KDN No.: PP8686/07/2013(032886) MIArb NEWSLETTER The Newsletter of the Malaysian Institute of Arbitrators Contents Note From President 1 Calendar of Events 2012–2013 3 Overcoming Evidential Difficulties in Delay Analysis 4 The Case for Indemnity Costs in Opposing Arbitral Awards 8 CPD Talk by Mr Kevin Reeves 12 Membership Upgrade Course 13 The Big Picture Incorporation of an Arbitration Clause by Inference? 14 List of MIArb Panel Arbitrators 20 List of New Members/ Upgrade for Session July 2012 to April 2013 26 Note From President Editorial Team: Shanthi Supramaniam, Hor Shirley Joshua Chong Contributors: Ow Sau Pin, Lee Shih, Nereen Kaur Veriah Dear Members, This will be my last message to you as president before my successor is elected at our Annual General Meeting in June 2013. My tenure has been challenging, and stressful but at the same time it was interesting, enjoyable, rewarding and satisfying. The credit for the positive parts these past 2 years goes to a wonderful council and secretariat with whom I have had the privilege and honour of working with. This is the 2nd Newsletter that has been produced by Shanthi, our editor, and I must congratulate her on a job well done and thank her and her team for the tireless effort that has been put in. This newsletter contains interesting articles on the immunity of arbitral institutions, overcoming evidential difficulties and indemnity costs which I hope you will find informative and useful. The recent evening talk we organised where Kevin Reeves spoke on “What the Courts are Now Saying About Delays” was a resounding success where we actually ran out of chairs to seat our guests. Our membership upgrade course which followed our fast track fellowship programme was also well received and I welcome all our new members and wish that they have a fruitful and rewarding time with us. As of May 2013, we kickstarted the “Joint Courses on Construction Law and ADR,” organised jointly by the Institution of Engineers Malaysia, the Royal Institution of Surveyors Malaysia, the Pertubuhan Akitek Malaysia and ourselves where a series of 5 courses will be held month on month and where we will present on the course on Arbitration. I also take this opportunity to welcome Mr Lam Ko Luen, Mr HT Ong and Captain Julian Brown who have been admitted into our panel of arbitrators this year. It has been my pleasure to serve MIArb and I encourage those who wish to play a bigger role in the institute to run for office. Chang Wei Mun President

Upload: lamhuong

Post on 26-Mar-2018

231 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: NEWSLETTER - MIArbmiarb.org/userfiles/MIArb_newsletter_2013_web2.pdf · This is the 2nd Newsletter that has been produced by Shanthi, ... KLRCA Fast Track Arbitration Rules ... (Jointly

KDN No.: PP8686/07/2013(032886)

MIArbN E W S L E T T E R

TheNewsletterof theMalaysianInstitute of Arbitrators

ContentsNote From President 1

Calendar of Events

2012–2013 3

Overcoming Evidential

Difficulties in Delay Analysis 4

The Case for Indemnity Costs

in Opposing Arbitral Awards 8

CPD Talk by Mr Kevin Reeves 12

Membership Upgrade Course 13

The Big Picture Incorporation

of an Arbitration Clause by

Inference? 14

List of MIArb Panel Arbitrators 20

List of New Members/

Upgrade for Session July

2012 to April 2013 26

Note FromPresident

Editorial Team: Shanthi Supramaniam,

Hor Shirley

Joshua Chong

Contributors: Ow Sau Pin, Lee Shih, Nereen Kaur Veriah

Dear Members,This will be my last message to you as president before my successor is

elected at our Annual General Meeting in June 2013.

My tenure has been challenging, and stressful but at the same time it was

interesting, enjoyable, rewarding and satisfying. The credit for the positive

parts these past 2 years goes to a wonderful council and secretariat with

whom I have had the privilege and honour of working with.

This is the 2nd Newsletter that has been produced by Shanthi, our editor,

and I must congratulate her on a job well done and thank her and her

team for the tireless effort that has been put in. This newsletter contains

interesting articles on the immunity of arbitral institutions, overcoming

evidential difficulties and indemnity costs which I hope you will find

informative and useful.

The recent evening talk we organised where Kevin Reeves spoke on

“What the Courts are Now Saying About Delays” was a resounding

success where we actually ran out of chairs to seat our guests. Our

membership upgrade course which followed our fast track fellowship

programme was also well received and I welcome all our new members

and wish that they have a fruitful and rewarding time with us.

As of May 2013, we kickstarted the “Joint Courses on Construction Law

and ADR,” organised jointly by the Institution of Engineers Malaysia, the

Royal Institution of Surveyors Malaysia, the Pertubuhan Akitek Malaysia

and ourselves where a series of 5 courses will be held month on month

and where we will present on the course on Arbitration. I also take this

opportunity to welcome Mr Lam Ko Luen, Mr HT Ong and Captain Julian

Brown who have been admitted into our panel of arbitrators this year.

It has been my pleasure to serve MIArb and I encourage those who wish

to play a bigger role in the institute to run for office.

Chang Wei Mun

President

Page 2: NEWSLETTER - MIArbmiarb.org/userfiles/MIArb_newsletter_2013_web2.pdf · This is the 2nd Newsletter that has been produced by Shanthi, ... KLRCA Fast Track Arbitration Rules ... (Jointly

The Malaysian Arbitration Act 2005(Amended 2011)An Annotation

by Datuk Sundra Rajoo

Key features

The book explains both the background and philosophy of the Arbitration Act 2005 with its background in the UNCITRAL ModelLaw on International Commercial Arbitration. It contains a compilation of current judicial and academic references that helpelucidate the topic and implementation of the Act.

Part 1: Introduction(1) A Brief Survey(2) The Malaysian Experience(3) The Legislative Reforms of 2005(4) UNCITRAL Model Law(5) The 2011 Reforms(6) The Format of the Act(7) Use of Case Laws and Legal Text

Part 2: Annotations to the Arbitration Act 2005 (1) Arbitration Act 2005 and its Annotations(2) UNCITRAL Model Law on International Commercial

Arbitration 1985 and its Explanatory Note by the UNCITRAL Secretariat (*the text reproduced)

Part 3: KLRCA and commentaries on the rules(1) The Kuala Lumpur Regional Centre for Arbitration(2) Services and Functions of KLRCA (3) KLRCA’s Rules: A commentary

(a) The genesis and conception of the rules (b) Current enhancements to the rules (c) KLRCA Arbitration Rules(d) KLRCA i-Arbitration Rules(e) KLRCA Fast Track Arbitration Rules

Appendix(1) Rules for Arbitration of the Regional Centre for

Arbitration Kuala Lumpur(2) UNCITRAL Arbitration Rules(3) Fast Track Rules of the Regional Centre for Arbitration

Kuala Lumpur(4) Convention on the Recognition and Enforcement of

Foreign Arbitral Awards

Table of contents

RM

125.00

ISB

N 9

78-9

67-

40

0-1

42-

1

This is a handy one volume reference for an overview on Arbitration in Malaysia, it is the first publication updated with the 2011legislative reforms. The book starts with a commentary on the overall Malaysian experience in arbitration, relevant legislative reforms, the UNCITRAL Model Law, the 2011 legislative reforms and the use of case law, legislation and codes. This is followedby an in-depth annotation of the Arbitration Act 2005 and the reproduction of the UNCITRAL Model Law. The last part of thisbook provides a write up about the KLRCA and their commentary on the relevant Rules. This should be a first point of referencefor anyone wishing to understand how arbitration works in Malaysia.

Alternatively, please contact our Helpdesk at Tel: 1800-88-8856 or Email: [email protected] or Twitter (Helpdesk): @HelpLNMY

http://twitter.com/LexisNexisMY/ http://facebook.com/LexisNexisMalaysia/

Order Now! via our eBookstore @ www.lexisnexis.com/store/my

Page 3: NEWSLETTER - MIArbmiarb.org/userfiles/MIArb_newsletter_2013_web2.pdf · This is the 2nd Newsletter that has been produced by Shanthi, ... KLRCA Fast Track Arbitration Rules ... (Jointly

3

Calendar ofEvents2012�201320 & 21 October 2012MIArb Membership Upgrade Course

Venue: MIArb Secretariat

The course was successfully held with attendance of 17 participants. Candidates were given oralassessment at the end of the course. Speakers were Mr Chang Wei Mun, Mr Jonathan Yoon,Mr Sanjay Mohanasundram, Mr Rajendra Navaratnam, Mr Kevin Prakash, Mr Ooi Huey Miin,Ms Ow Sau Pin and Ms Shanthi Supramaniam.

28 February 2013A talk on “What the Courts are Now Saying About Delays?”

Speaker:Mr Kevin Reeves

BSc, MSc (Construction Law & Arbitration), MRICS, MCIArb

RO Consulting Sdn Bhd (now known as ReevesOw Consulting Sdn Bhd)

Venue: MIArb Secretariat

The talk saw an overwhelming response from participants. Participants came from variousindustries – contractors, claims consultants, developers, engineers, quantity surveyors,architects, lawyers and etc. The talk explored the subject with respect to the methodsand core principles of delay analysis based on what the courts are now saying inconstruction and engineering projects.

4 March 2013, 4.00pmCourtesy Visit to RISM

Venue: Bangunan Juruukur, 3rd Floor, No. 64-66 Jalan 52/4, 46200 Petaling Jaya, Selangor

Attended by Chang Wei Mun, Sanjay Mohanasundram, Lam Ko Luen, A Mahadevan

13 March 2013, 3.00pmCourtesy Visit to IEM

Venue: Bangunan Ingenieur, No. 60/62 Jalan 52/4, 46200 Petaling Jaya, Selangor

Attended by Chang Wei Mun, Kevin Prakash, Hor Shirley, A. Mahadevan

Ongoing & Upcoming Events17 & 18 May 2013 and onwards Short Courses on Construction Law & ADR

(Jointly organised by IEM/PAM/RISM/MIArb)

May to September 2013KLRCA’s Series of Evening Talks

Nominated speakers: Mr Chang Wei Mun, Mr Lam Ko Luen, Mr Kevin Prakash &

Mr Ooi Huey Miin

22 June 20137th RAIF Conference in Philippines

Venue: Shangri-La Hotel, Cebu Philippines

Page 4: NEWSLETTER - MIArbmiarb.org/userfiles/MIArb_newsletter_2013_web2.pdf · This is the 2nd Newsletter that has been produced by Shanthi, ... KLRCA Fast Track Arbitration Rules ... (Jointly

4

OvercomingEvidentialDifficultiesin Delay Analysisby Ow Sau PinBSc (Hons) LLB (Hons) MRICS

MMIArb/ MIArb Council Member,

Director, ReevesOw Consulting Sdn Bhd, Kuala Lumpur

Last year the judgment on Walter Lilly &

Company Ltd v MacKay and Anor [2012]

EWHC 1773 (TCC) was published to

reveal what was doubtlessly a highly

dramatic dispute that any participants in the

construction industry can surely relate to. Mr

Justice Akenhead articulately addressed the

matters disputed with evidence being presented

by more than a dozen witnesses over two weeks

of hearings.

In the beginning and again in the middle of his

comprehensive award, Mr Justice Akenhead

described the project as ‘a disaster waiting to

happen’ and from the facts of the case, no other

description could be more apt. Walter Lilly was

contracted by MacKay to build and fit-out three

upmarket residential units in London. The contract

had ambiguous terms suggesting a fair share of

design responsibilities of which Walter Lilly

repeatedly sought clarification throughout the

project without much success. Numerous critical

design and construction issues were not provided

or resolved in a timely manner. The entire project

was fraught with late instructions, indecision, poor

coordination and significant client interference, all

typical ingredients to any challenging projects. In

the end there were excessive time and cost

overruns, a fuming client and an array of other

legal suits involving various other parties in the

project.

Amid the extensive sets of facts presented, Mr

Justice Akenhead was able to give helpful

guidance in his decision pertaining to the evidence

given on the various claims.

