ner building energy audit dme presentation 02 october 2002 mohato mokhobo

9
NER BUILDING ENERGY AUDIT DME Presentation 02 October 2002 Mohato Mokhobo

Upload: bernadette-flowers

Post on 27-Dec-2015

220 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: NER BUILDING ENERGY AUDIT DME Presentation 02 October 2002 Mohato Mokhobo

NER BUILDING ENERGY AUDIT

DME Presentation02 October 2002

Mohato Mokhobo

NER BUILDING ENERGY AUDIT

DME Presentation02 October 2002

Mohato Mokhobo

Page 2: NER BUILDING ENERGY AUDIT DME Presentation 02 October 2002 Mohato Mokhobo

Outline Of The PresentationOutline Of The Presentation• Background• Key stakeholders• NER energy audit• Recommendations• Implementation plan• Implementation Funding (Bonesa)

• Background• Key stakeholders• NER energy audit• Recommendations• Implementation plan• Implementation Funding (Bonesa)

Page 3: NER BUILDING ENERGY AUDIT DME Presentation 02 October 2002 Mohato Mokhobo

BackgroundBackground• This project is the outcome of

the dialogue between DME and DANCED (1999 to 2001) which aims at building capacity within South Africa towards Energy Efficiency (EE) and Renewable Energy (RE).

• It also aims at making DME/NER “case study ” that will lead to the implementation of EE to all government buildings in SA.

• This project is the outcome of the dialogue between DME and DANCED (1999 to 2001) which aims at building capacity within South Africa towards Energy Efficiency (EE) and Renewable Energy (RE).

• It also aims at making DME/NER “case study ” that will lead to the implementation of EE to all government buildings in SA.

Page 4: NER BUILDING ENERGY AUDIT DME Presentation 02 October 2002 Mohato Mokhobo

Key Stakeholders (NER)Key Stakeholders (NER)

• DANCED• DME• NER• COWI• CEF

• DANCED• DME• NER• COWI• CEF

Page 5: NER BUILDING ENERGY AUDIT DME Presentation 02 October 2002 Mohato Mokhobo

NER Energy AuditNER Energy Audit

• The audit concentrated more on lighting due to the fact that the Heating, Cooling and Air Conditioning (HVAC) system was in a poor operating condition.

• The audit concentrated more on lighting due to the fact that the Heating, Cooling and Air Conditioning (HVAC) system was in a poor operating condition.

Page 6: NER BUILDING ENERGY AUDIT DME Presentation 02 October 2002 Mohato Mokhobo

RecommendationsRecommendations

• Lighting:– It is recommended that case 3 be

implemented due to the fact that this is the option that renders maximum savings.

• HVAC:– The building holds the potential to be

one of the most energy efficient buildings if attention is given to upgrading and maintaining the HVAC and the control systems (development of a maintenance policy).

• Lighting:– It is recommended that case 3 be

implemented due to the fact that this is the option that renders maximum savings.

• HVAC:– The building holds the potential to be

one of the most energy efficient buildings if attention is given to upgrading and maintaining the HVAC and the control systems (development of a maintenance policy).

Page 7: NER BUILDING ENERGY AUDIT DME Presentation 02 October 2002 Mohato Mokhobo

Implementation PlanImplementation Plan

• A parallel phased in approach (lighting and HVAC) will be the best option given the circumstance and condition of the HVAC system.

• With lighting, a dry-run test will be performed before the actual implementation of the project.

• A parallel phased in approach (lighting and HVAC) will be the best option given the circumstance and condition of the HVAC system.

• With lighting, a dry-run test will be performed before the actual implementation of the project.

Page 8: NER BUILDING ENERGY AUDIT DME Presentation 02 October 2002 Mohato Mokhobo

Funding For Implementation (Lighting)

Funding For Implementation (Lighting)

• Talks are underway between Bonesa and NER to secure funds for the implementation of this project.

• Bonesa has agreed in principle to fund the project and a proposal will be drafted by October 2002.

• Talks are underway between Bonesa and NER to secure funds for the implementation of this project.

• Bonesa has agreed in principle to fund the project and a proposal will be drafted by October 2002.

Page 9: NER BUILDING ENERGY AUDIT DME Presentation 02 October 2002 Mohato Mokhobo