NEWS ON THE E-RES SUPPORT SCHEME IN ROMANIA Zoltán NAGY-BEGE ROMANIAN ENERGY REGULATORY DEPARTMENT Member of the Regulatory Board ANRE Bucharest - 19 November 2013

Upload: kirby-church

Post on 30-Dec-2015

27 views

Category:

Documents


4 download

DESCRIPTION

NEWS ON THE E-RES SUPPORT SCHEME IN ROMANIA Zolt á n NAGY-BEGE ROMANIAN ENERGY REGULATORY DEPARTMENT Member of the Regulatory Board. ANRE. ANRE. ANRE Order no. 30/2013 – The technical conditions for the PV power plants for connection to the grid. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: NEWS  ON  THE E-RES SUPPORT SCHEME  IN ROMANIA Zolt á n NAGY-BEGE

NEWS ON THE E-RES SUPPORT SCHEME

IN ROMANIA

Zoltán NAGY-BEGE

ROMANIAN ENERGY REGULATORY DEPARTMENT

Member of the Regulatory Board

ANRE

Bucharest - 19 November 2013

Page 2: NEWS  ON  THE E-RES SUPPORT SCHEME  IN ROMANIA Zolt á n NAGY-BEGE

ANRE

ANRE Order no. 30/2013 – The technical conditions for the PV power plants for connection to the grid.

•Capacity limit for dispatchable PV power plants – 5 MW

Bucharest - 19 November 2013

Page 3: NEWS  ON  THE E-RES SUPPORT SCHEME  IN ROMANIA Zolt á n NAGY-BEGE

2012 Monitoring report on GC support scheme – March 2013• ANRE proposed the reduction of GC number starting

from 1st January 2014: 1,5 CV for wind (instead of 2 CV) 2,3 CV for hydro (instead of 3 CV) 3 CV for PV (instead of 6 CV)

ANRE

Bucharest - 19 November 2013

Page 4: NEWS  ON  THE E-RES SUPPORT SCHEME  IN ROMANIA Zolt á n NAGY-BEGE

EGO no. 57/2013 for amending Law no. 220/2008 • PV power plants on agricultural lands• Electricity which exceeds the hourly notifications will

not get GCs• Postponement of GCs (1 GC for Wind and Hydro, 2 GC

for PV)• GC trading is not permitted for electricity traders who

acts only on the wholesale market

ANRE

Bucharest - 19 November 2013

Page 5: NEWS  ON  THE E-RES SUPPORT SCHEME  IN ROMANIA Zolt á n NAGY-BEGE

EGO no. 57/2013 for amending Law no. 220/2008 • GC trading allowed only on centralized markets• Overcompensation monitoring twice a year• Annual capacity limits (PNEAR)• Possibility to include renewable energy in the

regulated contracts

ANRE

Bucharest - 19 November 2013

Page 6: NEWS  ON  THE E-RES SUPPORT SCHEME  IN ROMANIA Zolt á n NAGY-BEGE

ANRE adapted the secondary legislation to EGO 57/2013• Order no. 55/2013 – amending Order 42/2011,

Accreditation regulation• Order no. 56/2013 – amending Order 43/2011, GC

issuing regulation• Order 57/2013 – Regulation of the organization and

functioning of the GC market (revokes Order no. 44/2011)

ANRE

Bucharest - 19 November 2013

Page 7: NEWS  ON  THE E-RES SUPPORT SCHEME  IN ROMANIA Zolt á n NAGY-BEGE

ANRE Order no. 48/2013 – The new regulation for licensing and authorising (replaces GD no. 540/2004)

ANRE Order no. 59/2013 – The new regulation for connection to the grid (will replace GD no. 90/2008)

ANRE

Bucharest - 19 November 2013

Page 8: NEWS  ON  THE E-RES SUPPORT SCHEME  IN ROMANIA Zolt á n NAGY-BEGE

ANRE

Year 2011 2012 2013*

GCs 1.752.794 5.547.302 9.228.000

Electricity consumption (MWh)

46.791.083 MWh 46.687.000 MWh 48.213.000 MWh

GC quotas0,03746 GC/MWh

1 GC/27 MWh2 Eur/MWh

0,1188 GC/MWh1 GC/8 MWh6 Eur/MWh

0,191 GC/MWh1 GC/5 MWh9 Eur/MWh

*=estimation

Bucharest - 19 November 2013

Page 9: NEWS  ON  THE E-RES SUPPORT SCHEME  IN ROMANIA Zolt á n NAGY-BEGE

ANRE

Bucharest - 19 November 2013

 

Producer licence &

Accreditation

Preliminary accreditation

[MW] [MW]Wind 1.998 470

Hydro (< 10 MW) 467 9Biomass 51 -

P.V. 677 97TOTAL 3.193 576

Page 10: NEWS  ON  THE E-RES SUPPORT SCHEME  IN ROMANIA Zolt á n NAGY-BEGE

Feed-in tariffs …?

ANRE

Bucharest - 19 November 2013

Page 11: NEWS  ON  THE E-RES SUPPORT SCHEME  IN ROMANIA Zolt á n NAGY-BEGE

THANK YOU!

[email protected]

Tel: 0730 089 404

ANRE

Bucharest - 19 November 2013