Wallbridge Mining Company Ltd. Armstrong-Ministic AMT Survey
"RECEIVEDJUN 20 2001
GEOSCIENCE ASSESSMENT OFFICE
GEOSYSTEM
AMT SURVEY,ARMSTRONG - MINISTIC LAKE,
ERMATINGER, CASCADEN and TRILLTOWNSHIPS, ONTARIO.
OPERATIONAL REPORT
Volume 1/1
2.21934prepared for
WALLBRIDGE MINING COMPANY LIMITED
byGEOSYSTEM CANADA INC.
Ottawa, Ontario.
June 2001
41I12SE2005 2.21634 CASCADEN 010
-
Wallbridge Mining Company Ltd. Armstrong-Ministic AMT Survey
CONTENTS1. INTRODUCTION...........................................................................................................l
1.1 SURVEY DESIGN..................................................................................................................l1.2 DATA ACQUISITION............................................................................................................21.3 REMOTE REFERENCE...........................................................................................................3
2. DATA PROCESSING AND EDITING...........................................................................32.1 PROCESSING OVERVIEW......................................................................................................32.2 ROBUST PROCESSING..........................................................................................................3
3. DATA PRESENTATION ................................................................................................43.1 DATA DESCRIPTION AND DIMENSIONALITY...........................................................................43.2 PHASE MAPS.......................................................................................................................4
4. BIBLIOGRAPHY ...........................................................................................................4
Figures
Figure la: Ministic Lake station locations. Coordinates are in meters on the UTM grid (NAD 27)......!Figure l b: Armstrong Lake station locations. Coordinates are in meters on the UTM grid (NAD 27). 2 Figure 2: Sounding 61e70n, located in the central portion of Ministic Lake........................................4
I: Phase maps of Field Data II: Personnel and equipment
II-1: Personnel II-2: Equipment II-3: Data Format
HI: Station Coordinates
Appendices
PlatesPlate l: Station and profile locations, scale l :20,000.
41I12SE2005 2 .21634 CASCADEN 010C
Report prepared by:
y. McNeice, M.Sc. Senior Geophysicist
-
Wallbridge Mining Company Ltd. Armstrong - Ministic AMT Survey
SUMMARY
One hundred and twelve audio-magnetotelluric (AMT) measurements were collected in Ermatinger, Cascaden and Trill Townships, Ontario at an average spacing of 200m along 12 north-south oriented lines, spaced 300m apart. AMT data in the frequency range 5.0-20,000 Hz, were acquired between January 7 and 16, 2001, using three 5-channel Metronix 24 bit ADU-06 acquisition systems. One system was a fixed reference station in a culturally quiet location, while the other two systems were used within the prospect area. Each AMT measurement consisted of a perpendicular pair of 50m dipoles, two orthogonal magnetic field sensors, and one vertical magnetic field sensor. Robust processing resulted in generally average data quality within the survey area. The AMT data were edited and rotated to a regional coordinate system determined through swift decomposition. The results are shown as a series of phase maps, the impedance phase at single frequency contoured as a function of grid position.
-
Wallbridge Mining Company Ltd. Armstrong - Ministic AMT Survey
1. INTRODUCTIONThis report describes acquisition and processing procedures of an audio-frequency magnetotelluric (AMT) survey conducted in Ermatinger, Cascaden and Trill Townships, on behalf of Wallbridge Mining Company Ltd. A total of 112 AMT stations were occupied along 12 north-south oriented profiles. Station coordinates are listed in Appendix HI.
LI Survey design
455000 456000 457000
5158000 -
5157000 -
5156000 -
5155000 -
fx sx -^ ^, a1- ^.y^
X/ '
y /* *X^ ,* ,*.X.X
.........y.... ..y.