Tracking reality Mackay and the architect had, during the course

of the works, believed that the lift shaft was

constructed grossly out of alignment. At that time,

several other critical issues remained unresolved

but the lift shaft was thought to be the most

significant of all other delaying events. The lift shaft

was short listed with a handful of other items that

were considered major causes of delay, each

cause embroiled in equally difficult and uncertain

positions with regard to where delay responsibility

lies. However on the issue of the lift shaft, a

significant sum of money was being withheld by

the client as a result of his extreme dissatisfaction

Page 5: NEWSLETTER - MIArbmiarb.org/userfiles/MIArb_newsletter_2013_web2.pdf · This is the 2nd Newsletter that has been produced by Shanthi, ... KLRCA Fast Track Arbitration Rules ... (Jointly

5

over the allegedly defective work. Therefore, it

was no surprise that Walter Lilly had firstly

brought the dispute before an adjudicator during

the concurrency of the work. The adjudicator

decided that the defects were ‘grossly

exaggerated’ and reduced the sum withheld by

more than 75%. That meant Walter Lilly was

effectively absolved from the perceived and

mistaken belief that its culpability was holding up

the works.

Nevertheless in revisiting the evidence, presented

before the Technology and Construction Court

(TCC), the expert witness for the defendants did

not consider accommodating this fact to

retrospectively fit into his delay analysis. If it had

been decided by the adjudicator that the lift was

indeed grossly out of alignment, the time to

rectify such non-conformance would have taken

anytime from six to nine months and at that

juncture, it would have constituted the longest

sequence of works to completion, hence a

critical delay. However, the parties later accepted

that the rectification need not be as extensive as

initially thought therefore Mr Justice Akenhead

considered that that the lift shaft was totally

irrelevant in any factual analysis of what caused

the delay.

Parties frequently adopt a ‘full-battle’ mode in

dispute resolution, which is not only costly but

has little value in resolving the actual issues in

question. The judge enlightens us in this case

that not all evidence is equal for the purpose of

factual analysis; parties should always check the

relevance of evidence presented. For that he was

immensely complimentary of the claimant’s

expert in carrying out a month-by month reality

check on all the programmes, or whatever few of

them submitted as evidence, during the critical

periods.

A lesson one canalso usefully extractfrom the case is the

importance oftracking or updating

programmes nomatter how

discouraging orirrepressible the

situation hasbecome at thematerial time.

Page 6: NEWSLETTER - MIArbmiarb.org/userfiles/MIArb_newsletter_2013_web2.pdf · This is the 2nd Newsletter that has been produced by Shanthi, ... KLRCA Fast Track Arbitration Rules ... (Jointly

6

The final daysA lesson one can also usefully extract from

the case is the importance of tracking or

updating programmes no matter how

discouraging or irrepressible the situation has

become at the material time. Both the experts

in the case agreed that when the project was

delayed over a year beyond the original

completion date there was ‘no programme of

all the works outstanding at that date which

could sensibly be used as a baseline in a

retrospective programme analysis.’

On the facts of this case, towards the last six

months of completion, parties had become

increasingly despondent with the elusive goal

of completion given the uncertain nature of

works required. There were deeply-

entrenched disagreements as to the

standards required to be met and therefore

the time necessary to comply with the differing

standards. It was of no help that the client

became increasing demanding and hostile

even to his team of consultants thereby

causing less attention to be cast on a

necessary tracking programme.

The lack of reliable updated programmes

during a project is not an uncommon

situation. The parties in this case would have

done well to give serious thought to updated

programmes to be evidence in any

subsequent dispute resolution. This can take

one of two forms, a revised programme

indicating completed tasks with as-built dates

together with outstanding works and durations

required oor simply a completion programme

setting out only the actual outstanding tasks

with a reasonable estimate of individual

completion periods, taking into consideration

the circumstances and challenges

surrounding each individual task.

Although a revised programme would have

been a more compelling record, a completion

programme nevertheless would have provided

adequate and sensible evidence for

retrospective delay analysis. In a situation

where there is a severe scarcity of evidence,

even the simplest evidence can shed some

light on the dispute. Provided of course, it is

relevant and consistent with reality.

Stating facts accurately Another major delay disputed in this case was

the stain to be applied to joinery work.

Although the stain was solely selected by the

defendants, it later became a major grievance

when it did not meet the defendants’

expectation.

After an initial colour and finish was applied on

a door panel as a mock-up, the defendants

appeared to have accepted it. It was also

recorded in a following meeting that the

claimant was to proceed with the remaining

surfaces accordingly. Despite numerous

inspections that took place without complaints

and after the staining work was largely

completed, the defendants later claimed that

the colour was ‘too dark’ and were

dissatisfied. The defendants then engaged an

expert on the subject matter to inspect the

staining. It turned out that there was no fault

that could be attributed to the claimant as

there was always going to be ‘natural variation

in the colour of timber across the grain…’ The

claimant, the architect and the expert

expressed their views that the works were in

compliance with the specification but the

defendants however were adamant that the

flooring had to be replaced otherwise the

costs of doing so by a third party would be

recovered from the claimant.

In a situation wherethere is a severescarcity of evidence,even the simplestevidence can shedsome light on thedispute.

Page 7: NEWSLETTER - MIArbmiarb.org/userfiles/MIArb_newsletter_2013_web2.pdf · This is the 2nd Newsletter that has been produced by Shanthi, ... KLRCA Fast Track Arbitration Rules ... (Jointly

7

During the hearings, MacKay’s position was

that he did not authorise the staining for the

whole house. Judge Akenhead however

found the defendant ‘… did positively instruct

and ask Walter Lilly to stain all the veneer

throughout the house…’ primarily because

numerous minutes of meeting thereafter did

not challenge the staining when it proceeded.

The judge rationalised that the defendants ‘…

had been concerned in the past about the

accuracy of minutes, it is not credible that they

did not challenge these minutes if they were

inaccurate in this particular regard.’

Minutes of meetings in construction projects

are often drafted by the architect or engineer.

Contractors very rarely seek for them to be

corrected even when they have reasonable

cause to do so. In Walter Lilly, this oversight

may have the opposite effect for the client but

the significance is the same. Minutes of

meetings, will be considered a source of

evidence. Therefore, if they do not record the

facts correctly as viewed by any one party,

that party should always seek to have the

record corrected. This action may be viewed

as pedantic at the material time but what is

being pedantic compared to being proven

wrong later when there is a need to rely on

such evidence?

In conclusion, accurate records ought to be

kept as evidence irrespective of whether there

are any disputes. Walter Lilly v MacKay

provides us typical examples of how the lack

of reliable records can cause considerable

evidential difficulties during formal dispute

resolution procedures. Such evidence may

not avert a dispute but it would definitely help

courts and tribunals in deciding who was

responsible. It would also do no less to help

experts in providing their opinions as to why

and how delays happened. In other words, let

the evidence speak for itself. �

Page 8: NEWSLETTER - MIArbmiarb.org/userfiles/MIArb_newsletter_2013_web2.pdf · This is the 2nd Newsletter that has been produced by Shanthi, ... KLRCA Fast Track Arbitration Rules ... (Jointly

8

The Case forIndemnity Costs inOpposing Arbitral Awards

by Lee Shih

([email protected]) / Partner, Skrine

In upholding the contractual agreement for parties

to arbitrate a dispute, a party who obtains an

arbitral award in his favour should be entitled to

expect that the Court will enforce the award as a

matter of course. After the award has been issued

however, the successful party will likely still face Court

challenges by the losing party through an application

filed to set aside the award or to oppose the

enforcement of the award.

If such an application is unsuccessful however, there

may be a case to argue that the successful party

should then be allowed costs on the higher indemnity

basis rather than just the standard basis.

This article will analyse how the different jurisdictions

have dealt with this issue and how in Malaysia, there is

a case for costs on an indemnity basis to be awarded

in such unsuccessful challenges to an arbitral award.

Hong Kong’s Position inSupport of Indemnity CostsThe Hong Kong Court of Appeal in Pacific China

Holdings Ltd (in Liquidation) v Grand Pacific Holdings

Ltd [2012] HKCA 332 has affirmed the principle that

an unsuccessful party in applying to set aside an

arbitral award, or in resisting the enforcement of the

award, in the absence of special circumstances, will

be liable to pay costs on an indemnity basis.

The Court of Appeal affirmed the principle set out by

Reyes J in the Hong Kong Court of First Instance case

of A v R [2009] HKCFI 342 and its own approach in

Gao Haiyan & Anor v Keeneye Holdings Ltd & Anor

(No 2) [2012] 1 HKC 491 in holding that, given

that the parties had agreed to arbitration,

applications by a party to set aside an arbitral

award or to resist enforcement should be

exceptional events.

The reasoning is that if the losing party is only

made to pay costs on a conventional party-and-

party basis, the winning party would in effect be

subsidising the losing party’s abortive attempt to

frustrate enforcement of a valid award. The

winning party would only be able to recover about

two-thirds of its costs of the challenge and would

be out of pocket as to one-third. This is despite

the winning party already having successfully

gone through an arbitration and obtained an

award in its favour. The losing party, in contrast,

would not be bearing the full consequences of its

abortive application.

Therefore, it now appears quite settled in Hong

Kong that the onus is on the losing party who is

unsuccessful in such a challenge to demonstrate

the special circumstances why an indemnity

costs order ought not to be granted.

Australia and EnglandBy contrast to the Hong Kong position however,

the cases from Australia and England adopt the

position that in an unsuccessful challenge to an

arbitral award, costs should still only be awarded

on the standard basis unless there are other

circumstances to justify an indemnity costs order.

Page 9: NEWSLETTER - MIArbmiarb.org/userfiles/MIArb_newsletter_2013_web2.pdf · This is the 2nd Newsletter that has been produced by Shanthi, ... KLRCA Fast Track Arbitration Rules ... (Jointly

9

In Australia, the Court of Appeal of Victoria in

IMC Aviation Solutions Pty Limited v Altain

Khuder [2011] VSCA 248 considered the issue

of whether indemnity costs should be awarded

in an unsuccessful challenge to an arbitral

award. The Judge at first instance had adopted

the approach of Reyes J in A v R in awarding

such indemnity costs. However, the Court of

Appeal overturned this decision and held that

there was nothing in the Victorian civil

procedure statute or in the nature of

enforcement proceedings for arbitral awards

which, of itself, warranted costs being awarded

against an unsuccessful party on a basis

different from that on which they would have

been awarded in other civil proceedings. The

general position would be that costs will

ordinarily be awarded against the unsuccessful

party on the standard basis unless the

successful party can establish special

circumstances.

In England, the English courts may likely award

indemnity costs where proceedings are brought

in breach of a binding arbitration agreement. In

the High Court decision of A v B (No 2) [2007]

EWHC 54 (Comm) for example, court

proceedings were stayed as the proceedings

were brought in breach of an arbitration

agreement. It was held that as the breach had

caused the innocent party to incur legal costs,

those costs should normally be recoverable on

an indemnity basis.

Similar to the Australian position however, the

English decisions have not appeared to adopt

…the general principle inMalaysia on indemnity costs

would also require something outof the norm in order to depart

from costs on the standard basis.

Page 10: NEWSLETTER - MIArbmiarb.org/userfiles/MIArb_newsletter_2013_web2.pdf · This is the 2nd Newsletter that has been produced by Shanthi, ... KLRCA Fast Track Arbitration Rules ... (Jointly

indemnity costs would also require something

out of the norm in order to depart from costs on

the standard basis. The Federal Court in Takako

Sakao (f) v Ng Pek Yuen (f) & Anor (No 2) [2010]

2 MLJ 181 set out some of the guideless for an

award of indemnity costs and emphasised that

the discretion to award such costs is unfettered.

Order 59 Rule 8 of the RC does provide some

guidance on the special matters to be taken

into account in the exercise of the Court’s

discretion in the award of costs, one of which is

to consider the “conduct of all parties, including

before and during the proceedings.” The act of

challenging an arbitral award can be seen as an

exceptional event (see this general sentiment

expressed in the Federal Court decision of

Intelek Timur Sdn Bhd v Future Heritage [2004]

1 MLJ 401 and the Court of Appeal in AJWA

For Food Industries Co (MIGOP), Egypt v Pacific

Inter-Link Sdn Bhd and another appeal [2013] 2

CLJ 395). Therefore, similar to the Hong Kong

position, the losing party should bear the full

consequences of its unsuccessful attempt at

challenging the award by being penalised with

indemnity costs.

