22

Public Transport in Paris Region Brief on the Region

Paris Region (Ile de France) is one of the 22 administrative

regions of France with

Area 12 000km2

29% of GDP

5 Million employees

20% of national11 500 000 inhabitants

19% of French population

22.5%of working population

11.5 million inhabitants

(19% of France’s population)

29% of France GDP

An area of 12 000 km2

8 counties/1281

municipalities

Page 3: Nicolini Rer

33

Public Transport in Paris Region Market share

Total movement per day : 23 million

Modal or means of

transport shares

Public transport represent

30% in Paris Region

60% within Paris City

10 % in suburb

In public

transport

30%

Other

motorised

mode

3%

by car

67%

Page 4: Nicolini Rer

44

Public Transport in Paris Region The operators

3 major operators provide public transport service in Paris

Region:

Optile ; association of 75 private bus companies operating

about 1000 bus routes into the greater Paris suburbs

RATP : 14 Metro lines – 2 RER lines – 3 Tramways – 350 bus

lines including 31 night lines (Noctilien) – 1 funicular

SNCF : Regional railways – RER – tram/train - 11 night bus

lines (Noctilien)

Page 5: Nicolini Rer

5

Public Transport in Paris Region Organisation

STIF

4 missions: Organize, Coordinate, Modernize and Forecast the

public transport services

Board of Directors : 29 local authority representatives

Chairman: President of the Regional Council of Ile de France

Each operator is bound to STIF by a contract

Duration: 4 years (2008-2011)

Shared responsibilities and shared risks

Page 6: Nicolini Rer

6

RATP Its Environment

78%

7%

15%

Optile

SNCF

RATP

Environment

3 operators

4 modes

3,7 Bn journeys/year

RATP

Leading operator in Ile de

France

2.9 B journeys / year

Running a multimodal

transportation network

16%

50%

22%

12%

RER

BUS

Banlieue

Métro

Page 7: Nicolini Rer

7

RATP Figure by Numbers

351

bus routes

14metro lines

€1,011

MIn investment

45,315 employees

2lines of

RER

3 Tram lines

€4,075M

In turn

over

€125 million

In net

earning

3,037 Million journeys

in 2008

Page 8: Nicolini Rer

8

RATP An integrated multimodal transportation network

Page 9: Nicolini Rer

9

RATP Metro

The metro by numbers

14 lines inc.1 automatic

213 km length

383 stations

10 000 employees inc. 3000drivers

1,4 billion travelers per year

Page 10: Nicolini Rer

10

RATP Surface network (Bus & Tram)

The surface network in figures

350 bus lines (3820 km)

1 BRT line (20 km)

3 tramways (32 km)

8000 bus and tram stops

4200 buses

15 000 employees inc. 12000 drivers

997 million journeys per year

Page 11: Nicolini Rer

11

RATP RER A&B

A

A little history…

BLine of Sceaux

1969 Nation Boissy

1970

La Defense Etoile

1972 La Defense

Saint Germain

1977

Line A Nation Etoile

Vincennes Noisy

Line B Luxembourg

Chatelet1988

Interconnexion Line

A

1983 extension to

Gare du Nord and

interconnexion Line

B

1992 Torcy

Chessy

1980 Noisy Torcy

Page 12: Nicolini Rer

12

Regional trainsThe RER in 2 lines

A

B

Stations

Length (km)

Served counties

Headway (min)

Commercial speed (km/h)

journeys per year (million)

Interconnection with SNCF

Airport link

A (East-West)

35

74

6 & Paris

2 to 3.5

49

300 in 2008

Nanterre-

Prefecture

B (North-South)

32

40

5 & Paris

3.5 to 5

39

168,5 in 2008

Gare du Nord

CDG and Orly via

Orly VAL

Page 13: Nicolini Rer

13

RER A&B Organization

Direction of RER

Regional train

Transport operation unit

lineA

Transport operation unit

lineB

Station operation unit

lineAStation operation unit

lineB

Specialized unit

Training & regulation

Specialized unit

Station development

Support unit

Human resources

Social policy

Support unit

Information systems

finance & revenue Management

Safety

Service quality

Traffic statistic

Sale

revenue

Fare systems

Security

Cleanliness

Communication

Page 14: Nicolini Rer

17

RER A & B Operation profile

A (East-West)

35

74

6 & Paris

2 to 3.5

49

300 in 2008

Nanterre-

Prefecture

B (North-South)

32

40

5 & Paris

3.5 to 5

39

168,5 in 2008

Gare du Nord

CDG and Orly via

Orly VAL

Stations

Length (km)

Served counties

Headway (min)

Commercial speed (km/h)

journeys per year (million)

Interconnection with

SNCF

Airport link

Page 15: Nicolini Rer

18

RER A&B The Rolling Stock

65 units Mi84Starting 1984Dual current 1500VDC/ 25kVACPower 3000KWCapacity 880 (1760/train)Length 104 m (208 m/train)

