1. Encourage development of clean energy sources and
integrate renewable technologies into Nevada’s energy
sector
2. Foster the creation of a modern, resilient, and cost-effective
energy grid
3. Support distributed generation and storage, with a specific
focus on rooftop solar and net metering
2
S T O R A G E S U P P O R T S T H E T A S K F O R C E ’ S G O A L S
© Copyright 2015 Tesla Motors, Inc. All rights reserved.
E N E R G Y S T O R A G E U S E S
3
SELF CONSUMPTION
© Copyright 2015 Tesla Motors, Inc. All rights reserved. 4
R E S I D E N T A L I N S T A L L A T I O N
3.3 kW / 6.4 kWh
© Copyright 2015 Tesla Motors, Inc. All rights reserved. 5
C O M M E R C I A L B U I L D I N G I N S T A L L A T I O N
250 kW / 1 MWh
© Copyright 2015 Tesla Motors, Inc. All rights reserved. 6
13 MW / 52 MWh
U T I L I T Y - S C A L E I N S T A L L A T I O N
© Copyright 2015 Tesla Motors, Inc. All rights reserved.
Vo
lum
etr
ic E
ne
rgy D
en
sity [
Wh
/l]
600
500
400
300
200
1985 1990 1995 2000 2005
350330
580
280
General Motors
EV1
Tesla Roadster
Tesla Model S
Tesla Model III
2010 2015
Ni/Cd
Ni/MH
Li-Ion
Doubling in 10 years
B A T T E R Y C E L L E N E R G Y D E N S I T Y T R E N D
7
© Copyright 2015 Tesla Motors, Inc. All rights reserved. 8
GW
h/Y
ear
Pro
du
ctio
n
Copyright©2015-2016/B3 Corporation
500,000 Vehicles + Energy Storage
G L O B A L B A T T E R Y C E L L M A R K E T
Projected Gigafactory Pack Production
Projected Gigafactory Cell Production
Energy Storage / UPS
xEV
Mobile IT
© Copyright 2015 Tesla Motors, Inc. All rights reserved.
Many utility processes and tariffs must be updated to
accommodate storage:
• Planning (Generation, Transmission, & Distribution)
• Valuation
• Procurement
• Operations
• Rate design
• Interconnection
The first energy storage projects in a region have higher development costs because significant utility learning is required
10
B A R R I E R S T O S T O R A G E D E P L O Y M E N T
© Copyright 2015 Tesla Motors, Inc. All rights reserved.
The best way to uncover which detailed
processes and tariff language must be
updated is to proactively deploy
commercial energy storage projects at all
points of the grid:
– Customer-connected
– Distribution-connected
– Transmission-connected
11
L E A R N B Y D O I N G
© Copyright 2015 Tesla Motors, Inc. All rights reserved.
• All utility planning, procurement, and interconnection procedures
should be updated to consider energy storage
• Policymakers should establish escalating near-term and medium-term
storage procurement targets for the state’s utilities
• A cost-effectiveness provision can allow utilities to defer their storage
procurement if somehow they cannot find cost-effective projects
12
P O L I C Y T O C A T A L Y Z E S T O R A G E D E P L O Y M E N T
• California’s AB 2514 (2010)
• Oregon’s HB 2193 (2015)
• Maryland’s HB 787 and HB 821 (2016) (proposed)
• New York’s SB 7533 (2016) (proposed)
Existing storage procurement legislation