X Xi
5s"
* * * ,
V* ^ ^^ ^ ^av * * t
* *' i 4
A^ A^"
^ v^ ^ ^ * * ""VV tr V * * * *
^ jS?1 c#~
X X .**
^ J^ o\^.*
X X X
x x xx x x *x -^ . x .
tA A^.* .^
x
V . . . . . . . . . . . .
^
-5158000
- 5157000
- 5156000
- 5155000
455000 456000 457000
Figure la: Ministic Lake station locations. Coordinates are in meters on the UTM grid (NAD 27).
-
Wallbridge Mining Company Ltd. Armstrong - Ministic AMT Survey
457000 456000
5154000 -
5153000 -
459000i
^ •*
' -*f '* t
. . . . . . ^ .t
xx .
*
tf^
4
#
X
•\. . . . . . . . . . . . . . . . . . . . . . .
Sf X X^ ^? ^ ft
•^ -^ •S'* ^
. ss
i
:
^ ^ ^ '
* X X :
x x i
- 5154000
- 5153000
457000 458000 459000Figure Ib: Armstrong Lake station locations. Coordinates are in meters on the UTM grid (NAD27).
The survey was carried out using three 24-bit ADU-06 systems manufactured by Metronix GmbH of Braunschweig, Germany. Magnetic sensors were the BF-6 induction coils produced by Electro-Magnetic Instruments Inc. (EMI) of El Cerrito, California. Appendix n contains a description of the personnel and equipment used for the survey, along with a description of the data formats.Layout followed the normal MT axis convention, that is, a right-handed system with z positive downwards. Dipole lengths of 50 meters and a fixed acquisition azimuth of geographic north was used throughout the survey. Access to the grid was by 4WD vehicle as far as possible, and then on snowmobile. Due to the low system weight, the operator and l or 2 helpers were able to pack all of the necessary gear without difficulty.
L 2 Data AcquisitionThe time series data were acquired in 2 sample bands. The highest sample rate used was 40960 Hz for duration of 7 seconds. A 2048 Hz sample band was recorded for 7 minutes. The 2048 Hz sample band was decimated to a sample rate of 128 Hz to compute the low frequency data.
-
Wallbridge Mining Company Ltd. Armstrong - Ministic AMT Survey
1.3 Remote ReferenceA remote reference site was maintained along the Fox Lake lodge road in Ermatinger Township.
2. DATA PROCESSING AND EDITING
2.1 Processing overviewThe basic steps required to transform field time-series to usable data are as follows:
1. Automatic selection of coherent data segments (low noise) by comparison of the electric and magnetic fields in each band (40960, 2048, and 128 Hz);
2. Robust processing of the 300 most coherent data segments in each sample band;3. Merging of individual bands (3) to form a complete sounding curve;4. Checking of calculated curves for geophysical plausibility.
Data were archived on CD ROM on a daily basis after the time series was transferred from the field computers to the processing computer. Time series were viewed with the Metronix visualization program QuickLook. Automatic coherency selection and robust processing were carried out using routines developed by Jim Larsen (Larsen and others, 1996). Data analysis, interpretation, and presentation were completed with Geosystem's interpretation software, WinGLink.
2.2 Robust processingRobust processing techniques were employed to improve data quality and reduce the effects of noise bias. The method of Larsen and others (1996) was used to estimate smooth magnetotelluric transfer functions (i.e. impedances) relating the electric and magnetic field data.Data segments were automatically selected on the basis of electric and magnetic field coherency, and used as input to the robust processing algorithm. The magnetic and electric fields are used in an iterative re-weighted method to determine the impedance tensor. During the iterations, the electric fields are corrected in both the frequency and time domains, utilizing a smooth MT transfer function to estimate the electric field data from the magnetic fields. The total time required to robust process a single sounding was approximately 15 minutes.The program outputs data at 8 equi-spaced frequencies per decade (e.g. 10, 15, 22, 32, 42, 48,62, and 82 Hz). All of the soundings were processed using the robust algorithm.
