news from the fair control system under development · ralph bär 2 what is fair? facility for...

4
News from the FAIR Control System under Development “Poster in Pills” Presentation Ralph C. Bär 15.10.2014 PCaPAC 2014, Karlsruhe

Upload: others

Post on 22-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: News from the FAIR Control System under Development · Ralph Bär 2 What is FAIR? Facility for Antiproton and Ion Research at GSI • Major extension to the present GSI complex •

News from theFAIR Control System under Development

“Poster in Pills” Presentation

Ralph C. Bär15.10.2014

PCaPAC 2014, Karlsruhe

Page 2: News from the FAIR Control System under Development · Ralph Bär 2 What is FAIR? Facility for Antiproton and Ion Research at GSI • Major extension to the present GSI complex •

Ralph Bär 2

What is FAIR?

Facility for Antiproton and Ion Research at GSI

• Major extension to the present GSI complex• Presently under construction (to be completed 2019)• International project, about 1.5 B€ investment

Some FAIR key features

• Superconducting double-ring accelerator (SIS-100/300) heavy-ion synchrotron, 1100 meter circumference

• Complex system of cooler and storage rings, about 3,5 km of beam lines

• Production of high intensity secondary beams: Antiprotons and exotic nuclei (RIBs)

Present GSI in Darmstadt (without FAIR)

Page 3: News from the FAIR Control System under Development · Ralph Bär 2 What is FAIR? Facility for Antiproton and Ion Research at GSI • Major extension to the present GSI complex •

Ralph Bär 3

FAIR Poster Presentations (today)

FAIR Overview Poster• General overview of the FAIR project• Challenges to Controls, Control system architecture• Highllight some development / central building blocks

Development of the Front-End Framework (S. Matthies)„FESA3 Integration in GSI for FAIR“

Front-End Software Integration (M. Wiebel)„An Extensible Equipment Control Library for Hardware Interfacing…“

Setting Management System (H. Hüther) „Progress and Challenges during the Development of theSettings Management for FAIR“

Industrial Controls: Cryogenic Control (D. Sanchez)„The FAIR R3B Prototype Cryogenics Control System“

More presentations on Friday (Timing, Hardware)

WPO005

WPO006

WPO007

WPO004

WPO008

Page 4: News from the FAIR Control System under Development · Ralph Bär 2 What is FAIR? Facility for Antiproton and Ion Research at GSI • Major extension to the present GSI complex •

Ralph Bär 4

FAIR Outlook

How FAIR should look in 2020(for latest view of the construction area see Poster)