Executive Summary NEW 60 KLPD MOLASSES/B- HEAVY MOLASSES BASED DISTILLERY 92, 93, 94, 337/1/2,318 1/2 village Mogdal, Tal.& Dist. Bidar, Karnataka Bidar Kissan Shakhar Karkhana Limited Of Draft Environment Impact Assessment report

Upload: others

Post on 21-Mar-2020

21 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: NEW 60 KLPD MOLASSES/B- HEAVY MOLASSES ... Kissan_E_20_6_2019.pdfwith sugar plant of 3500 TCD capacity & 15 MW bagasse based co-generation plant. BKSKL started its trial season during

Executive Summary

NEW 60 KLPD MOLASSES/B- HEAVY MOLASSES BASED DISTILLERY

92, 93, 94, 337/1/2,318 1/2 village Mogdal, Tal.&

Dist. Bidar, Karnataka

Bidar Kissan Shakhar Karkhana Limited

Of

Draft Environment Impact Assessment

report

Page 2: NEW 60 KLPD MOLASSES/B- HEAVY MOLASSES ... Kissan_E_20_6_2019.pdfwith sugar plant of 3500 TCD capacity & 15 MW bagasse based co-generation plant. BKSKL started its trial season during

1

New 60 KLPD molasses/B- heavy molasses based distillery at Mogdal, Tal & Dist- Bidar,

Karnataka by Bidar Kissan Shakhar Karkhana Limited

EIA Executive Summary

CONTENTS 1.0 Introduction ...................................................................................................................... 2

2.0 Project Location ................................................................................................................ 2

3.0 Salient features of integrated project .............................................................................. 4

4.0 Process description .......................................................................................................... 6

5.0 Description of the Environment ....................................................................................... 7

6.0 Anticipated Environmental Impacts ................................................................................. 7

7.0 Environmental Monitoring Programme ........................................................................... 9

8.0 Additional Studies .......................................................................................................... 10

9.0 Environmental Management Plan ................................................................................. 10

10.0 Environment Management Cost .................................................................................. 13

11.0 Project Benefits ............................................................................................................ 13

12.0 Conclusion .................................................................................................................... 13

Page 3: NEW 60 KLPD MOLASSES/B- HEAVY MOLASSES ... Kissan_E_20_6_2019.pdfwith sugar plant of 3500 TCD capacity & 15 MW bagasse based co-generation plant. BKSKL started its trial season during

2

New 60 KLPD molasses/B- heavy molasses based distillery at Mogdal, Tal & Dist- Bidar,

Karnataka by Bidar Kissan Shakhar Karkhana Limited

EIA Executive Summary

Executive Summary 1.0 Introduction

Bidar Kissan Shakhar Karkhana Limited (BKSKL) is a Public Limited Company, engaged in

manufacturing of sugar. BKSKL is situated at Mogdal village, Taluk & District: Bidar, Karnataka

with sugar plant of 3500 TCD capacity & 15 MW bagasse based co-generation plant. BKSKL

started its trial season during July, 2016.

BKSKL, now proposes to set up a new distillery plant of 60 KLPD capacity, adjacent to the sugar

plant located Mogdal village, National Highway No: 9, Taluk & Dist: Bidar, in the state of

Karnataka.

2.0 Project Location

The proposed distillery will be located at sr. no. 92, 93, 94, 337/1/2, 338/1/2 village Mogdal,

Tal. & Dist. Bidar, Karnataka. For the present study, an area covered in 10 Km radius from the

project location has been considered. Proposed distillery location is geographically located

at 17°42'25.38"N & 77°23'35.92"E. Project site and the 10 km radius study area falls in the

survey of India Toposheet no. 56 G/5 and 56 G/6.

Project area is connected to National Highway 65 adjacent to the sugar factory, railway station

Railway Station Bidar 25 km, Airport Hyderabad Airport 143 km. Nearest densely populated

city Bidar 25 km away from the project site. The surrounding area of the project site is rural

agrarian. Land for proposed project is a vacant plot and it is under for industrial purpose.

There is no forest land, wild life sanctuary and an eco-sensitive area comes in 10 km radius of

the proposed project location.

