NEWS ON THE E-RES SUPPORT SCHEME IN ROMANIA Zolt á n NAGY-BEGE ROMANIAN ENERGY REGULATORY DEPARTMENT Member of the Regulatory Board. ANRE. ANRE. ANRE Order no. 30/2013 – The technical conditions for the PV power plants for connection to the grid. - PowerPoint PPT PresentationTRANSCRIPT
NEWS ON THE E-RES SUPPORT SCHEME
IN ROMANIA
Zoltán NAGY-BEGE
ROMANIAN ENERGY REGULATORY DEPARTMENT
Member of the Regulatory Board
ANRE
Bucharest - 19 November 2013
ANRE
ANRE Order no. 30/2013 – The technical conditions for the PV power plants for connection to the grid.
•Capacity limit for dispatchable PV power plants – 5 MW
Bucharest - 19 November 2013
2012 Monitoring report on GC support scheme – March 2013• ANRE proposed the reduction of GC number starting
from 1st January 2014: 1,5 CV for wind (instead of 2 CV) 2,3 CV for hydro (instead of 3 CV) 3 CV for PV (instead of 6 CV)
ANRE
Bucharest - 19 November 2013
EGO no. 57/2013 for amending Law no. 220/2008 • PV power plants on agricultural lands• Electricity which exceeds the hourly notifications will
not get GCs• Postponement of GCs (1 GC for Wind and Hydro, 2 GC
for PV)• GC trading is not permitted for electricity traders who
acts only on the wholesale market
ANRE
Bucharest - 19 November 2013
EGO no. 57/2013 for amending Law no. 220/2008 • GC trading allowed only on centralized markets• Overcompensation monitoring twice a year• Annual capacity limits (PNEAR)• Possibility to include renewable energy in the
regulated contracts
ANRE
Bucharest - 19 November 2013
ANRE adapted the secondary legislation to EGO 57/2013• Order no. 55/2013 – amending Order 42/2011,
Accreditation regulation• Order no. 56/2013 – amending Order 43/2011, GC
issuing regulation• Order 57/2013 – Regulation of the organization and
functioning of the GC market (revokes Order no. 44/2011)
ANRE
Bucharest - 19 November 2013
ANRE Order no. 48/2013 – The new regulation for licensing and authorising (replaces GD no. 540/2004)
ANRE Order no. 59/2013 – The new regulation for connection to the grid (will replace GD no. 90/2008)
ANRE
Bucharest - 19 November 2013
ANRE
Year 2011 2012 2013*
GCs 1.752.794 5.547.302 9.228.000
Electricity consumption (MWh)
46.791.083 MWh 46.687.000 MWh 48.213.000 MWh
GC quotas0,03746 GC/MWh
1 GC/27 MWh2 Eur/MWh
0,1188 GC/MWh1 GC/8 MWh6 Eur/MWh
0,191 GC/MWh1 GC/5 MWh9 Eur/MWh
*=estimation
Bucharest - 19 November 2013
ANRE
Bucharest - 19 November 2013
Producer licence &
Accreditation
Preliminary accreditation
[MW] [MW]Wind 1.998 470
Hydro (< 10 MW) 467 9Biomass 51 -
P.V. 677 97TOTAL 3.193 576
Feed-in tariffs …?