new elementary school...acg/aps jointly funded items $ 5,500,000 $ 5,500,000 tbd3 $ - $ 6,000,000...
TRANSCRIPT
NEW ELEMENTARY SCHOOLREED SITE, ARLINGTON PUBLIC SCHOOLS CONCEPT DESIGNSCHOOL BOARD ACTION ITEM APRIL 5, 2018
04.05.2018
School Board Action 2
PROPOSED CONCEPT DESIGN
• Staff presented the proposed concept design as an information item at the
March 22, 2018 School Board meeting.
• The content in Exhibits A and B in the presentation are consistent with what
was shown in the information item.
04.05.2018
School Board Action 3 Integrated Scheme, site plan
RECOMMENDEDSCHEME
Pros
• Lowest loss of open / permeable
space
• Low transition time between classes
• Lowest total energy use per SF
• Lowest required parking
• Builds up on small footprint
• Keeps the most site amenities
• Preferred by BLPC, PFRC, and
community members
Cons
• Minor utility relocation
• Four-story building next to two-story
building and homes
• Demolishes a portion of an existing
asset that is only 9 years old
Exhibit A
04.05.2018
School Board Action 4
PROJECT FUNDING
FY 2017-26CIP1
Concept Design
Major Construction Bonds $ 38,250,000 $ 38,250,000
Capital Reserve $ 4,000,000 $ 4,000,000
Other (Operating)2 $ 1,250,000 $ 1,250,000
ACG/APS Jointly Funded Items $ 5,500,000 $ 5,500,000
TBD3 $ - $ 6,000,000
Total $ 49,000,000 $ 55,000,000
Notes:
1. Approved by the School Board on June 16, 2016.
2. Furniture and equipment that cannot be bond funded.
3. Specific source of funding has not yet been determined.
Exhibit B
04.05.2018
School Board Action 5
SCHOOL BOARD MOTION
• Staff presented the proposed concept design as an information item at the
March 22, 2018 School Board meeting.
• The content in Exhibits A and B in the presentation are consistent with what
was shown in the information item.