65 units Mi79

Starting 1980

Dual current 1500DC/25kVAC

Power 3000KW

Capacity 880 (1760/train)

Length 104 m (208 m/train)

91 units MS61

Starting 1964

1500V DC,1350 KW,

Capacity 630 (1890/train)

Length 73m (219m/train)

43 units Mi2N

Starting 19

Dual current 1500VDC/25kVAC

Power 4500KW

Capacity 1281 (2562/train)

Length 112m (224m/train)

Page 16: Nicolini Rer

22

RER A&B Passenger Information

87 sales & information offices

Information systems:

Timetable posted

SIEL real time display

Information panels

Mission codes

Public Address Systems (trains and

stations)

Page 17: Nicolini Rer

23

RER A&B Ticketing

Large choices of travel cards fitting different passengers’ needs

Long and short term subscriptions

For younger, schoolchildren or students: Imagine R

For commuters or frequent passengers: Pass Intégrale or Pass Navigo (1 week or 1 month subscription)

For tourists and occasional users: Paris Visite or Mobilis

Innovative technology

The Pass Navigo system

Page 18: Nicolini Rer

24

RER A&B Connection and sharing with SNCF

oTechnical: switching of

traction/voltage due to the dual modal

trains

oOperational: interchange of the

drivers

oFinancial: ticketing integration and

fare box accounting

Page 19: Nicolini Rer

25

Perspective and challenge

Today RER is reliable, safe

and efficient

The main difficulties come

from the growing number of

passengers and the share of

journeys

Improvement of people’s

mobility in suburbs remains

a challengePublic Transportation

Individual cars

Other modes

- 8% movement 1976-

2001

3 millions (13%)

Paris - Paris

- 8% 4 millions (17

%)

Paris -

Suburbs+5%

30%67%

3%

16 millions (70

%)

Suburbs-

Suburbs+50%

3

% 16%

81%

60%37%

3%

Conclusions

Page 20: Nicolini Rer

26

RER B NORD

Interoperability

Regularity Action plan

SNCF/RATP Action plan

Renewal of the trains MI 79

Purchase of material (equipment) MI2N

RER A&B Future projects

Page 21: Nicolini Rer

27

Conclusions

The Ile-de-France Masterplan: RATP is actively involved with State and Region authorities:

Initial study and presentation of projects that will probably come to execution in 20-25 years

The 2007-2013 State-Region Planning Contract:

A development dynamic involving:

19 projects including 3 multimodal hubs for RATP

109 km of new infrastructures, inc. 75 km of tramlines

€ 2.8 billion investment in addition to outlays on rolling stock

Page 22: Nicolini Rer

28

T2 La Défense

/ Pont de

Bezons

Pôle

Nanterre

Université

T1 St Denis / AG Les

Courtilles

TCSP

RN305

75 km of light rail

5 extentions

4 new lines

#

24 km of bus

lanes

3 new lines

B

10 km of metro

lines

4 extentions

m

3 Hubs

A total of 19

projectsTw Villejuif / Athis-

Mons / Juvisy-sur-Orge

Tw Châtillon

/ Viroflay

T1 Noisy-le-

Sec / Montreuil

(Val de

Fontenay)

Tw St Denis /

Garges-

Sarcelles

Tw St Denis / Epinay /

Villetaneuse

T2 Issy-Val-de-

Seine / Pte de

Versailles

Pôle

Mass

y

M4 à

Montroug

e et

Bagneux

M13 à AG

Courtilles

M8 à Créteil –

Parc des

Sports

M12 à Proudhon-Gardinoux et

Mairie Aubervilliers

TCSP Pompadour

/ Sucy-Bonneuil

TCSP Est-

TVM

Pôle

Noisy-le-

Grand

T3 Pte

d’Ivry / Pte

de la

Chapelle

Conclusions The 2007-2013 State-Region Planning

Contract

Page 23: Nicolini Rer

29

Conclusions The great

Paris

Evolution of the public transport in Paris Region in 3 steps

Creating a dense metro network adapted of the needs of Paris

inhabitants

Creating and improving RER lines to transport suburb inhabitants

Connection of the different RER lines in Paris

Today, the network is no longer adapted to the

demand.

The future is to connect one suburb to another without going through

Paris

Loop lines around

Paris

Page 24: Nicolini Rer

30

Conclusions The great

Paris

Page 25: Nicolini Rer

31

Thanks for your attention

Page 26: Nicolini Rer

32

Page 27: Nicolini Rer

33

2008 budget : 7.4 Bln Euros

Outcome

01.11RATP in its environment:

Financing public transportation in Ile de France

Income

41,6%

41,6%

13,9%3,0%

Local companies Fares

Regional & local authorities State

49,3%

6,7%4,0%

2,7%

37,2%

RATP SNCF

OPTILE Special operations