Implementing a New Energy Management System for the China Southern Grid Presented at 10th International Workshop on Electric Power Control Centers Hao WANG Dispatching Center, CSG June 2009

Upload: others

Post on 25-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: New EPCC Workshop 2019 - 15 EPCC Workshop - May 12 – 15, 2019 … HaoWang.pdf · 2016. 11. 7. · ¾Several of its functional capabilities are pace-setting in China, and are comparable

Implementing a New Energy Management System

for the China Southern GridPresented at

10th International Workshop on Electric Power Control Centers

Hao WANGDispatching Center, CSG

June 2009

Page 2: New EPCC Workshop 2019 - 15 EPCC Workshop - May 12 – 15, 2019 … HaoWang.pdf · 2016. 11. 7. · ¾Several of its functional capabilities are pace-setting in China, and are comparable

China Southern Grid

Page 3: New EPCC Workshop 2019 - 15 EPCC Workshop - May 12 – 15, 2019 … HaoWang.pdf · 2016. 11. 7. · ¾Several of its functional capabilities are pace-setting in China, and are comparable

Overall System Control Hierarchy of CSG

Guangdong Province

Guangxi Province

YunnanProvince

GuizhouProvince

Hainan Province

ChinaSouthern

Grid

Areas Areas Areas Areas

Counties/Cities

Areas

Counties/Cities

Counties/Cities

Counties/Cities

Counties/Cities

Page 4: New EPCC Workshop 2019 - 15 EPCC Workshop - May 12 – 15, 2019 … HaoWang.pdf · 2016. 11. 7. · ¾Several of its functional capabilities are pace-setting in China, and are comparable

Configuration of CSG-EMS

Backup

System

人机交互网交换机#3#4

Three screens Dispatcher x4

B/WPrinters

Networked RTUs & PMUs

Development & Maintenance

Workstation x6

Historical Data Server

Operations Planning

Workstation x3

Network Switches

ReportsWorkstation x2

Wall Display Protection Workstation

SCADA/AGC Server

EMS Application Server

DSA Servers

Dispatching Data Network

5 Provincial EMS

Metering System& other LocalAutomation

Systems

Comms& ICCPServer

Front End & Data Gathering

Server

Serial RTUs

Dedicated Channel

CSG DTS

System

ColorPrinter

MgmtUsers

Web Hosting,Historical Mirror,

Reports

Web Server System

IndependentSystem Monitor

Disk Storage

5 Prov. DTS

System

Model MergingServer

Page 5: New EPCC Workshop 2019 - 15 EPCC Workshop - May 12 – 15, 2019 … HaoWang.pdf · 2016. 11. 7. · ¾Several of its functional capabilities are pace-setting in China, and are comparable

Modules of CSG-EMS

Data Bus

DB PI

SCADA EMS Analy.WAMS

DSA Visualization

Safe Area I

CSG Joint DTS

DB PI

WEB

Safe Area III

Safe Area II

Local DTS

R T U

P M U

I

C

C

P

Prov. EMS

Model Merging

L

F

O

D

S

E

D

P

F

C

A

N

S

O

P

F

AGC AVC

S

C

A

P

S

C Report

Page 6: New EPCC Workshop 2019 - 15 EPCC Workshop - May 12 – 15, 2019 … HaoWang.pdf · 2016. 11. 7. · ¾Several of its functional capabilities are pace-setting in China, and are comparable

Model Merging >> Concept

Major Challenge: database-updating requirement imposed by the fast growth of the CSG grid.

Capability of supporting frequent on-line database changes and power-system model updates.

Each of the provincial control center is responsible to update the data of its own EMS on a daily basis.

Conceptually, the full power system model for the entire CSG grid, used in the CSG-EMS, is a merged model of the five individual province-EMS’s models, with the boundary areas among the provinces properly represented and adjusted.

Page 7: New EPCC Workshop 2019 - 15 EPCC Workshop - May 12 – 15, 2019 … HaoWang.pdf · 2016. 11. 7. · ¾Several of its functional capabilities are pace-setting in China, and are comparable

Model Merging >> Procedure

~

~

~

Upload

YN GX GD

~

GZ

Merging

Page 8: New EPCC Workshop 2019 - 15 EPCC Workshop - May 12 – 15, 2019 … HaoWang.pdf · 2016. 11. 7. · ¾Several of its functional capabilities are pace-setting in China, and are comparable

Model Merging >> Result

Models exported from Province-EMS in CIM-XML format, together with exports of related display files in SVG format, as well as SCADA measurement-point definitions in ICCPdescription file.

Real-time data and displays from Province-EMS are kept up-to-date through ICCP link and SVG re-link.

The merged full model covers all the 500kV and 220kV devices in CSG grid. And it can be updated whenever there is a change in one or more Province-EMSs.

EMS analytical results become much more accurate. Besides, the full model could be shared with the province.

Page 9: New EPCC Workshop 2019 - 15 EPCC Workshop - May 12 – 15, 2019 … HaoWang.pdf · 2016. 11. 7. · ¾Several of its functional capabilities are pace-setting in China, and are comparable

Visualization Example 1

Generators’ loadings, and the transmission line flows.

Page 10: New EPCC Workshop 2019 - 15 EPCC Workshop - May 12 – 15, 2019 … HaoWang.pdf · 2016. 11. 7. · ¾Several of its functional capabilities are pace-setting in China, and are comparable

Visualization Example 2

Relative voltages of different buses by contour lines.

Page 11: New EPCC Workshop 2019 - 15 EPCC Workshop - May 12 – 15, 2019 … HaoWang.pdf · 2016. 11. 7. · ¾Several of its functional capabilities are pace-setting in China, and are comparable

Historical Data Recording and Recalling

Using a PI system, all 500kV and 220kV data, as well as PMU data are being recorded continuously.

Instead of event-drive or PDR, but a holographic storage of the historical data.

The historical data can be recalled through displays at any later time.

Page 12: New EPCC Workshop 2019 - 15 EPCC Workshop - May 12 – 15, 2019 … HaoWang.pdf · 2016. 11. 7. · ¾Several of its functional capabilities are pace-setting in China, and are comparable

Conclusion

The new Energy Management System for the China Southern Grid is a state-of-art system.

Several of its functional capabilities are pace-setting in China, and are comparable in the world.

Successful experience of applying CIM and SVG standards to exchange models and displays for a large power system.

CSG-EMS has been installed and put into operation in the CSG control center in Guangzhou, China.

Page 13: New EPCC Workshop 2019 - 15 EPCC Workshop - May 12 – 15, 2019 … HaoWang.pdf · 2016. 11. 7. · ¾Several of its functional capabilities are pace-setting in China, and are comparable

Thanks !

Hao WANG Automation Division, Dispatching Center, CSG

[email protected]

Wenfeng ZHANGDeputy Director, Dispatching Center, CSG

[email protected]