new trier high school winnetka campus east side …

41
NEW TRIER HIGH SCHOOL | WINNETKA CAMPUS EAST SIDE ATHLETIC AND ACADEMIC STUDY BOARD OF EDUCATION PROCESS UPDATE PRESENTATION 12.14.2020

Upload: others

Post on 07-Apr-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

NEW TRIER HIGH SCHOOL | WINNETKA CAMPUS EAST SIDE ATHLETIC AND ACADEMIC STUDY

BOARD OF EDUCATION PROCESS UPDATE PRESENTATION12.14.2020

AGENDA

01 OVERVIEW02 REVIEW OF RECENT FACILITIES WORK 03 ANALYSIS PROCESS04 NEEDS ANALYSIS05 PEER COMPARISON06 AREA OF STUDY07 OPTIONS EVALUATED (A-E)08 FINANCING09 POTENTIAL PROJECT TIMELINE

OVERVIEW

EAST SIDE ATHLETIC AND ACADEMIC STUDY

• District has embarked on a study to maintain and improve the community’s investment in our facility for the benefit of our students on the east side of the Winnetka Campus

• This work will strengthen our academic, athletic and wellness programs to meet current and future needs

• Continue the successful approach, design, and functionality that has occurred on the west side of the campus and through the 15-Year Plan

• Will address significant underinvestment over many years in this area of the campus, and allow us to provide our students comparable facilities and experiences to our peer high schools

• Will invest the funds the taxpayers have provided to us to improve the student experience, rather than on escalating maintenance costs

WINNETKA CAMPUS EAST SIDE ATHLETIC AND ACADEMIC STUDY| 190285 | 04

OVERVIEW

REVIEW OF RECENT FACILITIES WORK

WINNETKA CAMPUS WEST ADDITION

WINNETKA CAMPUS EAST SIDE ATHLETIC AND ACADEMIC STUDY| 190285 | 06

REVIEW OF RECENT FACILITIES WORK

15 YEAR PLAN PROGRESS TO DATE

WINNETKA CAMPUS EAST SIDE ATHLETIC AND ACADEMIC STUDY| 190285 | 07

REVIEW OF RECENT FACILITIES WORK

ANALYSIS PROCESS

PROGRESS TO DATE

20212020

October 2020 Schematic Design 50%

June - October 2020 Target Value Design - Identify constraints and align priorities

December 2020 Schematic Design 90%

Jan

DecNovOctSeptAugJulJunMayAprMarFeb

November 2019 Board of Education Discussion of Analysis and TimelineAugust 2019 Board of Education Approves 15 Year Plan

November 2019 Architect selection for Year 3 / Winnetka East Side Academic/Athletic Analysis

December 2019 Architect Approval - Wight/Cashman/HOK

January 2020 Tours of comparable high school facilities

May 2020 Original Pre-Covid Board of Education decision point to proceedJanuary 2020 Identify Options A-E for further study

May 2020 Board of Education Discussion and Extension of Wight Contract to continue analysis

May 2020 Continued study to focus on Option C and C.2

EAST SIDE ATHLETIC AND ACADEMIC STUDY TIMELINE

20202019

DecNovOctSeptAugJulJun

WINNETKA CAMPUS EAST SIDE ATHLETIC AND ACADEMIC STUDY| 190285 | 09

ANALYSIS PROCESS

NEEDS ANALYSIS

FINDINGSFACILITY INADEQUATELY SIZED FOR STUDENTSDue to the age (1928), the limited size and aging systems and the fixed nature of the spaces, it is not possible to adapt and re-use most of the spaces.

LACK OF FLEXIBILITY AND ADAPTABILITYDoes not support multiple simultaneous practices. Stage and PESO gyms do not support high school level practices and events and are unsuitable for KW. Other spaces are not flexibile and adaptable to changing programmatic and educational needs.

ACADEMIC SPACES INADEQUATE AND ANTIQUATEDLimited classroom space is antiquated, cramped, and does not support current technology and furniture.

GATES SUPPORTS ONLY SINGLE EVENTSSpace was constructed in 1928 when the school had 1/4 of the students cur-rently enrolled. Participation at that time in KW and extracurriculars was a frac-tion of that and primarily used by boys.

