New BSP substation to provide essential power boost for London Underground New Connections The current major project to create a new Bulk Supply Point (BSP) for London Underground (LU) provides a perfect example of ABB’s capability to deliver a complete design, project management and construction service for rail substation projects. This capability not only includes all the electrical equipment, but also cabling and the very substantial civil works required to create a new substation building within an extremely restricted footprint. The need Transport for London (TFL) has five existing 132 kV BSPs that supply power for LU. This additional BSP is now needed to increase the available power to support the full operation of new air-conditioned rolling stock that is being phased in on the sub-surface (SSL) lines – the Circle, District, Hammersmith & City and Metropolitan – up to 2015. The location The BSP’s desired 240 MW capacity dictated that it should be located relatively close to a grid supply point. It also had to be located close to the LU infrastructure in order for the necessary cable connections to be made between it and the existing distribution system. The most appropriate site for the new BSP substation was identified adjacent to an underground station. The new BSP is designed to take electricity from a nearby National Grid 400/132 kV substation (constructed by ABB in 2004) and step it down through transformation (132/22/11 kV) to feed into the LU power supply system. In the past there were houses and shops on the site, but they have been long since demolished and most recently, the site was used as a carpark. The major challenge for ABB was in working within this restricted site, hemmed in on all sides with an operating railway close by, to create a large, modern substation building. Project coordination The project commenced in 2009, and ABB has focused on the excavation and civil works to create a new cable basement and multi-level reinforced concrete building. The scale of this exercise is illustrated by the need to remove 11,000 cubic metres of spoil materials – some 1,200 lorry loads. Extensive deep piling has also been carried out to create the foundations. Delivery of one of the grid transformers for London Underground’s new BSP.

Upload: lydang

Post on 05-Jan-2017

213 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: New BSP substation to provide essential power boost for London

New BSP substation to provide essential power boost for London Underground

New Connections

The current major project to create a new Bulk Supply Point (BSP) for London Underground (LU) provides a perfect example of ABB’s capability to deliver a complete design, project management and construction service for rail substation projects. This capability not only includes all the electrical equipment, but also cabling and the very substantial civil works required to create a new substation building within an extremely restricted footprint.

The needTransport for London (TFL) has five existing 132 kV BSPs that supply power for LU. This additional BSP is now needed to increase the available power to support the full operation of new air-conditioned rolling stock that is being phased in on the sub-surface (SSL) lines – the Circle, District, Hammersmith & City and Metropolitan – up to 2015.

The locationThe BSP’s desired 240 MW capacity dictated that it should be located relatively close to a grid supply point. It also had to be located close to the LU infrastructure in order for the necessary cable connections to be made between it and the existing distribution system.

The most appropriate site for the new BSP substation was identified adjacent to an underground station.

The new BSP is designed to take electricity from a nearby National Grid 400/132 kV substation (constructed by ABB in 2004) and step it down through transformation (132/22/11 kV) to feed into the LU power supply system. In the past there were houses and shops on the site, but they have been long since demolished and most recently, the site was used as a carpark. The major challenge for ABB was in working within this restricted site, hemmed in on all sides with an operating railway close by, to create a large, modern substation building.

Project coordinationThe project commenced in 2009, and ABB has focused on the excavation and civil works to create a new cable basement and multi-level reinforced concrete building. The scale of this exercise is illustrated by the need to remove 11,000 cubic metres of spoil materials – some 1,200 lorry loads. Extensive deep piling has also been carried out to create the foundations.

Delivery of one of the grid transformers for London Underground’s new BSP.

Page 2: New BSP substation to provide essential power boost for London

This level of civil works in a busy area of London has called for a very detailed approach to logistics and communications, not only with contractors and travel authorities but also in ensuring minimal disruption for the local community.

With the civil work completed, ABB is now moving on to install the electrical equipment. This includes: three 22/11 kV 25 MVA coupling transformers; two 132/22 kV 120 MVA grid transformers; a 39 panel 22 kV switchboard featuring ZX2 GIS (gas insulated switchgear); a 27 panel 11 kV switchboard featuring UniGear AIS (air insulated switchgear); LV switchgear; two 11 kV earthing/auxiliary transformers; ventilation system and associated mechanical systems; 110 V batteries and charger.

The substation is also being provided with new SCADA RTU (remote terminal units) for the 11 kV and 22 kV switchgear. Extensive fibre optic cabling will be installed to provide the communication path between the BSP, other substations and the LU control centres.

In its first large scale cabling exercise for LU, ABB is also carrying out cabling works associated with the BSP including around 20 km of 22 k and 11 kV XLPE cable installed in tunnels and ducts.

The new BSP project is scheduled for completion in the summer of 2012.

For more information please contact:

ABB LimitedPower SystemsOulton Road, StoneStaffordshire, ST15 0RSTel: +44 (0)1785 825050Email: [email protected]

www.abb.com/uk

CS

/NC

/201

2/06

ABB is creating the new BSP on a very restricted site next to an operating London Underground station.