Page 4: NEW 60 KLPD MOLASSES/B- HEAVY MOLASSES ... Kissan_E_20_6_2019.pdfwith sugar plant of 3500 TCD capacity & 15 MW bagasse based co-generation plant. BKSKL started its trial season during

3

New 60 KLPD molasses/B- heavy molasses based distillery at Mogdal, Tal & Dist- Bidar,

Karnataka by Bidar Kissan Shakhar Karkhana Limited

EIA Executive Summary

Figure 1: General Location Map

Figure 2: Google image of the plant

Page 5: NEW 60 KLPD MOLASSES/B- HEAVY MOLASSES ... Kissan_E_20_6_2019.pdfwith sugar plant of 3500 TCD capacity & 15 MW bagasse based co-generation plant. BKSKL started its trial season during

4

New 60 KLPD molasses/B- heavy molasses based distillery at Mogdal, Tal & Dist- Bidar,

Karnataka by Bidar Kissan Shakhar Karkhana Limited

EIA Executive Summary

3.0 Salient features of integrated project

Table 1: Brief information of the project and environmental settings

# Particulate Description

1. Project New 60 KLPD molasses/B- heavy molasses based distillery at sr. no. 92, 93, 94, 337/1/2, 338/1/2 village Mogdal, Tal & Dist- Bidar, Karnataka

2. Available land For proposed distillery 23 acres Green belt area: 7.6

3. Product Molasses based distillery / Ethanol Plant (60 KLPD) R S & IS / Fuel Ethanol/ENA : 60 KLPD Fuel oil: 0.195 KLPD (One at a time)

4. Existing sugar factory products

Existing 3500 TCD

Sugar (TPD) (13% on cane) 367.5 TPD

Bagasse (TPD) (28) 980 TPD

Press mud (TPD) (4%) 140 TPD

B-Molasses (TPD) (6 %) 245 TPD

5. Operation days Sugar factory season: 160 day Cogeneration : 193 (Seasonal operational days 160 and off season operational days 33) Distillery plant will operate for 300 days

6. Molasses requirement Total Molasses requirement 437 TPD B-Molasses Quantity: 197 TPD C Molasses : 240 TPD

7. Water requirement Total fresh water requirement for proposed distillery will be 472 CMD.

8. Source of water Karanja River.

9. Boiler Incineration Boiler – 25 TPH(45 bar (a) and 400 ºC ))

10. TG Proposed distillery incineration boiler 3 MW TG ( double extraction cum condensing turbine)

11. DG Proposed: 500 kVA

12. Electricity requirement Electricity generation Consumption

3.0 MW 2.2 MW

13. Fuel Concentrated spent wash: 8.2 MT/hr. (196.8 MTD) Coal: 2.0 MT/hr. (48 MTD)

14. Steam Steam generation capacity 25 TPH Total steam consumption 19.76 TPH Wash to ENA : 8.40 TPH @ 3.5 kg /cm2 (g) Wash to RS : 4.72 TPH @ 3.5 kg /cm2 (g) RS to AA : 1.44 TPH @ 3.5 kg /cm2 (g) Evaporation : 5.20 TPH @ 1.5 kg /cm2 (g)

15. Total effluent generation Proposed Distillery effluent generation: Spent wash 600-665 CMD, spent lees 146 CMD (100% lees shall be reuse in process), process condensate 504 CMD

Page 6: NEW 60 KLPD MOLASSES/B- HEAVY MOLASSES ... Kissan_E_20_6_2019.pdfwith sugar plant of 3500 TCD capacity & 15 MW bagasse based co-generation plant. BKSKL started its trial season during

5

New 60 KLPD molasses/B- heavy molasses based distillery at Mogdal, Tal & Dist- Bidar,

Karnataka by Bidar Kissan Shakhar Karkhana Limited

EIA Executive Summary

16. Effluent treatment system Total spent wash generation will be max 600-665 CMD, it will be concentrated in MEE and then burn in proposed 25 TPH spent wash fired boiler. Condensate water will be recycled back in the process RO based condensate polishing unit of capacity 650 CMD will be provided. Existing effluent 350 CMD ETP from sugar unit Treated water is recycled/reused in green belt development and ferti-irrigation.

17. Ash Distillery Coal ash from proposed distillery: 16.8 TPD (max 35% for Indian coal) Spent wash ash from proposed distillery: 25.58 TPD Spent wash ash collected from the furnace bottom hoppers shall be used as manure. Coal ash will be sold to the brick manufacturer. Sugar Existing bagasse ash generation: 15.3 TPD

18. ETP sludge Maximum sludge is recirculated back in the aeration tank. Excess of sludge from clarifiers is dewatered and partially dried in sludge drying beds.

