OPSPEC(OpacitySpectrometer)- auser-suppliedsnout,andisnotyetafacilityinstrument
Design RI Bob Heeter, LLNLImplementation Heeter, Ted Perry, LANL
Source
Filter Pack
Shielding
Crystals
Filter/Film pack
Standard KB
39LLNL-PRES-XXXXXX
GCD(GasCherenkovDetector)– Gamma-Raydetectorhas2xmoresensitivityoverGRHdiagnostic
LANLdesignedandfabricateda3.9 m"WellDIM"thatwillinsertaGasCherenkovDetectorclosetothecenteroftheNIFtargetchamberinashieldedenvironment.
40LLNL-PRES-XXXXXX
nTOF NorthPoleisinstalledandtakingdata;theNorthPoleNISsnoutisavailabletorunonshots
Neutron Time-of-Flight System Neutron Imaging Snout
41LLNL-PRES-XXXXXX
NED(NeutronEffectsDiagnostic)andtheLASR(LargeAreaSolidRadiochemstry)collectorareuser-provideddiagnosticpackages
NED positions test components at 50 cm from TCC and provides active read-out
LASR collects activated materials on a large foil
42LLNL-PRES-XXXXXX
NEPPS(NIFElectronPositronProtonSpectrometer)– DIM-mountedspectrometerthatprovidestime-integratedenergyspectrumoffastelectrons,positronsandprotons
For details, see talk by Hui Chen on Wednesday
43LLNL-PRES-XXXXXX
§ UserOfficeStaffandMission
§ Responseto2016UserGrouprecommendations
§ Updatestouserexperience:training,process,andsoftwaretools
§ NewFacilityCapabilities— Laser— TargetArea(diagnostics,positioners,etc.)
§ Web-baseddocumentationandresources
Outline
44LLNL-PRES-XXXXXX
[email protected] ator925422-2179
NewresourcesforUsers
§ WebrepositoryofNIFtechnicaldatahttps://lasers.llnl.gov/for-users/shot-ri-resources
§ NIFUserFora– coversalientorinterestingtopicsmonthly— Thechartspresentedareavailable
https://lasers.llnl.gov/for-users/shot-ri-resources/forum-archive
§ NIFUserGuide– hasbeenre-writtenin2016,significantlyupdatedfromthe2012version— Availableonlineasahyperlinkeddocument
https://nifuserguide.llnl.gov/ (summer-studentprojectforAlexCupps)— AvailableasdownloadablePDF
https://lasers.llnl.gov/content/assets/docs/for-users/2016-user-guide.pdf
45LLNL-PRES-XXXXXX
ResourcesforRIsareexpandedandorganized
https://lasers.llnl.gov/for-users/shot-ri-resources
50LLNL-PRES-XXXXXX
ResourcesforRIsareexpandedandorganizedhttps://lasers.llnl.gov/for-users/shot-ri-resources
Please explore and give us feeback!
51LLNL-PRES-XXXXXX
TheupdatedNIFUserGuideisnowonlineasahyperlinkeddocument
Check it out at https://nifuserguide.llnl.gov/Feedback welcome and encouraged!
52LLNL-PRES-XXXXXX
§ Arefinedshotlifecycleprocess— Checklistforreview/assessmentgatesandshotRIresponsibilities(SeptemberUserForum)— Pre-reviewsofallscheduledshots(January2016UserForum)— Targetrequestsanddesignreviews(January2016UserForum)— Wheretogoforhelp(BLIP– April2016,NOL– June2016,Hazards– March2016UserFora)
§ AnewintroductorymoduleforshotRItraining
§ Newshotset-uptools— CMTtoSSTtransition(March2016,November2016UserFora)— Datasystemsperformanceupgrades(August2016UserForum)
§ Newlasercapabilities— Updatedlaser-performancemodeling(June2016,December2016UserFora)— FiberDelaysetupandrequests– commissionedupto100nsofdelay— ARCcurrentandnear-termfuturecapabilities
§ Newfacilitycapabilitiesandnewtargetdiagnostics— TANDMpositioner(May2016,October2016UserFora),ATLASalignment,RCART— X-rayimagers,x-rayspectrometers,Thomsonscattering,gammadetectors,neutronics
§ Newweb-basedresourcesforusers(December2016UserForum)
Summary:therehavebeenupdatestoallaspectsoftheuserexperience
53LLNL-PRES-XXXXXX
§ Arefinedshotlifecycleprocess— Checklistforreview/assessmentgatesandshotRIresponsibilities(SeptemberUserForum)— Pre-reviewsofallscheduledshots(January2016UserForum)— Targetrequestsanddesignreviews(January2016UserForum)— Wheretogoforhelp(BLIP– April2016,NOL– June2016,Hazards– March2016UserFora)
§ AnewintroductorymoduleforshotRItraining
§ Newshotset-uptools— CMTtoSSTtransition(March2016,November2016UserFora)— Datasystemsperformanceupgrades(August2016UserForum)
§ Newlasercapabilities— Updatedlaser-performancemodeling(June2016,December2016UserFora)— FiberDelaysetupandrequests– commissionedupto100nsofdelay— ARCcurrentandnear-termfuturecapabilities
§ Newfacilitycapabilitiesandnewtargetdiagnostics— TANDMpositioner(May2016,October2016UserFora),ATLASalignment,RCART— X-rayimagers,x-rayspectrometers,Thomsonscattering,gammadetectors,neutronics
§ Newweb-basedresourcesforusers(December2016UserForum)
Summary:therehavebeenupdatestoallaspectsoftheuserexperience