2
3
BEFORE THE STATE WATER RESOURCES CONTROL BOARD
4 PUBLIC HEARING TO DETERMINE l
5 REQUESTED CHANGES IN WATER ; RIGHTS OF THE DEPARTMENT OF )
6 WATER RESOURCES AND U.S. BUREAU ) OF RECLAMATION FOR THE ;
7 CALIFORNIA WATERFIX PROJECT )
8
9
) ) )
~~~~~~~~~~~-----) MERCED IRRIGATION DISTRICT, )
10 MODESTO IRRIGATION DISTRICT, ) )
11 OAKDALE IRRIGATION DISTRICT, ) SOUTH SAN JOAQUIN IRRIGATION l
12 DISTRICT, TURLOCK IRRIGATION ) )
13 DISTRICT, CITY AND COUNTY OF SAN ) FRANCISCO, a California municipal )
14 corporation, each individually, and i collectively the SAN JOAQUIN )
15 TRIBUTARIES AUTHORITY, ) )
16
17
18
Interested Parties.
------------------------------
) ) )
THE SAN JOAQUIN TRIBUTARIES AUTHORITY'S PROTEST TO PHASE 1 OF THE PETITION REQUESTING CHANGES IN WATER RIGHTS OF THE DEPARTMENT OF WATER RESOURCES AND U.S. BUREAU OF RECLAMATION FOR THE CALIFORNIA W A TERFIX PROJECT
19 PLEASE TAKE NOTICE that the MERCED IRRIGATION DISTRICT, MODESTO
20 IRRIGATION DISTRICT, OAKDALE IRRIGATION DISTRICT, SOUTH SAN JOAQUIN
21 IRRIGATION DISTRICT, TURLOCK IRRIGATION DISTRICT, all of which are California
22 irrigation districts, the CITY AND COUNTY OF SAN FRANCISCO, a California municipal
23 corporation acting by and through its PUBLIC UTILITIES COMMISSION, and the SAN JOAQUIN
24 TRIBUTARIES AUTHORITY (all parties collectively refeiTed to as SJTA), submit their Protest to
25 Phase 2 of the above-referenced Petition as follows:
26 INTRODUCTION
27 The San Joaquin Tributaries Authority (SJT A) protests the California Depatiment of Water
28 Resources (DWR) and United States Bureau of Reclamation (Reclamation) (collectively Petitioners)
SAN JOAQUIN TRIBUTARIES AUTHORITY"S PROTEST TO PHASE I OF PETITION OF DWRJUSBR RE WATERFIX
![Page 2: New PUBLIC HEARING TO DETERMINE l THE SAN JOAQUIN … · 2016. 1. 19. · 1 2 3 before the state water resources control board 4 public hearing to determine l 5 requested changes](https://reader035.vdocuments.mx/reader035/viewer/2022071217/604bcbfa1e343f2181290911/html5/thumbnails/2.jpg)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
joint petition to change the water rights necessary to enable the California WaterFix Project
(Petition). The State Water Resources Control Board (State Water Board) cannot approve the
Petition because it is contrary to law and injures legal water users. (Water Code 1700 et. seq.) The
Petition requests the State Water Board approve changes to Petitioners' water rights that will enable
the construction and operation of largest statewide water facilities project in the last fifty years.
Despite the enonnity of the underlying project and change, the Petition is very limited and takes the
position that the request is for a simple relocation of diversion. The Petition fails to disclose the
operational changes that will result from changing the point of diversion. This failure is significant.
It prevents the State Water Board and stakeholders from any meaningful understanding and
analyzing the impacts of the proposed project. Without such understanding and analysis the State
Water Board cannot approve the Petition.
Specifically, the State Water Board cannot approve the Petition because its deficiencies make
it contrary to law. The Petition is not supported by environmental analysis required by the
California Environmental Quality Act (CEQA) and National Environmental Pollutant Act (NEPA).
