new gilboa dam reconstruction project update · 2019. 5. 22. · 11 cat-212b dam reconstruction...

19
GILBOA DAM RECONSTRUCTION PROJECT UPDATE Schoharie County Board of Supervisors Meeting December 17, 2010

Upload: others

Post on 16-Oct-2020

8 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: New GILBOA DAM RECONSTRUCTION PROJECT UPDATE · 2019. 5. 22. · 11 CAT-212B Dam Reconstruction GILBOA DAM RECONSTRUCTION PROJECT Phase 3: Dam Reconstruction (CAT-212B) Construction

GILBOA DAMRECONSTRUCTIONPROJECT UPDATE

Schoharie CountyBoard of Supervisors Meeting

December 17, 2010

Page 2: New GILBOA DAM RECONSTRUCTION PROJECT UPDATE · 2019. 5. 22. · 11 CAT-212B Dam Reconstruction GILBOA DAM RECONSTRUCTION PROJECT Phase 3: Dam Reconstruction (CAT-212B) Construction

2

GILBOA DAM RECONSTRUCTION PROJECT PROJECT GOALS: Ensuring Public Safety

Sustaining Public Water Supply

Page 3: New GILBOA DAM RECONSTRUCTION PROJECT UPDATE · 2019. 5. 22. · 11 CAT-212B Dam Reconstruction GILBOA DAM RECONSTRUCTION PROJECT Phase 3: Dam Reconstruction (CAT-212B) Construction

3

GILBOA DAM RECONSTRUCTION PROJECT

Project Scope and Current ScheduleDesign & Construction StatusDam Monitoring & Reservoir StatusPermitting, ITRT and Public CoordinationSignificant Accomplishments to DateQuestions

Agenda

Page 4: New GILBOA DAM RECONSTRUCTION PROJECT UPDATE · 2019. 5. 22. · 11 CAT-212B Dam Reconstruction GILBOA DAM RECONSTRUCTION PROJECT Phase 3: Dam Reconstruction (CAT-212B) Construction

4

GILBOA DAM RECONSTRUCTION PROJECT

Project Scope

Phase 1: CAT-359 Crest Gates InstallationPhase 2: CAT-212A Site PreparationPhase 3: CAT-212B Dam Reconstruction

CAT-212C Low-Level Outlet WorksPhase 4: CAT-212D Shandaken Intake ImprovementsPhase 5: CAT-212E Site Restoration

Page 5: New GILBOA DAM RECONSTRUCTION PROJECT UPDATE · 2019. 5. 22. · 11 CAT-212B Dam Reconstruction GILBOA DAM RECONSTRUCTION PROJECT Phase 3: Dam Reconstruction (CAT-212B) Construction

5

GILBOA DAM RECONSTRUCTION PROJECTCurrent Project Schedule

Page 6: New GILBOA DAM RECONSTRUCTION PROJECT UPDATE · 2019. 5. 22. · 11 CAT-212B Dam Reconstruction GILBOA DAM RECONSTRUCTION PROJECT Phase 3: Dam Reconstruction (CAT-212B) Construction

6

GILBOA DAM RECONSTRUCTION PROJECTPhase 1: Crest Gates Installation (CAT-359)

Anticipated Completion: Spring 2011Gate Equipment Fabricated & DeliveredCompletion Delayed

Page 7: New GILBOA DAM RECONSTRUCTION PROJECT UPDATE · 2019. 5. 22. · 11 CAT-212B Dam Reconstruction GILBOA DAM RECONSTRUCTION PROJECT Phase 3: Dam Reconstruction (CAT-212B) Construction

7

GILBOA DAM RECONSTRUCTION PROJECTPhase 2: Site Preparation (CAT-212A)

Order To Commence Work – September 30, 2009

Anticipated Completion – Spring 2011

Page 8: New GILBOA DAM RECONSTRUCTION PROJECT UPDATE · 2019. 5. 22. · 11 CAT-212B Dam Reconstruction GILBOA DAM RECONSTRUCTION PROJECT Phase 3: Dam Reconstruction (CAT-212B) Construction

8

GILBOA DAM RECONSTRUCTION PROJECTPhase 2: Site Preparation (CAT-212A)

Page 9: New GILBOA DAM RECONSTRUCTION PROJECT UPDATE · 2019. 5. 22. · 11 CAT-212B Dam Reconstruction GILBOA DAM RECONSTRUCTION PROJECT Phase 3: Dam Reconstruction (CAT-212B) Construction

9

GILBOA DAM RECONSTRUCTION PROJECTPhase 2: Site Preparation (CAT-212A)

Page 10: New GILBOA DAM RECONSTRUCTION PROJECT UPDATE · 2019. 5. 22. · 11 CAT-212B Dam Reconstruction GILBOA DAM RECONSTRUCTION PROJECT Phase 3: Dam Reconstruction (CAT-212B) Construction

10

GILBOA DAM RECONSTRUCTION PROJECTPhase 3: Dam Reconstruction and New LLO

Proposed Low-Level Outlet Works

Spillway & Training Wall Reconstruction

Embankment Improvements

Page 11: New GILBOA DAM RECONSTRUCTION PROJECT UPDATE · 2019. 5. 22. · 11 CAT-212B Dam Reconstruction GILBOA DAM RECONSTRUCTION PROJECT Phase 3: Dam Reconstruction (CAT-212B) Construction

11

CAT-212B Dam Reconstruction

GILBOA DAM RECONSTRUCTION PROJECTPhase 3: Dam Reconstruction (CAT-212B)

Construction Bids Received – December 16, 2010Order to Commence Work (OTC) – 2nd Qtr. 20115-Year Construction Period