WINNETKA CAMPUS EAST SIDE ATHLETIC AND ACADEMIC STUDY| 190285 | 11

NEEDS ANALYSIS

FINDINGSFACILITY DOES NOT ADEQUATELY SUPPORT STRENGTH AND CONDITIONINGStrong interest in KW and 35 sports programs and the over-crowded space only supports a fraction of the students that need to use the space each day.

CRAMPED AND UNSAFE INDOOR TRACKNon-standard 4 lane track interrupted by structural columns, wall and weight cages.

SPACE NOT OPTIMAL FOR VISITORS AND THE COMMUNITYCramped and dilapidated bathrooms, corridors and hallways not suitable for 3,000 students who use the space during the school day and thousands of students and visitors during athletic events. Many areas are not accessible for those with disabilities.

MAINTENANCE COSTS SUBSTANTIALLY INCREASING10-year maintenance cost projected to total $9.2MM; improvements will not provide any direct benefits to students or programs; last area with steam boilers and no air-conditioning. Improvements must be made immediately if project does not move forward. Many have been delayed for over 25 years.

WINNETKA CAMPUS EAST SIDE ATHLETIC AND ACADEMIC STUDY| 190285 | 12

NEEDS ANALYSIS

NEW TRIER STRENGTH AND CONDITIONING

WINNETKA CAMPUS EAST SIDE ATHLETIC AND ACADEMIC STUDY| 190285 | 13

NEEDS ANALYSIS

NEW TRIER INDOOR TRACK

WINNETKA CAMPUS EAST SIDE ATHLETIC AND ACADEMIC STUDY| 190285 | 14

NEEDS ANALYSIS

NEW TRIER INDOOR TRACK

WINNETKA CAMPUS EAST SIDE ATHLETIC AND ACADEMIC STUDY| 190285 | 15

NEEDS ANALYSIS

NEW TRIER GATES GYMNASIUM

WINNETKA CAMPUS EAST SIDE ATHLETIC AND ACADEMIC STUDY| 190285 | 16

NEEDS ANALYSIS

NEW TRIER GATES GYMNASIUM

WINNETKA CAMPUS EAST SIDE ATHLETIC AND ACADEMIC STUDY| 190285 | 17

NEEDS ANALYSIS

NEW TRIER CLIMBING WALL AND FENCING

WINNETKA CAMPUS EAST SIDE ATHLETIC AND ACADEMIC STUDY| 190285 | 18

NEEDS ANALYSIS

CLASSROOMS

WINNETKA CAMPUS EAST SIDE ATHLETIC AND ACADEMIC STUDY| 190285 | 19

NEEDS ANALYSIS

EXTERIOR MAINTENANCE AND UNUSED BOILER PLANT

WINNETKA CAMPUS EAST SIDE ATHLETIC AND ACADEMIC STUDY| 190285 | 20

NEEDS ANALYSIS

PEER COMPARISON

CENTRAL SUBURBAN LEAGUE

We recently completed a facility and participation survey among all CSL schools and additional comparable schools with the Chicago suburban area.

New Trier compared to other CSL Schools:• Largest enrollment• Most # of sports offered (35) • Highest number of competitive levels • Highest # of student athletes & levels offered• Highest participation rate• Only CSL South school without a fieldhouse

WINNETKA CAMPUS EAST SIDE ATHLETIC AND ACADEMIC STUDY| 190285 | 22

PEER COMPARISON

GLENBROOK SOUTH HIGH SCHOOL FITNESS CENTER

Most CSL and comparable schools were either constructed in the 1960s or later, or significantly remodeled and enhanced during this time period.