The Petition was filed with the State Water Board prior to consultation with National Marine
Fisheries Service (NMFS) and United States Fish and Wildlife Service (USFWS) as required by the
Endangered Species Act (ESA). In addition, the Petition was submitted to the State Water Board
prior to receiving either a 401 or 404 permit, which are each required prior to Project approval. Each
of the above processes is iterative; the proposed project is likely to undergo significant changes
through the processes and potential restrictions they are likely to impose. The State Water Board
cannot review the Petition prior to the above processes, to do so would either (a) pre-determine the
outcome of the other processes and require project changes not occur or be minimal; or (b) waste
time and resources because the Petition is based on a project that will be significantly altered.
The State Water Board cannot approve the Petition because the Petitioners have failed to
establish that the Petition will not result in injury to legal water users. To the contrary, the Petition
will injure legal water users. SJTA Members are injured by the Petition's reliance on ref,>ulations
that will restrict SJT A Members· full and beneficial use water. Further, legal water users are injured
by the prematurity of the Petition; legal water users throughout the state are spending time and
2 SAN JOAQUIN TRIBUTARIES AUTHORITY·s PROTEST TO PHASE I OF PETITION OF DWRJUSBR RE WATERFIX
![Page 3: New PUBLIC HEARING TO DETERMINE l THE SAN JOAQUIN … · 2016. 1. 19. · 1 2 3 before the state water resources control board 4 public hearing to determine l 5 requested changes](https://reader035.vdocuments.mx/reader035/viewer/2022071217/604bcbfa1e343f2181290911/html5/thumbnails/3.jpg)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
resources analyzing a Petition with insufficient information and analysis on a project that is not yet
final.
STANDING OF LEGAL WATER USERS
The SJT A includes the Merced, Turlock, Modesto, Oakdale, and South San Joaquin
Irrigation Districts, as well as the City and County of San Francisco (SJT A Members). Each of the
SJT A Members holds a portfolio of water rights on one of the Merced, Tuolumne, or Stanislaus
Rivers. The specific rights to diversion, points of diversion, places of use and other required
information are set forth in the permits and licenses attached hereto as Exhibit A. In addition, the
SJT A Members have previously provided the State Water Board with specific information requested
in the Notice regarding specific timing and reporting of water use. This information can be found in
the SJTA Members' submissions in response to the Information Order regulations beginning on
March 6, 2015 and periodically updated pursuant to requirements in the Infmmation Order.
THE PETITION IS CONTRARY TO LAW
(1) Petition Violates Water Code Section 85086
16 Water Code section 85086 states that any approval of the Petition "shall include appropriate
17 Delta flow criteria." This requirement further specifies that the flow criterion is different and
18 distinct from existing water quality control flow objectives. (Water Code, § 85086(c)(1) [stating the
19 flow criteria is "new," focused on the "Delta ecosystem" and pursuant to "public trust" protections].)
20 The Water Code clearly requires that the flow criteria will be developed in a new process specific to
21 the Delta and requires the Petitioners fund the analysis for developing such criteria. (Water Code,§
22 85086(d).)
23 The Petition does not include proposed flow criteria. Instead of developing and including
24 flow criteria in its Petition, the Petitioners state that Water Code section 85086 requirements will be
25 satisfied by the "existing regulatory framework for the Delta provided by the WQCP and D-1641."
26 (Petition, at 11.) The reference to the ongoing Bay Delta Plan review is not sufficient to satisfy the
27 requirements of section 85086. First, section 85086 requires the flow criteria to be developed before
28 approval of the Petition and be included in any approval. Second, the requirement that the flow
________ 3 SAN JOAQUIN TRIBUTARIES AUTHORITY"S PROTEST TO PHASE I OF PETITION OF DWR/USBR RE WATERFIX
![Page 4: New PUBLIC HEARING TO DETERMINE l THE SAN JOAQUIN … · 2016. 1. 19. · 1 2 3 before the state water resources control board 4 public hearing to determine l 5 requested changes](https://reader035.vdocuments.mx/reader035/viewer/2022071217/604bcbfa1e343f2181290911/html5/thumbnails/4.jpg)
I
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
criteria be included in the approval of the Petition indicates that Petitioners must be the parties
responsible for meeting or complying with the flow criteria. The ongoing Bay Delta Plan review
currently proposes to make SJTA Members responsible for meeting a portion of the water quality
objectives. Third, section 85086 states that the Petitioners must fund a new process that develops
flow criteria; reliance on an existing process, not funded by Petitioners, is not contemplated. Fourth,
the delegation of developing flow criteria through the Bay Delta Plan presupposes or predetermines
that the objectives developed in the Bay Delta Plan review will satisfy the requirement for flow
criteria. The Petition provides no suppmi for such assumption.
