New page for summary of test status. https://espace.cern.ch/mddb/Systems%20Dry%20Run%20Tests/Home.aspx. Dry Run week 19. Pulse injection kickers in point 2 BIS arming and frequency control (linking, starting) through sequencer Trigger BPMs with pre-pulses Prepulse coming 900 ms too late - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: New page for summary of test status](https://reader035.vdocuments.mx/reader035/viewer/2022062322/56814a6c550346895db78595/html5/thumbnails/1.jpg)
R. Alemany & V. Kain, 19th of May 09
LHC
New page for summary of test status
o https://espace.cern.ch/mddb/Systems%20Dry%20Run%20Tests/Home.aspx
1
![Page 2: New page for summary of test status](https://reader035.vdocuments.mx/reader035/viewer/2022062322/56814a6c550346895db78595/html5/thumbnails/2.jpg)
R. Alemany & V. Kain, 19th of May 09
LHC
Dry Run week 19o Pulse injection kickers in point 2
o BIS arming and frequency control (linking, starting) through sequencer
o Trigger BPMs with pre-pulses
o Prepulse coming 900 ms too late
o New LHC mastership scheme
o New mastership scheme: can become master on spare (remove user request)
o Logging of transfer lines
o Independent of user and extraction time (for PCs)
o Solution for power converter logging will be tested next dry run
2
![Page 3: New page for summary of test status](https://reader035.vdocuments.mx/reader035/viewer/2022062322/56814a6c550346895db78595/html5/thumbnails/3.jpg)
R. Alemany & V. Kain, 19th of May 09
LHC
FGCs – operational settings
o Slides by Alick
3
![Page 4: New page for summary of test status](https://reader035.vdocuments.mx/reader035/viewer/2022062322/56814a6c550346895db78595/html5/thumbnails/4.jpg)
R. Alemany & V. Kain, 19th of May 09
LHC
“Dry run” week 21 - cancelledo Extract to TT40 and TT60
o Check mastership: extract under LHC master, re-phasing, check pre-pulse
o Verify that cannot have any dynamic destination when under injection test mode
o Pulse MKIs (new softstart for MKI 8?)
postponed to next week
o Run collimators through sequencer this week
4
![Page 5: New page for summary of test status](https://reader035.vdocuments.mx/reader035/viewer/2022062322/56814a6c550346895db78595/html5/thumbnails/5.jpg)
R. Alemany & V. Kain, 19th of May 09
LHC
Dry run week 22o BLM online-check
o Transfer line logging: new PC logging
o BPM triggered by pre-pulses
o BCTs – SMP?
o Test RF power:
o Sequencer tasks, status fixed display, application
o Trim + incoorporate
o 26th of May: RBAC dry run:
o Mode: operational/ non-operational
o PIQUET role5
![Page 6: New page for summary of test status](https://reader035.vdocuments.mx/reader035/viewer/2022062322/56814a6c550346895db78595/html5/thumbnails/6.jpg)
R. Alemany & V. Kain, 19th of May 09
LHC
Dry run VI June > week 23
o RF low level:
o All tasks:
o Load actual settings: gains, voltages, frequencies
o Load gains, voltages, frequencies
o Reset F-rev [before first injection]
o Re-phase [before collisions]
o All applications ready and settings for operational hyper-cycle available:
o RF low level application: status of loops, plus possibility to switch loops
o Injection signals fixed displays available
o Follow-up issues
6
![Page 7: New page for summary of test status](https://reader035.vdocuments.mx/reader035/viewer/2022062322/56814a6c550346895db78595/html5/thumbnails/7.jpg)
R. Alemany & V. Kain, 19th of May 09
LHC
Dry run week 26o MKQA AC-Dipole
o All applications: tune, multiturn
o Timing events
o Interlocking tests (keys,...)
o Transverse feedback
o Application
o Cleaning
o Sequencer task
o Follow-up issues
7
![Page 8: New page for summary of test status](https://reader035.vdocuments.mx/reader035/viewer/2022062322/56814a6c550346895db78595/html5/thumbnails/8.jpg)
R. Alemany & V. Kain, 19th of May 09
LHC
8
![Page 9: New page for summary of test status](https://reader035.vdocuments.mx/reader035/viewer/2022062322/56814a6c550346895db78595/html5/thumbnails/9.jpg)
R. Alemany & V. Kain, 19th of May 09
LHC
9