WINNETKA CAMPUS EAST SIDE ATHLETIC AND ACADEMIC STUDY| 190285 | 23

PEER COMPARISON

GLENBROOK SOUTH HIGH SCHOOL FIELDHOUSE

WINNETKA CAMPUS EAST SIDE ATHLETIC AND ACADEMIC STUDY| 190285 | 24

PEER COMPARISON

EVANSTON TOWNSHIP HIGH SCHOOL

WINNETKA CAMPUS EAST SIDE ATHLETIC AND ACADEMIC STUDY| 190285 | 25

PEER COMPARISON

AREA OF STUDY

EXTENT OF OPTIONS EVALUATED

TREVIAN COMMONS

CON

COU

RSE

MCGEE THEATER

POOL

GAFFNEY AUDITORIUM

H-M THEATER

TREVIAN WAY

WINNETKA AVE

ESSE

X RO

AD

WO

ODL

AND

RD

NORTHENTRANCE

SERVICE

MAIN ENTRANCE

AUDI

TORI

UM

ENTR

ANCE

LOCKER ROOMS

GATES GYMNASIUM

BOILER HOUSE

BICKERT GYMNASIUM

WINNETKA CAMPUS EAST SIDE ATHLETIC AND ACADEMIC STUDY| 190285 | 27

AREA OF STUDY

OPTIONS EVALUATED

TREVIAN COMMONS

CON

COU

RSE

MCGEE THEATER

POOL

GAFFNEY AUDITORIUM

H-M THEATER

TREVIAN WAY

WINNETKA AVE

ESSE

X RO

AD

WO

ODL

AND

RD

NORTHENTRANCE

SERVICE

MAIN ENTRANCE

AUDI

TORI

UM

ENTR

ANCE

LOCKER ROOMS

GATES GYMNASIUM

GYMNASIUM ENTRANCE

ESSEX ENTRANCE

BICKERT GYMNASIUM

BOILER HOUSE

OPTION A

WINNETKA CAMPUS EAST SIDE ATHLETIC AND ACADEMIC STUDY| 190285 | 29

OPTIONS EVALUATED

• INADEQUATE EXISTING SPACES REMAIN

• ONGOING FACILITY MAINTENANCE ONLY

• NO IMPROVEMENTS FOR STUDENTS

• CAPACITY ISSUES REMAIN

• CONTINUED LACK OF FLEXIBILITY TO MEET STUDENT NEEDS

TREVIAN COMMONS

CON

COU

RSE

MCGEE THEATER

POOL

GAFFNEY AUDITORIUM

H-M THEATER

TREVIAN WAY

WINNETKA AVE

ESSE

X RO

AD

WO

ODL

AND

RD

NORTHENTRANCE

SERVICE

MAIN ENTRANCE

AUDI

TORI

UM

ENTR

ANCE

LOCKER ROOMS

GYMNASIUM ENTRANCE

ESSEX ENTRANCE

NEW CONSTRUCTION

BICKERT GYMNASIUM

GATES GYMNASIUM

BOILER HOUSE

OPTION B

WINNETKA CAMPUS EAST SIDE ATHLETIC AND ACADEMIC STUDY| 190285 | 30

OPTIONS EVALUATED

• EXISTING BOILER HOUSE TO REMAIN

• REMODEL EXISTING GATES GYMNASIUM AND FIELDHOUSE

• CONSTRUCT NEW FITNESS AREA, AND CLASSROOMS

• MINIMAL IMPROVEMENTS FOR STUDENTS

• CAPACITY ISSUES REMAIN

• CONTINUED LACK OF FLEXIBILITY TO MEET STUDENT NEEDS

OPTION C

TREVIAN COMMONS

CON

COU

RSE

MCGEE THEATER

POOL

GAFFNEY AUDITORIUM

H-M THEATER

TREVIAN WAY

WINNETKA AVE

ESSE

X RO

AD

WO

ODL

AND

RD

NORTHENTRANCE

SERVICE

MAIN ENTRANCE

AUDI

TORI

UM

ENTR

ANCE

EXIST LOCKER ROOMS

ESSEX ENTRANCE

TREVIAN ENTRANCE

NEW CONSTRUCTION

BICKERT GYMNASIUM

• IMPROVED SAFETY INCLUDING SECURE AND WELCOMING ENTRANCE FOR VISITORS

• REPLACE EXISTING GATES GYMNASIUM W/NEW COMPETITION GYM, AUXILIARY GYM, FITNESS AREA, FIELDHOUSE w/160M 4-LANE TRACK AND CLASSROOMS

