(2014 - May ’21) PARLIAMENTARY CONSTITUENCY NEW RAILWAYS NEW ROHTAK

Upload: others

Post on 27-Jan-2022

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NEW RAILWAYS NEW ROHTAK

(2014 - May ’21)

PARLIAMENTARY CONSTITUENCY

NEW RAILWAYSNEW ROHTAK

Page 2: NEW RAILWAYS NEW ROHTAK

Indian Railways is the lifeline of the nation and catalyst for India's

progress and economic development. Railway has been providing

comfortable, convenient and easy on the pocket transportation system

to its patrons. Major infrastructure projects in Railways has focus on

safety, enhancing speed and connecting far flung areas. New tracks are

being laid. Line doubling and electrification works are in full swing.

Latest technologies, digitalization and in house innovations are being

used to bring more efficiency and better results. Emphasis is also on

creating better business opportunities through long haul and piecemeal

trains.

The officers and staff of the Railways are dedicated, ready to adapt to

changing scenario of the transport sector, this booklet is aimed towards

listing some of the important activities involving in the recent past as

well as current projects in Rohtak. The budgets allocated to various

projects are not apportioned State wise but reflect the cost of the project.

PREFACE

General ManagerNorthern Railway

Ashutosh Gangal

Page 3: NEW RAILWAYS NEW ROHTAK

INPUTS BY RAILWAY IN ROHTAK PARLIAMENTARY CONSTITUENCY

ROHTAK PARLIAMENTARY CONSTITUENCYWORKS COMPLETED IN LAST SEVEN YEARS:

Infrastructural Developments:

v Construction of Road Over Bridge (ROB) at Rohtak Bye pass, Level Crossing 32 and 38 on Delhi Bathinda section.

v Construction of Underpass at unmanned Level Crossing No. 80, 82, 83 and 84 on Delhi Batäinda route.

v 2 Lane Road Over Bridge (ROB) in lieu of Level Crossing No. 31C near Asauda an Delhi Bhatinda Line.

v Underpass at Double fatak Rohtak Railway station on Delhi Bathinda Line.

v Improvement of circulating area and development of green patch at Rohtak Railway station.

v Construction of under pass near double phatak at Rohtâk Railway station.

v Construction of Road Over Bridge (ROB) at Level Crossing No. 79B near Lakan Majra on Gohana-Meham road.

v Construction of underpass at unmanned Level Crossing 10 and 17 on Rohtak Panipat Line.

v Manning of Unmanned Level Crossing nos. 9 and 33 on Rohtak Panipat Line.

v Construction of 3 underpass at km 33.43 Makrauli chandpur road, 42.21 Barra village and 45.56 Jhajjar Talab Road on Rohtak Rewari route.

v Construction of Limited Height Subway (LHS) sub-way as under on Asthal Bohar-Rewari line,Machhol-Chandpur, Baüra Village, Jhajjar - Talao Road.

v Shifting of Level Crossing Gate no. 48 from station yard at Kharwar.

v Construction of Road Over Bridge (ROB) at Level Crossing no.79 Lakhan Majra on Delhi Bathinda route.

v Construction of Road Over Bridge (ROB) on Level crossing 31 & 38.

v 20 No. benches kept at Makrauli and Samargopalpur.

v Construction of Manned Level Crossing No. 09 near Makroli station.

Passenger Amenities:

v Improvement of circulating area and platform surface at Bahadurgarh, Asaudah and Sampla, Kharawad, Rodh Nagar, Samar Gopalpur & Kharanti stations on Delhi Bathinda route.

v Improvement of urinals and toilets at Bahadurgarh and Sampla Railway stations.

v Provision of Coach Guidance Display Boards and Train information Display Boards at Rohtak Railway Station

v Provision of mini Platform shelters at Makrauli and Jasia stationson Rohtak Panipat Line, Provision of Lenches 6 nos each at

Samargopalpur and Asthal Bohar stations on Delhi BathindaLine and 6 nos each at Makrauli and Jasia stations on Rohtak Panipat Line.

v Development of Park in front of Station (Line par) at Bahadurgarh Railway station.

v Toilet made for Handicaped person at platform No. 01 at Bhadurgarh & Asthal Bohar Stations Railway station.

v Construction of 5.60 KM elevated track in Rohtak on Rohtak-Panipat line

v Provision of 225 KWp on-grid solar rooftop plant commissioned at Rohtak Railway station.

v Provision of 4 No. steel benches in 1st class waiting room at Rohtak Railway station.

v Improvement to circulating area at Rohtak & Bhadurgarh Railway station.

v Two nos. small passenger shelter built at Asthal Bohar Railway station.

v Park in circulating area & green patch development after fixing grill at Rohtak Railway station.

v Elevated bye pass line on Rohtak Panipat route.

v Intermediate block sections adjacent to in stations towards longer block sections an Rohtak-Samar Gopalpur, Jind- Barsola Jakhal- Bareta sections.

v Const. of Road over bridge on Level Crossing no. 22 at Jhajjar.

v INTRODUCTION OF NEW TRAINS : Train no- 12439/12440 (Shri Ganganagar - H Sahib Nanded Express) having Stoppages at NDLS, ROK, JIND, JHL Weekly started w.e.f. 31.05.2019.

v 05 New trains have been introduced during last 5 years in Rohtak Constituency.

FUTURE WORKS:

v Rohtak Meham Hansi New Line.

v Elevated bye pass line on Rohtak Panipat route.

v Intermediate block sections adjacent to in stations towards longer block sections an Rohtak-Samar Gopalpur, Jind-Barsola Jakhal- Bareta sections.

v Construction of Underpass at Bahadurgarh Railway station yard.

v Const. of Road Over Bridge (ROB) on Level Crossing no. 22 at Jhajjar Railway station.

ONGOING WORKS:

v Construction of new Rly Line between Rohtak - Hansi (65 Kms)

v Provision of 2.44 m wide Foot Over Bridge line par Basti to PF no.2/3 and at 1 Bahadurgarh section .

v Construction of Underpass at Bahadurgarh station yard.

Page 4: NEW RAILWAYS NEW ROHTAK

SOME IMPORTANT PHOTOS

Improvement of LUX level at platform, Circulating area at Rohtak

High Mast Tower at Rohtak Stand alone Solar at Bahardurgh

Onboard House Keeping Mechanized Cleaning

Coach with Rooftop Solar Panels The Work Force