NICS 2 NICS 2 UV-optimized spectrographUV-optimized spectrograph high resolution IR spectrographhigh resolution IR spectrograph
call for proposal: deadline November 2002call for proposal: deadline November 2002
project presentation: March 2003project presentation: March 2003
GIANO approved to phase A: July 2003:GIANO approved to phase A: July 2003: 50,000 50,000 euroeuro assigned assigned
GIANO Preliminary Design Review: December 2003 GIANO Preliminary Design Review: December 2003
22nd nd generation of TNG instrumentsgeneration of TNG instrumentsaccording to the prescription of the Gruppo Istruttorio per il TNGaccording to the prescription of the Gruppo Istruttorio per il TNG
requirements:requirements: wide spectral coverage, ultra-stable, fast track, low-cost
polarimetric unit
HR : 16,000 (1.5” ) 50,000 (0.5” )
slit length: 6.5”, 56 orders, 0.9 – 2.5
LR/VLR : 130 (1.5” ) 1,000 (0.5” )
slit length: 30”, 26/16 orders, 0.7 – 2.5
slits : 0.5”, 0.75”, 1.0”, 1.5”
Osservatorio di Bologna
• management & administration • scientific coordination • high - level software, WEB page
People: L.Origlia, E.Rossetti, P.Montegriffo,
M.Lolli, A.Piccioni, R.Abicca, A.Caiulo
Osservatorio di Arcetri
• optics, mechanics, cryogenics • electronics & low-level software • scientific coordination
People: S.Gennari, V.Biliotti, C.Baffa, R.Maiolino,
C.DelVecchio, E.Giani, A.Checcucci, G.Falcini
Osservatorio di Catania• pre-slit optics • polarimetry
People: F.Leone, S.Scuderi, P.Bruno
Centro Galileo Galilei
• management & procurement • integration at the telescope
People: E.Oliva, F.Ghinassi, M.Lodi
INOA di Firenze
• absorption cells
People: F.D’Amato
expected costexpected cost … …
650 650 K$K$ + 650 + 650 KeuroKeuro
time schedulingtime scheduling … …
3 years3 years
30%30% array array
2 yrs for 2 yrs for array deliveryarray delivery
man powerman power … …
23 people23 people
2929 man yrs man yrs
high instrumental efficiencies high instrumental efficiencies
HR : HR : 17% , 17% , LR : LR : 23% , V23% , VLR : LR : 26% 26%
limiting magnitudeslimiting magnitudes (conservative, based on real arrays)
LRLR (R=500, 4hr, S/N=10)
2020 inin JJ , , 1919 inin HH , , 18 18 inin K K ……UKIDSSUKIDSS
HR (R=25,000, 4hr, S/N=10) 17.117.1 inin J, J, 16.616.6 inin HH & & 15.415.4 inin KK
… … 2MASS2MASS
PhoenixPhoenix
• single order echelle • range: 0.8 – 2.5 m • R=75,000 with 0.17” slit• slit lenght: 60” • coverage: 200 Å • array: InSb 10242
Gemini South
Keck II Keck II Mauna KeaMauna Kea
NIRSPECNIRSPEC in echelle mode
• range: 0.9 – 5.5 m • R=25,000 with 0.4” slit • slit lenght: 8”-12” • coverage: 2000 Å • array: InSb 10242
ESO VLTESO VLT ParanalParanal
CRIRES …from 2005…CRIRES …from 2005…
• single order echelle • range: 1 – 5 m • R=20,000 with 1” slit • slit lenght: 50” • coverage: 250 Å • array mosaic: 3 InSb 10242
high resolutionhigh resolution
narrow slits & coverage,single lines
of bright stars narrow coverage,
single lines
Rmax 33,000poorly stable
GIANO highly competitive!GIANO highly competitive!
NICSNICS + AMICI:
• range: 0.8 – 2.5 m • R=50 with 1” slit • slit lenght: 4’ • array: HgCdTe 10242
TNGTNG La PalmaLa Palma
low resolutionlow resolution
SEDs, no linesSEDs, no lines
1000 AU 100 pc 5 kpc 5 Mpc 50 Mpc 1000 AU 100 pc 5 kpc 5 Mpc 50 Mpc high-z high-z
high resolutionhigh resolution … …
10 AU 100 pc 500 Mpc 10 AU 100 pc 500 Mpc high-z high-z
low resolutionlow resolution … …