• SIGNIFICANTLY IMPROVED STUDENT EXPERIENCE WITH GYM THAT CAN HOST MULTIPLE EVENTS

• ENHANCED TRACK WITH IMPROVED SAFETY; CAPACITY CONSTRAINTS REMAIN

• EXISTING KW LOCKER ROOMS TO REMAIN

• REDUCED MAINTENANCE COSTS

• REMOVE BOILER HOUSE

OPTIONS EVALUATED

WINNETKA CAMPUS EAST SIDE ATHLETIC AND ACADEMIC STUDY| 190285 | 31

OPTION C.2

TREVIAN COMMONS

CON

COU

RSE

MCGEE THEATER

POOL

GAFFNEY AUDITORIUM

H-M THEATER

TREVIAN WAY

WINNETKA AVE

ESSE

X RO

AD

WO

ODL

AND

RD

NORTHENTRANCE

SERVICE

MAIN ENTRANCE

AUDI

TORI

UM

ENTR

ANCE

NEW CONSTRUCTION

NEW CONSTABOVE

EXISTLOCKER ROOMS

TREVIAN ENTRANCE

ESSEX ENTRANCE

BICKERT GYMNASIUM

• IMPROVED SAFETY INCLUDING SECURE AND WELCOMING ENTRANCE FOR VISITORS

• REPLACE EXISTING GATES GYMNASIUM W/NEW COMPETITION GYM, AUXILIARY GYM, FITNESS AREA, FIELDHOUSE w/160M 4-LANE TRACK AND CLASSROOMS

• SIGNIFICANTLY IMPROVED STUDENT EXPERIENCE WITH GYM THAT CAN HOST MULTIPLE EVENTS

• ENHANCED TRACK WITH IMPROVED SAFETY; CAPACITY CONSTRAINTS REMAIN

• OPTION C.2 CONSTRUCT NEW 3RD FLOOR CLASSROOMS, EXPANDED FIELDHOUSE w/160M 6-LANE TRACK

WINNETKA CAMPUS EAST SIDE ATHLETIC AND ACADEMIC STUDY| 190285 | 32

OPTIONS EVALUATED

OPTION D

TREVIAN COMMONS

CON

COU

RSE

MCGEE THEATER

POOL

GAFFNEY AUDITORIUM

H-M THEATER

TREVIAN WAY

WINNETKA AVE

ESSE

X RO

AD

WO

ODL

AND

RD

NORTHENTRANCE

SERVICE

MAIN ENTRANCE

AUDI

TORI

UM

ENTR

ANCE

ESSEX ENTRANCE

TREVIAN ENTRANCE

NEW CONSTRUCTION

BICKERT GYMNASIUM

• IMPROVED SAFETY INCLUDING SECURE AND WELCOMING ENTRANCE FOR VISITOR

• REPLACE EXISTING GATES GYMNASIUM AND KW LOCKER ROOMS W/NEW COMPETITION GYM, AUXILIARY GYM, FITNESS AREA, FIELDHOUSE w/160M 6-LANE TRACK, CLASSROOMS AND LOCKER ROOMS

• SIGNIFICANTLY IMPROVED STUDENT EXPERIENCE WITH GYM THAT CAN HOST MULTIPLE EVENTS

• ENHANCED TRACK WITH IMPROVED SAFETY

• REDUCED MAINTENANCE COSTS

• REMOVE BOILER HOUSE

WINNETKA CAMPUS EAST SIDE ATHLETIC AND ACADEMIC STUDY| 190285 | 33

OPTIONS EVALUATED

OPTION E

TREVIAN COMMONS

CON

COU

RSE

MCGEE THEATER

POOL

GAFFNEY AUDITORIUM

H-M THEATER

TREVIAN WAY

WINNETKA AVE

ESSE

X RO

AD

WO

ODL

AND

RD

NORTHENTRANCE

SERVICE

MAIN ENTRANCE

AUDI

TORI

UM

ENTR

ANCE

NEW CONSTRUCTION

• IMPROVED SAFETY INCLUDING SECURE AND WELCOMING ENTRANCE FOR VISITOR

• REPLACE EXISTING GATES GYMNASIUM, BICKERT GYM AND KW LOCKER ROOMS W/NEW COMPETITION GYM, AUXILIARY GYM, FITNESS AREA, FIELDHOUSE w/160M 6-LANE TRACK, CLASSROOMS AND LOCKER ROOMS