-
Wallbridge Mining Company Ltd. Armstrong - Ministic AMT Survey
3. DATA PRESENTATION
3.1 Data description and dimensionalityThe AMT responses are primarily two-dimensional over the acquired frequency band. Data were rotated to ~150 (average strike 0-30 degrees) decomposinging the data into responses parallel and perpendicular to regional strike (the TE and TM modes respectively). In this coordinate system the TE mode appears to be the Ryx curve, electric field approximately perpendicular to SIC structure. An example of this is shown in figure 2 (Ryx ~ TE, Rxy = TM).
10.
i
0-
10'' 10'2 10"
Period (sec)
Figure 2: Sounding 61e70n, located in the central portion of Ministic lake The blue apparent resistivity curve is identified as the TE mode and red as the TM mode.
3.2 Phase mapsPhase maps of observed impedance phase at frequencies 100 and 30 Hz are plotted in Appendix I.
4. BIBLIOGRAPHYLarsen, J., Mackie, R.L., Manzella, A,, Fordelisi, A, and Rieven, S.
Wight, D.E.
1996 Robust smooth magnetotelluric transfer functions: Geophys. J. Int. 124, 801-919.
1988 SEG MT/EMAP Data Interchange Standard, Revision 1.0: SEG, Oklahoma City. 91pp.
-
Wallbridge Mining Company Ltd. Armstrong - Ministic AMT Survey
APPENDIX I: PHASE MAPS OF FIELD DATA
-
ONTARIO MINISTRY OF NORTHERN DEVELOPMENT AND MINESTransaction No:
Recording Date:
Approval Date:
Client(s):
392385
Survey Type(s):
W0170.30334
2001-JUN-20
2001-AUG-13
Work Report Summary
Status: APPROVEDWork Done from: 2001 -JAN-07
to: 2001-JUN-19
WALLBRIDGE MINING COMPANY LIMITED
EM
Work Report Details:
Claim*
SSSS
SSS
S
SS
1229362
1229363
1229501
1229502
1229503
1230737
1244716
1244717
1244718
1244719
Perform36,475
37,771
SO
54,316
SO
S863
53,454
S7.771
510,361
57,339
548,350
External Credits:
Perform Approve
56,475
57,771
SO
54,316
SO
5863
S3.454
S7.771
510,361
57,339
548,350
SO
Applied
soso
S2.000
54,400
S4.000
SO
SO
SO
SO
50
510,400
Applied Approve
soso
52,000
54,400
S4.000
SO
sosososo
S10.400
Assignso
52,000
5050sososo
54,000
584
SO
56,084
Assign Approve
02,000
0
0
0
0
0
4,000
84
0
56,084
Reserve56,475
55,771
SO
SO
SO
5863
53,454
S3.771
510,277
S7.339
537,950
Reserve Approve
56,475
S5.771
SO
50
SO
S863
53,454
53,771
510,277
S7.339
537,950
Due Date
2001-OCT-29
2001-OCT-29
2002-JUN-23
2002-JUN-23
2002-JUN-23
2002-FEB-21
2002-MAY-10
2002-MAY-10
2002-MAY-10
2002-MAY-10
Reserve:537,
537,
950 Reserve of Work Report*: W0170.30334
950 Total Remaining
Status of claim is based on information currently on record.
41I12SE2005 2 .21634 CASCADEN 900
2001-Aug-16 11:22 Armstrong-d Page 1 of 1
-
Ministry ofNorthern Developmentand Mines
Date: 2001-AUG-14
Ministers du Developpement du Nord et des Mines Ontario
GEOSCIENCE ASSESSMENT OFFICE 933 RAMSEY LAKE ROAD, 6th FLOOR SUDBURY, ONTARIO P3E 6B5
WALLBRIDGE MINING COMPANY LIMITED 129 FIELDING ROAD LIVELY, ONTARIO P3Y1L7 CANADA
Tel: (888) 415-9845 Fax:(877)670-1555
Dear Sir or Madam
Submission Number: 2 .21634 Transaction Number(s): W0170.30334
Subject: Approval of Assessment Work
We have approved your Assessment Work Submission with the above noted Transaction Number(s). The attached Work Report Summary indicates the results of the approval.