It remains to be seen which direction we will

move towards and whether we will adopt the

more punitive approach of awarding indemnity

costs for unsuccessful challenges to an award.

This may then enhance Malaysia’s position as

an arbitration-friendly jurisdiction, with the courts

upholding awards and discouraging frivolous

challenges. �

10

the Hong Kong approach in leaning towards

awarding indemnity costs for unsuccessful

challenges. The general position is that an order

for indemnity costs will be made only where

there is some conduct or some circumstances

which takes the case out of the norm (see the

English High Court decision of Fiona Trust &

Holding Corporate and ors v Yuri Privalov and

ors [2011] EWHC 664 (Comm) summarising the

general principles justifying the award of

indemnity costs).

The English High Court decision of Exfin

Shipping (India) Ltd Mumbai v Tolani Shipping

Co. Ltd Mumbai, [2006] EWHC 1090 (Comm)

is an example where costs were awarded on an

indemnity basis. The applicant was

unsuccessful in applying to set aside an arbitral

award and it was held that the applicant had

acted in its own perceived commercial interest

and without merit. That was sufficient to take the

case “out of the norm” thus justifying the order

for indemnity costs.

MalaysiaAn award of costs on an indemnity basis is set

out in Order 59 Rule 16(4) of the Rules of Court

2012 (“RC”) which essentially allows for all costs

except in so far as they are of an unreasonable

amount or have been unreasonably incurred.

The issue of whether costs on an indemnity

basis should be allowed in unsuccessful

challenges to an arbitral award does not appear

to have been considered by the courts here.

Thus far, the general principle in Malaysia on

It remains to be seen which direction wewill move towards and whether we will

adopt the more punitive approach ofawarding indemnity costs for unsuccessful

challenges to an award.

Page 11: NEWSLETTER - MIArbmiarb.org/userfiles/MIArb_newsletter_2013_web2.pdf · This is the 2nd Newsletter that has been produced by Shanthi, ... KLRCA Fast Track Arbitration Rules ... (Jointly
Page 12: NEWSLETTER - MIArbmiarb.org/userfiles/MIArb_newsletter_2013_web2.pdf · This is the 2nd Newsletter that has been produced by Shanthi, ... KLRCA Fast Track Arbitration Rules ... (Jointly

12

CPD Talk by Mr Kevin Reevesof RO Consulting Sdn Bhd* 28 February 2013

What the Courts Are Now Saying About Delays

1

1 Kevin Reeves delivering his presentation

2

3

2 Kevin Reeves engaging the audience in a Q&A session

3 Audience in rapt attention

* Now known as ReevesOw Consulting Sdn Bhd

Page 13: NEWSLETTER - MIArbmiarb.org/userfiles/MIArb_newsletter_2013_web2.pdf · This is the 2nd Newsletter that has been produced by Shanthi, ... KLRCA Fast Track Arbitration Rules ... (Jointly

13

Membership UpgradeCourse 20 & 21 October 2012

1 2

3 4 5

6 7

1 Some of the members who attended the course

2 The President, Mr Chang Wei Mun delivering his talk

3 Sanjay Mohanasundram

4 Jonathan Yoon

5 Kevin Prakash

6 Ow Sau Pin

7 Ooi Huey Miin

Page 14: NEWSLETTER - MIArbmiarb.org/userfiles/MIArb_newsletter_2013_web2.pdf · This is the 2nd Newsletter that has been produced by Shanthi, ... KLRCA Fast Track Arbitration Rules ... (Jointly

14

The Big PictureIncorporation of an ArbitrationClause by Inference?

by Nereen Kaur Veriah LL.B (Hons) (London) C.L.P.

Associate, Shook Lin & Bok

The issue of whether an arbitration clause may be incorporatedinto a contract by drawing inferences from the conduct ofparties or documents other than the contract in dispute is anarea of far-reaching consequences. This article looks at arecent judicial decision on this issue.

Page 15: NEWSLETTER - MIArbmiarb.org/userfiles/MIArb_newsletter_2013_web2.pdf · This is the 2nd Newsletter that has been produced by Shanthi, ... KLRCA Fast Track Arbitration Rules ... (Jointly

15

Section 9(5) of the Arbitration Act

2005 (“the 2005 Act”) provides

that, “a reference in an

agreement to a document

containing an arbitration clause shall

constitute an arbitration agreement,

provided that the agreement is in writing

and the reference is such as to make

that clause part of the agreement.”

In essence reference in a contract to a

document (containing an arbitration

agreement) is sufficient to incorporate the

arbitration agreement into that contract.

However, what amounts to a “reference”

to a document containing an arbitration

agreement received judicial attention

recently in the decision by the Federal

Court when it overturned the Court of

Appeal’s decision in the case of

Malaysian Newsprint Industries Sdn

Bhd1. There, the Court of Appeal held

that a reference may be made by

drawing inference from the conduct of

parties or documents other than the

contract in dispute, despite the fact that

the contract in dispute did not expressly

incorporate the document containing the

arbitration agreement.

The facts were these. The appellant

entered into a Technical Services

Agreement (TSA) with the respondents

for the respondents to provide services

as a consultant for the design and

construction of a newsprint mill. The TSA

contained an arbitration agreement.

However, prior to the expiry of the TSA,

both parties entered into negotiations to

extend the time period of the TSA. During

the negotiations, 6 proposals were

submitted by the respondents. Whilst the

first 5 proposals contained a

subordination clause (i.e. an express

term incorporating the TSA and hence

the arbitration agreement), the 6th

proposal did not.

1 Malaysian Newsprint Industries Sdn Bhd v Bechtel International Inc (2012) 9 CLJ 993

the Court of Appeal held that areference may be made by drawing

inference from the conduct of partiesor documents other than the contract

in dispute, despite the fact that thecontract in dispute did not expresslyincorporate the document containing

the arbitration agreement.

Page 16: NEWSLETTER - MIArbmiarb.org/userfiles/MIArb_newsletter_2013_web2.pdf · This is the 2nd Newsletter that has been produced by Shanthi, ... KLRCA Fast Track Arbitration Rules ... (Jointly

16

The appellant brought an action against the

respondent for breach of contract, negligence

and breach of statutory duty. The dispute was

in respect of services provided during the

extended period and in particular, the 6th

proposal. At the High Court, the respondents

applied for a stay of proceedings in favour of

arbitration pursuant to Section 6 of the

Arbitration Act 1952 (“the 1952 Act”). The

High Court Judge was of the view that the

disputed services was in respect of the 3rd

proposal and not the 6th. As the 3rd proposal

expressly refers to the TSA, the respondent’s

application was granted.

The appellant’s appealed to the Court of

Appeal. The appellant argued that the dispute

arose from the 6th proposal and as the 6th

proposal did not have a subordination clause,

it could not be said to have incorporate the

arbitration agreement. The Court of Appeal

however dismissed the appeal. In doing so,

the Court of Appeal drew an inference from

the appellant’s conduct and from documents

other than the contract documents (i.e. the

TSA and the first 5 proposals) and held that

the “big picture” was that the appellant had

agreed to arbitrate. This was so despite

acknowledging that the 6th proposal did not

contain a subordination clause (making

reference to the TSA). As such, the Court of

Appeal held that the appellant was stopped

from denying the arbitration agreement.

On appeal to the Federal Court, the issue was

whether the agreement to arbitrate in the TSA

could be inferred into the contract between

the parties, here the 6th proposal even though

there was no express incorporation.

The respondents relied on the case of Bauer1

where the issue before the Court of Appeal

was whether facts and circumstances in the

present case warranted a finding that the

parties either expressly or through their

conduct agreed to incorporate the arbitration

clause into the subsequent work orders (when

only the first work order contained an

arbitration clause). In deciding this issue, the

Court of Appeal considered the guidelines set

out in T.N. Rao v. Balabhadra AIR [1954]

Mad. 71, The Annefield [1971] and The Abu

Road Electricity & Industries Co. Ltd. v.

Industrial Gases Ltd. AIR [1977] Cal. 482 and

was of the view that clear words ought to be

used in incorporating a document containing

an arbitration clause. The Court of Appeal was

also of the view that the particular facts of

2 Bauer (Malaysia) Sdn Bhd v Daewoo Corporation (1999) 4 CLJ 665

The Federal Court held thatthe arbitration agreement is

one which has to bereduced in writing and not

adopted by way of drawinginference from the conductof the parties or documents

other than the contractgiving rise to the dispute.

Page 17: NEWSLETTER - MIArbmiarb.org/userfiles/MIArb_newsletter_2013_web2.pdf · This is the 2nd Newsletter that has been produced by Shanthi, ... KLRCA Fast Track Arbitration Rules ... (Jointly

17

ADDRESS:20TH FLOOR, AMBANK GROUP BUILDING 55 JALAN RAJA CHULAN50200 KUALA LUMPURMALAYSIATELEPHONE : (603) 2031 1788 (25 Lines)FASCIMILE : (603) 2031 1775/8/9WEBSITE : www.shooklin.com.myEMAIL : [email protected]

EXPERIENCE AND QUALITYShook Lin & Bok is known for its experience and quality in arbitration work. It is one of the largest

law firms and also the oldest law firm of local origin in Malaysia with an extensive litigation and non-litigation practice. The firm’s arbitration team led by Dato’ Cyrus Das, a Fellow of The Malaysian Institute of Arbitrators, acts for various multi-national clients including foreign governments in challenges and enforcements of awards arising from international arbitrations. The firm’s International & Domestic Arbitration Department comprise of several partners who are well-regarded in the various fields, including Construction & Engineering, Adjudication, Oil & Gas, Insurance, Shipping & Aviation, Joint Ventures and Commercial Disputes.

Dato’ Dr. Cyrus DasManaging PartnerShook Lin & [email protected]

Nagarajah MuttiahHead, International & Domestic [email protected]

Lam Ko LuenDeputy Head, International & Domestic ArbitrationDeputy President,The Malaysian Institute of [email protected]

each case were important in

determining the intention of the

parties.

Whilst the Federal Court in Bechtel

agreed with the decision of Bauer,

the Court held that Bauer was not

relevant to the present case as there

was no express incorporation in the

6th proposal of the document

containing the arbitration clause.

The Federal Court held that the

arbitration agreement is one which

has to be reduced in writing and not

adopted by way of drawing inference

from the conduct of the parties or

documents other than the contract

giving rise to the dispute. In allowing

the appeal, the Federal Court held

that the Court of Appeal erred when it

accepted that there was no reference

in the 6th proposal to the TSA, but

chose to look at the conduct of the

parties instead.

Based on the above decision, it

would appear that in determining

whether an arbitration agreement has

been successfully incorporated into a

contract, the reference to the

arbitration agreement must be

reduced into writing and into the

contract document which is the

subject matter of the suit or action.

Thus whilst the Courts will look at the

surrounding facts and circumstances

as they did in Bauer, it would appear

from the decision in Bechtel that the

Courts are disinclined to hold that

there is such a reference if the

intention to arbitrate is not evidenced

in clear terms. �

Page 18: NEWSLETTER - MIArbmiarb.org/userfiles/MIArb_newsletter_2013_web2.pdf · This is the 2nd Newsletter that has been produced by Shanthi, ... KLRCA Fast Track Arbitration Rules ... (Jointly

MIArb offers well appointed arbitration rooms complete with document storage facilities. These rooms can be used for meetings, conferences, seminars or workshops and can accommodate up to 80 people in theatre-style seating.

MIArb Rooms &Document StorageFacility for Rent

The room charges include• Use of discussion room (Room C) for

break-up sessions, on a shared basis with other arbitration room users

• Use of library by arbitrators and lawyers during recesses

• Use of reference library• Wifi access

ReservationsA deposit of 20% is required. The balance is payable 10 days before the first day of use.

Booking ConditionsBooking of rooms may be made by either party to the arbitration. The party making the booking shall be responsible for the payment of room rental and other additional costs incurred (e.g. refreshments, fax, telephone, etc.)