• SIGNIFICANTLY IMPROVED STUDENT EXPERIENCE WITH GYM THAT CAN HOST MULTIPLE EVENTS

• ENHANCED TRACK WITH IMPROVED SAFETY

• REDUCED MAINTENANCE COSTS

• REMOVE BOILER HOUSE

WINNETKA CAMPUS EAST SIDE ATHLETIC AND ACADEMIC STUDY| 190285 | 34

OPTIONS EVALUATED

COMPARISON SCORECARD

2

1

0

3

No provision included.

1

1

3

1

3

1

1

3

1

0

0

3

No improvement on quality/quantity of spaces. Includes moderate renvoation. Continued programmatic de� ciencies.

3

2

0

0

0

1

0

0

0

1

Slight improvement of existing, i.e. increased area, quality and daylight. Meets program needs as currently operated.

0

0

0

Signi� cant improvement on existing, increased area, quality and, daylight, improved adjacencies. Meets desired program needs for future.

0

0

0

0

3

0

3

3

3

0

3

0 3

3

3

Inst

ruct

iona

l and

Ath

leti

c Sp

aces

3

3

Supp

ort

Spac

esBu

ildin

g D

esig

n, S

yste

ms

and

Sec

urit

y

0

3

3

0

A

2

3

32

2

D

3

3

3

2

3

3

3

3

3

3

3

3

2

3

3

3

3

3

3

2

3

3

3

2

3

3

3

3

3

3

3

C.2

3

3

0

B C

Core Academic & KW Classrooms

DESIGN OPTION

Indoor Track

Competition Gymnasium

Weight Training

Cardio Fitness Area

Auxiliary Gymnasium

Outdoor Education

Collaboration Space

Kinetic Wellness/Athletics Offi ces

Locker Rooms

Athletic Trainer Space

Concessions Area

Welcoming & Secure Entry

Enhanced Wayfi nding (Pool Access)

Staff and Visitor Parking

Improved Mechanical & Lighting

Unifi ed Building Design Aesthetic

3

3

3

3

3

3

3

3

3

3

3

3

3

3

3

3

3

E

PROJECT NAME | 00.00.0000 | 01

2

1

0

3

No provision included.

No improvement on quality/quantity of spaces. Includes mod-erate renvoation. Continued programmatic de� ciencies.Slight improvement of existing, i.e. increased area, quality and daylight. Meets program needs as currently operated.Signi� cant improvement on existing, increased area, quality and, daylight, improved adjacencies. Meets desired program needs for future.

