new aircraft production new aircraft tc existing aircraft
DESCRIPTION
Halon Replacement Dates. New Aircraft Production New Aircraft TC Existing Aircraft. ICAO EASA ICAO EASA ICAO EASA. Lavatory. 2012 2021 2012 2012 None 2021. Handheld (Portable). 2017 20252015 2015 None 2025. Engine/APU. - PowerPoint PPT PresentationTRANSCRIPT
New Aircraft Production New Aircraft TC Existing Aircraft
ICAO EASA ICAO EASA ICAO EASA
Lavatory
Handheld (Portable)
Engine/APU
Cargo
2012 2021 2012 2012 None 2021
2017 2025 2015 2015 None 2025
None 2041 2015 2015 None 2041
None 2041 None 2019 None 2041
The following should be noted: EASA has retrofit dates as the EU has use restrictions on Halon. However they have no dates for new production (therefore new production is the same as retrofit). New type design dates are the same, except the add one for cargo in 2019. (This date is the date of application for type design. aircraft produced is probably 4 to 5 years later).
Halon Replacement Dates