In support of the Petition's reliance on the Bay Delta Plan review for the development of
flow criteria, the Petition alleges Petitioners currently comply with the existing water quality
requirements. This statement is not accurate or supported by historical data. Rather, since 1995,
Petitioners have fully complied with Bay Delta Plan objectives in only 8 of the 21 years. Assuming
arguendo that this statement is accurate, the SJT A protest regarding this issue could be resolved by
an agreement in which the Petitioners are responsible for meeting existing water quality objectives
and are also responsible for complying with any amendments to the water quality objectives in the
future.
(2) Petition is Deficient and Fails to Properly Describe Proposed Project
Water Code section I 701.2 requires that a petition to change the terms of a permit or license
shall "include all information reasonably available to the petitioner," and "include sufficient
information to demonstrate a reasonable likelihood that the proposed change will not injure any
other legal user of water." (Water Code, § 1701.2.) At the most basic level, these requirements
require Petitioners disclose the changes to how, when, where, and at what time the diversion of
water pursuant to the right will change. The Petition does not provide this information or otherwise
disclose how the WaterFix Project will be operated. For example, the Petition describes the altered
operations as follows:
"Construction of the north Delta intakes will allow greater flexibility in operation of both south and north Delta diversions, and better balancing of the associated water quality and hydrodynamic benefits for fish, drinking water, agriculture, and
4 SAN JOAQUIN TRIBUTARIES AUTHORITY'S PROTEST TO PHASE I OF PETITION OF DWRIUSBR RE WATERFIX
![Page 5: New PUBLIC HEARING TO DETERMINE l THE SAN JOAQUIN … · 2016. 1. 19. · 1 2 3 before the state water resources control board 4 public hearing to determine l 5 requested changes](https://reader035.vdocuments.mx/reader035/viewer/2022071217/604bcbfa1e343f2181290911/html5/thumbnails/5.jpg)
1 other beneficial uses. Diversions at the north Delta intake would be greatest in wetter years and lowest in drier years, when south Delta diversions would provide
2 the majmity ofCVP and SWP south of Delta exports."
3 (Petition, at 9.) This description of operations only provides general conclusions that are not
4 supported. Certainly this description does not satisfy Water Code section 1701's requirement to
5 "include all information reasonably available to the petitioner." For these reasons, the Petition
6 violates the requirements of Water Code section 170 I.
7 In addition, CEQA requires a project proponent provide a "description of the project's
8 technical, economic, and environmental characteristics." (Cal. Code Regs., tit. 14, § 15124.) The
9 purpose of these requirements is to ensure that the impacts of a project are understood and able to be
10 analyzed. The Petitioners fail to provide a description of the Project's technical characteristics by
11 failing to disclose how the dual conveyance system will be operated -basic disclosure regarding the
12 quantity and season of water diverted at the newly proposed point of diversion are not included in
13 either the Draft Environmental Impact Report/Statement (DEIS/R) or the Petition. This lack of
14 detail precludes stakeholders and regulatory agencies from properly understanding the timing or
15 quantity of water that will move through pipes as opposed to through natural conveyance. This
16 information is fundamental; the WaterFix Project cannot be analyzed without better understanding
17 the basic operational facts of how and where water will be taken out of the system.
