new browning high school construction
TRANSCRIPT
![Page 1: New Browning High School Construction](https://reader033.vdocuments.mx/reader033/viewer/2022051710/584da9641a28ab8573916c42/html5/thumbnails/1.jpg)
Long Beach Unified School District 1
New Browning High School Construction
Richard D. Browning High School
Community Update September 29, 2015
![Page 2: New Browning High School Construction](https://reader033.vdocuments.mx/reader033/viewer/2022051710/584da9641a28ab8573916c42/html5/thumbnails/2.jpg)
Long Beach Unified School District 2
New Browning High School Construction
Project Goals
1. Creating 21st century learning environments for the next generation
2. Changing type and size of high schools • Construction of new state of the art small
high school
3. Integrating high school pathways with rigorous college-prep curriculum
• Culinary Arts/Food Science • Hospitality
PROJECT GOALS & OBJECTIVES
![Page 3: New Browning High School Construction](https://reader033.vdocuments.mx/reader033/viewer/2022051710/584da9641a28ab8573916c42/html5/thumbnails/3.jpg)
Long Beach Unified School District 3
New Browning High School Construction
Browning student body • Enrollment of 840 • Enrollment will be phased in over four years, beginning with ninth grade in
September 2017. • School of choice selection process- meet eligibility criteria and
demonstrate strong interest in the pathways • Building leaders in culinary arts and hospitality
– Management of Lodging Facili1es – Managers in Travel and Tourism
– Restaurant and Beverage Management – Spa Management – Human Resources/Finance/Opera1ons Directors
![Page 4: New Browning High School Construction](https://reader033.vdocuments.mx/reader033/viewer/2022051710/584da9641a28ab8573916c42/html5/thumbnails/4.jpg)
Long Beach Unified School District 4
New Browning High School Construction
Proposed Curriculum
Grade PE Math Lab Science English World Languages
History/ Social Science
Visual/ Perform Arts
College Prep
CTE
9
PE
Business Algebra 1-‐2 or Accelerated Algebra 1-‐2
Biology
Accelerated English 1-‐2
Spanish 1-‐2 Span/Span Speakers 1-‐2 Chinese 1-‐2
Drawing & Pain1ng 1-‐2
Principals of Hospitality & Tourism Geography of Tourism
10
PE
Geometry or Accelerated Geometry
Food Science 1-‐2
Accelerated English 3-‐4
Spanish 3-‐4 Span/Span Speakers 3-‐4 Chinese 3-‐4
Modern World History Acc. or AP
Foods and Nutri1on
11
Intermediate Algebra 1-‐2 or Accelerated Intermediate Algebra 1-‐2
Chemistry 1-‐2, AP or Honors Chemistry
Honors English 5-‐6
Spanish 5-‐6 Span/Span Speakers 5-‐6 Chinese 5-‐6
U.S. History Honors or AP
Digital Arts & Imagining 1-‐2 Social Media & Marke1ng
Advanced Foods Hospitality Marke1ng
12
Pre-‐Sta1s1cs Finite Math, Pre-‐Calculus
Environmental Science Honors or AP
English 7-‐8 ERWC Rhetoric & Comp Mul1cultural or AP Lit
Spanish 7-‐8 AP Spanish Chinese 7-‐8
Govt/ Econ Honors
Business in Global Econ
Sports, Entertainment & Event Planning Sustainable Tourism
![Page 5: New Browning High School Construction](https://reader033.vdocuments.mx/reader033/viewer/2022051710/584da9641a28ab8573916c42/html5/thumbnails/5.jpg)
Long Beach Unified School District 5
New Browning High School Construction
BROWNING HS SITE PLAN
State of the art facility • 10.3 acre site; 130,000 sq. ft. • 4 buildings, 31 classrooms • Science laboratories • Technical educational
laboratories • Special education classrooms • Visual arts classrooms • Administration building • Media center • Gymnasium • Multi-purpose room • Nutrition services • Managed single point of entry
to campus on Obispo • State of the art fire alarm,
intercom, and security cameras
North West View
Admin/ CR
MPR/ CR
Gym
Library/ CR
Fields
![Page 6: New Browning High School Construction](https://reader033.vdocuments.mx/reader033/viewer/2022051710/584da9641a28ab8573916c42/html5/thumbnails/6.jpg)
