  • New Buildings for IIT Madras Research Park Phase II,

    SH: - Supply, Installation, Testing and Commissioning of Lifts

    BLOCK - E

    PASSENGER

    LIFT#PL-

    01/02/03

    SERVICE

    LIFT#SL-01

    PASSENGER

    LIFT#PL-01

    PASSENGER

    LIFT#PL-02

    PASSENGER

    LIFT#PL-04

    /05

    PASSENGER

    LIFT PL-07

    PASSENGER LIFT

    PL-01 /02

    SERVICE LIFT#SL-

    01

    PASSENGER

    LIFT#PL01 /03

    1088 @ 1.75

    M/C ABOVE

    1360 @ 1.5

    M/C ABOVE

    1600 @ 1.75

    M/C ABOVE

    1600 @ 1.75

    M/C ABOVE

    1088 @ 1.6

    MRL

    1088 @ 1.6

    MRL

    1088 @ 1.75 M/C

    ABOVE

    1360 @ 1.50 M/C

    ABOVE

    1088 @ 1.75

    M/C ABOVE

    2x 3 1 x 2 1 1 2 1 2 1 2

    A

    Quote should be net

    including supply and

    installation of lifts with

    scaffolding, minor builders

    work and all steel materials

    such as machine beams,

    bearing plates, buffer

    support ladder, sill angles,

    fascias etc., and should be

    inclusive of all applicable

    taxes.

    Rs

    No. of units Rs 6 2 1 1 2 1 2 1 2

    Total Rs

    Grand Total Rs

    BLOCK - D BLOCK - C BLOCK - A & BBLOCK NO & NAME

    Lift Designation

    Duty (K.G.) & Speed (M.P.S.)

    No. of Lifts

    BOQ Summary 1 / 47

  • PASSENGER LIFTS

    1

    2

    3

    4

    5

    6

    7

    Project RequirementSuppliers confirmation

    (MANDATORY)

    A Basic

    1 Equipment Source Country of Manufacture

    2 No of lifts SIX (6)Three in each Tower

    3 Lift designation PL 01/02/03

    4 Lift shaft lay out See plan of architectural

    drawings5 Capacity 1088 kgs

    6 Speed 1.75 mps

    7 No of stops Eleven (11)

    8 No of opening at front All at front

    9 No of opening at rear Nil

    10 Floors Served G,1-10 .

    11 Travel Height 41.0 Meter

    12 Hoist way Size per lift 2200 mm(w) x2500 mm(d)

    13 Overhead 5200 mm

    14 Pit depth Available 1800 mm

    15 Lift cabin size 1700 mm W x 1500 mm D x

    2800 mm H 16 Clear entrance size 900 mm x 2400 mm C/Opng

    17 Machine Room Above at Terrace Floor

    IIT Block A& B Passenger Lifts PL 01/02/03

    PRODUCT1.02 Summary Traction Lift Equipment

    Lift specification

    Prices should be Firm for the Quoted Delivery / Completion period.

    All formalities in arranging the Lift License shall be the responsibility of the lift

    contractor. Owner shall extend all co operation such as signing the necessary forms

    etc.

    Quote for AMC should be in separate head along with lift BOQ.

    GENERAL

    1.01 Quality Assurance

    All work shall be performed in accordance with the latest edition of the IS -14655, PARTS

    1, 2, 3, 4, 5, IS 14671, IS-2147 & IS 2332,NBC 2005, state and local codes as may be

    applicable

    Following data sheet must be duly filled in along with source of supply. Please do

    not indicate as Standard the standard must be specified under Suppliers

    Confirmation.

    Prices should be inclusive of all Taxes & Duties at the prevailing rate.

    Quoted Prices should be valid for acceptance for 60 days.

    Delivery / Completion: Delivery of materials 4 months from approval of shop

    drawings. Lift to be erected and handed over after inspection & testing within 3

    months thereafter. Shop drawings to be furnished within two weeks from date of

    LOI.

    Block A B

    Passenger Lifts 2 / 47

  • PASSENGER LIFTS

    Project RequirementSuppliers confirmation

    (MANDATORY)Lift specification

    415 Volts, 3Phase, 50 Hertz,

    10%230 Volts, I Phase , 50 Hertz

    10%B Equipment

    1 Hoist Machine AC Gearless Traction

    2 Roping type 1:1 or 2:1

    3 Hoist Motor Permanent Magnet

    synchronous motor4 Hoist motor insulation Class F

    5 Hoist motor drive control

    Variable Voltage Variable

    Frequency with digital closed

    loop velocity encoder

    6 Brake system Built in to machine

    ,electromagnetic 3 mm at all load conditions

    With Releveling Feature

    Advance Door Opening

    8 Speed variation 1% of rated speed

    9 Main controller Microprocessor controller.

    10 Group controller Built into main controller with

    all features ,refer drawings.