18
19 (3) The Petition is Premature
20 Water Code section 1701.2 requires all information reasonably available to Petitioners be
21 included in the Petition. This provision requires the Petitioners withdraw their Petition andre-file
22 after the numerous iterative regulatory processes have been completed. Only after environmental
23 review has been completed, including satisfaction of all CEQA and NEP A requirements, should the
24 State Water Board consider the Petition for approval. Similarly, Petitioners must complete
25 consultation under the Endangered Species Act and receive a 40 I certification before a final project
26 can be determined. It is likely that Petitioners compliance with these regulatory processes will
27 Ill
28 Ill
s. ______________ ___ SAN JOAQUIN TRIBUTARIES AUTHORITY'S PROTEST TO PHASE I OF PETITION OF DWRJUSBR RE WATERFIX
![Page 6: New PUBLIC HEARING TO DETERMINE l THE SAN JOAQUIN … · 2016. 1. 19. · 1 2 3 before the state water resources control board 4 public hearing to determine l 5 requested changes](https://reader035.vdocuments.mx/reader035/viewer/2022071217/604bcbfa1e343f2181290911/html5/thumbnails/6.jpg)
1
2
3
4
5
result in significant modifications to the WaterFix Project. Accordingly, it would be a waste of the
State Water Board's limited resources to review the existing preliminary proposal for the WaterFix
Project, given the Project is likely to significantly change.
(4) The State Water Board Cannot Rely on the Existing Environmental Documents
6 The Petitioners released the DEIR/S for the Bay Delta Conservation Plan project on
7 December 9, 2013. Since that time, Petitioners revised and renamed the project "WaterFix."
8 Petitioners recirculated the existing Draft Environmental Impact Statement/Repmt (DEIS/R) for the
9 WaterFix Project on July 9, 2015. Currently, the Petitioners are reviewing comments on the DEIS/R
10 and have yet to adopt a final environmental document identifying a preferred alternative project.
11 Petitioners have received numerous comments on the DEIS/R. Several comments are critical
12 and demand Petitioners make significant changes to the project. For example, the United States
13 Environmental Protection Agency (USEPA) stated the DEIS/R is inadequate because the "impacts of
14 the WaterFix Project on the Delta ecosystem cannot be fully evaluated at this time, and any attempt
15 to describe the environmental impacts of the project is necessarily incomplete." (US EPA Letter to
16 USBR, at 2). In fact, the "proposed project and alternatives evaluated in the DEIS ... defer actions
17 necessary to protect water quality and aquatic life to the future." (ld.) Although the "project has been
18 significantly revised since the initial DEIS ... [it still] relies on modeling results that are based on
19 the [original] BDCP alternatives ... [which] is not necessarily representative of the environmental
20 effects resulting from the WaterFix alternatives." (!d., at 3). Other comments are similarly critical of
21 the DEIR/S document. Given the comment and responses to the DEIS/R, it is likely that the
22 WaterFix Project may undergo significant revision and further environmental analysis. (Cal. Code
23 Regs., tit. 14, § 15088.5(a)(4) ("A lead agency is required to recirculate an EIR when ... the draft
24 EIR was so fundamentally and basically inadequate and conclusory in nature that meaningful public
25 review and comment were precluded.").)
26 The State Water Board cannot rely on preliminary environmental documentation. It is likely
27 the preferred project alternative described in the DEIS/R may undergo fmther changes or the
28 environmental analysis may significantly change. For these reasons, the State Water Board cannot
6 SAN JOAQUIN TRIBUTARIES AUTHORITY'S PROTEST TO PHASE I OF PETITION OF DWRJUSBR RE WATERFIX
![Page 7: New PUBLIC HEARING TO DETERMINE l THE SAN JOAQUIN … · 2016. 1. 19. · 1 2 3 before the state water resources control board 4 public hearing to determine l 5 requested changes](https://reader035.vdocuments.mx/reader035/viewer/2022071217/604bcbfa1e343f2181290911/html5/thumbnails/7.jpg)
1
2
3
4
5
approve the Petition until it is able to rely on valid environmental analysis via a final environmental
impact repm1/statement.
