New alternatives for financing a river dredging project (Argentina) Raul S. Escalante – Sebastián García – Martín D. Civeira HIDROVIA SA 1

Upload: bennett-howard

Post on 19-Jan-2016

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: New alternatives for financing a river dredging project (Argentina) Raul S. Escalante – Sebastián García – Martín D. Civeira HIDROVIA SA 1

New alternatives for financing a river dredging

project (Argentina)

Raul S. Escalante – Sebastián García – Martín D. Civeira

HIDROVIA SA

1

Page 2: New alternatives for financing a river dredging project (Argentina) Raul S. Escalante – Sebastián García – Martín D. Civeira HIDROVIA SA 1

The world

2

Argentina

Page 3: New alternatives for financing a river dredging project (Argentina) Raul S. Escalante – Sebastián García – Martín D. Civeira HIDROVIA SA 1

General location

3

Page 4: New alternatives for financing a river dredging project (Argentina) Raul S. Escalante – Sebastián García – Martín D. Civeira HIDROVIA SA 1

Argentine Waterways

3.000 km

4

Page 5: New alternatives for financing a river dredging project (Argentina) Raul S. Escalante – Sebastián García – Martín D. Civeira HIDROVIA SA 1

Hidrovía S.A. is a bi-national Company formed by:

• Jan de Nul NV (from Belgium)

• Emepa S.A. (from Argentina)

With the object of doing: • Capital and maintenance dredging Jan De Nul• Aids to Navigation system Emepa

5

Page 6: New alternatives for financing a river dredging project (Argentina) Raul S. Escalante – Sebastián García – Martín D. Civeira HIDROVIA SA 1

Waterway in charge of Hidrovía

Santa Fe – Confluencia640 Km

Santa Fe – Ocean1000 Km

Page 7: New alternatives for financing a river dredging project (Argentina) Raul S. Escalante – Sebastián García – Martín D. Civeira HIDROVIA SA 1

• Owner: Argentine Government

• Concession Expiring: 2021

• Risk Contract

• Incomes:

Santa Fe- Ocean: Toll Santa Fe- Confluencia: Argentine Government Financing

Dredging and AtoN services in Argentina

Page 8: New alternatives for financing a river dredging project (Argentina) Raul S. Escalante – Sebastián García – Martín D. Civeira HIDROVIA SA 1

25 ft navigable depth

34 ft navigable depth

Year 2011

Santa Fe – Ocean Waterway

8

Page 9: New alternatives for financing a river dredging project (Argentina) Raul S. Escalante – Sebastián García – Martín D. Civeira HIDROVIA SA 1

10 ft navigable depth

Year 2011/ 2012

Santa Fe - Confluencia

9

Page 10: New alternatives for financing a river dredging project (Argentina) Raul S. Escalante – Sebastián García – Martín D. Civeira HIDROVIA SA 1

Santa Fe – Confluencia640 Km

Santa Fe – Ocean1000 Km

Vessels

Page 11: New alternatives for financing a river dredging project (Argentina) Raul S. Escalante – Sebastián García – Martín D. Civeira HIDROVIA SA 1

• Capital and maintenance dredging

• Bathymetric surveys for depth control

• Aids to Navigation: deployment and maintenance

• Tide, waves and wind measurements

• Environmental Management Plan

• Projects and Studies Department

• Traffic Control

Tasks performed

Page 12: New alternatives for financing a river dredging project (Argentina) Raul S. Escalante – Sebastián García – Martín D. Civeira HIDROVIA SA 1

Total goods movement (international and domestic) in the waterway (SFO) – Year 2010

Total: 111 million tons

Page 13: New alternatives for financing a river dredging project (Argentina) Raul S. Escalante – Sebastián García – Martín D. Civeira HIDROVIA SA 1

Total goods movement (international and domestic) in the waterway (SFN) – Year 2010

(metric tons)