At the discretion of the Ministry, the assessment work performed on the mining lands noted in this work report may be subject to inspection and/or investigation at any time.
The geophysical portion of this submission has been reviewed by staff of the Ontario Geological Survey.
If you have any question regarding this correspondence, please contact LUCILLE JEROME by email at [email protected] or by phone at (705) 670-5858.
Yours Sincerely,
Ron GashinskiSupervisor, Geoscience Assessment Office
Cc: Resident Geologist
Mark Hall (Agent)Wallbridge Mining Company Limited (Assessment Office)
Assessment File Library
Wallbridge Mining Company Limited (Claim Holder)
Visit our website at http://www.gov.on.ca/MNDM/LANDS/mlsrnnpge.htrn Page: 1 Correspondence 10:16234
-
o o
m wM
M
O IN
H4
S 1-gjQfJWI
1 • •- ; - • •-'•' m. Q- l "t;-in^'; ; m-
iT^f ircTittW S*^t:^a
C Empl*"i*iiw and iccuwy a l* notpJ
l he mti*nii-ii*rir. iiinwri if ri*mdfrnm Aiglbil rt ir J! 1*4*1*11; in ihe Pr.iv ntt*
intmqttemvtfldalrti^ hhnHlkiiMMgmiqltirmMfrn a a OttMMui im rurrHVHWtonal. iWlY^y, or iwiiKm*iiRk*inlniillDnpui|imii* ^ft^lrrLwuntKon pnawi ur 1)11*11141 H conRHMl nomvaitaui HHIUH. Md Men rt Info i m ut kin may dta b* gllvhrt though iKi uc^LVri* T DK* I I RHIvUv Oflic*. Ur Ab MHltiy tl N Mini tWHuitti,
General Information and L imitations IhlD mw m* It 9t Hiowupir*fllittfMl InHmwB vid i Ml m 11 tl laid IlKAHlnn twin uriMrt*. imev, wwwnwnti, r(*M M myti.toutiinu HfMi, l KIM** vi MMi fuiimi DI dripatroon olUWt w B lnw*n Tram lit* CriH*i, AIM a^rtiM lv ri twiuif *nd land [i*cu utm ra if w flr iiMNbiflw entv to si Aa minna ciaiffl* nw ne* he Hhntie
PROVINCIAL HWIHa
MINING LAND TENURE
MAP
Date (Time of Issue Jun212001
TOWNSHIP l AREA
CASCADEN
10:53h Eastern
PLAN
G4022
ADMINISTRATIVE DISTRICTS l DIVISIONSMining Division SudburyL*nd Tittei/Reglstry Division SUDBURY
Ministry of Natural Resources District SUDBURY
TOPOGRAPHIC
o ,.. mQ c-..
LAND TENURE
E)
i u-'HM ft if M^ O^iy
i.' 1 '.. 1 .T 1, i L miimiw.. m
LAND TENURE WITHDRAWALS
Hh*t Iu'lk44 Hr4 MlnlFN ' fil-ti ^nl^rtw Wl MJMWI mtiiti tmn Wnrorrwi
o mi* r In Cauml Withdrawal lypoi
IMPORTANT NOTICES
LAND TENURE WITHDRAWAL DESCRIPTIONS
Wnm Jini?IH-* WMI Jflh 1 iH01
HfllH WMI
Wil C?TUB1 WHI
Wfi -J4IDI1 *H*n
wa.ztnn WMIW-S,14flO Wim
VU.240D
Jfh 1 ?W1 j*n i ran Jan 1 20111 OttJWII)
L*HD* IHUniNO OH Mhpv l ft K t yUBJLCl fO FL00UWU
To CDMTIHW FIFVBTIOH ftfif rillf. 4A?M
*LL.HtMBlHW(i CRUWI LiHDS (IR WhOV LflUt
HfiSFflVtn MOCTnHEH.1ftl7FltF HrHODS
HE b Of VMWDVUht.AMprSLAHDS iHtktW 1M1HDRAWM hRtJ
BY CUD c ft M council DATED ,UIY ?stH,wl?HLe MOJDHE D OF WWDV LAKt *HU ELAHK IHtHLH ARE.VMl HQfUlW
r RON STAKING BY ORO F R H rOUflCH I) A. f D ?5 JUI V 1917
HKO, P LAN H Jtia
C LIB L t HCCESH AUC,1M3B.aD.