INJURY TO LEGAL WATER RIGHTS
(1) Burden of Proving the Petition Will Not Result in Injury
6 The Petitioners have the burden of establishing that the Petition will not injure other legal
7 water users. (Water Code, § 1702; WR Order 79-22.) The Petition has not met this burden. The
8 Petition spends only a few paragraphs addressing the injury to legal water users. (Petition, at 19-21.)
9 This section is made up of general conclusions that are not supported. For example, the Petition
10 refers to the DElS/R and states the DEIS/R "considered" the impacts of the north Delta intakes on
11 water right holders and "finds that there are no regulatory actions that would affect non-project water
12 rights holders." (Petition, at 20.) The Petition fails to disclose which injuries were considered, which
13 "water right holders'' were considered, whether there are any non-regulatory actions that would lead
14 to injury, whether there were potential injuries, and how these injuries would be mitigated.
15 The Petition fails to identify or discuss impacts to upstream water users. Upstream water
16 users have long-requested assurance from Petitioners that the proposed project will not have
17 redirected impacts. The Petition fails to provide such assurance. To the contrary, the Petition does
18 not include any discussion of potential redirected upstream impacts, how the project will address
19 such potential impacts, or mitigation for such impacts. The Petition fails to analyze legal injury at
20 any specific detail. General and unsupported conclusions are not sufficient to meet Petitioners'
21 burden. For this reason, the State Water Board cannot approve the Petition as it is currently drafted.
22
23
24
25
26
27
28
(2) Injury to Water Use and Water Reliability of SJTA Members
The Petition injures the water rights held by the STJA Members and restricts the full exercise
of these rights. Water Code section 85086 requires that any approval of the Petition include flow
criteria. The Water Code makes clear the flow criteria is the responsibility of the Petitioners. The
Petition does not include new flow criteria. Instead, the Petition states that the flow requirement to
support the WaterFix Project will be satisfied at a later time through the State Water Board's review
of the Bay Delta Plan and revision of D-1641. The Bay Delta Plan review process is underway and
7 SAN JOAQUIN TRIBUTARIES AUTHORITY'S PROTEST TO PHASE I OF PETITION OF DWRIUSBR RE WATERFIX
![Page 8: New PUBLIC HEARING TO DETERMINE l THE SAN JOAQUIN … · 2016. 1. 19. · 1 2 3 before the state water resources control board 4 public hearing to determine l 5 requested changes](https://reader035.vdocuments.mx/reader035/viewer/2022071217/604bcbfa1e343f2181290911/html5/thumbnails/8.jpg)
1
2
3
4
5
6
7
8
9
10
11
12
13
the State Water Board has proposed that SJT A Members be responsible for some portion of the Bay
Delta Plan water quality flows. Indeed, the draft substitute environmental document that analyzes
the proposed changes to the Bay Delta Plan concludes that SJT A Members will make several
hundred thousand acre feet of water available for outflow and Project use. Thus, the SJT A Members
will have their water supply reduced by regulation in order to satisfy the flow criteria that is required
for approval of the Petition. This is a significant and unlawful injury to the water rights held by the
SJT A Members. The SJTA Members are strongly opposed to the proposed revisions to the Bay
Delta Plan for several reasons, one of which is the regulatory taking of SJT A Members' water rights
to support the Water Fix Project. This significant injury to the water rights of the SJT A Members
precludes the State Water Board from approving the Petition.
(3) Injury to Water Quality And Increased Regulatory Burden on Upstream Water Users
14 The Petition does not meet the burden of providing the proposed project will not injure legal
15 water users through adversely affecting water quality. The Petition states that the project will only
16 result in "minor impacts to Delta salinity, which can and will be avoided in real time operations that
17 will remain controlled by the Board's regulatory requirements ... " (Petition, at 19-20.) This
18 statement is fraught with problems. First, the statement is unsupported; no data or information is
19 provided to support the conclusion. Second, it is difficult to believe that removing significant
20 quantities of fresh water from flowing into the Delta will not impact the water quality in the Delta.
21 Third, the "control" provided by the State Water Board includes regulation that limits the ability of
22 the SJT A Members to fully exercise their water rights.