Use of rooms outside normal hoursRM50 per extended hour

Normal Opening Hours

8:30am – 5:30pm from Monday – Friday (Except Public Holidays)

Opening Hours on Saturdays,

Sundays & Public Holidays

Room charges as above plus RM30 per hour (the minimum administrative charge is RM120)

Cancellation charges

• More than 30 days notice 10%• 11 to 30 days notice 15%• 10 days or less notice 25%

Services available at extra charge

• Photocopying• Recording & transcripts• LCD projector• Whiteboard-photocopier• Outside catering for snacks & lunch

Storage cabinets

Rates for document storage cabinets are:

2-shelf cabinet3-shelf cabinet

RM2RM3

RM40RM60

Per day Per month

Page 19: NEWSLETTER - MIArbmiarb.org/userfiles/MIArb_newsletter_2013_web2.pdf · This is the 2nd Newsletter that has been produced by Shanthi, ... KLRCA Fast Track Arbitration Rules ... (Jointly

Room A

For Arbitration For Meetings, Conference,Seminars & Workshops

Full Day(9:00am – 5:30pm)

Half Day(9:00am – 1:00pm)(2:00pm – 6:00pm)

Full Day(9:00am – 5:30pm)

Half Day(9:00am – 1:00pm)(2:00pm – 6:00pm)

Capacity (persons)

RM250

RM150

RM250

RM150

40

Room B

For Arbitration For Meetings, Conference,Seminars & Workshops

Full Day(9:00am – 5:30pm)

Half Day(9:00am – 1:00pm)(2:00pm – 6:00pm)

Full Day(9:00am – 5:30pm)

Half Day(9:00am – 1:00pm)(2:00pm – 6:00pm)

Capacity (persons)

RM250

RM150

RM250

RM150

40

Room C

For Meetings, Conference,Seminars & Workshops

Full Day(9:00am – 5:30pm)

Half Day(9:00am – 1:00pm)(2:00pm – 6:00pm)

Full Day(9:00am – 5:30pm)

Half Day(9:00am – 1:00pm)(2:00pm – 6:00pm)

Capacity (persons)

RM200

RM120

RM200

RM120

15

For ArbitrationFor Meetings, Conference,Seminars & Workshops

Full Day(9:00am – 5:30pm)

Half Day(9:00am – 1:00pm)(2:00pm – 6:00pm)

Full Day(9:00am – 5:30pm)

Half Day(9:00am – 1:00pm)(2:00pm – 6:00pm)

Capacity (persons)

RM400

RM250

RM400

RM250

80

For Arbitration

Room A+Room B

Contact

Phone: (+60)3-7726 5311Fax: (+60)3-77265322Email: [email protected] [email protected]

Address

Unit 508, Lobby 2, 5th FloorBlock A, Damansara IntanNo. 1, Jalan SS20/2747400 Petaling Jaya,Selangor Darul Ehsan, Malaysia

Page 20: NEWSLETTER - MIArbmiarb.org/userfiles/MIArb_newsletter_2013_web2.pdf · This is the 2nd Newsletter that has been produced by Shanthi, ... KLRCA Fast Track Arbitration Rules ... (Jointly

1. 2. 3. 4. 5.

Ms A

ha

lya

Ma

he

nd

ra

Sui

te 5

29, B

lock

B2

Leis

ure

Com

mer

ce S

qua

re9,

Jal

an P

JS 8

/946

150

Pet

alin

g Ja

yaS

elan

gor

Dar

ul E

hsan

Te

l: 60

3-78

7752

36Fa

x: 6

03-7

8775

237

Em

ail:

ahal

yam

ahen

dra

@th

e.ne

t.m

y

Ta

n S

ri D

ato

’ C

ec

il W

.M. A

bra

ha

m

c/o

Zul

Rafi

que

& P

artn

ers

D3-

3-8,

Sol

aris

Dut

amas

No.

1, J

alan

Dut

amas

1

5048

0 K

uala

Lum

pur

, Mal

aysi

aTe

l: 60

3-62

0982

28Fa

x: 6

03-6

2098

221

Em

ail :

cec

il@zu

lrafiq

ue.c

om.m

y

Ir. C

ho

ng

Pic

k E

ng

(P

E C

ho

ng

)

4, L

oron

g K

emar

is E

mp

at,

Buk

it B

and

ar R

aya,

Ban

gsar

5910

0 K

uala

Lum

pur

, Mal

aysi

aTe

l: +

603-

2201

2378

Fax:

+60

3-20

9223

78H

/P: +

6012

-297

5323

Em

ail:

cpic

ke@

pc.

jarin

g.m

y

Pro

fesso

r D

r C

olin

YC

On

g

Sui

te 2

-2 G

adon

g P

rop

ertie

s C

entr

e, J

alan

G

adon

g, B

and

ar S

eri B

egaw

an B

E41

19 B

rune

i D

arus

sala

mTe

l: (6

73)(2

)420

913

Fax

: (67

3)(2

)420

911

Em

ail:o

ngle

gal@

bru

net.

bn

Ir D

r W

on

g F

oo

k K

eo

ng

No.

8-4

, Jal

an S

P 2

/2

Tam

an S

erd

ang

Per

dan

aS

eksy

en 2

, 433

00 S

eri K

emb

anga

nS

elan

gor,

Mal

aysi

aTe

l: 60

3-89

4366

86Fa

x: 6

03-8

9452

686

Em

ail:

wea

sbs@

stre

amyx

.com

Nam

es

& A

dd

ress

es

• La

wye

r

• La

wye

r

• C

hart

ered

Eng

inee

r (U

K)

• P

rofe

ssio

nal E

ngin

eer

(Mal

aysi

a)•

Ase

an C

hart

ered

Pro

f. E

ngin

eer

• A

dvo

cate

& S

olic

itor

(Hig

h C

ourt

of M

alay

a)

• La

wye

r•

Arb

itrat

or

• G

eote

chni

cal,

Civ

il &

S

truc

tura

l Eng

inee

r•

Bui

ldin

g D

emol

ition

E

ngin

eer

Pri

mary

Pro

fess

ion

• LL

B(H

ons)

Uni

vers

ity o

f Bris

tol

• LL

M K

ing’

s C

olle

ge, U

nive

rsity

of L

ond

on,

UK

• D

iplo

ma

in In

tern

atio

nal C

omm

erci

al

Arb

itrat

ion

(CIA

rb) U

K

• LL

B (H

ons)

Que

en M

ary

Col

lege

, Uni

vers

ity

of L

ond

on 1

968

• D

ip M

ech.

E.,

KL

Tech

(196

8)•

Par

t II,

Cou

ncil

of E

ngin

eerin

g In

stitu

tions

, U

K19

77•

Inte

rmed

iate

& P

art

I, U

nive

rsity

of L

ond

on

1991

• B

ache

lor

of L

aw (H

ons)

, Uni

vers

ity o

f W

olve

rham

pto

n 19

92•

LLM

, Uni

vers

ity o

f Mal

aya

2002

• D

ipIC

IArb

, 200

4

• LL

B (H

ons)

-Uni

vers

ity o

f She

ffiel

d•

LLM

(Com

mer

cial

Law

)•

Ph.

D (C

omm

erci

al L

aw &

Arb

itrat

ion)

U

nive

rsity

of L

ond

on•

Dip

lom

a in

Inte

rnat

iona

l Com

mer

cial

A

rbitr

atio

n (C

IArb

)

• B

.Sc

(Civ

il E

ngin

eerin

g, U

nive

rsity

of

Str

athc

lyd

e, S

cotla

nd)

• P

h. D

(Civ

il, M

inin

g &

Ap

plie

d G

eolo

gy,

Uni

vers

ity o

f Str

athc

lyd

e, S

cotla

nd)

• D

ip.E

F (A

ssoc

iatio

n of

Cos

t &

Exe

cutiv

e A

ccou

ntan

ts, U

K)

• P

ost

Gra

d. D

ip in

Arb

itrat

ion

(Col

lege

of

Est

ate

Man

agem

ent,

Rea

din

g)•

LLM

(Com

mer

cial

Law

, Uni

vers

ity o

f N

orth

umb

ria,U

K)

• LL

M (I

nter

natio

nal T

rad

e La

w, U

nive

rsity

N

orth

umb

ria U

K)

Qu

alif

icati

on

& T

rain

ing

• M

ariti

me

Arb

itrat

ion

• C

onst

ruct

ion

Arb

itrat

ion

• C

orp

orat

e A

rbitr

atio

n

• In

tern

atio

nal C

omm

erci

al D

isp

utes

• M

ariti

me

Arb

itrat

ion

• In

vest

men

t D

isp

utes

• C

onst

ruct

ion

Dis

put

es•

Pal

m O

il M

illin

g/P

roce

sses

• B

iom

ass

Pla

nts

• U

tiliti

es (H

eatin

g –

Boi

lers

& R

efrig

erat

ing

Pro

cess

es)

• P

roce

ss/M

anuf

actu

ring

Pla

nt

• C

omm

erci

al A

rbitr

atio

n•

Join

t V

entu

res

• In

sura

nce

• C

onst

ruct

ion

• O

il &

Gas

Ind

ustr

y•

Shi

pp

ing

Ind

ustr

y

• E

xper

t W

itnes

s in

Con

stru

ctio

n In

dus

try

• A

rbitr

ator

in C

onst

ruct

ion

Ind

ustr

y

Arb

itra

tion

Exp

eri

en

ce

• FM

IArb

• FC

IArb

• C

hart

ered

Arb

itrat

or

• FM

IArb

• FC

IArb

• FS

IArb

• Fe

llow

, AC

ICA

(Aus

tral

ian

Cen

tre

for

Inte

rnat

iona

l C

omm

erci

al A

rbitr

atio

n)•

Cha

rter

ed A

rbitr

ator

• P

ast

Cha

irman

CIA

rb

• P

ast

Vic

e P

resi

den

t A

PR

AG

• M

emb

er-I

CC

Com

mis

sion

on

Arb

itrat

ion

• P

ast

Mem

ber

of t

he L

ond

on C

ourt

of I

nter

natio

nal

Arb

itrat

ion

• M

emb

er, I

CC

A•

Mem

ber

, Exe

cutiv

e C

ounc

il of

I-C

eLLS

• M

emb

er, A

dvi

sory

Cou

ncil

of S

IAC

& K

LRC

A•

Mem

ber

, IC

SID

Pan

el•

Mem

ber

, IC

C M

alay

sia

Nat

iona

l Com

mitt

ee•

Cha

ir of

ICC

Mal

aysi

a A

rbitr

atio

n C

omm

ittee

• FM

IArb

• FC

IArb

• FI

Mec

hE•

FSIA

rb•

Fello

w-I

nstit

utio

n of

Eng

inee

rs, M

alay

sia;

Aus

tral

ia;

Sin

gap

ore

• H

onor

ary

Fello

w, T

he A

SE

AN

Fed

erat

ion

of E

ngin

eerin

g O

rgan

isat

ion

• P

anel

of A

rbitr

ator

s, IE

M,P

AM

, KLR

CA

, SIA

rb, M

IArb

• H

onFA

FEO

• B

arris

ter

& B

ench

er o

f the

Inne

r Te

mp

le•

FMIA

rb•

FCIA

rb•

Cha

rter

ed A

rbitr

ator

• FS

IArb

• P

resi

den

t of

the

Arb

itrat

ion

Ass

ocia

tion

of B

rune

i D

arus

sala

m•

Vis

iting

Fel

low

, Uni

vers

ity o

f Lon

don

, Sch

ool o

f Int

. A

rbitr

atio

n si

nce

1996

• V

isiti

ng P

rofe

ssor

, Uni

vers

ity o

f Lon

don

, Kin

g’s

Col

lege

• A

dju

nct

Ass

oc P

rof.