IHKfJOSItrOH StC.JBtH)ttB..IWt
HMno nhjHm grBir-iw,^^d bnd vi^nr tin H Jn** nfrMtndyL**ir*VuimP'uWih-biiit(aiani|4iit in-NdUtWJd.H REfifflVE 1?**)fi
hLUUDHC t LEV* l UN im?.?M t.S^ 1r*1uU FLt: a3IB
FI.OODH*FltV*TION 95 F T flL^: 4BHC
Src. 35 W-LL^ IBWyDO OH l OCI.MW H*V
SFC14 WU CZMflfi n^TMAYIlUltHA^
EM. J&Wfi WW i-aijrjiIJt.ZE w^ tuiUI
WH* HW 9
IMPORTANT NOTICES, IIDI adorn di Cnndldodn s
-
oiH CN
ino o
^^^•'l\^^^^^ti^^^&m
^^^^m^^^^f^; ; ••..•,;i!;:.!:: .-ii'-- i':::: iT&r. J-jMi : . r J Wi^/t /: i-iW:. l -̂ Ti,' : !:iii .f:-!'i: ^T^!j^' : :i: i ^;;;: : 'l'3J!'
t.',,,' J..'v.r I w j. 4 !. :: - -^^;;:!i i :.!iii^ : ;: -ilM;i-iiti' , . . ON, : ; ; -. ,i|;f!r!-*P^-Mi:^ l; ::' ! : ; : : : :: : : ;:!i:::! x; ^W:-i;-:iv:j-- 1 ••-i'twM'-^i;;::^i'ii!x^'ik•-^|:i!i^;^,;^|.- : ' :
•iv^^iiii^i:;^^;iili^^S^il^ip^;^^,:i-:':'' '*;-:? : :l : i*; i: ; W:3F 'ww : ;' :i : : i: i -i :. : ::ic^f!yi M" ! '^--" : :Sf :^ii'!:ii : ::;iiiHiJiJW i ; ; !i;i;i:. i ;f'-iTlr:: -;~. - :' :.''i ' : il*!-:. 1 ;\ V '-:-;;' -'
ivWV. i.;-..:.'^•WKW?WX \;Mt^^^M^m•m\).:-^-^.'. ; rr!i-i;^i-,i!:*TiS . !fe:^U. , i i : :(^|::!i;i^-i!::ii': ; i:| : /--,':^!.LiA*iAiiitot?ri;!;:!i:-::: : ' .