23 The State Water Board cannot approve the Petition because Petitioners have not satisfied
24 their respective burdens to establish that the changes in water quality will not injure a legal user of
25 water. The Petition acknowledges the WaterFix Project will slightly degrade salinity in the Delta.
26 This degradation is in addition to the failure to satisfy existing salinity standards in the Delta.
27 Together, the compromised water quality injures Delta water users ability to access water suitable
28 for application to all beneficial uses. In addition, the degradation of water quality increases
8 SAN JOAQUIN TRIBUTARIES AUTHORITv·s PROTEST TO PHASE I OF PETITION OF DWR/USBR RE WATERFIX
![Page 9: New PUBLIC HEARING TO DETERMINE l THE SAN JOAQUIN … · 2016. 1. 19. · 1 2 3 before the state water resources control board 4 public hearing to determine l 5 requested changes](https://reader035.vdocuments.mx/reader035/viewer/2022071217/604bcbfa1e343f2181290911/html5/thumbnails/9.jpg)
I
2
3
4
5
6
7
8
9
10
11
12
regulation of upstream water users, including the SJT A Members, by directly reducing their ability
to put their full water rights to beneficial use.
(4) Lack of Project Disclosure Leads to Injury
The Petition is required to identify and analyze environmental impacts. (Water Code, §
1701.) These requirements are in place, in part, to enable legal users of water to understand and
evaluate injury to their water rights. Because the Petitioners have not fully disclosed the operations
of the proposed project, it is not possible to fully understand or analyze potential injury to water
users. For example, without knowing the timing and quantity of water diverted in the north Delta
intakes, it is difficult to understand if water will be available for diversions in the Delta or how much
water upstream water right holders will need to release to meet any in-Delta water quality
requirements.
13 The failure to disclose the specific proposed operation of the Project is not a trivial issue.
14 Legal water users have been requesting Petitioners provide protection from potential re-directed
15 impacts from the inception of the WaterFix Project. Petitioners have failed to provide this
16 assurance. Now that Petitioners are moving f01ward with obtaining permitting, it is time to provide
17 assurance that the WaterFix Project will not have redirected impacts to upstream water users. The
18 Petition does not provide assurance, nor does it provide sufficient information upon which
19 stakeholders can identify impacts for themselves. This failure to disclose sufficient information is,
20 in itself, an injury to legal water users. It causes legal water users to conduct hydrologic modeling of
21 their own, to attend hearings on a premature Petition, and oppose the regulatory taking of water
22 through the Bay Delta Plan review. Further, the uncertainty of the statewide water system also
23 impacts the reliability of water rights held by legal water users. Not understanding how the
24 WaterFix Project will affect the Delta system and upstream water users undermines the reliability of
25 water deliveries for future generations.
26 Ill
27 Ill
28 Ill
9 SAN JOAQUIN TRIBUTARIES AUTHORITY'S PROTEST TO PHASE I OF PETITION OF DWRIUSBR RE WATERFIX
![Page 10: New PUBLIC HEARING TO DETERMINE l THE SAN JOAQUIN … · 2016. 1. 19. · 1 2 3 before the state water resources control board 4 public hearing to determine l 5 requested changes](https://reader035.vdocuments.mx/reader035/viewer/2022071217/604bcbfa1e343f2181290911/html5/thumbnails/10.jpg)
![Page 11: New PUBLIC HEARING TO DETERMINE l THE SAN JOAQUIN … · 2016. 1. 19. · 1 2 3 before the state water resources control board 4 public hearing to determine l 5 requested changes](https://reader035.vdocuments.mx/reader035/viewer/2022071217/604bcbfa1e343f2181290911/html5/thumbnails/11.jpg)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
DATED: January 5, 2016
DATED: January 5, 2016
DATED: January 5, 2016
