netc n7 status update to aim frb roy hoyt, netc n74 leslie lucas, slc lso jake aplanalp, aim pgm mgr...

17
NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Leslie Lucas, SLC LSO Jake Aplanalp, AIM Pgm Mgr 15-17 Feb 11

Upload: phyllis-horton

Post on 03-Jan-2016

225 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Leslie Lucas, SLC LSO Jake Aplanalp, AIM Pgm Mgr 15-17 Feb 11

NETC N7 Status Update to AIM FRB

Roy Hoyt, NETC N74Leslie Lucas, SLC LSO

Jake Aplanalp, AIM Pgm Mgr

15-17 Feb 11

Page 2: NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Leslie Lucas, SLC LSO Jake Aplanalp, AIM Pgm Mgr 15-17 Feb 11

OverviewOverview• NAVEDTRA 130B, 131B, 135C,

• NAVEDTRA drafts - 132, 137, 139

• NAVEDTRA 136 (ILE) re-write status & effect on AIM/CPM

• AIM/CPM status support of JDTA w/ participating Center updates

• AIM/CPM status support of OCCSTD capture/validation

• NETC/OPNAV N15 integration of NETC domain/acquisition community business processes

• AIM/CPM integration status w/ Perception

• FEA/BCA capability plans for CPM

• PPP Repository status

• SLC e-library project overview

Page 3: NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Leslie Lucas, SLC LSO Jake Aplanalp, AIM Pgm Mgr 15-17 Feb 11

NAVEDTRA 130B, 131B, and 135C StatusNAVEDTRA 130B, 131B, and 135C Status

• 130B• 131B (signed Nov 10)• 135C

Page 4: NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Leslie Lucas, SLC LSO Jake Aplanalp, AIM Pgm Mgr 15-17 Feb 11

NAVEDTRA 132, 137, 139 StatusNAVEDTRA 132, 137, 139 Status

• 132 (Assessment)• 137 (JDTA)• 139 (FEA)

Page 5: NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Leslie Lucas, SLC LSO Jake Aplanalp, AIM Pgm Mgr 15-17 Feb 11

NAVEDTRA 136 (ILE) Re-writeNAVEDTRA 136 (ILE) Re-write

• Current status‒ Promulgated by NETC in Nov 10

‒ 136A in work to address user community feedback and extend/refine ILE learning content business rules

• AIM/CPM impact– JDTA Tab - Rename “Skills Hierarchy” Report “Job

Duty Task Analysis” Report– Project Tab - Rename “Performance Requirements”

branch of Projects to “CTTL”– Project Tab – Rename “COI with ISD Considerations”

report to “IMDP”– Projects Tab- Rename “ISD Considerations” link on

C/M/L/S to “IMDP/Learning Strategy Elements”

Page 6: NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Leslie Lucas, SLC LSO Jake Aplanalp, AIM Pgm Mgr 15-17 Feb 11

AIM/CPM Support of JDTA and AIM/CPM Support of JDTA and Participating Center UpdatesParticipating Center Updates

• CPM Rel 4.0 operational Jan 10 / Rel 5.0 to be delivered Mar 11 – (Numerous minor updates have been made since Rel 4.0)

• JDTA NETCINST 1510.4 promulgated 24 Feb 10 / NAVEDTRA 137 in development

• Center projects:– CPPD/CSFE: Curriculum Developer– SLC/CSCS: IT Rating– CID: Information Professional– NETC N72/Carley: ‘A’ School re-engineering– PMS 420/NAWCTSD: LCS mission pkg JDTA

Page 7: NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Leslie Lucas, SLC LSO Jake Aplanalp, AIM Pgm Mgr 15-17 Feb 11

AIM/CPM Support of OCCSTD AIM/CPM Support of OCCSTD Capture/ValidationCapture/Validation

• NETC N74 coordination with NAVMAC• CPM JDTA tab being adapted for

OCCSTDS tab specific requirements‒ Part of CPM Rel 5.0

• AIM team working with NAVMAC and NETPDTC on OCCSTDS data interface with Perception LAS for fleet validation of preliminary OCCSTDS

Page 8: NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Leslie Lucas, SLC LSO Jake Aplanalp, AIM Pgm Mgr 15-17 Feb 11

Integration of NETC Domain/Acquisition Integration of NETC Domain/Acquisition Community Business ProcessesCommunity Business Processes

• SPAWAR and NAVSSES Philadelphia working JDTA projects in CPM

• Other?