Long Beach Unified School District 6
New Browning High School Construction
RENDERINGS OF NEW BUILDINGS
Obispo Street View (Front of School)
View of Courtyard
![Page 7: New Browning High School Construction](https://reader033.vdocuments.mx/reader033/viewer/2022051710/584da9641a28ab8573916c42/html5/thumbnails/7.jpg)
Long Beach Unified School District 7
New Browning High School Construction
RENDERINGS OF NEW BUILDINGS
Redondo Street View
Hill Street View
![Page 8: New Browning High School Construction](https://reader033.vdocuments.mx/reader033/viewer/2022051710/584da9641a28ab8573916c42/html5/thumbnails/8.jpg)
Long Beach Unified School District 8
New Browning High School Construction
TYPICAL DESIGN OF NEW BUILDINGS
Cut thru of Academic Building
Cut thru of Library
![Page 9: New Browning High School Construction](https://reader033.vdocuments.mx/reader033/viewer/2022051710/584da9641a28ab8573916c42/html5/thumbnails/9.jpg)
Long Beach Unified School District 9
New Browning High School Construction
CONSTRUCTION PHASE
START DATE
COMPLETION DATE
Phase 1: Site Prep May 2014 Completed
Phase 2: Building New High School
October 2014 Winter 2016
CONSTRUCTION PHASING
View from Obispo facing the entrance
View of Courtyard from the Fields
![Page 10: New Browning High School Construction](https://reader033.vdocuments.mx/reader033/viewer/2022051710/584da9641a28ab8573916c42/html5/thumbnails/10.jpg)
Long Beach Unified School District 10
New Browning High School Construction
• $52 million construc1on budget • Structural steel 90% complete • Slab on grade and 2nd floor concrete
60% complete • Exterior and interior framing begun • Exterior cladding and roofing to
begin soon • Interior finish work to begin once
the exterior cladding and roofing completed
• Site work and landscaping will be done towards the end of the project
• Construc1on hours: – M-‐F; 7am – 10pm (interior work, if
necessary) – Saturday (if needed); 9am-‐4pm
CONSTRUCTION
![Page 11: New Browning High School Construction](https://reader033.vdocuments.mx/reader033/viewer/2022051710/584da9641a28ab8573916c42/html5/thumbnails/11.jpg)
Long Beach Unified School District 11
New Browning High School Construction
CONSTRUCTION PROGRESS
![Page 12: New Browning High School Construction](https://reader033.vdocuments.mx/reader033/viewer/2022051710/584da9641a28ab8573916c42/html5/thumbnails/12.jpg)
Long Beach Unified School District 12
New Browning High School Construction
CONSTRUCTION PROGRESS
![Page 13: New Browning High School Construction](https://reader033.vdocuments.mx/reader033/viewer/2022051710/584da9641a28ab8573916c42/html5/thumbnails/13.jpg)
Long Beach Unified School District 13
New Browning High School Construction
CONSTRUCTION PROGRESS
![Page 14: New Browning High School Construction](https://reader033.vdocuments.mx/reader033/viewer/2022051710/584da9641a28ab8573916c42/html5/thumbnails/14.jpg)
Long Beach Unified School District 14
New Browning High School Construction
• Undergrounding of all utilities on Hill
• Tree wells will be installed
• Work estimated to begin in November 2015
• Traffic mitigation measures during construction will be taken
OFF SITE IMPROVEMENTS
![Page 15: New Browning High School Construction](https://reader033.vdocuments.mx/reader033/viewer/2022051710/584da9641a28ab8573916c42/html5/thumbnails/15.jpg)
Long Beach Unified School District 15
New Browning High School Construction
Long Beach Unified School District 15
• Contact: [email protected] • Communica1ons Coordinator: Vivien Hao
– Cell 323-‐893-‐4743 • Online Updates: hhp://measurekbond.net
Measure K School Bonds
![Page 16: New Browning High School Construction](https://reader033.vdocuments.mx/reader033/viewer/2022051710/584da9641a28ab8573916c42/html5/thumbnails/16.jpg)
Long Beach Unified School District 16
New Browning High School Construction
Q & A