PROJECT BACKGROUND Located adjacent to the Peace River, Fox Lake’s existing lagoon lacked sufficient capacity and inspections noted integrity of the existing berms was compromised. As a result of the existing lagoon condition, untreated wastewater was being directly released into the surrounding environment. BCL was retained by the Little Red River Cree Nation and the community of Fox Lake to complete design of a new lagoon and related sewer infrastructure to meet the long term needs of the community. Preliminary field investigation included extensive topographic surveying and geotechnical site excavations to confirm site selection and soil conditions for lagoon expansion. BCL completed the design and provided construction services for a new six cell HDPE lined lagoon and incorporated modifications to the existing storage cell to serve as an exfiltration cell for gradual release of treated effluent. The project also included a new sewage force main as well as a new pumping station complete with an upstream sewage grinder and back-up power generator to ensure continued sewage handling capabilities in power failure situations. PROJECT HIGHLIGHTS - A new six cell, 430,000 m3 total capacity, HDPE lined sewage lagoon. - 350,000 m3 of earthwork and 230,000 m2 of HDPE liner. -1.4 Km of upgraded lagoon access road. - New 2,100 lin.m, 200 mm dia. HDPE sewage force main. - A new wet well with building sewage pumping station, complete with sewage grinder, 35 hp 38.9 L/s sewage pumps, and 100 kw backup power generator. BUDGET Construction $19,125,000 (Including $5,500,000.00 of local content utilization) COMPLETION DATES Design August 2015 Construction Anticipated February 2019 P ROJECT BACKGROUND LITTLE RED RIVER CREE NATION | 200 - 302 Wellman Lane | Saskatoon, SK S7T 0J1 | PH: 1 (306) 477-2822 | www.bcl-eng.ca | FOX LAKE LAGOON UPGRADE Existing Lagoon Facility on lacked sufficient capacity and mised. As a result of the existing y released into the surrounding on and the community of Fox Lake cture to meet the long term needs c surveying and geotechnical site on expansion. BCL completed the PE lined lagoon and incorporated tration cell for gradual release of e main as well as a new pumping k-up power generator to ensure ons. goon. te with sewage grinder, 35 hp 38.9 00 of local content utilization) GRADE E xisting Lagoon Facility

Upload: others

Post on 18-Apr-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: New Fox Lake - Lagoon Upgrade - BCL Eng · 2021. 2. 6. · - A new six cell, 430,000 m3 total capacity, HDPE lined sewage lagoon. - 350,000 m3 of earthwork and 230,000 m2 of HDPE

PROJECT BACKGROUND

Located adjacent to the Peace River, Fox Lake’s existing lagoon lacked sufficient capacity and

inspections noted integrity of the existing berms was compromised. As a result of the existing

lagoon condition, untreated wastewater was being directly released into the surrounding

environment. BCL was retained by the Little Red River Cree Nation and the community of Fox Lake

to complete design of a new lagoon and related sewer infrastructure to meet the long term needs

of the community.

Preliminary field investigation included extensive topographic surveying and geotechnical site

excavations to confirm site selection and soil conditions for lagoon expansion. BCL completed the

design and provided construction services for a new six cell HDPE lined lagoon and incorporated

modifications to the existing storage cell to serve as an exfiltration cell for gradual release of

treated effluent. The project also included a new sewage force main as well as a new pumping

station complete with an upstream sewage grinder and back-up power generator to ensure

continued sewage handling capabilities in power failure situations.

PROJECT HIGHLIGHTS

- A new six cell, 430,000 m3 total capacity, HDPE lined sewage lagoon.

- 350,000 m3 of earthwork and 230,000 m2 of HDPE liner.

-1.4 Km of upgraded lagoon access road.

- New 2,100 lin.m, 200 mm dia. HDPE sewage force main.

- A new wet well with building sewage pumping station, complete with sewage grinder, 35 hp 38.9

L/s sewage pumps, and 100 kw backup power generator.

BUDGET

Construction $19,125,000 (Including $5,500,000.00 of local content utilization)

COMPLETION DATES

Design August 2015 Construction Anticipated February 2019

PROJECT BACKGROUND

LITTLE RED RIVER CREE NATION

| 200 - 302 Wellman Lane | Saskatoon, SK S7T 0J1 | PH: 1 (306) 477-2822 | www.bcl-eng.ca |

FOX LAKE LAGOON UPGRADE

Existing Lagoon Facility

on lacked sufficient capacity and

mised. As a result of the existing

y released into the surrounding

on and the community of Fox Lake

cture to meet the long term needs

c surveying and geotechnical site

on expansion. BCL completed the

PE lined lagoon and incorporated

tration cell for gradual release of

e main as well as a new pumping

k-up power generator to ensure

ons.

goon.

te with sewage grinder, 35 hp 38.9

00 of local content utilization)

GRADE

f

Existing Lagoon Facility