19. Air pollution control measures

Proposed for distillery : Electrostatic precipitator Existing with sugar unit: Electrostatic precipitator Existing sugar Stack: 76 m Proposed distillery stack height: 74 m

20. Man-power Proposed distillery skilled 20-30 & unskilled 30

21. Total project cost Project cost of the distillery: Rs. 97.35 Cr.

22. Total EMP capital cost Total 2.6 Cr.

23. Environment Sensitivity

24. Nearest Village Mogdal at 1.28 km

25. Nearest Town / City Bidar 25 km

26. Nearest IMD station Bidar (43125), Karnataka, India 25.0 km in West

27. Nearest National Highway National Highway 65 (Mumbai highway) adjacent to the sugar factory

28. Nearest Railway station Bidar 25 km

29. Nearest Airport Hyderabad Airport 143 km

30. National Parks, Wildlife Sanctuaries, Biosphere Reserves, Tiger/ Elephant Reserves, Wildlife Corridors etc. within 10 km radius

No any in within 10 km of project area

31. Reserved Forests (RF) / Protected Forests (PF),

Minkhere protected forest 4.8 in SW Rekulgi protected forest 6.39 km in WNW Kasimpur protected forest 9.4 km in N Bhimalkhed reserved forest 2.5 km in S

Page 7: NEW 60 KLPD MOLASSES/B- HEAVY MOLASSES ... Kissan_E_20_6_2019.pdfwith sugar plant of 3500 TCD capacity & 15 MW bagasse based co-generation plant. BKSKL started its trial season during

6

New 60 KLPD molasses/B- heavy molasses based distillery at Mogdal, Tal & Dist- Bidar,

Karnataka by Bidar Kissan Shakhar Karkhana Limited

EIA Executive Summary

4.0 Process description

Alcohol manufacturing mainly involved below given steps

Feed preparation and weighing

Dilution: Preparation of molasses for fermentation by appropriate dilution with water

Fermentation: Production of alcohol from fermentable sugars in molasses solution

with the help of yeast

Distillation: Product recovery through distillation processes

Figure 4: Distillery process flow chart

Nagankhera reserved forest 8.3 km in WSW Alipur reserve Forest 9.5 km in SSW Basirapur reserve forest 8.48 km in SW Muthangi reserve Forest 9.8 km in SW Tadapalli reserve forest 7.3 km in NE Bagdal reserve forest 7.38 in NNE

32. River/Water Body (within 10 km radius)

Karanja River flowing at a distance of 1.8 km in north east

33. Interstate boundary Karnataka and Telangana state border at 6.3 km in east

Spent lees will be recycled

Steam

RS/ENA/FO/AA/Ethanol

Ethanol & CO2 Emission

Storage

Spent wash treatment through MEE & Incineration boiler

Molasses Dilution

Fermentation

Spent wash and Spent lees

Multi-Pressure Distillation

Molecular Sieve

Activated Yeast

Page 8: NEW 60 KLPD MOLASSES/B- HEAVY MOLASSES ... Kissan_E_20_6_2019.pdfwith sugar plant of 3500 TCD capacity & 15 MW bagasse based co-generation plant. BKSKL started its trial season during

7

New 60 KLPD molasses/B- heavy molasses based distillery at Mogdal, Tal & Dist- Bidar,

Karnataka by Bidar Kissan Shakhar Karkhana Limited

EIA Executive Summary

5.0 Description of the Environment

The study area as per awarded model TOR, 2015 is earmarked to be 10 km from the project

site. The study period conducted was from Nov 2018 to Jan 2019. The guiding factors for the

present baseline study are the requirements prescribed by the guidelines given in the EIA

Manual of the MoEFCC and methodologies mentioned in Technical EIA Guidelines Manual for

Distilleries by IL&FS Ecosmart Ltd., approved by MoEFCC.

Table 3: Observation of Environmental monitoring

Environmental Attributes

Frequency of monitoring Parameters Observed Results

Meteorology Microprocessor based Weather Monitoring Station Continuous hourly recording

Wind direction North East and East

Max. Temp. 41.7 0C

Mini. Temp. 13.0 0C

Relative Humidity 36-85 %

Precipitation 885.8 mm

Ambient Air Quality

9 Locations 24 hourly samples Twice a week for 3 months (in µg/m3)

PM10 All parameters are within NAAQ 2009 standards. PM2.5

SO2

NOx

CO

Water Quality (Ground & Surface)

Once in season at 11 locations (Physical, chemical and biological parameters)

Colour All parameters are within limit except MPN count and E-Coli in surface water as well as ground water.

pH

TDS

COD

E-Coli

Soil Quality Once in season at 8 locations

Soil type and texture, Physico-chemical properties, NPK

Dark brown to black, soil is medium in fertility, good water holding capacity, heavy metal contamination signs not seen.

