neust sumacab campus

128
NUEVA ECIJA UNIVERSITY OF SCIENCE AND TECHNOLOGY Unibersidad ng Agham at Teknolohiya sa Nueva Ecija

Upload: ayvettereyes

Post on 19-Jan-2016

204 views

Category:

Documents


28 download

DESCRIPTION

one of the college in Nueva Ecija, Region III, Luzon, Philippines

TRANSCRIPT

PowerPoint Presentation

NUEVA ECIJA UNIVERSITY OF SCIENCE AND TECHNOLOGYUnibersidad ng Agham at Teknolohiya sa Nueva Ecija

Onward to Global ExcellenceWay back in thedays gonebyOur School was just a simple oneNow it moves togreaterheightsWith asymbolthat will ever shineWe give a toast tomentorzealWho works to make a GreatNEUST

Oh here is the country's prideTheNEUSTIt thrives through all the yearsLet'sforeverbe loyal and trueOh here is the nation's callFor better youth tomorrowHail to dear Alma MaterLet us work with our mightKeepachievingfor the gloryOf theNueva EcijaUniversity ofScienceand Technology

UNIVERSITY HYMMPresidentHilario C. Ortiz, Ll.B., Ph.D.Vice-presidentAngel A. Pangilinan, Ph.D.(VP for Academic Affairs)Zenaida R. Guillasper, Ph.D.(VP for Business and Finance)Feliciana P. Jacoba, Ph.D.(VP for Research, Extension and Training)Unit HeadRhodora R. Jugo, Ed.D.(High School PrincipalOfficialsFormer Names

1929- Nueva Ecija Trade School (NETS)

1953-Central Luzon School of Arts and Trades (CLSAT)

1964-Central Luzon Polytechnic College (CLPC)

Gen. Tinio Campus Sumacab CampusSan Isidro Campus Fort Magsaysay Campus Atate Campus Gabaldon CampusCampuses

NEUST SUMACAB CAMPUSTHE MAIN CAMPUSSUMACAB CAMPUSa 23.9 - hectare lot which is located at Sumacab Sur, Cabanatuan City.

Sumacab Campus, Cabanatuan City

Bachelor of Science in ArchitectureBachelor of Science in CriminologyBachelor in Primary EducationBachelor in Secondary EducationBachelor of Science in Hotel and Restaurant ManagementBachelor of Science in Business Administration

Courses Offer

Entrance to Neust Sumacab

Guard HouseFew animals where cared:

Birds, Alligator, snake, pig, duck and etc. where small zoo is called ZOOMACAB

SMALL FISH POND

NATIONAL SERVICE TRAINING PROGRAM OFFICE

UNIT HISTORYThe CLPC Unit was activated on 01 October 1957 pursuant to GO Nr 26, GHQ, AFP dtd 01 JUNE 1957. The unit was paced under the supervision and control of the 1st military Area (1MA) based at Camp Servillano Aquino Tarlac.On 01 February 1970, the unit was under the supervision and control of the Home Defense Affairs Unit, 1st Infantry (TABAK) Division at fort Magsaysay, Palayan City.Finally, when ARESCOM was activated on June 1992, The NEUST ROTC Unit then CLPC ROTC UNIT was placed under the control and supervision of the 301st (NE) Community Defense Center, 3RCDG, ARESCOM, stationed at Camp Tinio, Cabanatuan CityFrom 1957 to date, the NEUST ROTC Unit had fifty four(54) Post ROTC Commands. Likewise the unit had produced sixty nine(69) post Commander wherein many of them were commissioned in the Reserved Force, AFP and some are in the active military service

Hero ParkWhere Heneral Natividad, Heneral Tinio and other hero of Nueva Ecija where has a statue.the park was also the flag ceremony were held every Monday. This Building is serve as the p.e room of criminology.

UNIVERSITY MUSEUM Where the projects of the students of Sumacab is displayed. Also, the artifacts that came or found within the University

UNIVERSITY HOSTEL

This hostel is a dormitory for some officials.

ADMINISTRATION BUILDING

This infrastructure development project was conceived and approved by the Board of Regents for the purpose of establishing offices engaged in administrative functions and services. It was constructed under the leadership of President Hilario C. Ortiz and construction started in October, 2007 and completed in July, 2010.

INFIRMARY AND OFFICE OF STUDENTS AFFAIR

This infrastructure development project was conceived and approved by the Board of Regents for purpose establishing a building which will serve as its clinic and as an additional laboratory facility for the students enrolled at the College of Nursing. It was constructed under the leadership of President Hilario C. Ortiz and construction started in May, 2012 and completed in February, 2013.

This infrastructure development project was conceived and approved by the Board of Regents for purpose of establishing a reading and study area for students enrolled at the Main (Sumacab) Campus. It was constructed under the leadership of President Hilario C. Ortiz and constructed in September, 2009 and completed in July, 2011.

UNIVERSITY CYBER CENTER (UCC)UNIVERSITY CYBER CENTER (UCC)This infrastructure was located at the side of the College of Education building which has a computers for the fast learning of the students.