Major Scope ItemsInstall Post-Tensioned AnchorsExtend Downstream West Training WallStabilize North Training Wall and Improve DrainageRefurbish Upper Gate ChamberRefurbish Existing Stone MasonryEnhance East Overlook AreaImprove Instrumentation and Surveillance SystemsNorth Training Wall Service RampReconstruct Intermediate Channel Step, Plunge Pool, and East Upstream Retaining Wall

Page 12: New GILBOA DAM RECONSTRUCTION PROJECT UPDATE · 2019. 5. 22. · 11 CAT-212B Dam Reconstruction GILBOA DAM RECONSTRUCTION PROJECT Phase 3: Dam Reconstruction (CAT-212B) Construction

12

GILBOA DAM RECONSTRUCTION PROJECTPhase 3: Dam Reconstruction (CAT-212B)

SILT AND FILLSILT AND FILL

ROCKROCK

DRAIN SYSTEM

Spillway Control Section Improvements

RECONSTRUCTED CHANNEL LINING WITH SUBDRAINAGE

GALLERY

ORIGINAL PROFILE

ERODED FACADE

CONCRETE REMOVAL

EXISTING POST-TENSIONED

ANCHORS

CUTOFF / KEY

Major Scope Items (Cont.)Demolish and Reconstruct Spillway Control Section, Channel SlabNew Drainage Gallery and Access Stair Tower

Page 13: New GILBOA DAM RECONSTRUCTION PROJECT UPDATE · 2019. 5. 22. · 11 CAT-212B Dam Reconstruction GILBOA DAM RECONSTRUCTION PROJECT Phase 3: Dam Reconstruction (CAT-212B) Construction

13

GILBOA DAM RECONSTRUCTION PROJECTPhase 3: Dam Reconstruction

CAT-212C Low-Level Outlet Works

60% Design Complete – January 2011ITRT Workshop – February 2011Final Design Complete – December 2011Order to Commence Work: January 20133+ Year Construction Period

Page 14: New GILBOA DAM RECONSTRUCTION PROJECT UPDATE · 2019. 5. 22. · 11 CAT-212B Dam Reconstruction GILBOA DAM RECONSTRUCTION PROJECT Phase 3: Dam Reconstruction (CAT-212B) Construction

14

GILBOA DAM RECONSTRUCTION PROJECTLow-Level Outlet (CAT-212C)

Major Scope Items96 inch Diameter TunnelIntake Structure / DredgingGate 15 Access AreaGate ShaftPortal / Hydropower WyeValve Chamber Site WorkValve Chamber

Page 15: New GILBOA DAM RECONSTRUCTION PROJECT UPDATE · 2019. 5. 22. · 11 CAT-212B Dam Reconstruction GILBOA DAM RECONSTRUCTION PROJECT Phase 3: Dam Reconstruction (CAT-212B) Construction

15

GILBOA DAM RECONSTRUCTION PROJECTDam Monitoring

Last quarterly monitoring (Oct 2010) – No unusual observationsDEC Biennial Inspection – Conducted November 9, 2010Next quarterly monitoring – January 2011Sentinel Anchors- Minor damage to housing during

construction; successfully repaired

- Performing as anticipated

Page 16: New GILBOA DAM RECONSTRUCTION PROJECT UPDATE · 2019. 5. 22. · 11 CAT-212B Dam Reconstruction GILBOA DAM RECONSTRUCTION PROJECT Phase 3: Dam Reconstruction (CAT-212B) Construction

16

GILBOA DAM RECONSTRUCTION PROJECTInstrumentation System Enhancement

Add instruments (weirs) to monitor foundation drain flowsReplace surface monuments disrupted by constructionInstall load cells in west wall anchorsAutomate data collection (piezometers, inclinometers, extensometers, new & existing load cells)Remote Monitoring and Operation of Crest Gates and Low-Level Outlet

Page 17: New GILBOA DAM RECONSTRUCTION PROJECT UPDATE · 2019. 5. 22. · 11 CAT-212B Dam Reconstruction GILBOA DAM RECONSTRUCTION PROJECT Phase 3: Dam Reconstruction (CAT-212B) Construction

17

GILBOA DAM RECONSTRUCTION PROJECTPermitting & Coordination

Coordination continues with DEC; expect declaration of complete application and public notice in early 2011ITRT Coordination- 4 of 5 workshops held to date- Next workshop – Tentatively February 2011- ITRT has endorsed dam design; “Interim” report received May 17, 2010

Coordination with County Engineer continues

Page 18: New GILBOA DAM RECONSTRUCTION PROJECT UPDATE · 2019. 5. 22. · 11 CAT-212B Dam Reconstruction GILBOA DAM RECONSTRUCTION PROJECT Phase 3: Dam Reconstruction (CAT-212B) Construction

18

Significant Accomplishments to Date

Debris Boom – Installed 2005Spillway Notch – Constructed 2006Siphons – Constructed 2006 (Continue to operate)Spillway Anchors – Installed 2006Shandaken Intake Dredging – Completed 2008Spillway Crest Gates – Construction 60%+ CompleteGilboa Dam Site Preparation – Construction 50%+ CompleteGilboa Dam Reconstruction – Bids ReceivedLow-Level Outlet Design – ~60% CompleteEnhanced Monitoring & Surveillance - Ongoing

GILBOA DAM RECONSTRUCTION PROJECT

Page 19: New GILBOA DAM RECONSTRUCTION PROJECT UPDATE · 2019. 5. 22. · 11 CAT-212B Dam Reconstruction GILBOA DAM RECONSTRUCTION PROJECT Phase 3: Dam Reconstruction (CAT-212B) Construction

19

GILBOA DAM RECONSTRUCTION PROJECT

QUESTIONS?