Noise Quality Once in season at 9 Locations (Noise levels in dB(A))

Day 44.5-62.3

Night 39.2- 63.1

Land use Pattern

One time visit of the study area for ground truthing

Identification & classification of land use

Most of the land is Agricultural land followed by Barren land

Geology and hydrogeology

Once in study period Geology and hydrogeology of the study area

Basaltic lava flows, the ground water in Deccan trap basalt occurs mostly in the upper weathered and fractured parts down to 20-25 m depth, alluvium occurs in small areas.

Page 9: NEW 60 KLPD MOLASSES/B- HEAVY MOLASSES ... Kissan_E_20_6_2019.pdfwith sugar plant of 3500 TCD capacity & 15 MW bagasse based co-generation plant. BKSKL started its trial season during

8

New 60 KLPD molasses/B- heavy molasses based distillery at Mogdal, Tal & Dist- Bidar,

Karnataka by Bidar Kissan Shakhar Karkhana Limited

EIA Executive Summary

Environmental Attributes

Frequency of monitoring Parameters Observed Results

Ecology General in 10 km radial study area and data collected around the project site through field visits

Flora Accasia sp. Azadirachta indica , Cassia tora, Senna siamea etc.

Fauna Common mormon, Lemon pansy, green bee-eater, drongo etc.

Socioeconomic Data

General in 10 km radial study area and data collected around the project site through field visits

Socio-economic characteristics of the affected area

Sanitation facilities are unsatisfactory, Power supply facility is available in almost villages and town, Drinking water sources is mostly bore well, Medical facilities in terms of primary health centre and primary health sub centres in the rural areas are good.

6.0 Anticipated Environmental Impacts

Table 4: Anticipated Impacts

Environmental Facets Anticipated Impacts

Air Environment Probable increase in concentration of air pollutants due to

process, fugitive and utility emissions.

Water Environment Generation of industrial & domestic wastewater.

Land Environment Impacts on land due to improper disposal of hazardous/

solid waste.

Ecological Environment Positive as greenbelt of appropriate width will be

developed and maintained by the company in the area. No

impacts are envisaged on aquatic flora & fauna as there will

be zero effluent discharge outside the plant premises.

Social Environment Overall development of the area in respect of the

infrastructure development, educational growth, health

facilities etc.

Economic Environment Positive impacts on economy of the region and the country

as the Alcohol will be exported and revenue generation.

Noise Environment Minor increase in noise level within the project area.

Occupational Health & Safety Major health hazards are identified in worst case scenario.

Page 10: NEW 60 KLPD MOLASSES/B- HEAVY MOLASSES ... Kissan_E_20_6_2019.pdfwith sugar plant of 3500 TCD capacity & 15 MW bagasse based co-generation plant. BKSKL started its trial season during

9

New 60 KLPD molasses/B- heavy molasses based distillery at Mogdal, Tal & Dist- Bidar,

Karnataka by Bidar Kissan Shakhar Karkhana Limited

EIA Executive Summary

7.0 Environmental Monitoring Programme

Table 5: Environmental monitoring schedule

Particulate Parameters Number of location Frequency

Ambient air quality

PM10, PM2.5, SO2, NOx etc. Ambient air quality at minimum 3 locations. Two samples downwind direction at 500 m and 1000 m respectively. One sample upwind direction at 500m.

Monthly

Stack emission

PM, SO2 and NOx All stacks Monthly

Online stack monitoring will be installed

-

Work place PM2.5, SO2, NOx, CO, O3 Process emission in workplace area/plants (for each area/plant minimum 2 locations and 1 location outside plant area near vent)

Monthly

Waste water pH, EC, SS, TDS, O&G, Ammonical Nitrogen, COD, BOD, Chloride, Sulphides etc.

Wastewater from all sources. Inlet & outlet of ETP, spent wash, Condensate treatment plant

Monthly

Online Monitoring machine is already installed at existing ETP. Camera at spent wash tank will be installed.