^, V ;i 1C' i. : : L-;: Ti'fpBHJfiT^^ii,';' ! :: : : : -^^7r^?!;^^^ik^^j'jjia., i, i : i| ,- V-^% ^|:'i^!^^^^^'Wfe^ ;'Vi^ifi^Miiia^
^
-.,;...i ^ ,
i-^i^iij:^!/^;.:;!i : r*-i!d*fiii|j.;; i. Ni^ini^ilil^iliii^tillll.:'
- . t;^:^;-:^,!;;:^^:^/:!:^-!^;;^.:.^^' ^ r\ "^ ;As - ; v.i:':!.;' i':';'.;.':; ,':- C ;\n '•tiKwwtifM'-,'''; 1' i Iff !!;:Wfe!i•''^• :M^mis^iii^i0ita
tt luhi inimna ti*m* aftouia ciiMiuiiiHin tin wpvific^ Mining RwoidM i nitdMv rwiuon. rmmHH nitirf *iWFtdiarorjiJvHiji*Jhal, nuivay, DI limri iHls rv **i* dtuur^w i" nattfHMWtWfl. AddlUunBl liraimAlalt M# Wo P* Idtam ihiuughTtie hrd L**6 m**
ent and Hmii l*i irtclltanil in aw en Uilt jnvl* ccmplly* I
il notite* OITIGI o r ma Mlntauy ol Krt
at Information and Limitations hii man m* noi Miawunrmhta od ivdinuFv w-1 irHifiili m Itod kn^Mdint) cv riLntt, luwet, HiHKBunU, right uf My*, rhfJUie itgMt. IKimil, 41 O^wtfgimy i d B|]ii*niun of rlgtit Rna imsn*t ir a m in t ir*wn, Alta cirtJH twd lanur* and hd ijipi ma resin d br lifOMlF W*B mTiV m P*r munnfl ciritnk mv MX bi nua
PROVING AL M
MINING LAND TENURE
MAP
Date l T ime of Issue Jun202001
TOWNSHIP ; AREA
ERMATINGER
14:04h Eastern
PLAN
G-1045
ADMINISTRATIVE DISTRICTS / DIVISIONSMining Division SudburyLund Titles/Registry Division SUDBURY
Ministry of Natural Resources District SUDBURY
TOPOGRAPHIC LAND TENURE
tohnlil Ptfnnr
D c,,.p,.dfl.
0
LAND TENURE WITHDRAWALS
t ̂ ' ' ;
IMPORTANT NOTICES
LAND TENURE WITHDRAWAL DESCRIPTIONS
nmr Jnniani LiCFNrt oFrKnifnrFQHNO. isi?i*;siifn FRRSTOHACHPUHPOSea OH MINIS Ut *^ AKMHTRfJHC LJHt-f
JaniiUUI H
M rv 1- 1MB 3f
WJ.B2 W* JJl U 1i"*J
IMPORTANT NOTICES
Mklng trri muititl iltvinpmB-ni flL-lwrtir*.
JrJWUFltVfllPOfl llbtL/IM (rbi.tDIHJIUrltiaiSS
IS W4l-C?H)f!W OUT MnT^jiWit^^-Hriir.KilinivllFiikwMlHPiih!
beifi requl*Ml n n C o rt* m v Aon Htwrue, t uniulii^ Mining Hic*rrt*,'t
ifhrthfl i*a*atfflil MUKitay H tt tt* Of bflysHiTflH.'rtlihdrswNDrdiiT
W WIONI MAY l M WiltHS HloF l
* f r firn diuHflMMn avnt.^ln in ihs Prrwirurm^ M*ii|i{i H
-
o01 M
M
M
O CM
H H
s^^f^r^i-sail*:
, ;..:v*. : l ; l ' l : ' . sa'', '\ i:- W- .: I;:. i,.,nv': : ^iiiiwJT ̂ : ; : ; :
la t take mini HE d* m* * lw Hi w (oniUl *lh ihi Fir&vtr uLxm Mmjun. iMVHup *fi"i bilU'Kiiid lur rm/Hja^tan viildccurKydiVnDlgiivintnri. Aridlttond itfuim
ihinwn is [|enu*4 Ir i] m diutnl tfrta watten* m id i- PF
MihlflN H.W*idWl omc nvuy, *r iwdMHC duliTi m W Jiff b* vbtikiuri Iht
u! t hw Wim^fr Hor(n*fi QfviiattmHit AIM Mini* rai id4ktonal Utormjrwpi c nth* n iitfULii pM|hu*iw H th* mrummwn in i MI an ihi* m* IvwntpftMl from Viiicm Kiunj unah *ii tot rt L*n*l IRM DI Ra*rty Oflifl*,.ti| *e MBKW B|H*turiMtetwfCD*.