    11 Type of operation control Group operation with all

    related features,

    13 Door motor High speed heavy duty A/C

    motor

    14 Door drive control Variable Voltage Variable

    Frequency control

    15 Door controller Programmable microprocessor

    based

    16 Car doors type 900 mm(w) x2400 mm(h)

    C/OPNG

    17 Door Protection

    Two dimensional Panachrome

    Infra red door detector covering

    full height &width of entrance

    with minimum 150 cross beams

    with LEDs on edges & with

    variable timing , nudging

    ,limited door reversal,,

    recommended Panachrome

    manufactured by TL Jones.

    18 Landing doors type 900 mm(w) x 2400 mm(h) C/

    Opng

    19 Car and Landing sills Polished hard aluminum

    extrusion with non slip grooves

    20 Counter weight

    Cast iron fillers fitted in steel

    channel frame of size and

    numbers as per manufacturers

    standard

    21 Car and cwt guide rails Machined guide rails of

    suitable size and fish plates

    7

    Power Characteristics

    Leveling accuracy

    18

    Block A B

    Passenger Lifts 3 / 47

  • PASSENGER LIFTS

    Project RequirementSuppliers confirmation

    (MANDATORY)Lift specification

    22 Car and cwt guide shoes Spring loaded sliding / swivel

    roller type

    23 Load compensation Encapsulated chain with pit

    guideC Safety Features

    1 Emergency manual

    release

    Provision for manually releasing

    of brake and winding

    wheel/handle built in to hoist

    machine 2 Car safety Flexible guide clamp type

    3 Counterweight safety if

    required Flexible guide clamp type

    4 Over speed protection Over speed governor at

    machine room

    5 Landing door lock safety Emergency door unlocking

    device with key6 Landing door lock Electromechanical

    7 Door fire protection One(1) hour

    8 Safety buffers Spring / Oil buffers

    D Operating &Signal

    features

    1 no. COP in 3mm thick s/s

    plate consists of:-a. Vandal resistant micro press

    self illuminating floor markings

    using LEDsb. Vandal resistant micro press

    door close/open buttonc. Vandal resistant micro press

    door alarm buttone .Attendant /Normal with

    removable key and switchf. Car ventilator control switchg. Inter communication

    switch/buttonh. Inbuilt speaker and

    microphonei. Capacity plate and emergency

    display

    j, Scrolling type car position

    indicator and directional arrows

    k. All buttons are to be of

    Braille type l. Lockable concealed service

    control buttons/switch box

    Hall call station 1 riser/ floor( configuration

    dependent)

    Bottom terminal landing

    St / St 2mm thick cover plate

    with Vandal resistant micro

    press UP button

    Car

    All Pass & Service lifts

    except Firemans Lift to

    be quoted with option

    of Conventional COP &

    Touch Screen Panels.

    1

    Block A B

    Passenger Lifts 4 / 47

  • PASSENGER LIFTS

    Project RequirementSuppliers confirmation

    (MANDATORY)Lift specification

    Intermediate landing

    St / St 2mm thick cover plate

    with Vandal resistant micro

    press UP and DN buttons

    Top terminal landing

    St / St 2mm thick cover plate

    with Vandal resistant micro

    press DN button

    3 Hall position indicator at

    terminal floors

    Highly visible horizontal digital

    or Scrolling type position

    indicator combined with hall

    lanternsE Finishes

    Car

    1 Car side panels Stainless Still 304 Grade Brush

    finish

    2 Car Rear panel Stainless Still 304 Grade Brush

    finish

    3 Car front return panels Stainless Still 304 Grade Brush

    finish

    4 Car transom Stainless Still 304 Grade Brush

    finish

    5 Car door panels Stainless Still 304 Grade Brush

    finish

    6 Hand rails

    45mm dia, Stainless steel Brush

    finish on REAR side- min 16

    gauge grade 304,

    7 Flooring 25 mm recess for granite or

    marble

    8 Kick plates 3mm(thick) x120mm( w) in

    stainless steel on all sides

    9 False ceiling

    Selection from vendors options

    or as directed by owner /

    architect

    10 Lighting Indirect CFL fluorescent type

    of 400 lux Landing

    1 Landing door panels Stainless Still 304 Grade Brush

    finish

    Landing entrance frames

    A. At main lobbywide type (full width of wall) to

    match landing door

    B. At typical floors Narrow type in to match

    landing door F Other Features

    1 Number of start per hour Min 180 start/stops

    2 Communication system

    Three way communication

    between car and 24 hours

    security desk and lift machine

    room

    3 Car top inspection control

    Located on car top easily