NU

S (S

inga

por

e)

• P

rofe

ssio

nal C

ivil

Eng

inee

r M

alay

sia

• C

hart

ered

Civ

il E

ngin

eer

• C

hart

ered

Arb

itrat

or•

Acc

red

ited

Che

cker

for

Geo

tech

nica

l Wor

ks (B

EM

5 A

C/G

)•

AS

EA

N E

ngin

eer

• FM

IArb

• FC

IArb

• FI

EM

• M

AC

EM

• P

rofe

ssio

nal M

emb

er, C

oncr

ete

Rei

nfor

cing

Ste

el

Inst

itute

,US

A•

Ass

ocia

te M

emb

er, A

ssoc

iatio

n B

usin

ess

Exe

cutiv

es, U

K•

Pan

el M

edia

tor:

KLR

CA

• P

anel

Arb

itrat

or: K

LRC

A, I

EM

Pro

fess

ion

al A

ffili

ati

on

List

of M

IArb

Pan

el A

rbitr

ator

s

Page 21: NEWSLETTER - MIArbmiarb.org/userfiles/MIArb_newsletter_2013_web2.pdf · This is the 2nd Newsletter that has been produced by Shanthi, ... KLRCA Fast Track Arbitration Rules ... (Jointly

Nam

es

& A

ddre

sses

Arb

itra

tion E

xperi

ence

Pro

fess

ional A

ffili

ati

on

Pri

mary

Pro

fess

ion

Qualif

icati

on &

Tra

inin

g

Da

tuk

Willia

m L

au

Ku

ng

Hu

i

18-2

0, 1

st F

loor

, Jal

an K

amp

ong

Nya

bor

P.O

. Box

444

9600

0 S

ibu

Sar

awak

Tel:

084-

3361

55 (5

line

s)Fa

x: 0

84-3

3022

3E

mai

l: w

lau@

pc.

jarin

g.m

y

wkh

lau@

gmai

l.com

Da

to’ K

evin

Wo

o T

hin

Fo

ok

c/o

KW

Ass

ocia

te A

rchi

tect

s S

dn

Bhd

Blo

ck A

-2-5

&A

-3-5

, Pla

za D

amas

60, J

alan

Sri

Har

tam

as 1

5048

0 K

uala

Lum

pur

Tel:

603-

6201

0202

Fax:

603

-620

1030

3E

mai

l: kw

oo.a

rbitr

ator

@gm

ail.c

om

Dr

Oo

i T

eik

Au

n

No.

10,

Jal

an B

ukit

Bad

ak,(

Jln

5/17

)46

000

Pet

alin

g Ja

ya, M

alay

sia

Tel:

603-

7984

7299

Fax:

603

-798

4729

2E

mai

l: d

rtao

oi@

gmai

l.com

Da

to’ S

tan

ley I

sa

ac

s

c/o

Isaa

cs T

an &

Chu

17th

Flo

or, M

enar

a H

ap S

eng

(For

mer

ly M

ui P

laza

) Ja

lan

P. R

amle

e50

250

Kua

la L

ump

urTe

l: 60

3-20

8138

89Fa

x: 6

03-2

0936

535

Em

ail:

stan

leyi

saac

s@gm

ail.c

om

Ir. K

ho

o C

ho

on

g K

eo

w

c/o

Wan

Moh

amed

& K

hoo

Sd

n B

hd8C

, Jln

Mes

ra 1

, Tam

an M

esra

4015

0 S

hah

Ala

m, S

elan

gor

Tel:

603-

5519

1855

Fax:

603

-551

9286

6E

mai

l: w

mks

b@

stre

amyx

.com

k

ckar

b@

yaho

o.co

m

Rt

Ho

n. L

ord

Do

ug

las D

avid

Ha

ck

ing

Litt

leto

n C

ham

ber

s3,

Kin

g’s

Ben

ch W

alk

Nor

thTh

e Te

mp

leLo

ndon

EC

4Y 7

HR

, UK

Tel:

+44

2077

3544

00Fa

x:+

4420

7797

8699

Em

ail:

dav

id.h

acki

ng@

lond

on-a

rbitr

atio

n.co

m

• La

wye

r

• C

hart

ered

Arc

hite

ct

• C

onsu

lting

Eng

inee

r

• La

wye

r

• E

ngin

eer

(sin

ce 1

963)

• JP

S 1

963-

1969

• C

onsu

lting

Eng

inee

r si

nce

1969

to

pre

sent

• La

wye

r

• B

arris

ter-

at-L

aw (L

ond

on’s

Inn)

• B

ache

lor

of L

aw, L

ond

on S

choo

l of

Eco

nom

ics

• M

aste

r of

Law

(LS

E),

Uni

vers

ity o

f Lon

don

• C

hart

ered

Arb

itrat

or U

K•

Reg

iste

red

Ad

jud

icat

or, W

A B

uild

ing

Com

mis

sion

, WA

Min

istr

y of

Jus

tice

(NT)

• B

. Arc

h (H

ons)

UN

SW

, Aus

tral

ia•

Dip

. in

Arb

itrat

ion

(Col

lege

of E

stat

e M

anag

emen

t, R

ead

ing,

UK

)•

B.J

uris

(Hon

s)(M

al)

• B

E (C

ivil)

, Auc

klan

d•

ME

, Auc

klan

d•

Ph

D, S

heffi

eld

• B

ache

lor

of L

aw-

Mid

dle

Tem

ple

, Lon

don

• B

Sc

in C

ivil

Eng

inee

ring

(Uni

vers

ity o

f G

lasg

ow)

• D

iplo

ma

in In

tern

atio

nal C

omm

erci

al

Arb

itrat

ion

(CIA

rb)

• A

dva

nced

Cou

rse

in M

edia

tion

(KLR

CA

)

• B

.Art

s- C

lare

Col

lege

, Cam

brid

ge U

nive

rsity

• M

.Art

s-C

lare

Col

lege

, Cam

brid

ge•

LLB

- M

idd

le T

emp

le

• A

ccre

dite

d M

edia

tor

(LE

AD

R, I

AM

A)

• IM

I Cer

tified

Med

iato

r•

Con

stru

ctio

n, M

ariti

me

& C

omm

erci

al A

rbitr

atio

n

• C

onst

ruct

ion

Ind

ustr

y

As

Arb

itrat

or a

nd E

xper

t W

itnes

s si

nce

1994

to

pre

sent

in•

Con

stru

ctio

n In

dus

try

• G

eote

chni

cal E

ngin

eerin

g

• G

over

nmen

t A

rbitr

atio

n ca

ses

• A

rbitr

ated

ove

r 50

cas

es in

con

stru

ctio

n in

dus

try

sinc

e 19

84

• In

telle

ctua

l Pro

per

ty•

Trav

el In

dus

trie

s•

Mor

tgag

e In

dus

trie

s•

Con

stru

ctio

n In

dus

trie

s•

Inte

rnat

iona

l Com

mer

cial

Dis

put

es•

IT•

Mar

itim

e•

Wat

er In

dus

trie

s

• FC

IArb

• FM

IArb

• FS

IArb

• Fe

llow

, IA

MA

• In

tern

atio

nal M

edia

tor

Inst

itute

(IM

I)•

Reg

iste

red

Ad

jud

icat

or, W

este

rn A

ustr

alia

& N

orth

ern

Terr

itory

• N

atio

nal M

edia

tor

Acc

red

itatio

n S

yste

m, A

ustr

alia

(N

MA

S)

• C

hart

ered

Fel

low

of t

he In

stitu

te o

f Log

istic

s &

Tran

spor

t, A

ustr

alia

(C

ILTA

)•

Cha

rter

ed F

ello

w o

f the

Inst

itute

of L

ogis

tics

&

Tran

spor

t, M

alay

sia

(CIL

TM)

• Fo

rmer

Pre

sid

ent

of t

he In

stitu

te o

f Log

istic

s &

Tr

ansp

ort,

Mal

aysi

a

• FC

IArb

• FM

IArb

• A

PA

M•

RIB

A•

Cha

rter

ed A

rbitr

ator

• D

eput

y P

resi

den

t M

IArb

(200

3 to

200

5)•

Pre

sid

ent

MIA

rb (2

005

to 2

008)

• P

anel

Arb

itrat

or: C

IArb

, MIA

rb, K

LRC

A, S

IAC

, CIE

TAC

, A

PR

AG

, DIA

C, P

AM

• FI

EM

• M

ICE

• FM

IArb

• P

Eng

(Mal

aysi

a)•

CE

ng (U

K)

• A

PE

C E

ngin

eer

• A

SE

AN

Eng

inee

r•

AC

PE

(AS

EA

N)

• In

tern

atio

nal P

rofe

ssio

nal E

ngin

eer

• P

resi

den

t S

EA

GS

(199

3-19

96, 2

010-

2013

)•

Pre

sid

ent

MIA

rb (2

009)

• C

hairm

an A

GS

SE

A (2

007-

2010

)•

Exe

cutiv

e D

irect

or, I

EM

Tra

inin

g C

entr

e•

Pan

el o

f Arb

itrat

ors:

IEM

, MIA

rb, K

LRC

A

• FM

IArb

• FC

IArb

• E

x-S

enio

r Fe

der

al C

ouns

el, M

alay

sia

& H

ead

of C

ivil

Law

& L

itiga

tion,

AG

Cha

mb

ers

• P

arlia

men

tary

Dra

ftsm

an, M

alay

sia

• C

omm

issi

oner

of

Law

Rev

isio

n, M

alay

sia

• P

anel

Arb

itrat

or: K

LRC

A

• P

.Eng

, FM

IArb

, FC

IArb

, FIE

M, F

ICE

• C

hart

ered

Arb

itrat

or•

Pas

t C

hairm

an, C

IArb

(Mal

aysi

a) 1

998-

2000

• P

resi

den

t M

IArb

(200

3-20

05)

• P

ast

Vic

e P

resi

den

t IE

M (1

982-

1986

)•

Pas

t V

ice

Pre

sid

ent

Mal

aysi

an In

vent

ion

& D

esig

n S

ocie

ty (1

986-

1991

)•

Pan

el o

f Arb

itrat

ors

: KLR

CA

, M

IArb

, CIA

rb, I

EM

, H

KIA

C, S

IAC

, KC

AB

• FM

IArb

• FC

IArb

• FS

IArb

• M

emb

er o

f the

Hou

se o

f Lor

ds

Sel

ect

Com

mitt

ee o

n th

e E

urop

ean

Com

mun

ities

• M

emb

er o

f the

Hou

ses

of P

arlia

men

t Jo

int

Com

mitt

ee

on C

onso

lidat

ion

Bill

s

6. 7. 8. 9. 10.

11.

Page 22: NEWSLETTER - MIArbmiarb.org/userfiles/MIArb_newsletter_2013_web2.pdf · This is the 2nd Newsletter that has been produced by Shanthi, ... KLRCA Fast Track Arbitration Rules ... (Jointly

Nam

es

& A

ddre

sses

Pri

mary

Pro

fess

ion

Qualif

icati

on &

Tra

inin

gA

rbit

rati

on E

xperi

ence

Pro

fess

ional A

ffili

ati

on

Ar.

Me

na

ha

Ra

ma

na

th

67-2

, Med

an S

etia

1,

Pla

za D

aman

sara

, Buk

it D

aman

sara

5049

0 K

uala

Lum

pur

Tel:

012-

2029

026

Fax:

603

-209

5037

6E

mai

l: m

enah

a.ra

man

ath@

gmai

l.com

En

. M

oh

am

ed

Ism

ail B

in M

oh

am

ed

Sh

ari

ff

c/o

SK

RIN

EU

nit

No.