OJT / JOURNAL OFFICES BUILDINGOJT/Journal Offices BuildingThis infrastructure development project was conceived and approved by the Board of Regents for the purpose of establishing an office for the On the Job Training Program and University student publications. It was constructed under the leadership of President Hilario C. Ortiz and construction started in July, 2012 and completed in November, 2012.

UNIVERSITY STUDENT GOVERNMENT OFFICE

UNIVERSITY FOOD COURTThis infrastructure development project was conceived and approved by the Board of regents for the purpose of establishing a venue where students at the Main (Sumacab) Campus can buy and eat their snacks and meals. It was constructed under the leadership of President Hilario C. Ortiz and construction started in May, 2012 and completed in August.

Marketing Office

TRAINING CENTER (NIETO HALL)This infrastructure development project was conceived and approved by the Board of Regents for the purpose of establishing a building where farmers can conduct trainings and seminars. The department of Agrarian Reform thru Undersecretary Narcisiso Nieto donated the budget for its construction. It was constructed under the leadership of President Hilario C. Ortiz and Construction started in February, 2010 and completed in January, 2011.

OPEN GYM

Close Gym

The infrastructure development project was conceived and approved by the Board of Regents for purpose of establishing a venue for the College of Education students majoring in PE and for use by the faculty and non teaching personnel who are interested in physical fitness and aerobics programs. It was constructed under the leadership of President Hilario C. Ortiz and construction started in August, 2010 and completed in February, 2011.

PHYSICAL FITNESS BUILDING

QUADRANGLE

Swimming Pool

Picture of oval

OVAL

COVERED WALK/PATHWAYThis infrastructure development project was conceived and approved by the Board of Regents for the purpose of providing the students, faculty and staff a covered pedestrian lane where they will be protected from the heat of the sun or getting wet every time it rains while walking towards their classrooms or offices. It was constructed under the leadership of President Hilario C. Ortiz and construction started in June, 2011 and completed in January, 2013.

Student Centerscoed

HRM STUDENT CENTER-Located at the side of quadrangle.

STUDENT CENTER- A student center at the side of the USG office and side of the oval.STUDENT CENTER OF BUSINESS ADMINISTRATION BUILDING at the side of the building of cmbt.

STUDENT CENTER OF COLLEGE OF EDUCATION- Located inside of the college of Education.

STUDENT CENTER OF COLLEGE OF EDUCATION/UCC- at the back of college of education and at the front of UCC.DIFFERENT COLLEGES and their Respective Buildings

COLLEGE OF ARCHITECTUREThe infrastructure development project was conceived and approved by the Board of Regents for the purpose of establishing for the students pursuing BS in architecture. It was constructed under the leadership of President Hilario C. Ortiz and construction started in June, 2006 and competed in November, 2012.

COLLEGE OF CRIMINOLOGY

Criminology Laboratory Building This infrastructure development project was conceived and approved by the Board of Regents for the purpose of providing a laboratory for the conduction of experiments, scientific investigations and other studies for students taking up BS in Criminology. It was constructed under the leadership of President Hilario C. Ortiz and construction started in May, 2012 and completed in March, 2013.

College Criminology of Building This infrastructure development project was conceived and approved by the Board of Regents for the purpose a building for BS in Criminology. It was constructed under the leadership of President Hilario C. Ortiz and construction started in August, 2008 and completed September, 2009.

HOTEL AND RESTURANT ADMINISTRATION BUILDING This infrastructure development project was conceived and approved by the Board of Regents for the purpose as laboratory of HRM Students as an income generating project for the institution. It was constructed under the leadership of President Hilario C. Ortiz and construction started in September,2010 and completed February,2012.

COLLEGE OF EDUCATION

GoalsAs a center of development and excellence in teacher education and globally:

ANGLE OF COEDThis building is said to be the first building in NEUST Sumacab Campus.

NEW BUILDINGS

Neust Ecumenical chapel that soon will rise here is near at the guard house.

FOOD COURT (PHASE II)

This infrastructure that on going is the food court phase II. Located near at the close and open gym and back of the University Student Government Office.

The three court was in the oval and can seen over the grandstand is composed of three courts where in basket ball court is in the middle and volleyball court is at the both side.COURT

GRANSTAND

This infrastructure is called grandstand located at the side of oval, serve as the bench for watching in oval.

This infrastructure is dedicated for the advancement of research and development along the areas of science and technology which is one of the mandates of the University.This building was constructed through the university income as approved by the NEUST Board of Regents during the incumbency of President Hilario C. Ortiz.In grateful acknowledgement of President Ortiz effort to make the University Excel along the areas of research and technology, this edifice, will henceforth, be called PRESIDENT HILARIO C. ORTIZ HALL

This infrastructure is for the Information Technology which is on going that located near of the oval and side of the Physical Education Building

New infrastructure that is located at the side of the Information Technology Building that is small canteen

NEW BUILDING

Said to be an Auditorium