Surface water and ground water

pH, Salinity, Conductivity, TDS, Turbidity, DO, BOD, Phosphate, Nitrates, Sulphates, Chlorides, Total Coliforms (TC) & E.Coli

3-5 location Ground as well as Surface water. Within 1 km radius from spent wash tank and compost yard. 2 locations downward 1 location upward additional three locations within 10 km radius from the site. River sample One each at upstream and downstream

Half yearly

Solid waste Ash Process dust generated sludge and ash.

Before used as manure if used manure

Monthly

Soil Organic and Inorganic matter

N, P, K, moisture, EC, heavy metals etc.

At lands utilizing compost manure and treated effluent, 3 locations

Pre –monsoon and Post monsoon

Noise Equivalent noise level - dB (A) at min. Noise Levels measurement at high

5 location At all source and outside the Plant area.

Monthly

Page 11: NEW 60 KLPD MOLASSES/B- HEAVY MOLASSES ... Kissan_E_20_6_2019.pdfwith sugar plant of 3500 TCD capacity & 15 MW bagasse based co-generation plant. BKSKL started its trial season during

10

New 60 KLPD molasses/B- heavy molasses based distillery at Mogdal, Tal & Dist- Bidar,

Karnataka by Bidar Kissan Shakhar Karkhana Limited

EIA Executive Summary

Particulate Parameters Number of location Frequency

noise generating places as well as sensitive receptors in the vicinity

Green belt Number of plantation (units), number of survived plants/ trees, number of poor plant/ trees.

In and around the plant site Monthly

Soil Texture, pH, electrical conductivity, cation exchange capacity, alkali metals, Sodium Absorption Ratio (SAR), permeability, porosity.

2-3 near Solid/ hazardous waste storage. At least five locations from Greenbelt and area where manure of biological waste is applied. Near spent wash storage lagoon

Quarterly

Occupational health

Health and fitness check up of employees getting exposed to various hazards and all other staff

All worker Yearly/ twice a year

Emergency preparedness, such as fire fighting

Fire protection and safety measures to take care of fire and explosion hazards, to be assessed and steps taken for their prevention.

Mock drill records, on site emergency plan, evacuation plan

Monthly during operation phase

8.0 Additional Studies

The following additional such as risk assessment for storage and handling of alcohol and

mitigation measure due to fire and explosion and handling area has been carried out.

9.0 Environmental Management Plan

Following mitigation measures shall be adopted by factory to minimize the impact of project

on the surrounding environment.

Table 6: EMP for various environmental attributes

Environmental

Attributes

Mitigation Measures

Air Quality

Management

Process Emission

ESPs shall be provided for PM emissions.

The whole process will be carried out in closed condition so as to avoid

any chances of VOC emissions.

Utility Emission

All the D.G. sets shall be standby arrangement and will only be used

during power failure.

Adequate stack height shall be provided to Boiler and D.G. sets.

Page 12: NEW 60 KLPD MOLASSES/B- HEAVY MOLASSES ... Kissan_E_20_6_2019.pdfwith sugar plant of 3500 TCD capacity & 15 MW bagasse based co-generation plant. BKSKL started its trial season during

11

New 60 KLPD molasses/B- heavy molasses based distillery at Mogdal, Tal & Dist- Bidar,

Karnataka by Bidar Kissan Shakhar Karkhana Limited

EIA Executive Summary

Environmental

Attributes

Mitigation Measures

Electrostatic Precipitator shall be provided as an air pollution control

device to the boiler with approximately 99.99 % efficiency to capture

maximum boiler fly ash.

Fugitive Emission

The main raw material and product shall be brought in and dispatched

by road in covered enclosures.

Dust suppression on haul roads shall be done at regular intervals.

Water &

Wastewater

Management

The distillery would be based on ‘Zero Liquid Discharge’ technology.

Total spent wash generation will be 600-665 CMD. For existing unit spent

wash will be concentrated in MEE and then burn in proposed 25 TPH

spent wash fired boiler.

The Process condensate, spent lees will be cooled and will be treated in

Condensate Polishing Unit, after treatment of which it will be recycled

back to the process again.

The treated water will be used for gardening.

Proper storm water drainage will be provided during rainy season to

avoid mixing of storm water with effluent.

Rain water harvesting

Noise

Management

Closed room shall be provided for all the utilities so as to attenuate the

noise pollution.

Acoustic enclosure shall be provided to D.G sets.

