nhpc ppt final

15
Highlig hts 1 Company Name NHPC Limited SUBMITTED BY : KAPIL SHARMA MBA - M&S

Upload: kapilkaif

Post on 29-Nov-2014

500 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Nhpc Ppt Final

Highlights

1

Company NameNHPC Limited

SUBMITTED BY :KAPIL SHARMAMBA - M&S

Page 2: Nhpc Ppt Final

Highlights

2

Table of contents Executive Summary Background

History, Year of Incorporation & other details

Evolution of Edelweiss Behind the LOGO Demographics

Location, Branches, Employee details

Legal structure Corporate Structure

Organizational Structure Leadership, Organizational

chart

2

Operational Profile Products /Services /Solutions Business Lines Awards and Ratings

Financial Summary

Key Success Factors Company Initiatives & Strategy

Page 3: Nhpc Ppt Final

Highlights

3

Executive summaryNHPC Ltd has been incorporated in 1975 and is the largest hydro power company in INDIA.

It has developed and constructed 14 power stations and its total current installed capacity is 5295 MW.

Established track record in implementing hydro electric projects

The company has 4.6 GW capacity under construction

NHPC is set to increase capacity by80 percent from 5.1 GW in 09 to 9.4 GW by 2013.

Page 4: Nhpc Ppt Final

Highlights

4

BackgroundYear of Incorporation & Other details

NHPC was Incorporated in 1975.

NHPC Limited, formerly known as National Hydroelectric Power Corporation Ltd has been confered as MINI RATNA Category-I by Government of India in 2008-09.

1985 - 86 Hydro Power Training Institute set up at the Baira Siul hydroelectric project to train operators and supervisory staff

1987 - 88 Establishment of a satellite telecommunication network taken up to link various projects of our Company

1994 - 95 Awarded the lining work of Jawahar Tunnel in Jammu & Kashmir

2000 – 01 NHPC and the government of Madhya Pradesh entered into an MoU to exploit the hydro electric potential of the Narmada basin by completing the Indira Sagar and Omkareshwar projects .

2009-10 Incorporation of a joint venture company, National High Power Test Laboratory Private Limited, along with NTPC, Powergrid Corporation of India Limited and Damodar Valley Corporation.

Page 5: Nhpc Ppt Final

Highlights

5

DemographicsLocation, Branches, Employee details

Registered & Corporate Office :

NHPC Office Complex Sector-33 Faridabad – 121003 Haryana - IndiaPhone : 2278421 Fax : 2277941Email : [email protected]

Factory/plant

Teesta-V Plant: P.O. Singtam, East Sikkim - Sikkim – India

Dhauliganga-I Plant: Post Box No.1, Tapovan, Dharchula,Dist. Pithoragarh - Uttaranchal – India

Chamera-II Plant: Karian Dist. Chamba - 176310Himachal Pradesh - India

Page 6: Nhpc Ppt Final

Highlights

6

EMPLOYEE DETAILSName Current Position

A.B.L Srivastava Executive Chairman of the Board, Finance Director, Managing Director

D.K RAY Chief Executive Officer of LDHCL

VIJAY GUPTA Compliance Officer, Company Secretary

D. P. Bhargava Director - Technical, Executive Director

R. S. Mina Director - Personnel, Executive Director

J. K. Sharma Director - Projects, Executive Director

6

Page 7: Nhpc Ppt Final

Highlights

7

Organizational StructureLeadership

Shri S.K. Garg, (DIN : 00055651) 59 years, is our Chairman and Managing Director.

Shri A.B.L. Srivastava, (DIN : 01601682) 55 years, is our Director (Finance).

Shri D.P. Bhargava, (DIN : 01277269) 53 years, is our Director (Technical).

Shri J.K. Sharma, (DIN : 00387785) 52 years, is our Director (Projects).

Shri R.S. Mina, (DIN : 00149956) 53 years, is our Director (Personnel).

Shri Rakesh Jain, (DIN : 02682574) (Official part time Director).

Shri Sudhir Kumar (DIN : 02669103) (Official part time Director)

Smt. Komal Anand, (DIN : 01909263) (Independent Director),

Page 8: Nhpc Ppt Final

Highlights

8

Operational ProfileMajor Products/ Business Lines

Power Station State Capacity (MW) Year ofCommission

Baira Siul Himachal Pradesh 180 1981

Loktak Manipur 105 1983

Tanakpur Uttarakhand 120 1992

Dulhasti Jammu & Kashmir 390 2007

Indira Sagar Madhya Pradesh 1000 2005

Page 9: Nhpc Ppt Final

Highlights

9

Financial Summary

Source:

Financial Year ends at March 31

Qtry Fin 06/09 09/09 12/09 03/10

Revenue 1060 1195 1213 750

PAT 502 617 582 390

EPS 0.4 0.5 0.5 0.3

All figures in Rs. crores except for per share dataQtry fig. shows standalone results

Page 10: Nhpc Ppt Final

Highlights

10

• FINANCIAL 2009-10 2008-09 2007-08 2006-07

• Sales ** 4218.90 2671.85 2243.73 1754.12

• Miscellaneous 673.19 589.64 911.77 433.38

• PBIT , 3892.41 2201.76 2201.93 1610.04

depreciation & tax

• PAT & 2402.08 1178.34 1146.65 1087.74

depreciation

• Dividend 676.54 325.00 300.00 278.00

• Reserves 10972.45 6798.13 6093.34 5367.05

& surplus (cumulative)10

Page 11: Nhpc Ppt Final

Highlights

11

Key Success Factors

Achieve International standards of excellence in all aspect of hydro power.

Execute and operate projects in a cost effective, environment friendly and socio economic responsive manner

Adopt best practise of corporate governance.

Maximize creation of wealth through generation of internal funds and effective management of resources.

By fostering competent, trained and multiple disciplinary human capital.

Page 12: Nhpc Ppt Final

Highlights

12

Key Risk

• Execution Delay: Hydro-power projects typically require a long

gestation period and substantial capital outlays before completion

or before positive cash flows can be generated.

• Border Disputes with China

12

Page 13: Nhpc Ppt Final

Highlights

13

Company Initiatives & Strategy

NHPC is set to increase its global footprint through successful consultancy assignments, including project execution

This achievement is an outcome of NHPC performancein all aspects:-• planning, •consultancy or human resources.• enhanced IT capabilities and•network.

NHPC continuous process of growth in performance has enabled them to enhance our business leadership. Even as NHPC meet targets for better performance, NHPC never lose sight of our commitment to ethics and betterment of society

Page 14: Nhpc Ppt Final

Highlights

14

Corporate Social Responsibility

Provide Employment.

Provide electricity in rural areas.

Plant more trees .

Provide basic education system in rural areas.

Special measure for tribals

Development of public health centre, school, community centre etc

Page 15: Nhpc Ppt Final

Highlights

15 15

Thank You