50-

8-1,

8th

Flo

orW

ism

a U

oa D

aman

sara

50 J

alan

Dun

gun,

Dam

ansa

ra H

eigh

ts50

490

Kua

la L

ump

urTe

l: 60

3-20

8138

89Fa

x: 6

03-2

0936

535

Em

ail:

ism

ail@

skrin

e.co

m

Da

tuk

Su

nd

ra R

ajo

o N

ad

ara

jah

c/o

Sun

dra

Raj

oo A

rbitr

atio

n C

ham

ber

Sd

n B

hdN

o. 2

8-1,

Med

an S

etia

2B

ukit

Dam

ansa

ra50

490

Kua

la L

ump

urTe

l: 60

3-20

9622

28Fa

x: 6

03-2

0962

323

Em

ail:

sund

ra@

sund

rajo

o.co

mW

ebsi

te: w

ww

.sun

dra

rajo

o.co

m

Mr

Te

e G

eo

k H

oc

k

c/o

GH

Tee

& C

o22

A-3

, Jal

an P

JU 8

/3A

Per

dan

a B

usin

ess

Cen

tre

Ban

dar

Dam

ansa

ra P

erd

ana

4782

0 P

etal

ing

Jaya

, Sel

ango

r D

ETe

l: 60

3-77

2648

31Fa

x: 6

03-7

7265

251

Em

ail:

ghte

ecom

@un

ifi.m

y

Mr

Vin

aya

k P

rab

ha

ka

r P

rad

ha

n

c/o

SK

RIN

EU

nit

50-8

-1, 8

th F

loor

Wis

ma

UO

A D

aman

sara

50, J

alan

Dun

gun,

Dam

ansa

ra H

eigh

ts50

490

Kua

la L

ump

urTe

l: 60

3-20

9481

11Fa

x: 6

03-2

0943

211

Em

ail:

vp@

skrin

e.co

m

Da

to’

WS

W D

avid

so

n

c/o

Azm

an D

avid

son

& C

o.S

uite

13.

03, 1

3th

Floo

rM

enar

a Ta

n &

Tan

207,

Jal

an T

un R

azak

5040

0 K

uala

Lum

pur

Tel:

603-

2164

0200

Fax:

603

-216

4028

0

• A

rchi

tect

& B

uild

ing

Aud

it

• La

wye

r

• A

rchi

tect

• To

wn

Pla

nner

• A

dvo

cate

& S

olic

itor

(Non

-pra

ctis

ing)

• C

hart

ered

Arb

itrat

or

• La

wye

r

• A

dvo

cate

& S

olic

itor

• La

wye

r

• B

A(H

ons)

Arc

hite

ctur

e •

Pos

t G

rad

uate

Dip

lom

a in

Arc

hite

ctur

e,

Uni

vers

ity o

f Por

tsm

outh

, UK

• LL

B.(H

ons)

Uni

vers

ity o

f Sin

gap

ore

1969

• LL

M U

nive

rsity

of L

ond

on 1

974

• B

.Sc,

Hou

sing

, Bui

ldin

g &

Pla

nnin

g,

Uni

vers

ity S

ains

Mal

aysi

a 19

79•

LLB

Uni

vers

ity o

f Lon

don

• M

aste

rs in

Con

stru

ctio

n La

w &

Arb

itrat

ion

(with

Mer

its) L

eed

s M

etro

pol

itan

Uni

vers

ity•

Mas

ter

in P

hilo

sop

hy in

Law

, Man

ches

ter

Uni

vers

ity•

Gra

d. D

ip. i

n A

rchi

tect

ure,

TC

AE

Aus

tral

ia•

Gra

d. D

ip in

Urb

an 7

Reg

iona

l Pla

nnin

g TS

IT, A

ustr

alia

• C

LP M

alay

sia

• D

ipIC

IArb

UK

• LL

B (H

ons)

Uni

vers

ity o

f Mal

aya

1983

• LL

B (H

ons)

Uni

vers

ity o

f Sin

gap

ore-

1974

• LL

B Q

ueen

’s U

nver

sity

, Bel

fast

• B

uild

ing

& C

onst

ruct

ion

Ind

ustr

y

• H

ave

app

eare

d a

s le

adin

g co

unse

l in

man

y ar

bitr

atio

n ca

ses

on c

onst

ruct

ion

& in

telle

ctua

l pro

per

ty

• C

onst

ruct

ion

Ind

ustr

y •

Aut

hor

of “

Law

, Pra

ctic

e &

Pro

ced

ure

of A

rbitr

atio

n 20

03”

• Th

e M

alay

sian

Std

For

m o

f Bui

ldin

g C

ontr

act

(The

PA

M

1998

For

m, 2

nd E

d 1

999)

• A

rbitr

atio

n tit

le fo

r “H

alsb

ury’

s La

w o

f Mal

aysi

a, 2

002

pub

lishe

d b

y Le

xisN

exis

• C

o-au

thor

ed “

The

Arb

itrat

ion

Act

200

5 U

ncitr

al M

odel

La

w a

s ap

plie

d in

Mal

aysi

a 20

07”

• C

o-au

thor

ed “

The

PA

M 2

006

Std

For

m o

f Bui

ldin

g C

ontr

act

2010

• C

onst

ruct

ion

Ind

ustr

y•

Com

mer

cial

Dis

put

es•

Join

t V

entu

re D

isp

utes

• C

oal M

inin

g D

isp

utes

• D

isp

utes

on

Dis

trib

utor

ship

Agr

eem

ent

• D

isp

utes

on

Fab

ricat

ion

& M

anuf

actu

ring

Con

trac

ts•

Dis

put

es o

n B

.O.T

. Con

trac

t

• O

il &

Gas

Ind

ustr

y•

Con

stru

ctio

n In

dus

try

• C

omm

erci

al•

Mar

ine

Ind

ustr

y

• O

il &

Gas

Ind

ustr

y•

Con

stru

ctio

n In

dus

try

• C

omm

erci

al

• Fe

llow

, PA

M•

Pro

fess

iona

l Arc

hite

ct L

AM

• C

hart

ered

Mem

ber

Roy

al In

stitu

te o

f Brit

ish

Arc

hite

cts

(RIB

A)

• FM

IArb

• FM

IArb

• FC

IArb

• D

irect

or K

LRC

A•

Pre

sid

ent

AP

RA

G•

Foun

din

g P

resi

den

t S

CL,

Mal

aysi

a•

Cou

ncil

Mem

ber

MIA

rb (1

990-

2003

)•

Cou

ncil

of A

rchi

tect

ural

Ed

ucat

ion

Mal

aysi

a (1

999-

2001

)•

Mem

ber

of J

oint

Boa

rd o

f Arc

hite

cts

Mal

aysi

a &

the

M

alay

sia

Inst

itute

of A

rchi

tect

s P

rof.

Reg

istr

atio

n E

xam

P

anel

(199

7/19

99, 1

994/

1995

)•

Mem

ber

of C

PD

Wor

king

Com

mitt

ee B

oard

of

Arc

hite

cts

Mal

aysi

a (2

002-

2007

)•

Tuto

r &

Exa

min

er fo

r m

emb

ersh

ip c

ours

es, C

IArb

UK

• M

emb

er, A

cad

emy

of E

xper

ts, U

K•

Arb

itrat

or, O

lym

pic

Cou

ncil

of M

alay

sia

• C

ount

ry R

ep o

f the

Dis

put

e R

evie

w B

oard

Fou

ndat

ion

in S

eatle

US

A•

FCIA

rb•

FMIA

rb

• FM

IArb

• FC

IArb

• P

resi

den

t, M

IArb

(200

0-A

pril

200

3)

• FM

IArb

• FC

IArb

• C

hart

ered

Arb

itrat

or•

Com

mis

sion

er-U

nite

d N

atio

ns C

omp

ensa

tion

Com

mis

sion

(199

8-20

03)

• M

emb

er, P

erm

anen

t C

ourt

of A

rbitr

atio

n, T

he H

ague

• C

IArb

Pre

sid

ent

2013

• FM

IArb

• FC

IArb

• M

ICC

I (m

emb

er o

f arb

itrat

ion

com

mitt

ee)

12.

13.

14.

15.

16.

17.

Page 23: NEWSLETTER - MIArbmiarb.org/userfiles/MIArb_newsletter_2013_web2.pdf · This is the 2nd Newsletter that has been produced by Shanthi, ... KLRCA Fast Track Arbitration Rules ... (Jointly

Nam

es

& A

ddre

sses

Pri

mary

Pro

fess

ion

Qualif

icati

on &

Tra

inin

gA

rbit

rati

on E

xperi

ence

Pro

fess

ional A

ffili

ati

on

Ms W

on

g P

ek

Yin

, C

hri

sti

ne

12, L

alua

n Ta

mb

un P

erd

ana

6,P

anor

ama

Tam

bun

Per

dan

a,

3140

0 Ip

oh, P

erak

Tel:

605-

2412

969

Fax:

605

-253

6910

Em

ail:

kris

tique

@gm

ail.c

om

Mr

Wilfr

ed

Ab

rah

am

c/o

Zul

Rafi

que

& P

artn

ers

D3-

3-8,

Sol

aris

Dut

amas

No.

1, J

alan

Dut

amas

1

5048

0 K

uala

Lum

pur

Tel:

603-

6209

8228

Fax:

603

-620

9822

1E

mai

l: w

ilfre

d_a

bra

ham

@zu

lrafiq

ue.c

om.m

y

En

Za

fru

l M

ah

mo

od

22, J

alan

Sep

ah P

uter

i 5/1

9K

ota

Dam

ansa

ra47

810

Pet

alin

g Ja

yaTe

l: 60

3-76

2727

88Fa

x: 6

03-7

6257

059

Em

ail:

zafr

ulm

ahm

ood

@gm

ail.c

om

Mr

Vic

tor

Sm

ith

Cha

rnd

ell A

ssoc

iate

s C

o. L

td4/

F, U

nit

1402

, GP

Hou

se57

2 S

oi L

adp

rao

112

Wan

thon

glan

gB

angk

ok 1

0310

Tha

iland

Tel:

(66-

2) 5

1491

70-7

1Fa

x: (6

6-2)

514

9172

emai

l: vs

mith

@ch

arnd

ell.c

omw

ebsi

te: w

ww

.cha

rnd

ell.c

om

Mr

Vin

ce

nt

Lim

Ku

o P

ha

u

c/o

Vin

cent

Lim

& P

artn

ers

No.

18-

3A, 3

rd F

loor

, Jal

an K

amp

ung

Att

ap50

460

Kua

la L

ump

urTe

l: 03

-227

3467

5Fa

x: 0

3-00

2734

678

emai

l: kl

imtw

o@ya

hoo.

com

Mr

Be

lde

n P

rem

ara

j

Leve

l 1B

, Blk

B, K

omp

leks

Pej

abat

Dam

ansa

ra,

Jln

Dun

gun

Dam

ansa

ra H

eigh

ts50

490

Kua

la L

ump

urTe

l: 60

3-20

9502

03Fa

x: 6

03-2

0950

506

emai

l: b

eld

en@

bel

den

lex.

com

Mr

Mo

ha

na

da

ss K

an

ag

asa

ba

i

M/s

. Moh

anad

ass

Par

tner

ship

15-1

5 To

wer

A, L

evel

15

Men

ara

UO

A B

angs

arN

o.5

Jln

Ban

gsar

Uta

ma

145

900

Kua

la L

ump

ur

Tel:

603-

2282

0895

Fax:

603

-228

2089

7em

ail:

moh

an@

moh

anad

ass.

com

• Q

uant

ity S

urve

yor

• La

wye

r

• E

ngin

eer

• C

hart

ered

Arb

itrat

or•

Cha

rter

ed Q

S•

Cha

rter

ed B

uild

er

• La

wye

r

• La

wye

r

• A

dvo

cate

& S

olic

itor

• B

ache

lor

of C

onst

ruct

ion

Eco

nom

ics

RM

IT,

Aua

tral

ia•

Pos

t G

rad

uate

Dip

lom

a in

Arb

itrat

ion-

Col

lege

of E

stat

e M

anag

emen

t, U

K•

Ad

jud

icat

ion

trai

ning

Cou

rse

–CIA

rb (U

K)

• A

ccre

dite

d M

edia

tor

by

CIA

rb (U

K)

• A

ccre

dite

d M

edia

tor

CID

B•

Pan

el A

rbitr

ator

KLR

CA

• P

anel

Arb

itrat

or M

IArb

• B

arris

ter,

Mid

dle

Tem

ple

• B

ache

lor

of S

cien

ce C

ivil

Eng

inee

ring,

US

A•

Dip

in A

rbitr

atio

n, U

K

• B

Sc

QS

, Kin

gsto

n P

olyt

echn

ic•

LLM

Mas

ter

of L

aws

Deg

ree

in In

tern

atio

nal

Com

mer

cial

law

• B

Sc

Hon

s (E

ngin

eerin

g) (U

nive

rsity

of

Lond

on)