irmi; RFC i rmn i* i Him
GeneraMnforrnatJan a nd Limitations
fH Mjnlno llcHrd EVI ' Off* c l PI f re
n W 1*1" tPt*WMH C W t*
TOPOGRAPHIC
O 3
PROVINCIAL UM.WO
MINING LAND TENURE
MAP
Date y Time ci Issue May 30 2001
TOWNSHIP ; AREA
TRILL
OB:03h Eastern
PLAN
G-4115
ADMINISTRATIVE DISTRICTS \ D IVISIONSMining Division Sudbury
Land Titles/Registry Division SUDBURY
Ministry of Natural Resources District SUDBURY
LAND TENURE
EI
Q .,,,,, D .Jf ,..n*
Q
LAND TENURE WITHDRAWALS
l 1JI j' l l,. I ,IWM."*.1nm,niw uil.il 1 — •"*"'"**' UlrtwAdttMMIDMI *n
fJ.rti-.lnCoudrlftfcM
We .L" M.h.(M*tJn. r
IMPORTANT NOTICES
LAND TENURE WITHDRAWAL DESCRIPTIONS
MQ!t Wnn J4i
HWJ Wium Jar
Wnii Jn
SSWS^Jt'PD 7mn.HS'28 M+S T*
Ji W-S-5iW tLU.
Sil W.SJ+-W
HlH; B) l ^ L-0. #1ja
*H[I # i OJJILI rsA
2DU1 li
zoni i nui h7W1 A
oMW.S.Z4.HI
J iJi'^u SK. 35 W6?4H[J 28*^16 V^frtjb wiL sawi™ on r oi(SttlS WJl J12?^ !) (l H r HAV
i TOI.U iai/ rti RL STRICT THFHVDROI'OWtHIISl. Fit; ZlU/l.
IMPORTANT NOTICESrflU tmrrii t r a HI d ding.
m Eri iMvdn|irnrtit ortivitiux.
-
41I12SE2005 2.21634 CASCADEN 230
'J - ? *
455000 456000 457000 458000
5158000 -
5157000 -
5156000 -
5155000 H
5154000 -
5153000 -
^
- 5 156000
f ^*w ChV
- 5158000
N
- 5157000
5155000
5154000
degrees
5153000
5553514947
45434139373533312S27252321191715
455000 456000 458000
Scale 1 20000 500 1000 Armstrong-Ministic
Arm-Mm
Phase XY at 0.0333 sec
-
41I12SE2005 2.21634 CASCADEN
455000 456000
240
457000 458000
5158000
5157000 -
5156000 -
5155000 -
5154000 -
5153000 -
455000 456000 457000
——i——
458000
- 5156000
- 5158000
- 5157000
5154000
degrees
5153000
Scale 1 20000
Armstrong-MinisticArm-Win
Phase YX at 0.033 s ec
-
41I12SE2005 2 .21634 CASCADEN 250
455000 456000 457000 458000
5158000
5157000
5156000
5155000 -
5154000 H
5153000 -
- 5 158000
N
- 5157000
- 5156000
- 5155000
- 5154000
5153000
degrees
55 53 51 49 47 45 43 41 39 37 35 33 31 29
- 27 25
(23 21
5
455000 456000 457000 458000
Scale 1 20000 500 1000 1500 Armstrong-Ministic
Arm-Min
Phase XY at 0.01 sec
-
41I12SE2005 2 .21634 CASCADEN 260
455000 456000 457000 458000
5158000
5157000
5156000
5155000 -
5154000 -
5153000 -
- 5156000
- 5 158000 N
- 5157000
- 5155000
5154000
degrees
5153000
55535149474543413937353331
2927252321191715
455000 456000 457000 458000
Scale 1 20000 500 1000 1500 Armstrong-Ministic
Arm-Min
Phase YX at 0.01 s ec