USE OF NEW MATERIALS AND TECHNOLOGIES BY CPWD AT
MUMBAI
DR K M SONICHIEF ENGINEER, CPWD, MUMBAI
![Page 2: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/2.jpg)
Post Tensioned Slabs• POST TENSIONED SLABS– CBI OFFICE BUILDING– NISM BUILDINGS (PARTLY)– INCOME TAX BUILDING UNDER CONSTRUCTION– IDBI BUILDING UNDER CONSTRUCTION
![Page 3: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/3.jpg)
![Page 4: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/4.jpg)
![Page 5: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/5.jpg)
![Page 6: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/6.jpg)
Advantages of PT Slab• Material Savings• Reduction in concrete is due to thinner concrete
members.• Reduction in rebar in floor elements.• Reduction in dead load resulting into saving in
concrete and reinforcement of structural members including foundation.
• Saving in building cladding, vertical mechanical/service elements, rebar and concrete in shear walls and other materials due to lesser sizes.
![Page 7: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/7.jpg)
Steps in construction • Design
– The existing design has been based on Presscrete Post-Tensioning System (PPS). Concrete in one member panel shall be placed in one operation continuously without interruption.
• Concreting– Care is taken that the pre-stressing tendons do not get displaced or damaged prior to casting and during
casting. It is ensured that discharge of concrete is not directed onto the pre-stressing tendons. Vibrating is avoided from coming into contact with the pre-stressing tendons whenever possible. Proper compaction of the concrete in anchorage areas is ensured due to high local stresses in these areas and care taken that all the grout hoses remain exposed and protruding from the concrete surface.
• Stressing– After concreting, the carpenter removes the vertical sides end form work. All the stressing recesses are
cleared and pre-stressing barrels and wedges fixed to all pre-stressing castings. When concrete has reached the transfer strength as per the shop drawings (from the results of cube tests), stressing of cables is carried out. All cables are tensioned to the required jacking force and monitored through the pressure gauges.
• Grouting– Excess cable length is cut after the stressing. All pre-stressing tendons are ensured to be flushed with clean
water. Grout is mixed according to the design mix for at least two minutes until a colloidal consistency is produced. The water is put into the container first and the cement is then slowly added. When the cement and water are thoroughly mixed, the non-shrink additive added to the mix. The grout then is injected into the pre-stressing tendons. Grouting is carried out by injection at one end of the duct until clear grout flows out from the other end. The grout hose at the both end is then sealed. Grouting works commence when all scaffolds at a particular storey where grouting works are to be carried out, are removed.
![Page 8: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/8.jpg)
Limitations• Since the cables or tendons in the slab have
been stretched to high tensile strengths, it is extremely important that the slab is not drilled, cut, chiselled or disturb in a way so as to expose the tendons
![Page 9: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/9.jpg)
![Page 10: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/10.jpg)
![Page 11: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/11.jpg)
![Page 12: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/12.jpg)
![Page 13: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/13.jpg)
AAC BLOCKS• LOW DENSITY• GREEN MATERIAL
![Page 14: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/14.jpg)
Service trenches• Not a very new concept• Being adopted in NISM
![Page 15: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/15.jpg)
GFRC PANELS IN FACADE• Can be manufactured in many shapes• Can be painted
![Page 16: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/16.jpg)
![Page 17: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/17.jpg)
STAMPED FINISH CONCRETE
• Can be achieved in desired colours• The process includes – preparation of sub-grade, – placing of forms, – providing reinforcement for stability, – placing the concrete, – screeding and finishing the concrete, – applying colour and – stamping the concrete using desired moulds.
![Page 18: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/18.jpg)
Stamped finish concrete
![Page 19: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/19.jpg)
![Page 20: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/20.jpg)
Innovative Floorings• Wood plastic composite flooring, • Maple hardwood sports flooring for special
applications, • Geofoam block flooring • Crazy patterned flooring of leather finish,
flamed and polished granite • Italian marble flooring
![Page 21: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/21.jpg)
GEOFOAM FLOORING IN STEPS
![Page 22: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/22.jpg)
![Page 23: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/23.jpg)
Seating arrangement of class rooms
![Page 24: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/24.jpg)
![Page 25: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/25.jpg)
![Page 26: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/26.jpg)
Innovative False Ceiling• Acoustic false ceiling • Cloud acoustic false ceiling
![Page 27: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/27.jpg)
ACCOUSTIC FALSE CEILING
• Anutone False ceiling
![Page 28: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/28.jpg)
![Page 29: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/29.jpg)
![Page 30: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/30.jpg)
![Page 31: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/31.jpg)
Double Stack Car Parking
![Page 32: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/32.jpg)
Glass• Structural Glazing• Partitions• Fire resistant Lobbies• Doors• Murals• Solar PV Panels
![Page 33: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/33.jpg)
![Page 34: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/34.jpg)
![Page 35: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/35.jpg)
![Page 36: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/36.jpg)
![Page 37: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/37.jpg)
Dry Stone Cladding
![Page 38: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/38.jpg)
STP
![Page 39: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/39.jpg)
SOLAR ROOF TOP PANELS
![Page 40: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/40.jpg)
AHU ON TOILET SLAB
![Page 41: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/41.jpg)
SYNTHETIC GRASS
![Page 42: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/42.jpg)
FOLDABLE PARTITION
![Page 43: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/43.jpg)
LOUVERS
![Page 44: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/44.jpg)
Energy efficiency• In new buildings only LED fitting or energy
efficient T5 fittings are provided.• Energy efficient Chillers are provided • Solar roof top PV Panels• Recycling waste water• Rain water harvesting
![Page 45: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/45.jpg)
Pumping system• CPWD has adopted hydro-pneumatic
pumping system for water supply in most of large projects.
![Page 46: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/46.jpg)
Green buildings• CPWD is constructing all green buildings and
getting them rated in Mumbai• CBI – 4 star GRIHA• IDBI Belapur – 3 star GRIHA• NISM – 4 star GRIHA• NTH – 3 star GRIHA• Income Tax Building – 4 star GRIHA
![Page 47: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/47.jpg)
CBI OFFICEBUILDING
![Page 48: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/48.jpg)
NATIONAL INSTITUTE OF SECURITIES MARKETS
![Page 49: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/49.jpg)
Student and MDP Hostel blocks
Residential Block
NISM : Images
Orientation Block
Academic Block
Amphitheater
Hostel & MDP Block
Landscape development
Orientation Block
![Page 50: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/50.jpg)
![Page 51: New Building Materials](https://reader036.vdocuments.mx/reader036/viewer/2022062412/5873ddcb1a28abd72e8b5255/html5/thumbnails/51.jpg)