nfv updates

13
HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Public 24.Oct 2013 www.huawei.com Security Level: Alpha NFV Updates Deepanshu Gautam

Upload: norm

Post on 28-Jan-2016

59 views

Category:

Documents


0 download

DESCRIPTION

NFV Updates. Deepanshu Gautam. MANO Descriptors. TOSCA is expected to support all!!!. NFV recommends TOSCA. ACCEPTED (Work in Progress). IMS MRF using TOSCA. ACCEPTED. IMS MRF use case. In Black: TOSCA constructs In red : mapping NFV requirements. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: NFV Updates

HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Public

24.Oct 2013

www.huawei.com

Security Level: Alpha

NFV Updates

Deepanshu Gautam

Page 2: NFV Updates

HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Public

MANO Descriptors

Page 2

TOSCA is expected to support all!!!

Page 3: NFV Updates

HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Public

NFV recommends TOSCA

Page 3

ACCEPTED

(Work in Progress)

Page 4: NFV Updates

HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Public

IMS MRF using TOSCA

Page 4

ACCEPTED

In Black: TOSCA constructsIn red: mapping NFV requirementsNote: Refer to the attached document for detailed

IMS MRF Service Template

IMS MRF use case

Page 5: NFV Updates

HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Public

TOSCA for MANO Descriptors

Page 5

TOSCA Service Template TOSCA NodeType Note yet defined ???

Page 6: NFV Updates

HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Public

VNF Forwarding Graph

Page 6

Virtual Link (VL)The VLD describes the basic topology of the connectivity (e.g. ELAN, ELINE, ETREE) between one or more VNFs connected to this VL, bandwidth and QoS class, IP address and VLAN allocation), and additional information (e.g. location, anti-affinity rules etc.).

Work in Progress

Page 7: NFV Updates

HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Public

VLD

Page 7

The VLD describes the basic topology of the connectivity (e.g. ELAN, ELINE, ETREE) between one or more VNFs connected to this VL, the required parameters for each interface (e.g. bandwidth and QoS class, IP address and VLAN allocation)

Page 8: NFV Updates

HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Public

Next meeting (13-16 May)

• Okinawa

• WG specifications will be stable after Okinawa

• WG will be approved on 18 June

• NFV Phase 1 release approval Dec 2014

• NFV Phase 2 initiation Feb 2015

• Phase 2 proposal under discussion already

Page 8

Page 9: NFV Updates

HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Public

Conclusions

• Liaison statement from TC is received by ETSI NFV Support

• The Liaison will be discussed in Okinawa meeting

• ISG will also appoint an ISG liaison officer for OASIS

• Gap Analysis work in ETSI has deferred to post Okinawa.

• A new EG will be formed which will consolidate input from all WGs

and create a single report to be shared externally.

• TC is requested to look into NFVs requirements and see how

TOSCA can support them and how.

Page 9

Page 10: NFV Updates

HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Public

Current MANO Architecture

Page 10

Current NFV Architecture

Page 11: NFV Updates

HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Public

Timeline

Page 11

Page 12: NFV Updates

HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Public

NOIP (NFV OpenSource)

Page 12

NFV Open Source project is proposed to be governed by Linux Foundation

Page 13: NFV Updates

HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Public

Membership

Page 13