new escanaba high school

1
Facility Assessment: Addition and Renovation Escanaba Public Schools: High School Campus Project Description The additions to and renovation of Escanaba High School is a $17 million project to the modern style 1960 Perkins and Wills designed 190,000 square foot structure. The project emphasis is on completely upgrading the buildings systems infrastructure. The project includes two new state of the art science rooms for chemistry and physics. A new wood shop room, new art room, new multi purpose room for physical education, music and after school practice activities. Complete renovation of the gymnasium locker rooms along with a new weight room, and auxiliary physical education room, to accommodate wrestling, cheerleading and gymnastics. Enhancing the main entrance with a larger lobby and more efficiently configured administration offices will also provide a more secure and inviting environment to students, parents and visitors. The entire building envelope was replaced with thermally insulated windows offering more diffused light, window treatments, and automated controls at clerestory locations. New mechanical systems include new air handlers and unit ventiliators, energy efficient temperature controls, along with new energy efficient light fixtures and controls. Location Escanaba, Michigan Size 190,000 sq. ft. Project cost $17 million Completion August 2012 Client contact Dr. Michele Lemire Client phone 906.786.5411 Construction Manager Wolgast Corporation

Upload: jim-keefer-jr-leed-ap

Post on 12-Apr-2017

72 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: NEW Escanaba High School

Facility Assessment: Addition and RenovationEscanaba Public Schools: High School Campus

Project Description The additions to and renovation of Escanaba High School is a $17 million project to the modern style 1960 Perkins and Wills designed 190,000 square foot structure. The project emphasis is on completely upgrading the buildings systems infrastructure.

The project includes two new state of the art science rooms for chemistry and physics. A new wood shop room, new art room, new multi purpose room for physical education, music and after school practice activities. Complete renovation of the gymnasium locker rooms along with a new weight room, and auxiliary physical education room, to accommodate wrestling, cheerleading and gymnastics. Enhancing the main entrance with a larger lobby and more efficiently configured administration offices will also provide a more secure and inviting environment to students, parents and visitors. The entire building envelope was replaced with thermally insulated windows offering more diffused light, window treatments, and automated controls at clerestory locations. New mechanical systems include new air handlers and unit ventiliators, energy efficient temperature controls, along with new energy efficient light fixtures and controls.

Location Escanaba, Michigan

Size 190,000 sq. ft.

Project cost $17 million

Completion August 2012

Client contact Dr. Michele Lemire

Client phone 906.786.5411

Construction Manager Wolgast Corporation