  • New Hope Road Multi-Use Path

    Bobby Croom, PE, PTOE

    City of Goldsboro

  • Funding• $900,000 Federal and

    State Funds for Preliminary Engineering, Design, and Construction.

    • Typically, a 20% match by the City, however NCDOT is providing the local match in this case.

  • Pre-Construction• Environmental

    Documentation

    • FHWA, USACE, NMFS, US EPA, US FWS, NCHPO, NCDCM, NCDWR, NCWRC

    • Design

    • ROW Acquisition/Certification

    • Utility Relocation

  • Red (???) Cockaded Woodpecker

  • Male Red Cockaded Woodpecker

  • Construction – April 25, 2016

  • Construction

  • Construction

  • Questions?