• LL

B U

nive

rsity

of L

ond

on•

Bac

helo

r of

Art

s (P

hilo

sop

hy),

Lond

on•

Mas

ter

of A

rts

in A

pp

lied

Lin

guis

tics,

New

E

ngla

nd, A

ustr

alia

• LL

B H

ons,

Uni

vers

ity o

f Liv

erp

ool,

UK

• B

arris

ter,

Lin

coln

Inn

• LL

B H

ons

• C

LP

• C

onst

ruct

ion

Ind

ustr

y

• In

sura

nce

• C

onst

ruct

ion

• In

tern

atio

nal C

omm

erci

al L

aw•

Sp

orts

• C

onst

ruct

ion

Ind

ustr

y

• E

ngin

eerin

g &

Con

stru

ctio

n In

dus

try

• C

onst

ruct

ion

Ind

ustr

y

• C

onst

ruct

ion

& E

ngin

eerin

g•

Oil

& G

as•

Ene

rgy

& U

tility

• G

ener

al In

sura

nce

• C

onst

ruct

ion

& E

ngin

eerin

g•

Oil

& G

as•

Com

pan

y La

w Is

sues

• C

ontr

acts

& C

omm

erci

al D

isp

utes

• FC

IArb

• FM

IArb

• M

CIO

B

• FM

IArb

• P

rofe

ssio

nl C

ivil

Eng

inee

r•

FCIA

rb•

FMIA

rb•

FIH

T,U

K•

Pan

el A

rbitr

ator

, IE

M

• FR

ICS

• FC

IOB

• FC

IArb

• FH

KIA

rb•

MLC

IA•

FSIA

rb•

FMIA

rb•

Cha

rter

ed A

rbitr

ator

• P

rofe

ssio

nal E

ngin

eer

• FI

EM

• FC

IArb

• FM

IArb

• P

anel

Arb

itrat

or

• FC

IArb

• FM

IArb

• A

dvo

cate

& S

olic

itor,

Hig

h C

ourt

of M

alay

a•

Mem

ber

of L

AW

AS

IA•

Mem

ber

of S

CL,

UK

• M

emb

er o

f PA

AM

• M

emb

er o

f IP

BA

• K

LRC

A P

anel

Arb

itrat

or

• FM

IArb

• FC

IArb

• FS

IArb

• P

anel

Arb

itrat

or: K

LRC

A, M

IArb

, IC

C M

alay

sia

18.

19.

20.

21.

22.

23.

24.

Page 24: NEWSLETTER - MIArbmiarb.org/userfiles/MIArb_newsletter_2013_web2.pdf · This is the 2nd Newsletter that has been produced by Shanthi, ... KLRCA Fast Track Arbitration Rules ... (Jointly

Nam

es

& A

ddre

sses

Pri

mary

Pro

fess

ion

Qualif

icati

on &

Tra

inin

gA

rbit

rati

on E

xperi

ence

Pro

fess

ional A

ffili

ati

on

Mr

Ch

an

g W

ei M

un

c/o

Raj

a, D

arry

l & L

oh18

th F

loor

, Wis

ma

Sim

e D

arb

yJa

lan

Raj

a La

ut50

350

Kua

la L

ump

urTe

l: 60

3-26

9499

99Fa

x: 6

03-2

6984

759

emai

l: ch

angw

eim

un@

rdl.c

om.m

y

Mr

Nit

in N

ad

ka

rni

c/o

Lee

His

ham

mud

din

Alle

n &

Gle

dhi

llLe

vel 1

6, M

enar

a TM

Asi

a Li

fe18

9, J

alan

Tun

Raz

ak50

400

Kua

la L

ump

urTe

l: 60

3-21

6123

30Fa

x: 6

03-2

1613

933

emai

l: nn

@lh

-ag.

com

Mr

Na

he

nd

ran

Na

va

ratn

am

c/o

Kad

ir, A

ndri

& P

artn

ers

8th

Floo

r, M

enar

a S

afua

n80

Jal

an A

mp

ang

5045

0 K

uala

Lum

pur

Tel:

603-

2078

2888

Fax:

603

-207

8843

1E

mai

l: nn

@ka

apla

w.c

om

Ir G

on

g N

gie

De

e

EC

ON

(Mal

aysi

a)65

A, J

alan

SS

25/

247

301

Pet

alin

g Ja

yaS

elan

gor

DE

, Mal

aysi

aTe

l: 60

3-78

0318

33Fa

x: 6

03-7

8046

433

H/P

: 019

-262

2138

Em

ail:

ndgo

ng@

yaho

o.co

m

Mr

S.

Ah

me

d S

arw

an

a J

usti

ce

(R

etd

)

c/o

Ab

raha

m &

Sar

wan

aP

IDC

Hou

se, M

ezza

nine

Flo

orD

r. Z

iaud

din

Roa

dK

arac

hi 7

5530

Pak

ista

nTe

l: 92

21-3

5687

360

Fax:

922

1-35

6873

64M

obile

: 923

01-8

2928

13E

mai

l: in

fo@

abra

ham

slaw

.net

Mr

Ma

lco

lm H

olm

es,

QC

11th

Flo

or, W

entw

orth

Cha

mb

ers

180

Phi

llip

Str

eet

Syd

ney,

New

Sou

th W

ales

Aus

tral

iaTe

l: +

61-2

-923

2840

9Fa

x: +

61-2

-923

2762

6M

obile

: +61

-411

4658

36E

mai

l:m

alco

lmho

lmes

@w

entw

orth

cham

ber

s.co

m.a

u

Mr

Ra

nd

olp

h K

ho

o B

oo

Te

ck

c/o

Dre

w &

Nap

ier

LLC

10 C

olly

er Q

uay

#10-

00O

cean

Fin

anci

al C

entr

eS

inga

por

e 04

9315

Tel:

+65

-653

1241

8Fa

x: +

65-6

2200

324

Mob

ile: +

65-9

3626

211

Em

ail:

rand

olp

h.kh

oo@

dre

wna

pie

r.co

m

• La

wye

r

• La

wye

r

• A

dvo

cate

& S

olic

itor

• C

ivil/

Str

uctu

ral E

ngin

eer

• A

dvo

cate

& S

olic

itor

• E

x-Ju

dge

, Hig

h C

ourt

of

Sin

dh,

Kar

achi

• A

rbitr

ator

, Cou

nsel

• A

dvo

cate

& S

olic

itor

• C

hart

ered

Arb

itrat

or

• D

irect

or,

Dre

w &

Nap

ier

LLC

• A

dvo

cate

& S

olic

itor

• B

ache

lor

of L

aws

(Can

terb

ury)

• LL

B H

ons

(Uni

vers

ity o

f Lon

don

)

• B

Sc

(Mat

eria

ls S

cien

ce)

• B

ache

lor

of L

aws

• B

E H

ons,

MS

c(E

ng) S

inga

por

e•

LLB

Hon

s (L

ond

on)

• D

ipIC

IArb

(CE

M, U

K)

• C

LP

• B

.A. U

niv.

Kar

achi

, Pak

ista

n•

LLB

Uni

v. K

arac

hi, P

akis

tan

• LL

M U

niv.

Pen

nsyl

vani

a U

SA

• B

.A.,

LLB

Syd

ney

• B

ache

lor

of C

ivil

Law

(Oxf

ord

Uni

.)•

Dip

lom

a in

Inte

rnat

iona

l Com

mer

cial

A

rbitr

atio

n (C

IArb

)

• LL

B (H

ons)

NU

S

• C

onst

ruct

ion

Ind

ustr

y•

Com

mer

cial

Tra

nsac

tions

• In

tern

atio

nal T

rad

e•

Inte

rnat

iona

l Law

• In

sura

nce

• C

onst

ruct

ion

• In

telle

ctua

l Pro

per

ty

• Ta

x &

Pro

ject

Dis

put

es

• In

solv

ency

& R

ecei

vers

hip

• C

orp

orat

e G

over

nanc

e, D

irect

ors’

Dut

ies

& F

iduc

iary

O

blig

atio

ns; T

akeo

ver’

s &

Sha

reho

lder

s D

isp

utes

• C

onst

ruct

ion

& B

uild

ing

Law

• P

lann

ing

Law

• In

sura

nce

• To

rt &

Con

trac

t in

clud

ing

spec

ifica

lly L

ibel

, Nui

sanc

e,

Neg

ligen

ce &

Qua

si-c

ontr

actu

al C

laim

s•

Jud

icia

l Rev

iew

• R

even

ue L

aw

• C

&S

Eng

inee

ring

• C

onst

ruct

ion

Con

trac

ts•

Pili

ng &

Pile

d F

ound

atio

ns

• C

omm

erci

al, C

ivil

& C

onst

itutio

nal

• Ju

dic

ial R

evie

w•

Con

stru

ctio

n D

isp

utes

• B

usin

ess

& In

vest

men

t•

Shi

pp

ing

• In

telle

ctua

l Pro

per

ty•

Cor

por

ate

& F

inan

ce•

Insu

ranc

e•

Inso

lven

cy

• In

tern

atio

nal a

nd d

omes

tic a

rbitr

atio

ns in

volv

ing

com

mer

cial

, con

stru

ctio

n, in

sura

nce,

min

ing,

mar

itim

e an

d s

por

ts d

isp

utes

• G

ener

al c

ivil

litig

atio

n, s

pec

ialis

ing

in in

tern

atio

nal &

d

omes

tic a

rbitr

atio

n, c

omp

any,

con

trac

t la

w,

shar

ehol

der

, mat

rimon

ial &

fam

ily a

sset

dis

put

es

• FC

IArb

• FM

IArb

• FS

IArb

• P

anel

Arb

itrat

or: K

LRC

A, M

IArb

, KC

AB

, IC

C M

alay

sia

• M

edia

tor

with

Mal

aysi

an M

edia

tion

Cen

tre

• FC

IArb

• FM

IArb

• P

anel

Arb

itrat

or: K

LRC

A, M

IArb

• M

edia

tor

with

Mal

aysi

an M

edia

tion

Cen

tre

• C

hart

ered

Arb

itrat

or•

FCIA

rb•

FMIA

rb•

IPB

A M

emb

er•

Acc

red

ited

Med

iato

r

• FM

IArb

• FC

IArb

• FI

EM

• M

ICE

• P

Eng

• C

Eng

• P

anel

Arb

itrat

or, K

LRC

A, I

EM

, MIA

rb

• FM

IArb

• IP

BA

Mem

ber

• M

emb

er o

f LA

WA

SIA

• P

anel

Arb

itrat

or

• FC

IArb

• FI

AM

A•

FMIA

rb•

Pan

el A

rbitr

ator

of A

AA

, SIA

C, C

IETA

C, K

LRC

A, H

KIA

C,

AC

ICA

, MC

CI,

JCA

A, K

CA

B

• FS

IArb

• FC

IArb

• FM

IArb

• P

anel

Arb

itrat

or, L

aw S

ocie

ty A

rbitr

atio

n S

chem

e

25.

26.

27.

28.

29.

30.

31.

Page 25: NEWSLETTER - MIArbmiarb.org/userfiles/MIArb_newsletter_2013_web2.pdf · This is the 2nd Newsletter that has been produced by Shanthi, ... KLRCA Fast Track Arbitration Rules ... (Jointly

Nam

es

& A

ddre

sses

Pri

mary

Pro

fess

ion

Qualif

icati

on &

Tra

inin

gA

rbit

rati

on E

xperi

ence

Pro

fess

ional A

ffili

ati

on

Mr

So

h L

ieh

Sie

ng

c/o

Cha

rlton

Mar

tin C

onsu

ltant

s S

dn

Bhd

A-1

0-3,

Nor

thp

oint

Mid

-Val

ley

No.