Free flow of traffic movement shall be maintained. Earmuffs shall be

used while running equipment’s of the plant.

Proper maintenance, oiling and greasing of machines at regular intervals

shall be done to reduce generation of noise.

Greenbelt shall be developed around the periphery of the plant to reduce

noise levels.

Odour

Management

Odour shall be primarily controlled at source by good operational

practices, including physical and management control measures.

Better housekeeping will maintain good hygiene condition by regular

steaming of all fermentation equipment.

Use of efficient biocides to control bacterial contamination.

Control of temperature during fermentation to avoid in-activation/

killing of yeast.

Avoid staling of fermented wash.

Solid &

Hazardous

The hazardous waste i.e. spent oil generated shall be very minor and shall

be burnt in boiler along with fuel.

Boiler coal ash shall be sold to brick manufacturer.

Page 13: NEW 60 KLPD MOLASSES/B- HEAVY MOLASSES ... Kissan_E_20_6_2019.pdfwith sugar plant of 3500 TCD capacity & 15 MW bagasse based co-generation plant. BKSKL started its trial season during

12

New 60 KLPD molasses/B- heavy molasses based distillery at Mogdal, Tal & Dist- Bidar,

Karnataka by Bidar Kissan Shakhar Karkhana Limited

EIA Executive Summary

Environmental

Attributes

Mitigation Measures

Waste

Management

spent wash ash will be used as

ETP & yeast sludge can be used in greenbelt development

Traffic

Management

Culverts shall be maintained.

The trucks carrying raw material & fuel shall be covered to reduce any

fugitive dust generation.

Good traffic management system shall be developed and implemented

for the incoming and outgoing vehicles so as to avoid congestion on the

public road.

Green Belt

Development

/ Plantation

Plantation shall been done as per Central Pollution Control Board (CPCB)

Norms.

The plantation in and around the plant site helps/will help to attenuate

the pollution level.

Native species shall be given priority for Avenue plantation.

Corporate

Social

Responsibility

An amount of INR 1.94 Cr. (As CER OM dated 1.05.2018 Greenfield

project. 2% of total project cost) will be allocated for CSR activities in the

coming 3 years which will be utilized on the basis of requirement for

weaker sections of the society for next 3 years.

Occupational

Health &

Safety

Factory shall monitor the health of its worker before placement and

periodically examine during the employment

Health effects of various activities and health hazard if any observed shall

be recorded and discussed with the health experts for corrective and

preventive actions need to be taken by the industry

All safety gear shall be provided to workers and care shall be taken by

EMC that these are used properly by them. All safety norms shall be

followed

Page 14: NEW 60 KLPD MOLASSES/B- HEAVY MOLASSES ... Kissan_E_20_6_2019.pdfwith sugar plant of 3500 TCD capacity & 15 MW bagasse based co-generation plant. BKSKL started its trial season during

13

New 60 KLPD molasses/B- heavy molasses based distillery at Mogdal, Tal & Dist- Bidar,

Karnataka by Bidar Kissan Shakhar Karkhana Limited

EIA Executive Summary

10.0 Environment Management Cost

Table 7: Environment Management Cost

Sr. No Description Capital Cost (Rs. in lakhs)

Recurring Cost (Rs. in lakhs)

1. Air pollution 120 3

2. Environmental Monitoring (Air, water, waste water, Soil, Solid waste, Noise)

_ 3

3. CPU 80

4. occupation health 5 10

5. Green belt 25 10

6. Solid waste 5 1

7. Rain water 25 1

Total 260 28

11.0 Project Benefits

1. Readily available infrastructure, fuel, & water for renewable energy power generation

project.

2. Provides an initiative to sugar mill to concentrate more on conservation of energy &

reduction of operating cost, thereby improving their profitability of operation.

3. Saves the expenditure on safe storage and disposal of bagasse.

4. Benefits of quick return on biomass power capital investment and generation of

additional revenue.

5. The economic benefits available to the sugar factories from sale of exportable surplus

and improvement in the operations

6. Entire integrated project is proposed to be set up based on the stand-alone commercial

viability of each component of the project.

12. Conclusion

Zero liquid discharged is proposed with efficient mitigation measures implemented.

Air emissions through stack will be controlled by ESP.

Loss of vegetation and habitat will not be attributed.

Personal protective equipment’s, safety precautions, emergency plan & disaster

management plan shall be in place to avoid the environment hazards.