new charter school opens for 2006-2007 school year salt ... - school.pdf · this beautiful school...
TRANSCRIPT
New charter school opens for 2006-2007 schoolyear Salt Lake City, Utah
This beautiful school serves elementary levelstudents, grades 1-6. The school is a little over
48,000 square feet in size.
The General Contractors, Zollinger CommercialConstruction, a family run business out of Logan,
Utah spec Thermo-shield Interior Coatings in placeof ordinary paint.
Entry-way and hallsget
Thermo-shield.
Hallways arebrighter andquieter with
Thermo-shield.
Thermo-shield classrooms are comfortable,cozy, and quiet.
Improved acoustics, and reduced sound transmission.Always low VOC with no harmful emissions or effects
on humans or the environment
The walls, ceilings, and duct work ofthe large multi-purpose room are all
Thermo-shield.
The teachers whose rooms border thisgreat room say it has the feel of a library
rather than the lunch room.
SCHOOL HEATS BUILDINGWITH CHILDREN !
AFTER THE FIRST WINTER, THE HEATINGBILLS WERE CHECKED AND THE SCHOOL
DETERMINED IT HAD COST THEM ANAVERAGE OF ONLY $300.00 PER MONTH
TO HEAT THIS 48,000 SQ FT SCHOOL
MY MOTHER HAS A HOME IN THE SLCAREA WHICH IS A LITTLE LESS THAN
4000 SQ FT. EVEN WITH 6” WALLS, SHEPAID ON AVERAGE $650.00 TO HEAT
HER HOME DURING THE SAME RECORDCOLD 06-07 WINTER