new hangar and storage shed design at burlington international airport
DESCRIPTION
New Hangar and Storage Shed Design at Burlington International Airport. Senior Capstone Design Project Civil and Environmental Engineering University of Vermont. Erin Flynn and Phillip Peterson Presenting. - PowerPoint PPT PresentationTRANSCRIPT
New Hangar and Storage Shed Design at Burlington International Airport
Senior Capstone Design Project Civil and Environmental Engineering
University of Vermont
Erin Flynn and Phillip Peterson Presenting
OverviewWorking with Heather Kendrew and Robert McEwing at the Burlington Airport as part of service-learning project.
TeamsTeam 1: Site preparation, demolition/deconstruction of existing buildings
Team 2: Equipment and chemical storage facility layout and design
Team 3: New Hangar layout and design
Site Overview
Pavement Removal
Slab Removal
Silt Fences and
Erosion Control
Team 1: SITE PREPARATION
Demolition
-Existing Conditions
-Salvage and Recycling
of Building Materials
-Demolition Procedure
-Demolition Costs
-Demolition Permits
Team 2:Storage Facility
Existing Building 870
Site Plan & Building Layout
Existing structures and utilities, overlay (shaded area) of the proposed storage facility
Interior layout of proposed storage facility
Radiant Floor Heating System
Team 3 Hangar Design
Existing hangar – 40,000 sqft
New Hangar
70,000 sqft
Structural Design
Structural Design
Sliding Hangar Door No part of the door
weight is supported by the building frame
Door is carried by ASCE certified Crane Rails
Door is guided by top rollers that travel on overhead guides
Can be customized to almost any size
Building Layout
Oil-water separatorDrainage
Water Main
Summary
Storage Shed and New Hangar Design•Storage Shed Pre-Fab•Hangar Original Design