Page 9: NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Leslie Lucas, SLC LSO Jake Aplanalp, AIM Pgm Mgr 15-17 Feb 11

AIM Interface with Perception LASAIM Interface with Perception LAS• Support for NETC N51 assessment

program as well as for NAVMAC OCCSTDS fleet validation process

• Working with NETC, NAVMAC, and QuestionMark for implementation via Perception API

• Participants:– NAVMAC and NETC N51 as SMEs

– NETPDTC as Navy technical agent for Perception

– AIM team on Web service data output from AIM I, AIM II, and LO Module

Page 10: NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Leslie Lucas, SLC LSO Jake Aplanalp, AIM Pgm Mgr 15-17 Feb 11

FEA/BCA Capability Plans for CPMFEA/BCA Capability Plans for CPM

• FEA – NETCINST 1500.6 (NAVEDTRA 139)• BCA – NETCINST 1510.3• Business processes integrated into

NAVEDTRA 136• AIM team supporting business process

definition‒ initial design of CPM support for FEA/BCA as

part of Rel 5.0 development‒ implementation in future release

Page 11: NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Leslie Lucas, SLC LSO Jake Aplanalp, AIM Pgm Mgr 15-17 Feb 11

PPP Repository StatusPPP Repository Status

• AIM team supporting NETC N74 (Leslie Desenburg) in operation of the PPP repository hosted on fedsun at NAWCTSD

• Coordinating with NETPDTC for eventual transition to NETC enterprise data center

Page 12: NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Leslie Lucas, SLC LSO Jake Aplanalp, AIM Pgm Mgr 15-17 Feb 11

SLC e-Library Project OverviewSLC e-Library Project Overview

• Goal: Provide site access to electronic library‒ Validated mission, functions, tasks of Librarians

‒ Developed business rules for access, inventory control , and user requests

‒ Identified publications available electronically to support CINs

‒ Defined functional requirements for e-library layout

‒ Planned for hosting and deployment

• Project lead: Beth Wigfield (SLC N6)

Page 13: NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Leslie Lucas, SLC LSO Jake Aplanalp, AIM Pgm Mgr 15-17 Feb 11

Questions?

Page 14: NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Leslie Lucas, SLC LSO Jake Aplanalp, AIM Pgm Mgr 15-17 Feb 11

Backup Slides

Page 15: NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Leslie Lucas, SLC LSO Jake Aplanalp, AIM Pgm Mgr 15-17 Feb 11

NAVEDTRA 132 Navy School Testing NAVEDTRA 132 Navy School Testing Program Management ManualProgram Management Manual

• Current re-write status‒ NETC N74 staff finalizing draft update

• AIM/CPM impact

Page 16: NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Leslie Lucas, SLC LSO Jake Aplanalp, AIM Pgm Mgr 15-17 Feb 11

• AIM/CPM impact continued– Proposed condensing skill and knowledge proficiency levels

to three levels each. This differs from KSATRs. Skill proficiency is based on Alexander Romiszowski’s taxonomy of Imitation, Practice, and Habit. Knowledge is based on Bloom’s Taxonomy (Cognitive Domain) (1) knowledge and comprehension; (2) application and analysis; and (3) synthesis and evaluation.

– CPM data to be utilized in test design/recommendations (performance, frequency, criticality, etc.)

– “ . . . establishes the requirement that curriculum developers use the empirical data gathered in NETC’s Course Development and Revision End-to-End Process, so that they are fully informed about the nature of the work, the relationship of the learning objectives to the work, and the Navy’s training expectations based upon validated Fleet requirements” – NAVEDTRA 132

Page 17: NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Leslie Lucas, SLC LSO Jake Aplanalp, AIM Pgm Mgr 15-17 Feb 11

NAVEDTRA 137 [JDTA]NAVEDTRA 137 [JDTA]

• Current status‒ NETC N74 staff finalizing draft

• Intended application• AIM/CPM impact