1 M

edan

Sye

d P

utra

Uta

ra59

200

Kua

la L

ump

urTe

l: +

603-

2287

5175

Fax:

+60

3-22

8751

76M

obile

: +06

012-

6189

318

Em

ail:

liehs

ieng

.soh

@ch

arlto

nmar

tin.c

om

Ms E

lain

e Y

ap

Ch

in G

aik

c/o

Won

g &

Par

tner

sLe

vel 2

1, T

he G

ard

ens,

Sou

th T

ower

Mid

Val

ley

City

, Lin

gkar

an S

yed

Put

ra59

200

Kua

la L

ump

urTe

l: 60

3-22

9878

38Fa

x: 6

03-2

2822

669

Mob

ile: 0

12-3

2221

46E

mai

l: el

aine

.yap

@w

ongp

artn

ers.

com

Mr

Ra

jen

dra

Na

va

ratn

am

c/o

Azm

an D

avid

son

& C

oS

uite

13.

03, 1

3th

Floo

rM

enar

a Ta

n &

Tan

207,

Jal

an T

un R

azak

5040

0 K

uala

Lum

pur

Tel:

603-

2164

0200

Fax:

603

-216

4028

0E

mai

l: ra

j.nav

arat

nam

@az

man

dav

idso

n.co

m.m

y

Mr

On

g H

oc

k T

ek

c/o

BK

Ent

rust

y22

-1 &

22-

2 Ja

lan

2/10

9ED

esa

Bus

ines

s P

ark,

Tam

an D

esa

5810

0 K

uala

Lum

pur

Tel:

603-

7982

2123

Fax:

603

-798

2312

2M

obile

: 012

-239

1888

Em

ail:

hton

g@en

trus

ty.c

om

Mr

La

m K

o L

ue

n

c/o

Sho

ok L

in &

Bok

20th

Flo

or, B

angu

nan

Am

Ban

k G

roup

55 J

alan

Raj

a C

hula

n50

200

Kua

la L

ump

urTe

l: 60

3-20

3117

88Fa

x: 6

03-2

0311

778

Em

ail:

kolu

en@

shoo

klin

.com

.my

Ca

pta

in J

ulia

n B

row

n

c/o

JCP

Mar

ine

Pte

Ltd

896

Dun

earn

Roa

dS

ime

Dar

by

Cen

tre

#04-

05D

Sin

gap

ore

5894

72Te

l: +

65-6

2257

767

Fax:

+65

-622

5716

9E

mai

l: ju

lian.

bro

wn@

jcp

mar

ine.

com

• R

egio

nal D

irect

or

• A

dvo

cate

& S

olic

itor

• A

dvo

cate

& S

olic

itor

of

Hig

h C

ourt

of M

alay

a &

B

rune

i Dar

ussa

lam

• M

D o

f Ent

rust

y G

roup

of

Com

pan

ies

• D

irect

or o

f BK

Bur

ns &

O

ng s

/b &

BK

Bur

ns (S

) P

te L

td.

• La

wye

r

• M

ariti

me

Con

sulta

nt•

Arb

itrat

or

• B

Eng

(Hon

s), M

Sc,

CE

ng

• LL

B (H

ons)

, BS

c(H

ons)

• B

Sc

(Hon

s) E

lect

rical

Eng

inee

ring,

UK

• LL

B (H

ons)

UK

• B

Sc(

Hon

s) B

uild

ing

Eco

nom

ics

& Q

S, U

K•

MS

c C

onst

ruct

ion

Man

agem

ent

& B

usin

ess

Ad

min

istr

atio

n, U

K•

Dip

ICA

rb

• B

.Com

m. L

LB (A

ustr

alia

)

• LL

.M in

Inte

rnat

iona

l Tra

nsp

ort

& M

ariti

me

Law

• D

iplo

ma

in A

rbitr

atio

n•

P.G

. Dip

lom

a in

Mar

itim

e La

w•

Mas

ter

Mar

iner

• E

ngin

eerin

g &

Con

stru

ctio

n In

dus

try

• E

xper

t W

itnes

s

• H

ave

app

eare

d a

s co

unse

l in

man

y ar

bitr

atio

n ca

ses

on

com

mer

cial

and

con

stru

ctio

n d

isp

utes

• G

ener

al c

omm

erci

al li

tigat

ion

• A

rbitr

ated

man

y ar

bitr

atio

n ca

ses

sinc

e 20

03 fo

r C

onst

ruct

ion

Ind

ustr

y, c

omm

erci

al a

nd g

ener

al d

isp

utes

• A

pp

eare

d a

s le

ad c

ouns

el in

man

y ar

bitr

atio

n ca

ses

sinc

e 20

00

• B

uild

ing

& C

onst

ruct

ion

Ind

ustr

y

• B

uild

ing,

Con

stru

ctio

n &

Eng

inee

ring

Dis

put

es•

JV D

isp

utes

• M

inin

g C

ontr

act

Dis

put

es•

Land

dev

elop

men

t &

Pro

ject

Dev

elop

men

t A

gree

men

t D

isp

utes

• D

isp

utes

Rel

atin

g to

Pro

duc

tion

Sha

ring

Agr

eem

ents

(Oil

& G

as)

• G

ener

al C

ontr

actu

al D

isp

utes

• M

ariti

me

Ind

ustr

y

• FM

IArb

• FC

IArb

• M

ICE

• P

anel

Arb

itrat

or

• FM

IArb

• M

IEM

• P

rofe

ssio

nal E

ngin

eer

• M

emb

er o

f Hon

. Soc

iety

of M

idd

le T

emp

le U

K•

Cha

rter

ed A

rbitr

ator

• FC

IArb

• FM

IArb

• P

anel

Arb

itrat

or –

KLR

CA

, SIA

C, P

OR

AM

, IE

M, I

CC

M

alay

sia

• M

MIM

• M

IVM

A•

FRIS

M•

ICE

CA

• FR

ICS

• FC

Inst

CE

S•

FCIO

B•

FCIA

rb•

FSIA

rb•

FMIA

rb•

Pan

el a

rbitr

ator

& A

ccre

dite

d M

edia

tor

• FC

IArb

• FM

IArb

• P

anel

Arb

itrat

or, A

dju

dic

ator

, KLR

CA

• FM

IArb

• FC

IArb

• FS

IArb

• A

DR

Pan

el o

f FO

SFA

, IB

IA, K

LRC

A, L

MA

A

32.

33.

34.

35.

36.

37.

Page 26: NEWSLETTER - MIArbmiarb.org/userfiles/MIArb_newsletter_2013_web2.pdf · This is the 2nd Newsletter that has been produced by Shanthi, ... KLRCA Fast Track Arbitration Rules ... (Jointly

List of New Members/Upgrade forSession July 2012 to April 2013FFellow M/No. Date Approved

1.Mr Malcolm Holmes F/090 26/07/2012

2.Mr Soh Lieh Sieng F/091 26/07/2012

3.Mr Darryl Goon Siew Chye F/092 26/07/2012

4.Mr Ooi Huey Miin F/093 18/09/2012

5.Capt. Julian Christopher Patric Brown F/094 18/09/2012

6.Mr Khoo Boo Teck Randolph F/095 18/09/2012

7.Justice (Ret) Mohideen M P Haja Rubin F/096 18/09/2012

8.Mr Rajendra Navaratnam F/097 21/11/2012

9.Dato Sin Yoong Ming F/100 21/03/2013

10.Dato Abdul Shukor bin Ahmad F/101 21/03/2013

11.Mr Choon Hon Leng F/102 21/03/2013

12.Mr R. Jayasingam a/l Ratnasingam F/104 23/04/2013

13.Mr C. Michael Heihre F/105 23/04/2013

Upgraded from Member to Fellow

1.Mr Wang Cheow Kean F/087 26/07/2012

2.Mr Tan Chik Tiam F/088 26/07/2012

3.Mr Lam Ko Luen F/089 26/07/2012

4.Mr Ho June Khai F/098 17/01/2013

5.Mr Ernest JK Azad F/099 21/02/2013

6.Mr Yong Hee Leong F/103 23/04/2013

7.Ms Tan Swee Im F/106 23/04/2013

Member

1.Mr Kung Chong Min Jeremy M/365 26/07/2012

2.Ir Pook Fong Fee M/370 21/11/2012

3.Dr Kogulan Padama Padamakavander M/376 21/02/2013

Upgraded from Associate to Member

1.Miss Hor Shirley M/366 26/07/2012

2.Miss Victoria Loi Tien Fen M/367 16/08/2012

3.Mr Wilson Ho Sheen Lik M/369 21/11/2012

4.Mr Ching Wai Hong M/371 20/12/2012

5.Mr Lee Chin Sheng M/372 20/12/2012

6.Mr Cheah Tek Ming M/373 20/12/2012

7.Mr Lio Chee Yeong M/375 17/01/2013

8.Mr Chan Pak Kuan M/379 21/03/2013

9.Mr Isacc Sunder Rajan Packianathan M/380 21/03/2013

Upgraded from Affiliate to Member

1.Miss Diana Chang Kuok Eng M/368 21/11/2012

2.Ir. Katheresan a/l Murugan @ Gopal M/374 17/01/2013

3.Mr Oazair bin Huneid Tyeb M/377 21/02/2013

4.Miss Kiran Kaur Ram a/p Ramu Naido M/378 21/02/2013

Associate

1.Mr Joshua Chong Wan Ken A/164 16/08/2012

2.Mr Gunasagaran Kristnan A/165 18/10/2012

3.Mr Oon Chee Koon A/166 18/10/2012

4.En. Fawwaz Fikri bin Shuib A/167 18/10/2012

5.Mr Ching Wai Hong A/168 18/10/2012

6.En. Adi Azhar bin Abdul Majid A/169 18/10/2012

7.Miss Delwyn Low Yi Wen A/170 21/03/2013

8.Mr Tan Meng Yue A/171 23/04/2013

Affiliate M/No. Date Approved

1.Miss Karina Kaur Grewal AF/167 26/07/2012

2.Miss Liew Zhuo Yi AF/168 26/07/2012

3.Mr RA Ganapathy a/l Supermaniam AF/169 26/07/2012

4.Mr Taranjit Singh AF/170 26/07/2012

5.Miss Nanthini a/p Arumugam AF/171 26/07/2012

6.Miss Christina Toh Siu Khim AF/172 26/07/2012

7.Capt. Oh Eng Hoe AF/173 26/07/2012

8.Mr Katheresan a/l Murugan @ Gopal AF/174 26/07/2012

9.Miss Felicia Victor AF/175 18/10/2012

10.Mr Lim Lee Hock AF/176 18/10/2012

11.Mr Ryan Lim Chaen Heng AF/177 21/02/2013

12.Mr Manjeev Singh a/l Ragbir Singh AF/178 20/12/2012

13.Miss Lim Yi Wen AF/179 20/12/2012

14.Mr Choi Jiann Haur AF/180 21/02/2013

15.Mr Liaw Vern Xien AF/181 21/02/2013

16.Miss Gayle Brooke Gabriel AF/182 20/12/2012

17.Miss Angeline Ang Mei Fong AF/183 20/12/2012

18.Mr Jason Gines Anom AF/184 20/12/2012

19.Mr U. Maghandren AF/185 18/10/2012

20.Miss Manpreet Kaur a/p Pritam Singh AF/186 21/02/2013

21.Mr Yee Jun Hong AF/187 23/04/2013

Resignation

1.Mr Chong Thaw Sing F/027 26/07/2012

2.Ms Jacqueline Chang Li-Ching M/179 16/08/2012

3.Mr Thomas Alexander Green M/321 17/01/2013

Deceased

1.Mr Tan Eng Keong F/002 20/03/2013

Panel of Arbitrators listing April 2012 to March 2013

1.Mr S. Ahmed Sarwana (F/044) 19/04/2012

2.Mr Malcolm Holmes, QC (F/090) 26/07/2012

3.Mr. Randolph Khoo Boo Teck (F/095) 18/09/2012

4.Mr Soh Lieh Sieng (F/091) 21/11/2012

5.Ms Elaine Yap Chin Gaik (F/081) 21/11/2012

6.Mr Rajendra Navaratnam (F/097) 20/12/2012

7.Mr Ong Hock Tek (F/066) 17/01/2013

8.Mr Lam Ko Luen (F/089) 17/01/2013

9.Captain Julian Brown (F/094) 21/03/2013