Total: 16 million tons

Page 14: New alternatives for financing a river dredging project (Argentina) Raul S. Escalante – Sebastián García – Martín D. Civeira HIDROVIA SA 1

Toll and Subsidy 1995 – 2010Santa Fe – Ocean

14

Page 15: New alternatives for financing a river dredging project (Argentina) Raul S. Escalante – Sebastián García – Martín D. Civeira HIDROVIA SA 1

1,2 $ / Ton

15

Toll 2010Santa Fe – Ocean

Page 16: New alternatives for financing a river dredging project (Argentina) Raul S. Escalante – Sebastián García – Martín D. Civeira HIDROVIA SA 1

Toll Formula

16

T = TD + TAtoN

TD: Dredging toll

TAtoN: Aids to Navigation toll

Page 17: New alternatives for financing a river dredging project (Argentina) Raul S. Escalante – Sebastián García – Martín D. Civeira HIDROVIA SA 1

Toll Formula - AtoN

17

TAtoN = tb x NRT

NRT: net register tonnagetb: AtoN coefficient ($/ton)

Page 18: New alternatives for financing a river dredging project (Argentina) Raul S. Escalante – Sebastián García – Martín D. Civeira HIDROVIA SA 1

Toll Formula - Dredging

18

TD = td x CF x NRT

td: Dredging coefficient ($/ ton)

CF: Correction FactorNRT: net register tonnage

Page 19: New alternatives for financing a river dredging project (Argentina) Raul S. Escalante – Sebastián García – Martín D. Civeira HIDROVIA SA 1

Toll Formula - Dredging

19

Page 20: New alternatives for financing a river dredging project (Argentina) Raul S. Escalante – Sebastián García – Martín D. Civeira HIDROVIA SA 1

Commodities (soybean) price evolution

20

Page 21: New alternatives for financing a river dredging project (Argentina) Raul S. Escalante – Sebastián García – Martín D. Civeira HIDROVIA SA 1

Port and River Costs• River Pilotage• Variable Port costs: berth, different vessel and passenger taxes, tug… • Fixed Port costs: customs, maritime agency…

21

Page 22: New alternatives for financing a river dredging project (Argentina) Raul S. Escalante – Sebastián García – Martín D. Civeira HIDROVIA SA 1

Costs Compared

22

• Pilotage (round trip Recalada-Rosario) 2,35 • HV Toll 1,20 • Tugboat 0,79 • Port taxes 0,30 • Maritime Agent 0,29 • Berth and port facilities (per day) 0,10 • Commodities (soybeam Chicago) + 515,00

Page 23: New alternatives for financing a river dredging project (Argentina) Raul S. Escalante – Sebastián García – Martín D. Civeira HIDROVIA SA 1

Other PracticesShort Dredging Contract

• Bidding process• Time consuming• Administrative aspects• Siltation after end of contract• Possible delays in payment

23

Page 24: New alternatives for financing a river dredging project (Argentina) Raul S. Escalante – Sebastián García – Martín D. Civeira HIDROVIA SA 1

Other PracticesPublic Dredging

• Governments can sometimes be quite efficient, but...

• Delays• Objectives not accomplished• More “relaxed” controls

24

Page 25: New alternatives for financing a river dredging project (Argentina) Raul S. Escalante – Sebastián García – Martín D. Civeira HIDROVIA SA 1

Dredging is an Aid to Navigation

25

Page 26: New alternatives for financing a river dredging project (Argentina) Raul S. Escalante – Sebastián García – Martín D. Civeira HIDROVIA SA 1

Conclusions• Public financing is difficult to maintain through

the years• Dredging and AtoN works in charge of the

Government sometimes are not as efficient as they should

• Our financing depends only on vessels using the waterway, which reasonable toll fees

26

Page 27: New alternatives for financing a river dredging project (Argentina) Raul S. Escalante – Sebastián García – Martín D. Civeira HIDROVIA SA 1

27

Thanks for your attention