By: Ken Robbins SOUTH SAN JOAQUIN IRRIGATION DISTRICT
By: TURLOCK IRRIGATION DISTRICT
By:
CIT OF SAN FRANCISCO
ll SAN JOAQUIN TRlBUTARIES AUTHORITY·s PROTEST TO PHASE I OF PETITION OF DWR!USBR RE WATERFIX
![Page 12: New PUBLIC HEARING TO DETERMINE l THE SAN JOAQUIN … · 2016. 1. 19. · 1 2 3 before the state water resources control board 4 public hearing to determine l 5 requested changes](https://reader035.vdocuments.mx/reader035/viewer/2022071217/604bcbfa1e343f2181290911/html5/thumbnails/12.jpg)
I
2
3
4
5
6
7
8
9
IO
11
I2
13
I4
I5
I6
I7
I8
I9
20
2I
22
23
24
25
26
27
28
Re: B4ore the California State Water Resources Control Board Public Hearing to Determine Requested Changes in WaterRights of the Department of Water Resources and U.S. Bureau of Reclamation for the California Water Fix Project San Joaquin Tributaries Authority's Protest to Phase I of the Petition
PROOF OF SERVICE BY EMAIL/MAIL (Government Code §11440.20)
I, Linda L. Wood, declare that:
I am employed in the County of Sacramento, State of California. I am over the age of eighteen years and not a party to the within cause. My business address is 2617 K Street, Suite 100, Sacramento, CA 95814. On this date, in the following manner, I served the foregoing document(s) identified as:
THE SAN JOAQUIN TRIBUTARIES AUTHORITY'S PROTEST TO PHASE I OF THE PETITION REQUESTING CHANGES IN WATER RIGHTS OF THE DEPARTMENT
OF WATER RESOURCES AND U.S. BUREAU OF RECLAMATION FOR THE CALIFORNIA WATERFIX PROJECT
.,.. .,.. .,.. UNITED STATES MAIL [CCP §1013): I enclosed the documents in a sealed envelope addressed to the following persons and placed the envelope for collection and mailing, following our ordinary business practices. I am readily familiar with our practice for collection and processing correspondence for mailing. On the same day that the correspondence is placed for collection and mailing, it is deposited in the ordinary course of business with the United States Postal Service, in a sealed envelope with postage thereon fully prepaid at Chico, California addressed as below:
___ FACSIMILE: Based on prior consent, I caused the documents to be sent to the following persons via telecopier/facsimile machine a true copy thereof to the parties indicated below:
--~·OVERNIGHT DELIVERY [CCP §1013(c)): I enclosed the documents in a sealed envelope provided by an overnight delivery carrier and addressed it to the persons identified below. I placed said envelope for collection at a regularly utilized drop box of the overnight carrier.
......... E-MAIL [CCP §1010.6): Based on pending consent of the parties, and/or court order or an agreement of the parties to accept service by e-mail, I caused the documents to be sent to the following persons at the following e-mail address, and did not receive, within a reasonable time after the transmission, any electronic message or other indication that the transmission was unsuccessful:
--~PERSONAL DELIVERY [CCP §415.1 OJ I aiTanged to have the documents personally delivered to the office of the persons identified below on _____ _
SEE ATTACHED SERVICE LIST
Proof of Service
![Page 13: New PUBLIC HEARING TO DETERMINE l THE SAN JOAQUIN … · 2016. 1. 19. · 1 2 3 before the state water resources control board 4 public hearing to determine l 5 requested changes](https://reader035.vdocuments.mx/reader035/viewer/2022071217/604bcbfa1e343f2181290911/html5/thumbnails/13.jpg)
I
2 California Department of Water Resources
3 c/o James Mizell 1416 Ninth Street, Room 11 04
4 Sacramento, CA 95818 Email: [email protected]
5
6
7
8
9
10
11
U.S. Bureau of Reclamation c/o Amy Aufdemberge U.S. Department of Interior Office of Regional Solicitor, Pacific Southwest Region 2800 Cottage Way Sacramento, CA 95825-1898 Email: Amy.A,[email protected]
SERVICE LIST
12
13
I declare under penalty of perjury under the laws of the State of California that the foregoing is tJue and con·ect, and that this declaration was executed on January 5, 2016, at Sacramento, California.