PROJECT NAME | 00.00.0000 | 04

WINNETKA CAMPUS EAST SIDE ATHLETIC AND ACADEMIC STUDY| 190285 | 35

OPTIONS EVALUATED

OPTION C VS OPTION C.2

TREVIAN COMMONS

CON

COU

RSE

MCGEE THEATER

POOL

GAFFNEY AUDITORIUM

H-M THEATER

TREVIAN WAY

WINNETKA AVE

ESSE

X RO

AD

WO

ODL

AND

RD

NORTHENTRANCE

SERVICE

MAIN ENTRANCE

AUDI

TORI

UM

ENTR

ANCE

EXIST LOCKER ROOMS

ESSEX ENTRANCE

TREVIAN ENTRANCE

NEW CONSTRUCTION

BICKERT GYMNASIUM

TREVIAN COMMONS

CON

COU

RSE

MCGEE THEATER

POOL

GAFFNEY AUDITORIUM

H-M THEATER

TREVIAN WAY

WINNETKA AVE

ESSE

X RO

AD

WO

ODL

AND

RD

NORTHENTRANCE

SERVICE

MAIN ENTRANCE

AUDI

TORI

UM

ENTR

ANCE

NEW CONSTRUCTION

NEW CONSTABOVE

EXISTLOCKER ROOMS

TREVIAN ENTRANCE

ESSEX ENTRANCE

BICKERT GYMNASIUM

OPTION C• CONSTRUCT NEW COMPETITION GYM,

AUXILIARY GYM, FITNESS AREA, FIELDHOUSE w/160M 4-LANE TRACK AND 5 CLASSROOMS

• SIGNIFICANTLY IMPROVED STUDENT EXPERIENCE WITH GYM THAT CAN HOST MULTIPLE EVENTS

OPTIONS NOT CONSIDERED• OPTIONS A AND B PROVIDE MINIMAL IMPROVEMENT FOR STUDENTS, AND DOLLARS EXPENDED

WOULD LIKELY BE LOST AS FUTURE BOARDS MAKE DECISIONS TO IMPROVE FACILITY.• OPTIONS D AND E PROVIDE ADDITIONAL STUDENT AND MAINTENANCE BENEFITS, BUT THERE IS

NOT A VIABLE FINANCIAL MODEL TO PURSUE THEM.

OPTION C.2• SPACE FOR 8 ADDITIONAL CLASSROOMS,

OTHER ACADEMIC NEEDS AND NEEDS IDENTIFIED IN 15-YEAR PLAN

• 160M 6-LANE EXPANDED FIELDHOUSE

• ADDITIONAL INSTRUCTIONAL SPACE ON UPPER LEVELS

WINNETKA CAMPUS EAST SIDE ATHLETIC AND ACADEMIC STUDY| 190285 | 36

OPTIONS EVALUATED

FINANCING

POTENTIAL FUNDING SOURCES

FUND BALANCE (RESERVES)

Effectively using fund balance estimated between $1MM - $15MM

DEBT SERVICE EXTENSION BASE (DSEB)

Continuing to utilize a historical funding source effectively

DEBT CERTIFICATES (OPER. FUNDS)

Funds for significant work within our budgetary constraints with estimated annual debt service payments of $2.7MM - $3.8MM

RESPONSIBLY USING EXISTING RESOURCESConsidering financing models that use existing resources. Potential funding options do not include a referendum.

WINNETKA CAMPUS EAST SIDE ATHLETIC AND ACADEMIC STUDY| 190285 | 38

FINANCING

POTENTIAL PROJECT TIMELINE

DESIGN THROUGH CONSTRUCTION

2021 2022 20232020

JAN

FEB

MAR

APR

MAY

JUN

JUL

AUG

SEP

OCT

NOV

DEC

JAN

FEB

MAR

APR

MAY

JUN

JUL

AUG

SEP

OCT

NOV

DEC

JAN

FEB

MAR

APR

FEB

APR

MAY

JUN

JUL

AUG

MAR

MAY

JUN

JUL

AUG

SEP

OCT

NOV

DEC

JAN

INDEPENDENT ESTIMATE

90% SD SET ISSUED

CONTINUED REVIEW, DISCUSSION AND OUTREACH

DESIGN DEVELOPMENT• Systems selections and coordination• Ongoing Target Value Design

CONSTRUCTION DOCUMENTS• Bidding & procurement (multiple packages)• Permitting and village reviews

FACILITY CONSTRUCTION• Student KW and Athletics programs maintained during construction• Re-purpose existing spaces and shift some competition to Northfield• Continued communication w/ staff, neighbors and community

BOE PRESENTATION

OPEN FOR STUDENTS

WINNETKA CAMPUS EAST SIDE ATHLETIC AND ACADEMIC STUDY| 190285 | 40

POTENTIAL PROJECT TIMELINE

CONTINUED REVIEW, DISCUSSION AND OUTREACH

01.05.2021 Neighbor Meeting01.05.2021 Key Stakeholders - Boosters, NTPA, Staff01.11.2021 Village of Winnetka01.11.2021 Finance Committee01.11.2021 Board of Education Workshop Discussion01.19.2021 Board of Education Meeting02.08.2021 Finance Committee02.16.2021 Board of Education Presentation

WINNETKA CAMPUS EAST SIDE ATHLETIC AND ACADEMIC STUDY| 190285 | 41

POTENTIAL PROJECT TIMELINE